Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 10941

Received: 14/12/2020

Respondent: mr Graham Cockroft

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

The site should be expected to comply fully with policies P7 an P8. The wording within BL2 is weak. Compliance with these policies should be mandatory.

Also flooding caused by Mount Brook and River Blythe downstream of the site is a recognised problem. More floodwater storage capacity is required upstream. BL2.3.iii. should require the development to make a significant positive contribution towards reducing downstream flood risk.

Change suggested by respondent:

BL2 should include:-
Development of the site is dependent upon walking, cycling and public transport improvements being secured and capable of being viably maintained, in full compliance with P7 and P8.
Development of the site will positively contribute to reducing flood risk caused by Mount Brook and River Blythe at Cheswick Green and further down stream .

Full text:

The site should be expected to comply fully with policies P7 an P8. The wording within BL2 is weak. Compliance with these policies should be mandatory.

Also flooding caused by Mount Brook and River Blythe downstream of the site is a recognised problem. More floodwater storage capacity is required upstream. BL2.3.iii. should require the development to make a significant positive contribution towards reducing downstream flood risk.