No

Draft Local Plan Review

Representation ID: 5520

Received: 17/03/2017

Respondent: Mr David Varley

Representation Summary:

No not fully.
Balsall Common village centre is very small and the increase in population over recent years has meant the centre can no longer cope with the throughput of vehicles and parking in the area. In the plan there appears to be no mention of major improvements to this area but to suggest an increase of a further 1150 houses to the village. 800 of those dwellings are suggested for Barratt's Farm area which would cause further chaos in the centre of the village.

Full text:


In response to the consultation please find below my response to the questions posted by Solihull Council.

Question 1 Do you agree that we have identified the right challenges facing the Borough? No not fully.

As a resident of Balsall Common living in the Parish of Berkswell I can mainly comment on the area in which I live.

Balsall Common Centre is exactly .5 mile from my house. The village centre is very small and the increase in population over recent years has meant the centre can no longer cope with the throughput of vehicles and parking in the area. In the plan there appears to be no mention of major improvements to this area but to suggest an increase of a further 1150 houses to the village. 800 of those dwellings are suggested for Barratt's Farm area which would cause further chaos in the centre of the village. Key to the plans must be the development of a potential new extension to a village possibly to the north of the village. I have witnessed several crashes of vehicles reversing into one another in the centre and some near misses with pedestrians. Safety should be a priority and facilitating parking is also important if the area develops. It is key to the growth of the village and needs to be reviewed.

Question 2 Do you agree with the Borough Vision we have set out? No I would refer to the answer in question 1. Balsall Common village centre on Staion Road needs to be reviewed for the longer term success of a growing village. It does not appear on the plan.

Question 3 Do you agree with the spatial strategy?
No as spatial strategy cannot fully be answered by a subjective criteria. It is a reasonable starting point but one that may need weighting. Transport links and terminal need planning at the same time as development. In 25 years from now electric vehicles could be the norm and there has to be plans now for access to charging points etc. Being near public transport can change. Berkswell station platform needs improvement for the future it may become an issue if trains were no longer allowed to stop at the station.
I do agree that Brownfield sites should be used in preference to Greenfield sites however in Balsall Common you have chosen to develop 3 Greenfield sites at odds with your categories. Why?

Question 7 Sustainable Economic Growth
For Balsall Common there needs to be a review of the centre and how people can access the facilities. Possibly developing a different facility either at the Station end of Station Road or possibly north of the village.

Question 11 Do you agree with P4 ?. No
To add a further 1150 houses to Balsall Common at the same time as having a HS2 line ploughed through the centre is ridiculous. Having 800 potential new houses confined in Balsall Common between Station Road, Meeting House Lane and Waste Lane (Barratt's Farm), together with the possibility of a new school with that area is not possible without easy access to facilities and the road network. There is little employment within the village and most people have to commute. The car is the main transport from the village and I estimate on the Barratt's Lane development at least a further 1200 vehicles with 2500 vehicle journeys per day extra without considering the new school! Not everyone wants to live in flats and there needs to be areas for social care within the community together with opportunities for bungalows at reasonable prices. These are not explored in the proposals. Whilst a by-pass is mooted it is not final and without that road, access for the housing in the confined area of Barratt's farm would be unsafe.

Question 15 Do you believe we are planning to build new homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included? No I don't think the volume or locations are correct.

1 In Balsall Common all 3 sites are Greenbelt sites. Once the greenbelt is lost it will never be replaced and the amenity which is cherished by all residents and visitors making the village have a unique feel to it's location equidistant between Coventry and Solihull would be lost forever.

The Barratt's Lane site is one of the narrowest parts of the Meriden Gap and it would see erosion of limited greenbelt between Coventry and Balsall Common. The residents and visitors to Balsall Common value and cherish the open feel and countryside views for recreational walking and pursuits. Once built on it would cease to have the same appeal. In August the landowner showed plans for access to their site to be made from Station Road and by knocking down two cottages on Meeting House Lane as an access point directly onto the Lane. If the access onto MHL were to be accepted it would be an extremely unsafe situation. There are no pavements on Meeting House Lane and the width of the Lane would make it difficult to turn onto the lane especially for refuse vehicles, pantechnicons etc. Safety would be the major issue with the possibility of up to 2000 cars using the lane with pedestrians daily is unacceptable. Much would depend on whether or not a by-pass could be built as to whether Barratt's Farm would be right for access and for the building of so many houses. A school on the site would only aggravate the traffic situation within the site. I do not support the plan for 800 homes on this site.

Whilst Solihull have chosen 3 sites for development it may want to review this with the possibility of eliminating or reducing the units for Barratt's farm or even to look elsewhere completely if the by-pass is not approved. Why I would put this forward is that if access was difficult it may be worth investing in a larger area to the north of the village where a school and facilities could be located which would help to mitigate traffic in the village centre. In real terms the proposals from Solihull will not help the village unless facilities are made available on the area surrounding the Station. I would favour an area for growth in the north of the village to give direct access to the Kenilworth Road and provision of facilities to ease the burden on the village centre.

The Frog Lane site is not huge and the Windmill Lane site is infilling the triangle already being developed. Whilst I don't like to see development on the greenbelt I don't have a view on these small sites.

16 Do you believe we have identified the infrastructure to support these developments? No A defined route and by-pass is required. Room for multimodal transport developments and terminus is required. We have a Doctor's surgery but probably need more Doctor's for the growing size of population. A further affordable care home and day care facilities in the Barratt's farm area is probably needed. Car parking and village centre development (elsewhere) is required.

18 Improving Accessibility and encouraging sustainable travel.
Balsall Common's bus service is hourly. To get from Waste Lane to the A45 in Coventry by bus takes 45minutes to Coventry City Centre then wait for 15 mins for a 20 minute bus ride to take you back to the A45 arriving near your destination of 4.1miles away from Balsall Common in 1hr 20mins. This is why most households have 2 cars . This will mean a further increase in vehicle movements and problems in a village centre location.