Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 15029

Received: 14/12/2020

Respondent: Kier Living Ltd - Coleshill Road

Agent: Mr Hywel James

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Local Housing Need and Standard Methodology:
- Correct to use SM to calculate housing requirement in accordance with NPPF Para. 60.
- Govt published revised standard method figures for consultation in August 2020. Projects a 25% increase in Solihull’s housing need up from 804 to 1,011 dpa, or 12,901 to 16,176 over plan period. Strong likelihood this will be adopted. Therefore DSP unlikely to meet housing need over plan period.
- Would need to review in less than 5 years, further Green Belt would need to be released as Borough 67% GB with little brownfield land available.
- NPPF Para. 146 – GB boundaries should endure beyond plan period. Review so soon would be inconsistent with NPPF, and unsound.
- DSP should release more land, or at very least identify safeguarded land.

Change suggested by respondent:

- Plan needs to release more land from the Green Belt;
- At very least Plan needs to identify safeguarded land, to provide appropriate flexibility.

Full text:

See attached letter