Policy BC3 - Kenilworth Road/Windmill Lane, Balsall Common
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11203
Received: 13/12/2020
Respondent: Dr Hollie Patten
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11204
Received: 13/12/2020
Respondent: Iain Foster
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11205
Received: 12/12/2020
Respondent: Jaki Salisbury
Number of people: 2
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
We wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11206
Received: 09/12/2020
Respondent: Ms Jane Harris
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11207
Received: 14/12/2020
Respondent: The Friends of the Berkswell Windmill
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11208
Received: 04/12/2020
Respondent: Jennifer Davies
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11209
Received: 10/12/2020
Respondent: Jennifer Smith
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11210
Received: 13/12/2020
Respondent: Mrs Jennifer K Darby
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11211
Received: 13/12/2020
Respondent: Joanne Clare
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the
Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails
to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA
(2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land
(greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy.
Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and
in the wider borough which either should have been allocated, based on merit, or for which the omission
has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town
Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194
are not complied with. As such, the enabling of sustainable development will not be delivered should Site
BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and
character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11212
Received: 09/12/2020
Respondent: John Ardin
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11219
Received: 13/12/2020
Respondent: Mr John Wilson
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11224
Received: 10/12/2020
Respondent: Jonathan Kirk
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11233
Received: 13/12/2020
Respondent: Judith Dean
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11234
Received: 13/12/2020
Respondent: Karin Chessell
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
I wish to formally & strongly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is unsound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
Solihull Council need to take an active role in helping to protect the biodiverse rich habitat that is Site BC3 and we all wish to protect the setting and character of the Grade II * Listed Berkswell Windmill. The Windmill does not belong in the middle of a housing estate. Please make sure that this does not happen!!!
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11235
Received: 12/12/2020
Respondent: Kathryn Liston
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11236
Received: 10/12/2020
Respondent: Catherine Byrne
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
I am writing to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plans.
The Draft Submission Local Plan is not sound in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to support and protect the biodiverse rich habitat that is Site BC3 and protect the setting, historical relevance and character of the Grade II Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11237
Received: 02/12/2020
Respondent: Ms Kelsey Jackson
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Yours faithfully,
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11238
Received: 12/12/2020
Respondent: Kirsty Fitzgerald
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11239
Received: 10/12/2020
Respondent: Miss LAURA GOULDING
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11240
Received: 13/12/2020
Respondent: Laura Slaymaker
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11241
Received: 02/12/2020
Respondent: Mrs Lauren Coombes
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11242
Received: 12/12/2020
Respondent: Liam Tuke
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11243
Received: 10/12/2020
Respondent: Linda Fenn
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11252
Received: 13/12/2020
Respondent: Lionel Johnson
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness. Despite local opposition, alternative sites in Brownfield and National Pledges from the Conservatives to not build on Greenbelt. Concerned by the loss of natural habitat, the influx of traffic onto Windmill Lane and impact on facilities. Concerned as doctors fails to provide appointments for the current population, the roads are congested, and the infrastructure cannot cope. Amount of housing proposed will make Balsall common unable to function.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
Please find below my further objection to the proposed development of site BC3. I am disappointed to see that this continues to be presented as a viable option despite local opposition, alternative sites in Brownfield and National Pledges from the Conservatives to not build on Greenbelt. Having listened to the Solihull Council meeting online where this was discussed, I feel extremely let down by local MPs who were unhappy with suggesting this site but appeared to vote in favour of a substandard Local Plan as they needed to meet a deadline. I believe that the proposed site fails to meet the requirements needed for it to be viable as outlined below.
We are extremely concerned by the loss of natural habitat, the influx of traffic onto Windmill Lane which is already a notorious rat run and the lack of facilities that we already suffer from. At present, the doctors fails to provide appointments for the current population, the roads are congested and the infrastructure cannot cope. The amount of housing proposed generally in Balsall Common will make it impossible for our village to function properly.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11253
Received: 09/12/2020
Respondent: Ms Lisa Cordell
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11254
Received: 10/12/2020
Respondent: Lorraine Harris
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 11255
Received: 03/12/2020
Respondent: Lucy Burrell
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill
> Policy BC3 presents potential danger to residents and riders due to extra traffic generated.
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Having recently moved to Hob Lane which has over 5 Riding stables a small school and two working farms, the extra traffic that would Come from these new builds would be downright dangerous to residents and riders the road is not suitable for the extra traffic, HS2 closures have highlighted this already not to mention the the junctions at either end of windmill lane. It’s downright ludicrous and dangerous building on this wildlife haven.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 13695
Received: 10/12/2020
Respondent: Mariana Defteraiou
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
>Visited Windmill on Holiday
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I had the opportunity to visit the area and this amazing windmill during my holidays. I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 13710
Received: 06/12/2020
Respondent: David Langton
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Does not consider the Local Plan to be sound for the reason set out in the report submitted by the BARRAGE action group 'Part A: Objection to the proposed allocation of Site BC3 Windmill Lane/Kenilworth Road Balsall Common' dated 29/11/2020
Remove site BC3 as a proposed site for allocation
Object
Solihull Local Plan (Draft Submission) 2020
Representation ID: 13714
Received: 12/12/2020
Respondent: Marilyn Watson
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.
Never more have people needed green space, wildlife and country parks!