Draft Local Plan Review

Representation ID: 1230

Received: 13/02/2017

Respondent: Mrs Judith Thomas

Representation Summary:

Given the major impact of Site 1 on local infrastructure, all monies received by SMBC from the development should be reserved solely for use in the locality impacted by the development. When designing the infrastructure plan, it should be acknowledged that Balsall Common will already be extensively impacted by HS2 construction works in the period 2018 to 2026.

Full text:

Given the major impact on local infrastructure, all monies received by SMBC from the development should be reserved solely for use in the locality impacted by the development. When designing the infrastructure plan, it should be acknowledged that Balsall Common will already be extensively impacted by HS2 construction works in the period 2018 to 2026. This needs to be considered when designing infrastructure plans and phasing of development build. As a minimum there should be no commencement of any Barratts Farm development work until such time as the HS2 works are completed