Object

Draft Local Plan - Supplementary Consultation

Representation ID: 6909

Received: 02/03/2019

Respondent: Jeff Mathieson

Representation Summary:

there is no way that School road could possibly cope with any more traffic as it is already hazardous during school peak times and delays getting onto the a34. School road in the other direction is a narrow lane which would struggle to accomodate increased traffic volumes. also the local amenities are insufficient for so many more local residents. with the blythe valley development, school road will already be under much more pressure due to additional local traffic.

Full text:

there is no way that School road could possibly cope with any more traffic as it is already hazardous during school peak times and delays getting onto the a34. School road in the other direction is a narrow lane which would struggle to accomodate increased traffic volumes. also the local amenities are insufficient for so many more local residents. with the blythe valley development, school road will already be under much more pressure due to additional local traffic.