Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 15023

Received: 14/12/2020

Respondent: Kier Living Ltd - Coleshill Road

Agent: Mr Hywel James

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Site has several constraints that will compromise deliverability and capacity as set out in DSP:
- Site Assessment document concludes
that development on this site would result in an indefensible GB boundary to the east.
- SA states that there are several constraints including:
i. loss of more than 20 ha of agricultural land;
ii. proximity to a listed building;
iii. within a medium landscape sensitivity area with low capacity for change;
iv. overlaps a local wildlife site.
Developability of site constrained by heritage assets and local wildlife site and multiple site owners.
Consider unrealistic that site can 400 homes in first five years of new local plan period is indicated in SHELAA.

Change suggested by respondent:

Further housing sites, such as the CFS 193, must be allocated to provide assurances that the
minimum housing requirement can be met.

Full text:

See attached letter