Support

Solihull Local Plan (Draft Submission) 2020

Representation ID: 11265

Received: 11/12/2020

Respondent: Arden Wood Shavings Ltd

Agent: Stansgate Planning LLP

Representation Summary:

Policy HA1 is considered sound subject to minor modification/clarification.

The red line boundary of HA1 on the Illustrative Concept Masterplan is unclear. The red line boundary on the Site Analysis Plan and Landscape Assessment Plan are inconsistent.

Policy HA1 criteria 3 needs some flexibility to allow for a situation where unidentified development and infrastructure costs cause the site to be not viable. This would allow an assessment at planning application stage to take account of any abnormal costs and apply infrastructure requirements accordingly.

Change suggested by respondent:

The red line boundary of allocation HA1 needs to accord with the boundary of the existing Arden Woods Shavings site.

Policy HA1 criteria 3 should be amended to read “Likely infrastructure requirements will include, subject to viability:”

Full text:

Please find attached representation form and statement ON BEHALF OF Arden Wood Shavings in respect of Policy HA1 Meriden Road, Hampton in Arden.

Attachments: