Q15. Do you believe we are planning to build new homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think

Showing comments and forms 31 to 60 of 355

No

Draft Local Plan Review

Representation ID: 506

Received: 27/01/2017

Respondent: Mr Michael Doble

Representation Summary:

1050 new homes in Knowle is disproportionate compared to elsewhere in the Borough. It will destroy the village atmosphere and make it little more than part of the Birmingham urban sprawl. Homes should be built to the West in Bentley Heath to relieve pressure on Knowle village, allowing convenient highway connections to Solihull and access to Widney Manor railway station.
All possible sites have not been fully considered, including those in Knowle, Dorridge and Bentley Heath. Future planning applications on these sites will be difficult to refuse as they are more suitable, and pressure on local facilities will increase.

Full text:

I am in receipt of your letter of 8 December 2016 giving notice that our property is adjacent to the Proposed Housing Allocation, 8 Hampton Lane, Knowle. I would like to put forward my opinion and objection to the proposals, which after discussion with many people and neighbours are in line with general opinion.

The proposal for 1050 new homes in Knowle is completely disproportionate with the proposed deployment of new homes elsewhere in the Borough. I have enjoyed living in Knowle for 45 years and have seen many changes, not all to the benefit of the community. However, this proposed expansion will destroy the village atmosphere and make it little more than part of the Birmingham urban sprawl. 50% affordable housing is far too high and will only serve to lower the standard of the existing environment. I believe Government guidelines state that 25% affordable housing is a reasonable objective and see little need for this to be so excessively exceeded.

The present infrastructure will not support this number of homes. New or improved schooling will need to be provided, additional car parking provided, improvement to access roads and additional medical care are a just few of the major considerations.

The current preferred option put forward by Solihull MBC includes just 2 development areas. The Arden Triangle and Hampton Road. This is ridiculous as the majority of the future generated traffic will be centred on the Warwick Road and High Street. Hampton Road is already too busy and its junction with Wootton Close, Arden Vale Road and the existing Football Pitch is an accident waiting to happen. Current street parking in Hampton Road creates poor visibility and interrupted traffic flow. The junction of the High Street with Hampton Road and Lodge Road is a notorious bottleneck. All of these problems will only be exacerbated with the additional homes.

Careful planning of the Arden Triangle could provide The New Schooling, a new Car park and medical centre. There would still be adequate space for the proposed development of up to 750 new homes. Access would be from Station Road and The Warwick Road. If this development is accepted it should be the limit to the development within Knowle itself. Fair use of the money derived from the sale of the Council owned land, and any Section 106 agreement would cover the cost of rebuilding the necessary infrastructure. The remaining homes should be built to the West in say Bentley Heath, where access would be via Widney Manor Road into Solihull, rather than the Warwick Road and motorway connection via the A34 (J4). Additional shopping could be provided together with other essential infrastructure facilities that are clearly missing at present. This would relieve the pressure on Knowle village, with its woefully inadequate parking; it would also be convenient to Widney Manor railway station.

With regards to the Hampton Road Proposal, this should have taken the form of 3 completely separate proposals. Each should be considered independently of one another. If planning permission were to be granted on the Football pitch and woodland, it should be up to the football club to seek an alternative site. The development of the football pitch itself could possibly be accepted, as it would not extend beyond the existing developed frontage of Hampton Road and would form a boundary limit to any future development to the East, within the Green Belt. I note that the plans for the football pitch also include the cricket pitch in one of the documents. This is very misleading and clearly shows that this proposed site is just the thin edge of the wedge. The football club have failed to maintain or improve their existing facilities, so I fail to understand how they can hope to maintain a very much larger complex. The owners of the woodland adjacent to the football pitch are currently felling many trees; I trust that this is being carefully monitored by the Council to ensure that no specimen or mature trees are felled and that TPO's have been put in place.

The creation of a commercial sports complex on the land off Hampton Road, by the canal, would be totally inappropriate within the Green Belt. The proposed site includes inadequate car parking, and the proposed increase in commercial activities is not acceptable within the Green Belt. A visit to the Old Silhillians Club at Copt Heath, on a Sunday morning, will quickly demonstrate the effect that the construction of a similar sports facility will have on the immediate area. There will be car parking all over the proposed new development and down Hampton Road. The Old Silhillian's site includes vastly superior car parking, yet cars are frequently parked on the verges and down Lady Byron Lane. One must also question whether yet another sports complex is actually required. The huge costs in running such a complex will necessitate large scale non sports related activities including: Bar& dining, Conferencing, Discos and other fund raising activities, all within the Green Belt. The use of Section 106 money for the building of this complex would be totally inappropriate; it should be for the benefit of the general local population, not just for the members of a local sports club.

The development of Thacker's nursery and the fields fronting onto Hampton Road, opposite Grimshaw Hall, is an unnecessary extension of the village into the Green Belt. This land has been deliberately neglected in recent years to aid an application for residential housing. It is basically good quality agricultural land which forms a sloping site down to Purnell's Brook. The lower area liable to flooding, and the drainage run off from the new site would greatly exacerbate the problem. . The development of this sloping/elevated site would have a devastating effect on the surrounding and adjoining housing. The area is a haven for wildlife including bats, badgers, birds of prey and other protected species. This land should be brought back into agriculture, rather than being left vacant in the hope of future development. If this proposal succeeds it will encourage more land owners to neglect vulnerable sites, in the hope of getting residential/commercial development.

It is my opinion that Solihull Metropolitan Borough Council have failed in their duty to fully consider all possible sites and have taken the easy option of adopting two professionally submitted proposals, to the exclusion of all other options.
There are several sites within the Knowle, Dorridge and Bentley Heath area which have been put up for consideration and overlooked. Inevitably future planning applications will be made on some of these which will be difficult to refuse, as they are eminently more suitable for development than the selected sites. This will result in the continuing urbanisation of the area and further increase the pressure on local facilities.

I therefore urge Solihull MBC to change its proposals and limit the Hampton Road proposed site to the Football pitch only.

No

Draft Local Plan Review

Representation ID: 517

Received: 30/01/2017

Respondent: Mr Adam Hunter

Representation Summary:

Concern over dickens Heath development allocation 4 from a house bordering development.

Full text:

I would like to comment on the building of house in allocation 4 west of dickens Heath. The local infrastructure, schools, doctors etc are struggling with the current demands. The roads /parking can not cope with additional cars, and at peak times the roads are already congested. The building will damage The local environment merging dickens Heath with Shirley, tidbury green, withal so there will distinction. There will Be no community green space taking away the rural character of the area. I believe the wildlife of the area should be protected. Recent developments have already increased the size of dickens Heath way beyond what was originally planned.

As I border the proposed development I'm personLy concerned about building noise & disruption, weekend working all over a lengthy period of time.
I'm concerned about size, scope of the development and type of housing that will be created, plus the proximity of housing and the potential loss of privacy and being overlooked to the point of being overbearing. Will the housing be in keeping with size design of the current local community.
This development will change my local area from a rural area to a more urban area this will effect the value of my own house.

I would question if other sites should be given increased priory over this development and if the council has truly researched other non developed areas in the borough. Considering a genuinely new development rather than further extending dickens Heath.

Yes

Draft Local Plan Review

Representation ID: 524

Received: 29/01/2017

Respondent: Mark & Nathalie Fitch

Representation Summary:

Comments on Balsall Common sites and the need to have infrastructure in place prior to development taking place as this would enable the developments to be more acceptable to the local communities.

Full text:

Please see attached our views on the Solihull Draft Local Plan for consideration.

We are primarily commenting on impacts on Balsall Common, but there are themes that are likely to be common to other areas.

Solihull Local Plan - consultation response, relating to Balsall Common only.
The suggested locations for additional housing appear to balance the need for housing and retaining the village feel. The exception is perhaps the Barrett's Farm site, which is substantial and a reasonable expectation is that this would materially change the character and centre of the village, given the influx of new villagers. Partial development of that area would seem more proportionate.
These proposed developments will place increased burden on transport and village facilities.
To increase acceptability of these developments, existing local residents need to feel investment is being made in their community. Therefore infrastructure improvements must come before housing to give residents feeling of spare capacity. Local constraints should be addressed, e.g. traffic, movements around schools, parking in village centre, before the new residents arrive.
Local railway stations are currently highly utilised with parking overspilling onto local roads. Supporting sustainable travel is an important objective and there needs to be substantial improvement in connecting transport and parking facilities to support increasing village population. While Network Rail is a statutory consultee, it may be more effective to develop options for improvement to have direct engagement with the Route to reflect that funding is increasingly being directed through local channels. This early engagement e.g. with Network Rail Western Route Managing Director to secure funding for station improvements ahead of housing development will be essential to avoid further overstretching of the current facilities. It is also important that these local improvements are not deferred or delayed due to HS2 developments that are planned at some time in the future.
When considering the new school facilities we would like to see broader community needs to be considered, e.g. flexible, divisible spaces with high quality resources. This may include auditoriums that could support local groups, provide local cinema and other youth projects. This may allow the release of other smaller village facilities by consolidating into a community space that has sufficiently regular use to support additional services, e.g. a cafe, or community advice services.

No

Draft Local Plan Review

Representation ID: 529

Received: 30/01/2017

Respondent: William Gamble

Agent: Hancock Town Planning

Representation Summary:

object to the three sites in BC as their site (Waster Lane) is seen to be better placed to deliver housing as it does not have any site-specific requirements, in addition to scoring higher in the PBA assessment than the BFarm site

Full text:

see attached letter and appendices
Please find attached representations on behalf of my client William Gamble regarding the Draft LPR and relating to land at Waste Lane, Balsall Common

No

Draft Local Plan Review

Representation ID: 544

Received: 31/01/2017

Respondent: Councillor K Meeson

Representation Summary:

housing should be built on brownfield land in Birmingham before greenbelt is considered.

Full text:

I am in general agreement with the review proposals but wish to make the following comments:
* Birmingham's Housing Need. There are considerable areas of derelict former industrial land, both within the city council area and adjacent local authority areas. Whilst some of these sites are contaminated and developers would prefer prime building land, these should be restored and used to provide housing in order to maximise provision and reduce the need to build on green field sites and protect the Green Belt. This was government policy in the mid-1990s and still makes sense.
* Green Belt. The government has signalled its intention to minimise loss of Green Belt and we should only consider encroachment on Solihull's confirmed Green Belt where development enhances the quality of the environment. For example, by allowing housing on former industrial/commercial sites that may have been in existence for many years but would not today be considered appropriate development in the Green Belt or are no longer providing a community benefit.
Where it is necessary to sacrifice any areas of Green Belt there should be clear and defensible boundaries to avoid further encroachment. In particular, where it is proposed to build on land adjacent to established villages/communities, there should be an agreed new boundary to ensure they remain as clear 'insets' and do not gradually spread. Applications for 'infilling' should only be allowed where this is a genuine plot between neighbouring dwellings, as opposed to stretches of countryside that happen to lie between scattered houses.
* Transport Corridors and Parking. Adequate public transport needs to be provided for any new major housing developments but account must also be taken of the chronic parking issues around rail stations. Further development that would increase pressure on suburban rail stations (Olton, Dorridge, Marston Green, Widney, Hampton in Arden) and consideration given to creation of Park and Ride schemes to reduce the current parking pressures.
* Health Provision. Development should take account of the increased pressure on existing Doctors' Surgeries, where residents already have to wait weeks for a routine appointment and even have difficulty in getting emergency appointments. New surgeries/health centres should be a requirement of large developments unless there is clear evidence that the local surgery had capacity to register new patients.

No

Draft Local Plan Review

Representation ID: 546

Received: 31/01/2017

Respondent: Diane & Andrew Cunningham

Representation Summary:

Oakes Farm Scheme as an alternative to site 2.

Full text:

My view on the Proposed sites for Balsall Common is that ..... : We are totally opposed to Frog Lane being development because the loss of playing fields. If housing has to come, amenities need to be built and Oakes Farm scheme is the lesser of two evils.

No

Draft Local Plan Review

Representation ID: 547

Received: 01/02/2017

Respondent: Mrs Eleanor Lee

Representation Summary:

alternative site - Oakes farm

Full text:

My view on the Proposed sites for Balsall Common is that ..... : I prefer development on Oakes Farm rather than Frog Lane

No

Draft Local Plan Review

Representation ID: 549

Received: 01/02/2017

Respondent: Andrew Hawtin

Representation Summary:

Balsall Common sites - Response via Oakes Farm survey

Full text:

My view on the Proposed sites for Balsall Common is that ..... : My view is this would impact current homes and people's houses less and spread the development evenly around the village.

No

Draft Local Plan Review

Representation ID: 550

Received: 01/02/2017

Respondent: Emily Evans

Representation Summary:

alternative site -Oakes Farm

Full text:

My view on the Proposed sites for Balsall Common is that ..... : Frog lane site should be stopped. Oakes Farm is suitable alternative. I like spitfire properties designs. I urge s106 to be spent is the parish for amenities.

No

Draft Local Plan Review

Representation ID: 552

Received: 29/01/2017

Respondent: Angela Chandler

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:


"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"


I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.


The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.


1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sitesavailable, would strongly suggest thatdue consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.


5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably causedelays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".


6) Site 3 scores poorly in relation to allaccessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.



10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time asHS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to bothinfrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to"manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport


2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2


4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 555

Received: 30/01/2017

Respondent: Mr Ronald Handfield

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 558

Received: 29/01/2017

Respondent: Mr Alexander Hamilton

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 561

Received: 29/01/2017

Respondent: Mr John Addy

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

Further to my previous email please note the following

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time asHS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 564

Received: 01/02/2017

Respondent: Mr John Thornhill

Representation Summary:

There should be no building houses on green belt farm land. Where are we going to get our food from during the next war?
There is no extra provision for parking in the village centre.
How will the roads cope with the increase in pupil numbers at the local schools. Drop off and pick up time is terrible now.
Frog Lane development. We keep cattle in a field in the winter in Frog Lane and with all the extra traffic, lights and noise etc. we won't be able to use it. So that will be the end of our business!

Full text:

There should be no building houses on green belt farm land. Where are we going to get our food from during the next war?
There is no extra provision for parking in the village centre.
How will the roads cope with the increase in pupil numbers at the local schools. Drop off and pick up time is terrible now.
Frog Lane development. We keep cattle in a field in the winter in Frog Lane and with all the extra traffic, lights and noise etc. we won't be able to use it. So that will be the end of our business!

No

Draft Local Plan Review

Representation ID: 570

Received: 01/02/2017

Respondent: Ms Linda Fenn

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the"very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

NB: Can you also please remove the paddock located at Kerly Close which is included and hatched on your site plans - this is a private paddock which is owned and maintained by the residents of Kerly Close and contains legal restrictive covenants as to its use and development. This paddock is to remain as part of the Green Belt.

No

Draft Local Plan Review

Representation ID: 574

Received: 30/01/2017

Respondent: Karen Munton

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

Having attended the meeting on Saturday 7th January regarding the Solihull Plan and how it may effect Balsall Common, I remain extremely concerned of the apparent lack of thought that has been invested into the Draft Local Plan and the irreversible damage the proposed developments will have. In particular, I would note the following significant concerns and would welcome your detailed responses;

1. Schooling - whilst we accept that in the medium to long term, measures could be put in place to accommodate the resulting need for increased school places, no detailed consideration whatsoever has been given to the existing circumstances and the short term impact any additional housing will have. The current schooling provision is already at absolute capacity and there is no opportunity to accommodate further pupils. With our children attending the local schools, we are acutely aware of the issues already created by over-population, including lessons being unable to be taken due to insufficient space, children sitting on the floor eating their lunch because there is insufficient room and last minute changes to timetable to accommodate basic provision. Only last week our daughter had PE cancelled owing to lack of available timetable space with regard to the school hall. The school hall is tiny and used by over 700 children for lunchtimes and PE. The situation is already far from acceptable and any additional pressure will only make things worse. Before any Plan is advanced, proper consideration must be given to this area.

2. Infrastructure - we find it astonishing that no detailed consideration has been given to the infrastructure changes required on the back of any new development. The village is already struggling to cope, there is insufficient parking and the major transport routes and nodes throughout the village already are clogged. We'd invite you to witness this yourselves during school drop up, pick up and rush hour times. Unfortunately and given the nature of HGV and bus traffic using the roads, it is only a matter of time before a serious accident occurs and your apparent neglect of this key area to date is shocking. We fail to understand why a sensible and balanced infrastructure plan is not formulated first, followed by the housing plan thereafter. By proceeding in this manner, we would expect far more sympathy and acceptance from the people living within the village.

3. Site selection - it was clear from the meeting that little thought had been given to this area - especially with regard to what would be best for the village and it's residents. Instead, the developers (who set to profit handsomely from any development) have ear marked the sites and the Council has done little diligence to challenge the proposals. We'd also note that perfectly adequate brownfield sites have seemingly been neglected; we'd ask that these are reconsidered as a matter of urgency.


Overall, the meeting on Saturday was very disappointing. The Council attendees were clearly ill-prepared, did little to acknowledge or respond to villagers' concerns and gave the very strong impression that regardless of any resistance, the decision had already been made. We'd also note that the communication of this meeting was very poor and the Council should accept its responsibility to better communicate future meetings to build awareness.

In summary, the Plan as it relates to Balsall Common is ill-conceived, has neglected the current issues within the Village and has completely ignored some significant challenges that must be addressed if any additional housing within the Village is going to work. Rather than rush this through, we'd urge the Council re-draft the draft Plan in light of resident's concerns as opposed to make a significant mistake that current and future generations living in the village will need to bear.

I would also like to to make the following points with regarding the Council's Draft Local Plan with specific reference to Q15:

I wish to object to the development of site 3 in particular (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The BARRAGE action group have provided a detailed review of this site as noted below. In addition to these points I would like to highlight that a significant area of private land which will not be available for development is included within the hatched area of greenbelt land as noted on the local plan. The gardens of Kerly Close and the Paddock are all privately owned and as such will not be available for development.

In addition the land behind these properties is an area of significant flooding and which currently includes a drainage ditch, the maintenance and upkeep of this would need to be taken into account in any planning permission given, as its removal could result in flooding of the existing properties.

Other reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 578

Received: 30/01/2017

Respondent: David Munton

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

Having attended the meeting on Saturday 7th January regarding the Solihull Plan and how it may effect Balsall Common, I remain extremely concerned of the apparent lack of thought that has been invested into the Draft Local Plan and the irreversible damage the proposed developments will have. In particular, I would note the following significant concerns and would welcome your detailed responses;

1. Schooling - whilst we accept that in the medium to long term, measures could be put in place to accommodate the resulting need for increased school places, no detailed consideration whatsoever has been given to the existing circumstances and the short term impact any additional housing will have. The current schooling provision is already at absolute capacity and there is no opportunity to accommodate further pupils. With our children attending the local schools, we are acutely aware of the issues already created by over-population, including lessons being unable to be taken due to insufficient space, children sitting on the floor eating their lunch because there is insufficient room and last minute changes to timetable to accommodate basic provision. Only last week our daughter had PE cancelled owing to lack of available timetable space with regard to the school hall. The school hall is tiny and used by over 700 children for lunchtimes and PE. The situation is already far from acceptable and any additional pressure will only make things worse. Before any Plan is advanced, proper consideration must be given to this area.

2. Infrastructure - we find it astonishing that no detailed consideration has been given to the infrastructure changes required on the back of any new development. The village is already struggling to cope, there is insufficient parking and the major transport routes and nodes throughout the village already are clogged. We'd invite you to witness this yourselves during school drop up, pick up and rush hour times. Unfortunately and given the nature of HGV and bus traffic using the roads, it is only a matter of time before a serious accident occurs and your apparent neglect of this key area to date is shocking. We fail to understand why a sensible and balanced infrastructure plan is not formulated first, followed by the housing plan thereafter. By proceeding in this manner, we would expect far more sympathy and acceptance from the people living within the village.

3. Site selection - it was clear from the meeting that little thought had been given to this area - especially with regard to what would be best for the village and it's residents. Instead, the developers (who set to profit handsomely from any development) have ear marked the sites and the Council has done little diligence to challenge the proposals. We'd also note that perfectly adequate brownfield sites have seemingly been neglected; we'd ask that these are reconsidered as a matter of urgency.


Overall, the meeting on Saturday was very disappointing. The Council attendees were clearly ill-prepared, did little to acknowledge or respond to villagers' concerns and gave the very strong impression that regardless of any resistance, the decision had already been made. We'd also note that the communication of this meeting was very poor and the Council should accept its responsibility to better communicate future meetings to build awareness.

In summary, the Plan as it relates to Balsall Common is ill-conceived, has neglected the current issues within the Village and has completely ignored some significant challenges that must be addressed if any additional housing within the Village is going to work. Rather than rush this through, we'd urge the Council re-draft the draft Plan in light of resident's concerns as opposed to make a significant mistake that current and future generations living in the village will need to bear.

I would also like to to make the following points with regarding the Council's Draft Local Plan with specific reference to Q15:

I wish to object to the development of site 3 in particular (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The BARRAGE action group have provided a detailed review of this site as noted below. In addition to these points I would like to highlight that a significant area of private land which will not be available for development is included within the hatched area of greenbelt land as noted on the local plan. The gardens of Kerly Close and the Paddock are all privately owned and as such will not be available for development.

In addition the land behind these properties is an area of significant flooding and which currently includes a drainage ditch, the maintenance and upkeep of this would need to be taken into account in any planning permission given, as its removal could result in flooding of the existing properties.

Other reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 582

Received: 30/01/2017

Respondent: David Harvey

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 586

Received: 30/01/2017

Respondent: Diane Langton

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 590

Received: 30/01/2017

Respondent: David Langton

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 594

Received: 30/01/2017

Respondent: James Langton

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 599

Received: 30/01/2017

Respondent: Catherine Langton

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 611

Received: 01/02/2017

Respondent: Graham Jones

Representation Summary:

The criteria used to identify locations for new development need to be toughened up so that easy solution are not prioritised.
The housing shortage is going to give developers massive windfall profits and the Council should insist that development priority should be given to more difficult and perhaps more costly brown field sites.

Full text:

The criteria used to identify locations for new development need to be toughened up so that easy solution are not prioritised.
The housing shortage is going to give developers massive windfall profits and the Council should insist that development priority should be given to more difficult and perhaps more costly brown field sites. One option to achieve this could be to increase the section 106 payments required of developers, but I believe that is too simplistic and a better solution would be to require developers to provide 1 new home on a brown field site for each new house built on a greenfield site. This would probably require developers to cooperate/ find partners.

No

Draft Local Plan Review

Representation ID: 615

Received: 01/02/2017

Respondent: Graham Jones

Representation Summary:

The plan targets a small number of communities with large numbers of new houses, many driven by the convenience of builders. For example, Knowle has been allocated over 1000 new homes, a 25% increase on the current stock. No community should be required to suffer such an increase and there should be a cap of 10% at most applied to allocations in individual communities.

Full text:

The plan does not set out the rationale for selecting locations for development, apart from the fact that the sites proposed by developers are easy to exploit. Instead a proper transport plan should be developed to determine suitable Park and Ride sites and rapid transit routes and these locations should then be used to inform the list of housing locations.
The plan targets a small number of communities with large numbers of new houses, many driven by the convenience of builders. For example, Knowle has been allocated over 1000 new homes, a 25% increase on the current stock. No community should be required to suffer such an increase and there should be a cap of 10% at most applied to allocations in individual communities.
The Plan also fails to consider at all the option of a new garden city type of development. This could well be located adjacent to UK Central where infrastructure and sustainability needs could be built in from the start. The plan should propose that the immediate need for new housing is met by small additions to existing communities, with the longer term needs (2 years +) met by a new garden city community.

No

Draft Local Plan Review

Representation ID: 620

Received: 31/01/2017

Respondent: Helen Young

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

200 houses on Site 3 between the Kenilworth Road and Windmill Lane
I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.
4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.
5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".
6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties
7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.
8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.
9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.
10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport
2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots
3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development
5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged
6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 628

Received: 01/02/2017

Respondent: Andy Wilson

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
Having used the train service from Berkswell to Birmingham New Street for 7 years whilst at school, I was affected by the decision to cut the number of services down from 3 to 2 per hour. This was definitely not a frequent service as the decision led to me often getting home 40 minutes later as the Berkswell trains ran at 13 minutes past the hour and 53 minutes past the hour (my school day ended at 4 so I rarely was able to catch the 4:13). I sometimes instead had to travel to Hampton in Arden which was highly inconvenient.

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 642

Received: 21/01/2017

Respondent: David Acton

Representation Summary:

Objection to site 88 Widney Manor Road being excluded as allocated site. The assessment undertaken related to the wrong site.
The site is not part of a Local Wildlife Site.
The site is clearly part of the perimeter of Bentley Heath settlement.
The site should be included as a housing allocation.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 653

Received: 02/02/2017

Respondent: Mr D Perks

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

Objection to the development site 3 @ windmill Lane
I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 661

Received: 01/02/2017

Respondent: Matthew Becker

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 665

Received: 01/02/2017

Respondent: Mr Marshall Moses

Representation Summary:

Object to the concentration of 2550 homes in such close proximity to the South Shirley area and seek a fairer distribution across the Borough.
Development is in the Green Belt
There should be retention of a wider Greenbelt between South Shirley and the built area of Dickens Heath.
Retain and enhance the existing amenity fields and the green corridor to the bridle way, with access to Bills Lane, the canal and the countryside beyond.
The environmental impact on wildlife by the removal of such large amounts of Greenbelt.

Full text:

Local Plan Review - South Shirley @ Dickens Heath Areas.
With reference to the Local Plan Review for South Shirley and Dickens Heath. I as a resident of Majors Green wish to draw the following concerns to your attention with respect to the draft consultation proposals in this area:-

* To retain and enhance the existing amenity fields and the green corridor to the bridle way, with access to Bills Lane, the canal and the countryside beyond.

* I object to the concentration of 2550 homes in such close proximity to the South Shirley area and seek a fairer distribution across the Borough.

* That there should be retention of a wider Greenbelt between South Shirley and the built area of Dickens Heath.

* More houses being built on an area which is part of West Midlands Greenbelt.

* Areas such as Dickens Heath have been expanded over the last 15 years and must have, by now, reached their limit. Any further expansion would reduce gaps between the new village and other settlements and therefore create urban sprawl.

* The impact of existing developments on local road systems which have had no road improvements to compensate for additional growth is significant.

* Whitlocks End railway station is on the boundary with Bromsgrove District Council and is the main public transport facility for Dickens Heath. Whitlocks End station car park is heavily used and consequently this has led to an increase in traffic on local roads, again without any improvement in infrastructure.

* The environmental impact on wild life by removal of such large amounts of Greenbelt