Representation Summary:

As with Site 4 the infrastructure is not fit to support these additional houses. Already this area is very congested and with a further 350 houses from Site 4 the traffic will converge and be added to site 26 on a busy junction to create a logjam all the way into and out of Shirley. As in many areas local roads are overwhelmed with increasing traffic and infrastructure suitability is a determining factor. Vehicles heading to B'ham will be forced onto Haslucks Green Road and access the narrow Drawbridge Rd and Peterbrook Rd to utilise back routes to the City.

Full text:

As with Site 4 the infrastructure is not fit to support these additional houses. Already this area is very congested and with a further 350 houses from Site 4 the traffic will converge and be added to site 26 on a busy junction to create a logjam all the way into and out of Shirley. As in many areas local roads are overwhelmed with increasing traffic and infrastructure suitability is a determining factor. Vehicles heading to B'ham will be forced onto Haslucks Green Road and access the narrow Drawbridge Rd and Peterbrook Rd to utilise back routes to the City.