Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 14474
Received: 10/12/2020
Respondent: Jon Ashley
Legally compliant? Not specified
Sound? Not specified
Duty to co-operate? Not specified
The plan pretends they are separate to deceive. These sites do not have good transport links and reference to improved links to Shirley Station are NOT present in the LCWIP out for consultation.
BL 3 is not well drained and is subject to bogginess and ponding.
Shirley West suffers increased traffic by design
I have looked at your proposed form for Submission of Representations. It is not fit for purpose.
I wish to submit multiple and linked representations.
I find the plan and the consultation process severely flawed such as to make the current plan and timetable for consultation Unsound and not legal.
I outline my reasoning in the attached document which is ordered according yo your plan and where possible references specific paragraphs and Policies.
My high level objections to the consultation process are stated at the start of the attached document.