Representation Summary:

Arden Eco Park was submitted under the Call for Sites as an employment site as it is long established as such. However the site never been properly considerd by the LPA.

The site is strategically placed in the UK Central Zone and should be considered as a site for a Power from Waste development to service Arden Cross development area directly to the north.

That would be stategically located and make use of this brownfield site.

Change suggested by respondent:

Arden Eco Park should be allocated as a site for a Power from Waste site to service Arden Cross.

Full text:

The wider former Arden Brickworks site, now called Arden Eco Park, covers a total area of around 38.6 hectares (95.4 acres). The Eco Park site is accessed from the A45 via a one-way service road running on the south side of and parallel to the A45 between Stonebridge Island to the east, at the junction of the A45/A452, and M42/J6 to the west.

The Arden Eco Park lies within the M42 Solihull Economic Gateway with additional expansion proposed to this gateway. It is located in the West Midlands Green Belt in the Meriden Gap which separates Birmingham from Coventry and is largely surrounded by agricultural land apart from a large Kennel complex – Top Hat Kennels - on the frontage which is likely to be directly affected by HS2, and Pasture Farm to the east. The HS2 line is due to pass just to the east of Arden Eco Park leading into the new Interchange Station north of the A45.

Birmingham International Airport, the National Exhibition Centre and Birmingham International Station are located around 2 miles to the north west accessed off the A45 to the west of the M42.

Future development of the site

As such Arden Eco Park is a major previously developed site in a strategic position and already operates a Materials Recovery Facility (MRF) at the rear of the site alongside the remaining areas of clay extraction. The Local Plan recognises the clay extraction operation as well as the MRF as established facilities.

The major frontage part site comprises a Civic Amenity Facility which has operated for many decades to service the wider Solihull community but is proposed to be relocated to a site near Damson Parkway which for many is likely to be less accessible that the present facility at Bickenhill. HS2 will run directly adjacent to the eastern boundary and Adren Cross is directly on the north side of the A45.

Behind the Civic Amenity site lie a large number of business units used by utility and civil engineering companies for offices and ancillary facilitate as well as open storage (B8) with ancillary facilities mainly covered by a Certificate of Lawful use granted by the LPA in 2007 (ref 2007/ 1171). The site comprises a large area of hardstanding a range of buildings in brick or profiled steel buildings which have largely replaced the former brickwork buildings.

The owners of the land have ambitions to establish a major Power from Waste facility on this site which would make a major contribution to the energy needs of the area around including the Arden Cross development area around the HS2 Interchange with over 5000 new houses as well as business development.

The Arden Eco Park site has been submitted under the Council’s Call for Sites in relation to the Local Plan as land for business and employment uses given into extensive past history. The Local Plan has not recognised that submission and no provision is being made in the plan for the site to contribute positively to needs of the Solihull Economic Gateway which it is well placed to do.

No provision is made in the Plan for dealing with major brownfield sites in the Solihull Local Plan which are included within many other local plans. Leaving it to the development management process is not sufficient to give a proper and appropriate policy framework for considering proposals. In the future.

The Arden Eco Park site should be allocated as a site for energy from waste and other related development.