Q1. Do you agree that we've identified the right challenges facing the Borough? If not why not? Are there any additional challenges that should be addressed?

Showing comments and forms 121 to 141 of 141

Yes

Draft Local Plan Review

Representation ID: 3848

Received: 17/02/2017

Respondent: Ron Shiels

Agent: DS Planning

Representation Summary:

* Yes, agree with the challenges identified particularly Challenge B, the
requirement, in line with the NPPF, to meeting the Boroughs full objectively
assessed housing needs and also accommodating some of the HMA wide
housing shortfall and,
* The fourth bullet of the objective in Challenge B to address constraints in
supply through windfall development and,
* Challenge E, to maintain the integrity of the Green Belt.

Full text:

see attached

No

Draft Local Plan Review

Representation ID: 3880

Received: 17/02/2017

Respondent: IM Land

Agent: Turley

Representation Summary:

Challenge B - agree with objectives, particularly the first three bullet points.
Challenge H - agree with objectives, particularly first and third bullet points.

Full text:

In respect of the Draft Solihull Local Plan Review consultation please find attached representations which are submitted by Turley on behalf of IM Land.

No

Draft Local Plan Review

Representation ID: 3888

Received: 17/02/2017

Respondent: IM Properties

Agent: Turley

Representation Summary:

Challenge B - agree with objectives, particularly the first three bullet points.
Challenge G - objectives do not seek to address the 'need' for employment land specifically, a fundamental component of economic growth.

Full text:

In respect of the Draft Solihull Local Plan Review consultation please find attached representations which are submitted by Turley on behalf of IM Properties and IM Land.

Yes

Draft Local Plan Review

Representation ID: 3916

Received: 17/02/2017

Respondent: Stoford Properties

Agent: Barton Willmore

Representation Summary:

Agree with Challenges, in particular Challenge D.
Employment Land Review by PBA (Jan 2017) highlights Borough is strategically placed to capture industrial and logistics demand because of the access to the national motorway networks.
SHLEAA identifies that a recent regional study has confirmed there is substantial demand for large industrial and distribution units across WM Region, with Solihull/M42 at the epicentre.
Stoford Properties consider one of objectives of Challenge D should be to maximise employment growth for office, industrial and logistics development in UKC Hub area, where there are excellent road links to A45 and M42.

Full text:

We would like to submit a formal response to the Solihull Draft Local Plan Review Consultation on behalf of Stoford Properties. As part of our response, please find attached our Representations Letter.

Yes

Draft Local Plan Review

Representation ID: 3950

Received: 17/02/2017

Respondent: Taylor Wimpey

Agent: Barton Willmore Planning

Representation Summary:

Agree with challenges identified.
Not changed much since SLP 2013.
Vitally important to address unmet housing needs within the Borough, in particular the significant shortfall in the delivery of affordable housing. Some of biggest challenges faced within Borough.

Full text:

In accordance with the consultation deadline for the Draft Local Plan Review, please find attached the following sent on behalf of our clients Taylor Wimpey UK Ltd:

* Letter addressing our representations on behalf of our client Taylor Wimpey UK Ltd
* Appendix 1 Proposed Allocation Plan Layout
* Appendix 2 Grove Road, Knowle Promotional Document

Yes

Draft Local Plan Review

Representation ID: 4082

Received: 17/02/2017

Respondent: Mr J Allen

Agent: Cerda Planning Ltd

Representation Summary:

Offer comments on challenges:
A - problems accessing housing outside the regeneration area is a consequence of the type of housing stock which dominates theses areas. Therefore need more variety.
B - Need to widen housing offer (mix and type, including starter homes and shared ownership) and range of affordable housing in mature suburbs and rural areas.
E - Need to consider the release of other poorly performing Green Belt whose size prevents it from being a strategic allocation but could accommodate other more specialist housing need.

Full text:

see attached letter

Yes

Draft Local Plan Review

Representation ID: 4087

Received: 17/02/2017

Respondent: Persimmon Homes Central

Representation Summary:

Consider right challenges have been identified.
Challenge B is key.
Recognised need to plan for economic growth and impacts of HS2 development.
Council should use this plan to set the correct minimum number of homes required within this plan period, set out how and where these homes are to be provided, with particular reference to Solihull's share of Birmingham's need.

Full text:

Please find attached Persimmon Homes Central's representations in response to the draft plan published November 2016. Also attached are our site specific representations regarding our site at Tythe Barn Lane, Dickens Heath, which forms part of the strategic allocation.

No

Draft Local Plan Review

Representation ID: 4109

Received: 17/02/2017

Respondent: The Home Builders Federation Midland Region

Representation Summary:

Council not meeting OAHN.

Full text:

Please find attached the HBF response to the above mentioned consultation for your consideration

No

Draft Local Plan Review

Representation ID: 4217

Received: 17/02/2017

Respondent: Mrs Mary Hitchcock

Representation Summary:

Object. Council Tax payers should have been consulted before agreeing to take Birmingham housing shortfall.

Full text:

see letter

No

Draft Local Plan Review

Representation ID: 4230

Received: 17/02/2017

Respondent: Richard Lloyd

Representation Summary:

No.
Challenge C - Balsall Common village centre suffers from many of the challenges listed for Solihull, Shirley, and Chelmsley Wood Centres

Full text:

Challenges
1. Do you agree that we've identified the right challenges facing the Borough? If not why not? Are there any additional challenges that should be addressed?
Vision

No.
Challenge C - Balsall Common village centre suffers from many of the challenges listed for Solihull, Shirley, and Chelmsley Wood Centres.

2. Do you agree with the Borough Vision we have set out? If not why not, and what alternative would you suggest?

No.
The vision seems to rely on increasing transport dependency. It implies that employment growth will necessitate people travelling from outside the area to work within Solihull, and Solihull residents travelling long distances outside the Borough to go to work. A better strategy would be to focus on creating local employment, with the transport growth aimed at transporting materials and goods. Transport of people for employment purposes could be reduced by improved broadband network infrastructure and tele-working.
the spatial strategy seems to run counter to the wish in para 74 for preserving the environment.
There doesn't seem to be any proposals to meet the aspiration in para 75 to reduce carbon emissions.
In para 86 it's said growth will occur on the edge of settlements which will inevitably increase traffic and transport need, and runs counter to the aspirations in paras 72 and 75. A bypass for Balsall Common is proposed without consideration of the impact on the viability of the village centre, the environment, or existing residents.

Spatial Strategy
3. Do you agree with the spatial strategy we have set out? If not why not, and what alternative would you suggest?
Sustainable Economic Growth

No.
The proposed significant expansion of rural settlements is in conflict with the stated preference and national policy of giving preference to brown field sites, and does not recognise the absence of high frequency public transport in most of the Borough.
Given the shortage of housing land to meet the Government's housing targets, it is essential that all new development is to a high density to reduce the land-take.

4. Do you agree with Policy P1? If not why not, and what alternative would you suggest?

No.
There doesn't seem any plan to mitigate the increased traffic, congestion, carbon emissions, air quality degradation, and noise disturbance. The land should not be developed until after the aggregate resources have been extracted. Renaming the area as Arden Cross is simply tacky and tasteless. It already has a name, Middle Bickenhill.

7. Do you agree with Policy P2? If not why not, and what alternative would you suggest?

No.
Balsall Common centre has suffered from the loss of business premises, the loss of the Health Centre to a greenfield site on the edge of the village, inadequate parking, the lack of a bus station, and now a proposal to divert through-traffic. A comprehensive development plan is required to address all these issues.

Providing Homes for All
11. Do you agree with Policy P4? If not why not, and what alternative would you suggest?

No.
The shortage of land and the need for housing means that there should be a significant increase in density and the provision of smaller homes.

12. Do you agree with the level of affordable housing being sought in Policy P4? If not why not, and what alternative would you suggest?

No.
The affordable housing provision should be greater than 50% for all sites - which would require development of an individual house to be "affordable".

14. Do you agree that we are planning to build the right number of new homes? If not why not, and how many do you think we should be planning to build?

No.
The housing target should just meet local needs. Excess requirements should be met in the rural expanses in neighbouring counties, who are expected to have a "duty to cooperate". Solihull should not cater for Birmingham overspill. Solihull Borough has essentially reached capacity in terms of housing provision, and a Predict and Provide policy will lead to a continuous decline in the quality of the environment and to the detriment of residents.

15. Do you believe we are planning to build new homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?

No.
The planning objectives of re-using previously-developed land and creating new settlements have been ignored. Areas such as Balsall Common are being encouraged to sprawl in contravention of accessibility, sustainability, and Green Gelt policies. The Green Belt analysis has not been conducted in line with the NPPF as non-defensible boundaries have been used. The scores attached to preserving the narrowest part of the Meriden Gap are too low and irrational. Balsall Common seems to have been singled out for concentrated and disproportionate expansion, in contrast to areas such as Dorridge, which has far better public transport. In particular, sites 1 and 3 appear to have been chosen for administrative convenience rather than compliance with local and national policies.
Preference should be given to developing brown-field sites and to raising the housing density generally.

16. Do you believe we have identified the infrastructure required to support these developments? If not why not? Are there any additional facilities you believe are required, if so what are they?

No.
With regard to Site 1, the proposed highway access is completely unsuitable and will put traffic onto residential roads. No "bypass" is proposed, but with the lack of funding the proposals are likely to create a rat-run that will cause further environmental harm for residents. There is no strategy to deliver bus service and school provision. With regard to Site 3, it is far too distant from the village centre to benefit from the quoted infrastructure improvements.

18. Do you agree with the policies for improving accessibility and encouraging sustainable travel? If not why not, and what alternatives would you suggest?

No.
Para 267 is incorrect, the HS2 Environmental Impact has been assessed on the basis that no road improvements would be needed south of the A45. It is highly unlikely that people will travel from south of Balsall Common to HS2 at Middle Bickenhill when there are nearer and more convenient alternatives at Warwick. In addition, the current railway is available to feed the new station via the People Mover. The additional housing proposed for Balsall Common is wrongly sited if it creates additional commuting traffic. There are alternative sites to the north of Balsall Common that would have good access to new employment sites and would not require road improvements.
One reason for abandoning the bypass for Balsall Common was the need to maintain the vitality of the village centre retail options. The proposed new housing would be too far from the centre to offset any loss of through-custom. The A452 only becomes congested when there are problems on the motorway network, and there is no identified need for improved capacity. Much of the traffic is generated within the village. Capacity is limited by the traffic lights at the south of the village, and improvements to that junction should be the first to be considered if demand increases.
There doesn't seem to be any justification for expensive projects like Metro and Sprint (Policy 8A). The passenger demand should first be proven by running bus services. The main factors limiting greater use of public transport are: service interval; unreliability; lack of real-time information; primitive or non-existent waiting shelters; absence of evening services; difficult access for the less agile. Berkswell Station has an irregular service with 40 minute waiting times, and has had a marked reduction in the quality of the waiting facilities. It is difficult for the disabled to board the trains due to the platform gap.
The service interval target (Policy P7) has been increased from 15 minutes between busses and 20 minutes between trains. Rail services have been dropped from the policy, and should be specificed with the same targets as for busses. The previous target intervals were too long for many users, but the proposed 30 minute wait is far too long. The rural area generally has only an hourly service, and few dwellings are within 400 metres of a stop, so Policy P7 is hugely optimistic and unrealistic.

Protecting and Enhancing our Environment
19. Do you agree with the policies for protecting the environment? If not why not, and what alternatives would you suggest?

No.
There should be a clear policy for requiring solar PV on all new buildings, and prohibiting green-field solar farms. In addition, policies should encourage use of solar PV in paved areas etc. There should be clear architectural/design standards for all solar PV installations.

Promoting Quality of Place
20. Do you agree with the policies for quality of place? If not why not, and what alternatives would you suggest?
Health and Supporting Local Communities

No.
Policy P16 should be expanded to include requirements to identify unrecognised archaeological remains during any development. A more integrated approach should be adopted to finding traces of early settlement in the area. All works in new areas should be preceded by geophysical surveys.
Policy P17 should specify Balsall Common as inset in the Green Belt and protected like the other named settlements.

21. Do you agree with the policies health and supporting communities? If not why not, and what alternatives would you suggest?

No.
Policy P20 does not provide sufficient long-term protection for public open space. All such areas should be designated as Village Greens, and green spaces in new developments should be dedicated as Village Greens by the developers.

Delivery and Monitoring
22. Do you agree with the Policy P21? If not why not, and what alternatives would you suggest?

No.
Policy P21 should be clearer about spending all "planning gain" within the affected communities. In addition, all new developments should only be approved following agreement of a detailed strategic site plan agreed within the community.
**********************************************

No

Draft Local Plan Review

Representation ID: 4287

Received: 17/02/2017

Respondent: Mrs Christine Plant

Representation Summary:

The improvement to the centre of Balsall Common is a key challenge that needs to be addressed. The central shopping area has inadequate parking facilities. It is congested at peak times to the point where some residents are forced to shop further afield.

Full text:

see letter

Yes

Draft Local Plan Review

Representation ID: 4430

Received: 17/02/2017

Respondent: Arden Academy & Mr V Goswami

Representation Summary:

support the approach taken by the council.

Full text:

joint submission by Arden Academy & Mr Ved Goswami re: Arden Triangle site 9 Knowle
see attached documents

No

Draft Local Plan Review

Representation ID: 4499

Received: 17/02/2017

Respondent: Mrs Pamela Forrest

Representation Summary:

Increased housing would not sustain the attractiveness of the area or existing properties;
Increased traffic would not assist tackling climate change;
Increased traffic would reduce accessibility;
Increased population would add pressure on local services;
Loss of Green Belt;
Increased flooding;
New housing in Shirley area will not benefit HS2;

Full text:

see letter -

Yes

Draft Local Plan Review

Representation ID: 4822

Received: 17/02/2017

Respondent: Kler Group - Gentleshaw Lane

Agent: Cerda Planning Ltd

Representation Summary:

Correctly identified the challenges that face the local authority.

Full text:

see attached documents

Yes

Draft Local Plan Review

Representation ID: 4877

Received: 17/03/2017

Respondent: Persons with an interest Site 9

Agent: Cerda Planning Ltd

Representation Summary:

Correctly identified the challenges that face the local authority.

Full text:

see attached documents

Yes

Draft Local Plan Review

Representation ID: 4948

Received: 17/02/2017

Respondent: Taylor Wimpey

Agent: Lichfields

Representation Summary:

Consider that the most significant challenge is the need to address the imbalance housing offer across the Borough and where possible assisting with accommodating the wider HMA.
The additional challenge is addressing the shortfall in the Birmingham Housing Market Area. Not only is there a need to provide the total number of new houses over the plan period but there is a need to provide these locations where the balance of beneficial and adverse effects is most acceptable.

Full text:

see attached - site 12 land south Dog Kennel Lane

Yes

Draft Local Plan Review

Representation ID: 5308

Received: 17/02/2017

Respondent: Jaguar Land Rover

Agent: Mr Neil Tiley

Representation Summary:

Broadly welcome Challenges and Objectives.
Should set out commitment to need to continually review the Local Plan to accord with national guidance.
Challenge D - be more positive; set challenge of actively improving economic role of Borough, not just maintaining it.
Actively address managing congestion through infrastructure planning and investment.
Challenge F - Currently studying provision of PV panels on roof of proposed Logistics Operations Centre.
Challenge H - require permissive policies to support economic growth of employers such as JLR.
Challenge N - HS2 construction works may have significant adverse effects on efficient operation of highways network.

Full text:

see JLR letter via agent

No

Draft Local Plan Review

Representation ID: 5520

Received: 17/03/2017

Respondent: Mr David Varley

Representation Summary:

No not fully.
Balsall Common village centre is very small and the increase in population over recent years has meant the centre can no longer cope with the throughput of vehicles and parking in the area. In the plan there appears to be no mention of major improvements to this area but to suggest an increase of a further 1150 houses to the village. 800 of those dwellings are suggested for Barratt's Farm area which would cause further chaos in the centre of the village.

Full text:


In response to the consultation please find below my response to the questions posted by Solihull Council.

Question 1 Do you agree that we have identified the right challenges facing the Borough? No not fully.

As a resident of Balsall Common living in the Parish of Berkswell I can mainly comment on the area in which I live.

Balsall Common Centre is exactly .5 mile from my house. The village centre is very small and the increase in population over recent years has meant the centre can no longer cope with the throughput of vehicles and parking in the area. In the plan there appears to be no mention of major improvements to this area but to suggest an increase of a further 1150 houses to the village. 800 of those dwellings are suggested for Barratt's Farm area which would cause further chaos in the centre of the village. Key to the plans must be the development of a potential new extension to a village possibly to the north of the village. I have witnessed several crashes of vehicles reversing into one another in the centre and some near misses with pedestrians. Safety should be a priority and facilitating parking is also important if the area develops. It is key to the growth of the village and needs to be reviewed.

Question 2 Do you agree with the Borough Vision we have set out? No I would refer to the answer in question 1. Balsall Common village centre on Staion Road needs to be reviewed for the longer term success of a growing village. It does not appear on the plan.

Question 3 Do you agree with the spatial strategy?
No as spatial strategy cannot fully be answered by a subjective criteria. It is a reasonable starting point but one that may need weighting. Transport links and terminal need planning at the same time as development. In 25 years from now electric vehicles could be the norm and there has to be plans now for access to charging points etc. Being near public transport can change. Berkswell station platform needs improvement for the future it may become an issue if trains were no longer allowed to stop at the station.
I do agree that Brownfield sites should be used in preference to Greenfield sites however in Balsall Common you have chosen to develop 3 Greenfield sites at odds with your categories. Why?

Question 7 Sustainable Economic Growth
For Balsall Common there needs to be a review of the centre and how people can access the facilities. Possibly developing a different facility either at the Station end of Station Road or possibly north of the village.

Question 11 Do you agree with P4 ?. No
To add a further 1150 houses to Balsall Common at the same time as having a HS2 line ploughed through the centre is ridiculous. Having 800 potential new houses confined in Balsall Common between Station Road, Meeting House Lane and Waste Lane (Barratt's Farm), together with the possibility of a new school with that area is not possible without easy access to facilities and the road network. There is little employment within the village and most people have to commute. The car is the main transport from the village and I estimate on the Barratt's Lane development at least a further 1200 vehicles with 2500 vehicle journeys per day extra without considering the new school! Not everyone wants to live in flats and there needs to be areas for social care within the community together with opportunities for bungalows at reasonable prices. These are not explored in the proposals. Whilst a by-pass is mooted it is not final and without that road, access for the housing in the confined area of Barratt's farm would be unsafe.

Question 15 Do you believe we are planning to build new homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included? No I don't think the volume or locations are correct.

1 In Balsall Common all 3 sites are Greenbelt sites. Once the greenbelt is lost it will never be replaced and the amenity which is cherished by all residents and visitors making the village have a unique feel to it's location equidistant between Coventry and Solihull would be lost forever.

The Barratt's Lane site is one of the narrowest parts of the Meriden Gap and it would see erosion of limited greenbelt between Coventry and Balsall Common. The residents and visitors to Balsall Common value and cherish the open feel and countryside views for recreational walking and pursuits. Once built on it would cease to have the same appeal. In August the landowner showed plans for access to their site to be made from Station Road and by knocking down two cottages on Meeting House Lane as an access point directly onto the Lane. If the access onto MHL were to be accepted it would be an extremely unsafe situation. There are no pavements on Meeting House Lane and the width of the Lane would make it difficult to turn onto the lane especially for refuse vehicles, pantechnicons etc. Safety would be the major issue with the possibility of up to 2000 cars using the lane with pedestrians daily is unacceptable. Much would depend on whether or not a by-pass could be built as to whether Barratt's Farm would be right for access and for the building of so many houses. A school on the site would only aggravate the traffic situation within the site. I do not support the plan for 800 homes on this site.

Whilst Solihull have chosen 3 sites for development it may want to review this with the possibility of eliminating or reducing the units for Barratt's farm or even to look elsewhere completely if the by-pass is not approved. Why I would put this forward is that if access was difficult it may be worth investing in a larger area to the north of the village where a school and facilities could be located which would help to mitigate traffic in the village centre. In real terms the proposals from Solihull will not help the village unless facilities are made available on the area surrounding the Station. I would favour an area for growth in the north of the village to give direct access to the Kenilworth Road and provision of facilities to ease the burden on the village centre.

The Frog Lane site is not huge and the Windmill Lane site is infilling the triangle already being developed. Whilst I don't like to see development on the greenbelt I don't have a view on these small sites.

16 Do you believe we have identified the infrastructure to support these developments? No A defined route and by-pass is required. Room for multimodal transport developments and terminus is required. We have a Doctor's surgery but probably need more Doctor's for the growing size of population. A further affordable care home and day care facilities in the Barratt's farm area is probably needed. Car parking and village centre development (elsewhere) is required.

18 Improving Accessibility and encouraging sustainable travel.
Balsall Common's bus service is hourly. To get from Waste Lane to the A45 in Coventry by bus takes 45minutes to Coventry City Centre then wait for 15 mins for a 20 minute bus ride to take you back to the A45 arriving near your destination of 4.1miles away from Balsall Common in 1hr 20mins. This is why most households have 2 cars . This will mean a further increase in vehicle movements and problems in a village centre location.

Yes

Draft Local Plan Review

Representation ID: 5571

Received: 17/02/2017

Respondent: Arden Cross Consortium

Agent: Turley

Representation Summary:

The allocation of Arden Cross can significantly contribute to meeting the majority of challenges in the Borough.
Suggest bullet point two of Challenge M should be altered to better reflect the Arden Cross Vision of a mixed use urban quarter that maximises the benefits of the site's current and planned connectivity. This should include the most efficient use of the site for a range of complementary uses that capitalise on the opportunity for investment stimulated by HS2. The "garden village" concept is inappropriate in this context since it would not enable the full potential benefits of HS2 to be captured.

Full text:

On behalf of our client, the Arden Cross Consortium, please find attached a copy of representations submitted to the public consultation on the Solihull Draft Local Plan Review (November 2016) and Interim Sustainability Appraisal Report (January 2017).

No

Draft Local Plan Review

Representation ID: 5613

Received: 10/03/2017

Respondent: Environment Agency

Representation Summary:

Challenge F - recommend additional objectives relating to sustainable urban drainage systems
Challenge L - suggest rewording of the 2nd objective to make it stronger.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 5696

Received: 17/02/2017

Respondent: Mrs C A Bennett

Representation Summary:

Key challenge is improvement of Balsall Common centre.
Parking and congestion is a daily issue.

Full text:

See Attachment