Q16. Do you believe we have identified the infrastructure[35] required to support these developments? If not why not? Are there any additional facilities you believe are required, if so what are the

Showing comments and forms 31 to 60 of 845

No

Draft Local Plan Review

Representation ID: 556

Received: 30/01/2017

Respondent: Mr Ronald Handfield

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 559

Received: 29/01/2017

Respondent: Mr Alexander Hamilton

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 562

Received: 29/01/2017

Respondent: Mr John Addy

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

Further to my previous email please note the following

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time asHS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 572

Received: 01/02/2017

Respondent: Ms Linda Fenn

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the"very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

NB: Can you also please remove the paddock located at Kerly Close which is included and hatched on your site plans - this is a private paddock which is owned and maintained by the residents of Kerly Close and contains legal restrictive covenants as to its use and development. This paddock is to remain as part of the Green Belt.

No

Draft Local Plan Review

Representation ID: 576

Received: 30/01/2017

Respondent: Karen Munton

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

Having attended the meeting on Saturday 7th January regarding the Solihull Plan and how it may effect Balsall Common, I remain extremely concerned of the apparent lack of thought that has been invested into the Draft Local Plan and the irreversible damage the proposed developments will have. In particular, I would note the following significant concerns and would welcome your detailed responses;

1. Schooling - whilst we accept that in the medium to long term, measures could be put in place to accommodate the resulting need for increased school places, no detailed consideration whatsoever has been given to the existing circumstances and the short term impact any additional housing will have. The current schooling provision is already at absolute capacity and there is no opportunity to accommodate further pupils. With our children attending the local schools, we are acutely aware of the issues already created by over-population, including lessons being unable to be taken due to insufficient space, children sitting on the floor eating their lunch because there is insufficient room and last minute changes to timetable to accommodate basic provision. Only last week our daughter had PE cancelled owing to lack of available timetable space with regard to the school hall. The school hall is tiny and used by over 700 children for lunchtimes and PE. The situation is already far from acceptable and any additional pressure will only make things worse. Before any Plan is advanced, proper consideration must be given to this area.

2. Infrastructure - we find it astonishing that no detailed consideration has been given to the infrastructure changes required on the back of any new development. The village is already struggling to cope, there is insufficient parking and the major transport routes and nodes throughout the village already are clogged. We'd invite you to witness this yourselves during school drop up, pick up and rush hour times. Unfortunately and given the nature of HGV and bus traffic using the roads, it is only a matter of time before a serious accident occurs and your apparent neglect of this key area to date is shocking. We fail to understand why a sensible and balanced infrastructure plan is not formulated first, followed by the housing plan thereafter. By proceeding in this manner, we would expect far more sympathy and acceptance from the people living within the village.

3. Site selection - it was clear from the meeting that little thought had been given to this area - especially with regard to what would be best for the village and it's residents. Instead, the developers (who set to profit handsomely from any development) have ear marked the sites and the Council has done little diligence to challenge the proposals. We'd also note that perfectly adequate brownfield sites have seemingly been neglected; we'd ask that these are reconsidered as a matter of urgency.


Overall, the meeting on Saturday was very disappointing. The Council attendees were clearly ill-prepared, did little to acknowledge or respond to villagers' concerns and gave the very strong impression that regardless of any resistance, the decision had already been made. We'd also note that the communication of this meeting was very poor and the Council should accept its responsibility to better communicate future meetings to build awareness.

In summary, the Plan as it relates to Balsall Common is ill-conceived, has neglected the current issues within the Village and has completely ignored some significant challenges that must be addressed if any additional housing within the Village is going to work. Rather than rush this through, we'd urge the Council re-draft the draft Plan in light of resident's concerns as opposed to make a significant mistake that current and future generations living in the village will need to bear.

I would also like to to make the following points with regarding the Council's Draft Local Plan with specific reference to Q15:

I wish to object to the development of site 3 in particular (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The BARRAGE action group have provided a detailed review of this site as noted below. In addition to these points I would like to highlight that a significant area of private land which will not be available for development is included within the hatched area of greenbelt land as noted on the local plan. The gardens of Kerly Close and the Paddock are all privately owned and as such will not be available for development.

In addition the land behind these properties is an area of significant flooding and which currently includes a drainage ditch, the maintenance and upkeep of this would need to be taken into account in any planning permission given, as its removal could result in flooding of the existing properties.

Other reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 580

Received: 30/01/2017

Respondent: David Munton

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

Full text:

Having attended the meeting on Saturday 7th January regarding the Solihull Plan and how it may effect Balsall Common, I remain extremely concerned of the apparent lack of thought that has been invested into the Draft Local Plan and the irreversible damage the proposed developments will have. In particular, I would note the following significant concerns and would welcome your detailed responses;

1. Schooling - whilst we accept that in the medium to long term, measures could be put in place to accommodate the resulting need for increased school places, no detailed consideration whatsoever has been given to the existing circumstances and the short term impact any additional housing will have. The current schooling provision is already at absolute capacity and there is no opportunity to accommodate further pupils. With our children attending the local schools, we are acutely aware of the issues already created by over-population, including lessons being unable to be taken due to insufficient space, children sitting on the floor eating their lunch because there is insufficient room and last minute changes to timetable to accommodate basic provision. Only last week our daughter had PE cancelled owing to lack of available timetable space with regard to the school hall. The school hall is tiny and used by over 700 children for lunchtimes and PE. The situation is already far from acceptable and any additional pressure will only make things worse. Before any Plan is advanced, proper consideration must be given to this area.

2. Infrastructure - we find it astonishing that no detailed consideration has been given to the infrastructure changes required on the back of any new development. The village is already struggling to cope, there is insufficient parking and the major transport routes and nodes throughout the village already are clogged. We'd invite you to witness this yourselves during school drop up, pick up and rush hour times. Unfortunately and given the nature of HGV and bus traffic using the roads, it is only a matter of time before a serious accident occurs and your apparent neglect of this key area to date is shocking. We fail to understand why a sensible and balanced infrastructure plan is not formulated first, followed by the housing plan thereafter. By proceeding in this manner, we would expect far more sympathy and acceptance from the people living within the village.

3. Site selection - it was clear from the meeting that little thought had been given to this area - especially with regard to what would be best for the village and it's residents. Instead, the developers (who set to profit handsomely from any development) have ear marked the sites and the Council has done little diligence to challenge the proposals. We'd also note that perfectly adequate brownfield sites have seemingly been neglected; we'd ask that these are reconsidered as a matter of urgency.


Overall, the meeting on Saturday was very disappointing. The Council attendees were clearly ill-prepared, did little to acknowledge or respond to villagers' concerns and gave the very strong impression that regardless of any resistance, the decision had already been made. We'd also note that the communication of this meeting was very poor and the Council should accept its responsibility to better communicate future meetings to build awareness.

In summary, the Plan as it relates to Balsall Common is ill-conceived, has neglected the current issues within the Village and has completely ignored some significant challenges that must be addressed if any additional housing within the Village is going to work. Rather than rush this through, we'd urge the Council re-draft the draft Plan in light of resident's concerns as opposed to make a significant mistake that current and future generations living in the village will need to bear.

I would also like to to make the following points with regarding the Council's Draft Local Plan with specific reference to Q15:

I wish to object to the development of site 3 in particular (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The BARRAGE action group have provided a detailed review of this site as noted below. In addition to these points I would like to highlight that a significant area of private land which will not be available for development is included within the hatched area of greenbelt land as noted on the local plan. The gardens of Kerly Close and the Paddock are all privately owned and as such will not be available for development.

In addition the land behind these properties is an area of significant flooding and which currently includes a drainage ditch, the maintenance and upkeep of this would need to be taken into account in any planning permission given, as its removal could result in flooding of the existing properties.

Other reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 584

Received: 30/01/2017

Respondent: David Harvey

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 588

Received: 30/01/2017

Respondent: Diane Langton

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 592

Received: 30/01/2017

Respondent: David Langton

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 596

Received: 30/01/2017

Respondent: James Langton

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 601

Received: 30/01/2017

Respondent: Catherine Langton

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 616

Received: 01/02/2017

Respondent: Graham Jones

Representation Summary:

Appendix 1 identifies only the proposed infrastructure improvements very local to the new developments. It is essential that in addition it addresses the wider transport needs including the need for ambitious new public transport schemes and measures to deal with the restricted road infrastructure outside the immediate area of the development. Appendix 1 should therefore be expanded to show the wider infrastructure needs across Solihull.

Full text:

Transport

Appendix 1 identifies only the proposed infrastructure improvements very local to the new developments. It is essential that in addition it addresses the wider transport needs including the need for ambitious new public transport schemes and measures to deal with the restricted road infrastructure outside the immediate area of the development. Appendix 1 should therefore be expanded to show the wider infrastructure needs across Solihull.

Cultural facilities

Towns such as Knowle and Shirley need good cultural facilities to benefit the increasing population. An urgent review is required so that detailed proposals can be included in the next draft of the plan. Given the scale of the proposed housing developments the money for these facilities can be mainly provided from section 106 levies. However, it is important that these facilities are ring-fenced from other interests such as school academies, which can deny access to local residents (e.g. because of safeguarding issues). The council should ensure that the section 106 levies are spent in the communities where the development is taking place.

No

Draft Local Plan Review

Representation ID: 622

Received: 31/01/2017

Respondent: Helen Young

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

200 houses on Site 3 between the Kenilworth Road and Windmill Lane
I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.
4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.
5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".
6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties
7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.
8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.
9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.
10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport
2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots
3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development
5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged
6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 625

Received: 14/01/2017

Respondent: Councillor D Bell

Representation Summary:

I cannot support proposed housing that is accepted as being remote from most facilities.i can only support large scale housing if it is conditional on providing infrastructure such as new schools,sports facilities , new parks better parking in the centre and at the station and a promise of relief for the already strained Kenilworth Road..We deserve much more than just housing.
The objectives are commendable but we need to ensure that each site produces infrastructure for the settlement. Schools, all weather pitches, better parking and where possible roads that bypass the centre and moves the traffic past.

Full text:

I cannot support proposed housing that is accepted as being remote from most facilities.i can only support large scale housing if it is conditional on providing infrastructure such as new schools,sports facilities , new parks better parking in the centre and at the station and a promise of relief for the already strained Kenilworth Road..We deserve much more than just housing.
The objectives are commendable but we need to ensure that each site produces infrastructure for the settlement. Schools, all weather pitches, better parking and where possible roads that bypass the centre and moves the traffic past.

No

Draft Local Plan Review

Representation ID: 626

Received: 31/01/2017

Respondent: Mr & Mrs Ken & Carol Herbert

Representation Summary:

Concerns on traffic volumes around Majors Green, South Shirley, Shirley Station & Whitlocks End Station.
It is dangerous for pedestrians and the existing situation will be exacerbated by additional development in the area.

Full text:

We would like to voice our objection to the above Local Plan for the following reasons:
We are residents in Rushleigh Road, Majors Green, Solihull, and walk every day from home and back to Shirley Station where we use public transport.
The part of Haslucks Green Road which we use being from Whitlocks End Station to Shirley Station has a 30 mph speed limit. At the present time, virtually 95% of vehicles far exceed this limit. The width of the road was not built to accommodate heavy duty vehicles (30 tonnes plus), and the volume of high volume of traffic.
As pedestrians walking down the footpath, as the road and the footpath are not wide enough, these large vehicles are very close to the footpath and you feel very unsafe. Sometimes they mount the footpath as they are unable to pass each other.
Currently to cross Bills Lane in either direction you take your life in your hands as firstly vehicles coming down Bills Lane are travelling far too fast, and if they are turning left they immediately look to the right as there is no 'Stop' sign at this junction. As a pedestrian you cannot see up Bills Lane for any on-coming traffic to make it safe to cross. Likewise if you are crossing Bills Lane in the other direction from Shirley Station you can look back to see if it is clear, and proceed to cross, but as vehicles are coming so fast down the hill again it has become dangerous to cross the road.
As people do not adhere to the speed limit, there have been numerous occasions when vehicles which are travelling far too fast have left the road and gone through the hedge/fence. In the past few weeks, there have been two occasions where vehicles have left the road: one has gone through the hedge at the bottom of the hill just past Bills Lane, and just recently a vehicle has mounted the pavement, gone through the chain link fence and taken with it four concrete fence posts (about half way down the hill from Shirley Station).
Should we have been walking along the footpath on these occasions, we doubt we would be sending this e-mail today.
This is the current situation, which year on year is getting worse, and with the future housing development proposals this will only be exacerbated.
Therefore before any decision is made on these proposals, all objections should be seriously considered.

No

Draft Local Plan Review

Representation ID: 630

Received: 01/02/2017

Respondent: Andy Wilson

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
Having used the train service from Berkswell to Birmingham New Street for 7 years whilst at school, I was affected by the decision to cut the number of services down from 3 to 2 per hour. This was definitely not a frequent service as the decision led to me often getting home 40 minutes later as the Berkswell trains ran at 13 minutes past the hour and 53 minutes past the hour (my school day ended at 4 so I rarely was able to catch the 4:13). I sometimes instead had to travel to Hampton in Arden which was highly inconvenient.

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 632

Received: 30/01/2017

Respondent: Cheswick Green Parish Council

Representation Summary:

worried about the impact of development on infrastructure - schools, medical provision, traffic flow and congestion on Dog Kennel Lane.

Full text:

letter from Cheswick Green Parish Council attached.

No

Draft Local Plan Review

Representation ID: 634

Received: 30/01/2017

Respondent: Mrs J A Leighton

Representation Summary:

concerned about impact on traffic, doctors, and schools

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 637

Received: 30/01/2017

Respondent: Mr G E Leighton

Representation Summary:

concerned about impact on infrastructure, road, Doctors, schools

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 646

Received: 01/02/2017

Respondent: Mr & Mrs Batty

Representation Summary:

Increased pressure on infrastructure such as health services, schools, road and rail.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 647

Received: 05/12/2016

Respondent: Mr & Mrs Brad & Eleanor Lee

Representation Summary:

Amenities - Balsall Common is a village. The amenities we have are built to cope with a village population. From the local schools to the facilities for parking at the local shops, we will not be able to cope with this increase in population.
It will cause extensive congestion as well as increased pollution.

Full text:

We write with regard to the proposed housing development on 'FROG LANE' Balsall Common.
We are strongly against said development due to the following points:

1. Frog Lane is used by our family everyday to walk our dog. We enter the playing field from the Frog Lane entrance and meet other regular dog walkers everyday. If this site is used for housing, where do you propose we go? There are no other green spaces close-by that we can use for this purpose. On the weekends we walk around the local football teams training or playing matches, what will happen to these teams?

2. Congestion- I would recommend that someone from Solihull council come and try to get down Balsall Street East at school drop off and pick up! Cars are parked on both sides of the road from Welby Gate right through to Alder Lane and if we want to leave our house, we have to time it so that it doesn't coincide with this time. Once the new housing development on Kenilworth Road are all sold this will increase school numbers again considerably and cause more parking problems. To add to this by having a further housing development in Frog Lane, does not make any sense whatsoever and will cause extensive congestion as well as increased pollution.

3. Amenities - Balsall Common is a village. The amenities we have are built to cope with a village population. From the local schools to the facilities for parking at the local shops, we will not be able to cope with this increase in population.

Lastly.....this is a GREEN Field site! Why is this even being considered! It is our understanding that there are other BROWN Field sites that were identified originally, Frog Lane was never ever highlighted as a possibility! Are we not supposed to be protecting our countryside!!

No

Draft Local Plan Review

Representation ID: 649

Received: 01/02/2017

Respondent: Mr & Mrs G P & M P Troth

Representation Summary:

Response in relation to infrastructure highlights that which has been identified in the DLP eg.road infrastructure is insufficient. Rural character of minor roads should be retained

Full text:

see attached letter

Yes

Draft Local Plan Review

Representation ID: 652

Received: 24/01/2017

Respondent: Mr & Mrs D & L Davies

Representation Summary:

recognise that additional social infrastructure would be needed to support the development

Full text:

see attached letter and map of woodlands estate

No

Draft Local Plan Review

Representation ID: 655

Received: 02/02/2017

Respondent: Mr D Perks

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

Objection to the development site 3 @ windmill Lane
I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 658

Received: 02/02/2017

Respondent: Mr David Pickering

Representation Summary:

Re Hampton Road and South of Knowle, the resulting additional traffic will lead to huge congestion problems on Warwick Road, Knowle High Street and Station Road which could not be relieved without significantly harming the historic centre of Knowle. New primary school(s) would be required. Sewage and water supplies may be inadequate without very large additional works. Provision of new health centres, new green spaces and new community centres would all be required to prevent the developments being just soul-less housing estates.

Full text:

Re Hampton Road and South of Knowle, the resulting additional traffic will lead to huge congestion problems on Warwick Road, Knowle High Street and Station Road which could not be relieved without significantly harming the historic centre of Knowle. New primary school(s) would be required. Sewage and water supplies may be inadequate without very large additional works. Provision of new health centres, new green spaces and new community centres would all be required to prevent the developments being just soul-less housing estates.

No

Draft Local Plan Review

Representation ID: 663

Received: 01/02/2017

Respondent: Matthew Becker

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 680

Received: 17/01/2017

Respondent: Mrs Pamela Martin

Representation Summary:

Concerns about impact of housing increase in Blythe and Shirley wards due to SLP allocations, Tidbury Green appeals and proposals in Draft Local Plan on traffic on roads connecting to Majors Green, in particular Haslucks Green Road.
Seek confirmation of traffic flow analysis of existing and future proposals.
Houndsfield Lane used a short cut from Shirley to Dickens Heath; Ford floods during heavy rain. Potential for bridge.
Consultation required with Worcestershire County Council Highways Authority.
Roads in Worcestershire unable to cope; traffic flows to motorways.
Trains and station car park oversubscribed.
Seek confirmation that infrastructure needs of Majors Green considered.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 684

Received: 01/02/2017

Respondent: Simon Heath

Representation Summary:

Regarding sites 11, 12 and 13, education and health care provision will struggle to meet future demand.
The surrounding road network is at capacity (including local roads, the A34 and M42, J4).

Full text:

see attached letter

Yes

Draft Local Plan Review

Representation ID: 685

Received: 01/02/2017

Respondent: Mr Alex Lukeman

Representation Summary:

Difficult to comment on road infrastructure. It is under pressure and will need detailed consideration in the area of Bills Lane, Haslucks green Road, Shakespeare Drive and Stratford Road.

Full text:

Comments on draft local plan impacting on Shirley South
Comments re proposed new housing between Whitlock's End farm and Dickens Heath Road:

Our main concern is the loss of available public amenity land adjacent to Woodloes Road, Baxters Green and the Badgers Estate. This land has been enjoyed by locals for many years and if you consider Shirley as a whole there is little open land to the south. Shirley Park has diminished in size and is some distance away. If this public amenity were lost then no similar open space would exist until that at the other side of Dickens Heath leading onto Braggs Farm Lane. This is a valuable breathing space both well used and a buffer between this part of South Shirley and the ever developing Dickens Heath.

At this current time it is difficult to comment on problems of added road congestion as the proposals on the local infrastructure have not been detailed. However, local roads will have to feed into the current road system which is already under pressure from increased housing on Dickens Heath. This will require detailed consideration in the area of Bills Lane, Haslucks Green Road, Shakespeare Drive and Stratford Road.

It is unlikely the above will be alleviated by the public transport system as current park and ride systems are over subscribed. In an era of tight public expenditure controls additional funding for such schemes is unlikely to be forthcoming even if the valuable resource of land were made available.

We hope these comments will be noted when further consideration is given to the local plan.

No

Draft Local Plan Review

Representation ID: 713

Received: 03/02/2017

Respondent: Mr David Roberts

Representation Summary:

The infrastructure is badly ignored in all your plans! This I firmly believe and I have a BIG Ask list that needs a wider discussion than this questionnaire affords .

Suggests a bypass for Knowle.

Full text:

see attached letter and scanned annotated hard copy local plan pages