Support

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14057

Received: 14/12/2020

Respondent: Taylor Wimpey

Agent: Turley

Representation Summary:

Support the vision to provide a range of quality homes across the Borough by 2036 whilst also setting out the opportunity to maximise the economic and social benefits of the High Speed 2 rail link and interchange both for the Borough and wider area.
Vision could be strengthened by identifying the important link between the provision of new employment opportunities and the requirement to deliver new homes within the Borough. The two are intrinsically linked and together will ensure a prosperous future for SMBC. It is in this context that the DSP should be viewed.

Change suggested by respondent:

Vision could be strengthened by identifying the important link between the provision of new employment opportunities and the requirement to deliver new homes within the Borough.

Full text:

See attached documents.

Attachments: