Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 10818

Received: 13/12/2020

Respondent: Mr Richard King

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Relocation HWRC contradicts Council’s own declared objectives, para 38 (c), (d), (g), (j) and (k), the defined Challenges and associated Objectives, specifically Challenges A, C, E, F, J, M & N.
Paras 293 & 299, Solihull MBC charges itself with development and growth of clean air; improving the health and well-being of residents; creating sense of space, reducing noise impacts. Proposals contained in Para 831 are irreconcilable with these goals.
Para 831 development contains two serious inaccuracies: road infrastructure and new HWRC site being “relatively isolated”.

Change suggested by respondent:

Development of remaining green belt between Damson Parkway & A45 should be stopped due already high levels of noise and air pollution. HWRC needs to be relocated to site away from residential areas, not nearer! Look at developments made by Leics (Ashby) and Oxon (Ardley).

Full text:

Relocation HWRC contradicts Council’s own declared objectives, para 38 (c), (d), (g), (j) and (k), the defined Challenges and associated Objectives, specifically Challenges A, C, E, F, J, M & N.
Paras 293 & 299, Solihull MBC charges itself with development and growth of clean air; improving the health and well-being of residents; creating sense of space, reducing noise impacts. Proposals contained in Para 831 are irreconcilable with these goals.
Para 831 development contains two serious inaccuracies: road infrastructure and new HWRC site being “relatively isolated”.

Attachments: