No
Draft Local Plan Review
Representation ID: 3480
Received: 17/02/2017
Respondent: Canal & River Trust
Representation Summary:
The potential for improvements to the canal towpath, towpath access and canal bridge crossings (including those on the vicinity of sites) and other works that may be required should also be included within the infrastructure requirements for sites 4, 8, 9, 12, 13, 16 and 17.
Full text:
see attached letter