Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 10654
Received: 30/11/2020
Respondent: Mrs Helen Baker
Legally compliant? No
Sound? No
Duty to co-operate? No
I have always felt that the secondary school need replacing which the council should be providing. Some new homes are needed but they need to fit into the area and on a much reduced scale as this is a village and already extremely congested. The plan generally doesn't take advantage of any brown fill sites or unused buildings anywhere in the area which should be considered first before valuable green areas are ruined. It doesn't make plans for any local renewable energy or future proofing transport, deliveries etc.
think it is covered above
I have always felt that the secondary school need replacing which the council should be providing. Some new homes are needed but they need to fit into the area and on a much reduced scale as this is a village and already extremely congested. The plan generally doesn't take advantage of any brown fill sites or unused buildings anywhere in the area which should be considered first before valuable green areas are ruined. It doesn't make plans for any local renewable energy or future proofing transport, deliveries etc.