Policy BC3 - Kenilworth Road/Windmill Lane, Balsall Common

Showing comments and forms 91 to 120 of 206

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13716

Received: 02/12/2020

Respondent: Mark Temple

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3- Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from Solihull’s Draft Local Plan and Final Local Plan.
The Draft Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre have not been included. This is due for publication by the year end.
3) Consistent with National Policy:
Inconsistencies with the NPPF are demonstrated throughout this report. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the bio-diverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13718

Received: 03/12/2020

Respondent: Matthew Becker

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13719

Received: 10/12/2020

Respondent: Melanie Smith

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness

I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.

The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:

1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.

2) Justified:

The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:

There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.

I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13722

Received: 30/11/2020

Respondent: David Miller

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Does not consider the Local Plan to be sound for the reasons set out in the report submitted by the BARRAGE action group 'Part A:Objection to the proposed allocation of Site BC3 Windmill Lane/Kenilworth Road Balsall Common' 29/11/2020

Change suggested by respondent:

Remove Site BC3 as a proposed site for allocation

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13723

Received: 10/12/2020

Respondent: Myran Larkin

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13724

Received: 14/12/2020

Respondent: Miss Natalie Conway

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness

I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.

The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:

1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.

2) Justified:

The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.


3) Consistent with National Policy:

There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.

I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13725

Received: 06/12/2020

Respondent: Diane Langton

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Does not consider the Local Plan to be sound for the reasons set out in the report submitted by the BARRAGE action group 'Part A: Objection to the proposed allocation of site BC3 Windmill Lane/Kenilworth Road Balsall Common' 29.11.2020

Change suggested by respondent:

Remove site BC3 as a proposed site for allocation

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13727

Received: 13/12/2020

Respondent: Mrs Natalie File

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness

I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.

The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:

1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.


2) Justified:

The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.

3) Consistent with National Policy:

There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.

I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13728

Received: 02/12/2020

Respondent: Dr Gurpreet Singh

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Does not consider the Local Plan to be sound for the reasons set out in the report submitted by the BARRAGE action group 'PART A: Objection to the proposed allocation of the site BC3 Windmill Lane/Kenilworth Road Balsall Common'. 29.11.2020

Change suggested by respondent:

Remove site BC3 as a proposed site for allocation

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13729

Received: 06/12/2020

Respondent: Nick Larkin

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out of 4 Tests of Soundness

I wish to formally object to site BC3 Windmill lane / Kenilworth Road and ask that it is removed from the Solihull Draft Submissions Local Plan and Final Local Plan.

The draft Submission Local Plan is not sound in proposing the allocation of BC3 for housing as it fails to comply with 3 of the 4 tests of Soundness:

1. Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2015 units). NPPF para 11 has not been given due consideration. To build 4410 units on Green Belt land (greenfield) and 1195 in the Meriden gap is not required in order to comply with planning policy. Moreover, it is demonstrated that site BC3 specifically is not sustainable using the Council's own criteria.

2. Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider Borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings of the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.

3. Consistent with National Policy:
There are inconsistences with the NPPF. Specifically paragraphs 11, 94, 108, 109, 122, 138, 185, and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should site BC3 remain in the Draft Local Plan.

I wish to protect the biodiverse rich habitat that is site BC3 and I also wish to protect the setting and character of the Grade 2 Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13730

Received: 29/11/2020

Respondent: Jean Fleming

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

- Concern over insufficient infrastructure
- Loss of Greenfield detrimental to wildlife
- doesn't consider the Local Plan to be sound for the reasons set out in the report submitted by the BARRAGE action group 'PART A: Objection to the proposed allocation of Site BC3 Windmill Lane/Kenilworth Road Balsall Common' 29.11.2020

Change suggested by respondent:

Remove site BC3 as a proposed site for allocation

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13731

Received: 12/12/2020

Respondent: Nicola Watson

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13733

Received: 14/12/2020

Respondent: Mrs Nicolette Aldersley

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13734

Received: 05/12/2020

Respondent: Nikki Burns

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it isremoved from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13735

Received: 14/12/2020

Respondent: Nikki Cockerton

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removedfrom the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13770

Received: 09/12/2020

Respondent: Nikki Fenton

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness

I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.

The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:

1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.


2) Justified:

The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.

3) Consistent with National Policy:

There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13772

Received: 12/12/2020

Respondent: Noel Fleming

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13775

Received: 09/12/2020

Respondent: Oliver Novakovic

Legally compliant? Not specified

Sound? Yes

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.
>Object to access via Kenilworth Road and specifically Meer Stones Road to new site as it would create a H&S risk to people and children living in the cul-de-sac due to main road fronting onto houses.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness

I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.

The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:

1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.


2) Justified:

The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.

3) Consistent with National Policy:

There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

I would also like to object to access via Kenilworth Road and specifically Meer Stones Road to new site. This objection relates to the main road off Kenilworth entering into Meer stones Road not being developed for additional traffic. The cul de sac road being suggested for access is not level and the width would prohibit maintenance / pedestrian path as required under planning. Also it would create a H&S risk to people abs children living in the cul de sac die to main road fronting onto houses.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13778

Received: 13/12/2020

Respondent: Osian Foster

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:

1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.

2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.

3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.

I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13779

Received: 10/12/2020

Respondent: Paul Hebdith

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness

I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.

The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:

1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.

2) Justified:

The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:

There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.

I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13780

Received: 13/12/2020

Respondent: Phil Chessell

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

I wish to formally & strongly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is unsound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:

1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.

3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill. The Windmill does not belong in the middle of a housing estate

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13781

Received: 13/12/2020

Respondent: Philip Wood

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Dear Sir/Madam,
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13782

Received: 13/12/2020

Respondent: Rachel Clifford

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13783

Received: 05/12/2020

Respondent: Rebecca Clare

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
>Despite local opposition, alternative sites in Brownfield and National Pledges from the Conservatives to not build on Greenbelt. Concerned by the loss of natural habitat, the influx of traffic onto Windmill Lane and impact on facilities. Concerned as doctors fails to provide appointments for the current population, the roads are congested, and the infrastructure cannot cope. Amount of housing proposed will make Balsall common unable to function.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Please find below my further objection to the proposed development of site BC3. I am disappointed to see that this continues to be presented as a viable option despite local opposition, alternative sites in Brownfield and National Pledges from the Conservatives to not build on Greenbelt. Having listened to the Solihull Council meeting online where this was discussed, I feel extremely let down by local MPs who were unhappy with suggesting this site but appeared to vote in favour of a substandard Local Plan as they needed to meet a deadline. I believe that the proposed site fails to meet the requirements needed for it to be viable as outlined below.
We are extremely concerned by the loss of natural habitat, the influx of traffic onto Windmill Lane which is already a notorious rat run and the lack of facilities that we already suffer from. At present, the doctors fails to provide appointments for the current population, the roads are congested and the infrastructure cannot cope. The amount of housing proposed generally in Balsall Common will make it impossible for our village to function properly.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13784

Received: 13/12/2020

Respondent: Richard Clare

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA
(2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land
(greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy.
Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and
in the wider borough which either should have been allocated, based on merit, or for which the omission
has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town
Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194
are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and
character of the Grade II * Listed Berkswell Windmill.

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13786

Received: 14/12/2020

Respondent: Richard Cobb Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:

1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainablusing the Council’s own criteria and could in whole or part be replaced with better sites around Balsall Common such as Site 82.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.

3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13799

Received: 08/12/2020

Respondent: Richard Onions

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Other Brownfield sites put forward more viable.
> BC3 home to array of Wildlife.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

I have previously and continue to object to the development on site BC3 and remain astounded that this site continues to be considered for development. National pledges have been made by the Conservative Party to protect Greenbelt land and alternative Brownfield sites have already been put forward as viable alternatives to site BC3. Site BC3 is home to an array of wildlife (of which we have photographic evidence) and this is just one of the many reasons why this site is totally unsuitable for development.
I feel totally let down by our local MPs who have voted in favour of the Local Plan. Below is my formal objection to building on site BC3.
Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.

3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13800

Received: 10/12/2020

Respondent: Rosemary Hall

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness

I wish to formally object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.

The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:

1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.

2) Justified:

The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:

There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.

I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13801

Received: 05/12/2020

Respondent: Russell Jones

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from Solihull’s Draft Local Plan and Final Local Plan.

The Draft Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:

1) Positively Prepared:
The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.

2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre have not been included. This is due for publication by the year end.

3) Consistent with National Policy:
Inconsistencies with the NPPF are demonstrated throughout this report. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.

I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13803

Received: 13/12/2020

Respondent: Sam Wilson

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Objection (Wants site BC3 removed from Solihull Draft Submission Local Plan and Final Local Plan): Fails 3/4 tests of soundness.
> Not positively prepared as it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units (Greenfield) and 1195 units (Meridian Gap) is not required to comply with planning policy. Furthermore, site BC3 specifically is not sustainable using the council’s own criteria.
> Allocation of site BC3 has not been justified. Omission of sites within Balsall common and in the wider Borough which should have been chosen based on merit or for which the omission has not been justified. Final findings from Solihull Town Centre Masterplan are not incorporated and cannot be reconciled with the Draft Local Plan.
>Inconsistencies with the NPPF, specifically para 1; 94; 108; 109; 122; 138; 185 and 194 are not complied with. Sustainable development will not be complied with if site BC3 remains in the Draft Local Plan.
>Wishes to preserve the biodiverse rich habitat that is Site BC3 and protect the character of the Grade II Listed Berkswell Windmill.

Full text:

Objection to Site BC3 - Fails 3 out 4 Tests of Soundness
I wish to formerly object to Site BC3 Windmill Lane/Kenilworth Road and ask that it is removed from the Solihull Draft Submission Local Plan and Final Local Plan.
The Draft Submission Local Plan is not sound, in proposing the allocation of Site BC3 for housing, as it fails to comply with 3 of the 4 tests of Soundness:
1) Positively Prepared:

The plan has not been positively prepared in that it is not practical to deliver the unmet need of the HMA (2105 units). NPPF para. 11 has not been given due consideration. To build 4410 units on Green Belt Land (greenfield) and 1195 in the Meriden Gap is not required in order to comply with planning policy. Moreover, it is demonstrated that Site BC3 specifically is not sustainable using the Council’s own criteria.
2) Justified:
The allocation of site BC3 has not been justified. There are omission sites both within Balsall Common and in the wider borough which either should have been allocated, based on merit, or for which the omission has not been justified. Moreover, the findings from the final version of the masterplan for Solihull Town Centre are not incorporated and cannot be reconciled with the Draft Local Plan.
3) Consistent with National Policy:
There are inconsistencies with the NPPF. Specifically paragraphs 11; 94; 108; 109; 122; 138; 185 and 194 are not complied with. As such, the enabling of sustainable development will not be delivered should Site BC3 remain in the Draft Local Plan.
I wish to protect the biodiverse rich habitat that is Site BC3 and I also wish to protect the setting and character of the Grade II * Listed Berkswell Windmill.