Representation ID: 4270

Received: 17/02/2017

Respondent: Catesby Estates Limited

Agent: WYG

Representation Summary:

the housing split (figures in the DLP) do not sum and clarification is considered necessary, particularly on how the published split of the housing target fits into the wider overall housing target for the Plan period.
It is also considered that the housing requirement in Policy P5 should be expressed as a minimum.
consensus must be reached between Solihull and the HMA authorities as to how the Birmingham shortfall will be distributed.

additional housing site allocations should be identified in order to provide flexibility for a scenario where Solihull is required to meet a higher proportion of this shortfall.

Full text:

see 3 separate letters
1) Land to the rear of Meriden C of E Primary School, Fillongley Road, Meriden
2) Land Hampton Lane, Solihull
3) Land Windmill Lane / Kenilworth Rd, Balsall Common