Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14192

Received: 11/12/2020

Respondent: Berkswell Parish Council

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Paragraph 527. Object to the lack of certainty of the delivery of the whole length of the Balsall Common Relief Road in one. A phased approach with the Station Road to Waste Lane section completed first will lead to rat running along Hob Lane/Waste Lane/Windmill Lane and compromise highway safety.

Change suggested by respondent:

The Balsall Common Relief Road is critical to the soundness and deliverability of the plan in a way that meets the requirements of the NPPF.
The wording of paragraph 527 should be amended by addition of the following sentence.
“It is planned that the Relief Road will be delivered as a single entity within the same time frame to connect Meer End with Station Road. In that way a continuous relief road will be completed in a single event without compromising local lanes”

Full text:

See attached