Object

Draft Local Plan - Supplementary Consultation

Representation ID: 7624

Received: 12/03/2019

Respondent: BFNAG

Representation Summary:

There are better alternatives to releasing such a large area from Green Belt in the narrowest part of the Meriden Gap. Will not be available until HS2 is complete.
Concept Master Plans are welcomed but we've major concerns that, over the long term, pressure from multiple landowners/developers will result in significant changes to the detriment of both new and existing residents.
No notice has been taken of Berkswell's NDP especially regarding the concept plan. This states no access to new development off residential roads (MHL, Oxhayes Close, Barretts Lane) and requires open public spaces between existing and new settlements.

Full text:

There are better alternatives to releasing such a large area from Green Belt in the narrowest part of the Meriden Gap. Will not be available until HS2 is complete.
Concept Master Plans are welcomed but we've major concerns that, over the long term, pressure from multiple landowners/developers will result in significant changes to the detriment of both new and existing residents.
No notice has been taken of Berkswell's NDP especially regarding the concept plan. This states no access to new development off residential roads (MHL, Oxhayes Close, Barretts Lane) and requires open public spaces between existing and new settlements.