Q23. Are there any other comments you wish to make on the Draft Local Plan?

Showing comments and forms 121 to 150 of 389

No

Draft Local Plan Review

Representation ID: 3122

Received: 16/02/2017

Respondent: Balsall Parish Council

Representation Summary:

The Accessibility Study is flawed. The conclusion that Balsall Comm has medium to high accessibility and therefore suitable for growth is not justified.
The phasing of development in Balsall Common needs to be considered after HS2 construction. It would be wilfully negligent of the Council to fail to manage the growth by phasing new housing in Balsall Common before 2026.

Full text:

see attached report
Balsall Parish Council resolved at the Council meeting on 15 February 2017 to submit this report in response to the Solihull Draft Local Plan Consultation ending 17 February 2017

No

Draft Local Plan Review

Representation ID: 3124

Received: 17/02/2017

Respondent: Highways England

Representation Summary:

Further details will be required to consider the implications of the levels of planned growth upon the SRN so as to ensure the potential transport implications of developments are considered.
M42 J4 will be affected and a cumulative assessment of proposals will be required to allow full consideration of the impacts. This will need to take account of the potential for a Motorway Service Area.
Need to consider potential impacts on J5 including developments in Solihull Town Centre arising from the masterplan.
Need to work together to consider additional transport evidence required.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 3144

Received: 14/02/2017

Respondent: Dr Carrie-Anne Johnson

Representation Summary:

The proposed addition of up to 1350 houses to Balsall Common, representing a sizeable increase in population (>25%), will have a significant impact on the character of the village. It will remove the local distinctiveness of the area, characterised by its open countryside setting, sense of remoteness, distinctive fieldscapes and woodland assets. All of this is in direct conflict with the statement (DLP paragraph 86) that "the local distinctiveness of the area... ...will have been protected".
The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

I am responding to the Council's Draft Local Plan (DLP).

In response to Q1:

"Do you agree that we've identified the right challenges facing the Borough? If not why not? Are there any additional challenges that should be addressed?"

I believe that improving the centre of Balsall Common has failed to be recognised as an additional key challenge that Solihull Council needs to address. The current facilities within Balsall Common centre struggle to support the existing populace so could not support up to an additional 1350 houses.

In response to Q2:

"Do you agree with the Borough Vision we have set out? If not why not, and what alternative would you suggest?"

I do not agree with the vision set out. It neither provides for improving the centre of Balsall Common nor outlines how it will need to change in order to cater for the needs of a growing local community. There is already insufficient parking for the current populace. The vision for Balsall Common fails to note the need for improvements to local facilities, services and public transport which would encourage more sustainable travel patterns and improved connectivity to surrounding communities.

The inclusion of a generic statement that 'Schools will have continued to thrive and grow' appears naive. The primary school is already at capacity and the required growth will not be possible at its current location. Relocation of this facility should be considered alongside the other significant developments which have been proposed.

I also do not agree with part of the vision which describes that 'an alternative route will have been provided to relieve traffic from the Kenilworth Road'. Any such alternative route will result in a further loss of greenbelt, an increase in traffic and act as a catalyst for additional development.

In response to Q3:

"Do you agree with the spatial strategy we have set out? If not why not, and what alternative would you suggest?"

I agree with a strategy and approach where areas of previously developed land (Brownfield) are selected ahead of non-developed land (Greenfield) and areas with good public transport links are considered ahead of those with poorer public transport links.

However, I do not agree that the appropriate growth opportunities have been correctly identified within DLP paragraph 108. I do not understand why Green Belt and Greenfield sites are identified as locations where growth should be focused when there are a number of Brownfield sites (e.g.part- PDL site 240 - Land north of Balsall Common) which do not feature within LPR proposed sites. This is contrary to the guidance as set out within:

a. The strategic objectives of this document (DLP paragraph 96), and
b. "Step 1: Planning for the right homes in the right places" of the Government's "Fixing our broken housing market" white paper by "maximising the contribution from brownfield and surplus public land" (https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/590043/Fixing_our_broken_housing_market_-_housing_white_paper.pdf)

In response to Q7:

"Do you agree with Policy P2? If not why not, and what alternative would you suggest?"

I do not agree with Policy P2 as I believe the challenges facing the centre of Balsall Common in light of the proposed housing growth have failed to be recognised and its own master plan is needed. Specifically there is a need to ensure that the provision of parking in the village centre meets the needs of retailers and residents, whilst not acting as a constraint to development.

In response to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In response to Q16

"Do you believe we have identified the infrastructure required to support these developments? If not why not? Are there any additional facilities you believe are required, if so what are they?"

No - parking facilities at Berkswell Station are already insufficient to support the current need. This results in vehicles needing to park elsewhere e.g. along Hallmeadow Road. An increase in the population would put further strain on this facility and as such I believe additional parking facilities are required.

In response to Q18

"Do you agree with the policies for improving accessibility and encouraging sustainable travel? If not why not, and what alternatives would you suggest?"

Policy 7 is only concerned with the proximity to and the frequency of bus services. A defining factor for commuters' transport mode choice is the destination or the appropriateness of the service. e.g. Whether a dwelling is within 400m of a bus stop is irrelevant if the service cannot deliver you to your destination in a timely manner.

In response to Q22

"Do you agree with the Policy P21? If not why not, and what alternatives would you suggest?"

Policy 21 does not specifically state that all CIL payments, new homes bonus or the profit on the sale of Council land for housing should be spent in the areas where the housing is built. I strongly believe that such payments received for a development should be allocated to the directly affected community.

In response to Q23

"Are there any other comments you wish to make on the Draft Local Plan?"

The proposed addition of up to 1350 houses to Balsall Common, representing a sizeable increase in population (>25%), will have a significant impact on the character of the village. It will remove the local distinctiveness of the area, characterised by its open countryside setting, sense of remoteness, distinctive fieldscapes and woodland assets. All of this is in direct conflict with the statement (DLP paragraph 86) that "the local distinctiveness of the area... ...will have been protected".

Furthermore, I support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable

No

Draft Local Plan Review

Representation ID: 3156

Received: 15/02/2017

Respondent: Michael & Lynda Beasley

Representation Summary:

Disproportionate allocation of homes in Balsall Common has not been justified.
Dorridge, Knowle, Chadwick End, Fen End etc. are in less sensitive and less pressured areas of Green Belt.
Strong perception in the Balsall Common area that Council has abandoned the Greenbelt and discarded their own policies and values.
Have lost local trust.
Appears land belonging to us has been erroneously included in Site 1. Should this development take place, we would expect a barrier to be put in place to protect livestock.
Area will already suffer from increased noise, pollution and loss of Green Belt due to HS2.

Full text:

Response to Solihull MBC 23 question extended consultation on the draft local plan
Question 1 are the right borough challenges identified
Will the impact of Brexit have a material effect on the total number of homes needed in the Borough?
Question 2 agreement with the Borough Vision
Only In a very small part yes, but it is clearly written from an urban Solihull-centric perspective, once more bringing into disrepute the belief that Solihull successfully combines a well-balanced combined Urban and Rural vision. Looked at from a holistic position, Solihull MBC in this draft proposal will not be satisfied with following their own policies until an urban jungle is built through the most vulnerable and narrow portion of the Green Belt between Balsall Common and Coventry City.
SMBC fought a huge battle at enormous cost to preserve this piece of land from a coal mine development; why is it now prepared to sacrifice this precious 'lung' between two major city conurbations?
Balsall Common is already a congested community with poor infrastructure and very poor public sector connectivity with the local economic centres which are primarily to the East and South ie NOT Solihull and this is the way traffic flows at peak times.
Further, no consideration has been given to considering sites to the South and West of the settlement toward the considerable economic development driven by JLR at their Fen End site, where they plan to site 2,000+ engineers. Many of these people will seek homes in Balsall Common and, therefore, to reduce cross-village traffic any major development should be on the West side of the village. Similarly, if a village bypass should ever be needed then consideration should be given to siting this on the West side.
Adding the proposed disproportionate housing and its resulting population to Balsall Common in sensitive and fragile Green Belt areas will simply make the problems worse and continue the belief that SMBC will ignore its own Policies when they do not suit political goals.
Question 3 agreement with Spatial Strategy?
The approach defined for sites being appropriate for development as written looks good with the right priorities, but unfortunately they have not been adhered to in this draft plan.
Barratt's Farm land is Greenfield land not Brownfield land and has significant drain off issues. Additionally, as stressed above, the village is virtually bereft of effective public transport.
The demolition of the Meriden Gap Green Belt and its impact on the local ecology of the green fields, ancient hedge rows and trees will directly affect the existing local residents and families who extensively use the area and its many crisscrossing footpaths for open air exercise and leisure activities. The additional traffic emanating from such a large increase in housing will add to the air pollution caused by poor control of the take-off and landing heights from Birmingham Airport, especially the northern turn over the settlement.
If this land is built on, then the drain off problem identified above will represent a risk to local adjoining properties to the north and south.
This area is already under severe threat of noise and Greenbelt erosion from HS2.
Piling in some 800 homes with shops, a school and other amenities with poor access to existing roads is a planning nightmare.
The site between Windmill Lane and the A452 Kenilworth Road to the South of the settlement is broadly a Brownfield site, BUT it is also proposed for a density of housing which is too high. This will generate traffic onto the narrow Windmill Lane that has poor visibility junctions at each end, or onto the A452 Trunk road with difficult North and South junctions.
Question 7 regarding sustainable Economic Development?
Good principles, but again not seriously considered in the draft plan with no consideration of the disproportionate building of houses on an already congested and ill planned village centre.
Question11 policy P2 providing homes for all
The total proposed housing numbers are grossly disproportionate to the size of the existing community and will have a very significant detrimental impact on the size, shape, character and environment of Balsall Common as a Rural Village. It is also noticed that while mention is made of affordable homes, no mention is made of homes for older members of the community.
Question 15 appropriateness of draft proposed sites.
As mentioned throughout this response, Solihull MBC have failed to follow their own Policies in establishing the appropriateness of the chosen sites and yet proposals for a new village on a brown field site development to the north of the region have been ignored. This is also true of potential sites to the South/East of Solihull toward Hampton in Arden and Catherin de Barnes, these being closer to the proposed new High Speed HS2 interchange.
Question 16 completeness of required supporting infrastructure to complement the proposed draft development?
While Doctors and Schooling infrastructure is mentioned, no mention is made of shopping, banking etc and banks are currently withdrawing from Balsall Common. A lack of action on the site to the rear of the Co-op shop has caused it to be isolated from other retail outlets and has exacerbated the lack of any sense of a cohesive village centre. Car parking facilities in the Village are very limited and in some areas dangerous.
Question18 sustainable Travel
Good ideals but difficult to execute when public transport, apart from Birmingham focused rail, is very, very poor in the area.
Question 22 Delivery
CIL payments for local development should be focussed in the local area for locally requested and agreed infrastructure improvements.
Question 23 Any other comment
No explanation has been given to the fact that a grossly disproportionate number of houses are proposed to be built in Balsall Common in important and sensitive Green Belt land compared with elsewhere in Solihull Borough. Areas such as Dorridge, Knowle, Chadwick End and Fen End to the South are in less sensitive and less pressured areas of Green Belt land.
There is a very strong perception in the Balsall Common area that Solihull MBC have abandoned the Greenbelt and consciously discarded their own policies and values and have consequently lost what trust they had as a result.
It also appears from the draft local development plan consultation information booklet that land belonging to Lynda Beasley (Wyer) and Michael Cooper has been included in the proposed Barratt's Farm development. We assume this error will be rectified. In the event this development does proceed we would expect a barrier to be put in place to protect livestock on the above mentioned fields.

No

Draft Local Plan Review

Representation ID: 3165

Received: 15/02/2017

Respondent: Myran Larkin

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:
"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"
I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.
The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.
1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.
4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.
5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".
6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties
7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.
9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.
10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."
In light of the above, I would support the recommendations from BARRAGE that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport
2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots
3) The phasing of any development must recognise the impact and disruption of HS2
4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development
5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged
6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3227

Received: 16/02/2017

Respondent: Julian Crook

Representation Summary:

I could not work out how to submit these comments via your Online Portal, which I found very confusing to use, so I hope my comments will be taken into account in the format attached.

Full text:

see letter re: site 16

No

Draft Local Plan Review

Representation ID: 3238

Received: 16/02/2017

Respondent: Arden Wood Shavings Ltd

Agent: Stansgate Planning LLP

Representation Summary:

The Local Plan Review evidence base generally supports the allocation of site 6 but underestimates its benefits within a sustainable settlement with services and facilities in easy reach, which offers planning gain from removal of the existing use, firm defensible Green Belt boundary following physical features with visual enhancement potential. The SHELAA suitability assessment does not accurately reflect the site's suitability, as there is no known contamination/landfill, no explanation is provided re ground conditions or bad neighbour constraints and it is not a builders yard, and the EA flood map shows only 1% of the site within zone 3.

Full text:

see attached response by agent

No

Draft Local Plan Review

Representation ID: 3294

Received: 16/02/2017

Respondent: Mr & Mrs J King

Agent: PRW Strategic Advice

Representation Summary:

Green Belt Assessment - does not recognise in its scoring the potential benefits of a strategic policy approach.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 3295

Received: 16/02/2017

Respondent: Mr & Mrs J King

Agent: PRW Strategic Advice

Representation Summary:

Accessibility Study - look only at opportunities and constraints presented by existing infrastructure, rather than by potential improvements that could be delivered alongside new development.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 3313

Received: 12/02/2017

Respondent: Heidi Becker

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common)

My husband and I attended the consultation at Balsall Common library and were disappointed that despite a large number of valid objections and useful points being made, I didn't notice any members of the council actually making a note of anything the residents had said. I wonder what the point was of having such a consultation if it was not to gain information to be shared with other members of the planning committee? The man from the council that we spoke to said that he didn't even live locally and was only ever in Balsall Common about once a month, so how could he possibly know what it is like to live here when he doesn't know the areas as well as the residents do and clearly has no idea how bad the traffic and congestion already is and how stretched to the limit all of the current local services are.

It also concerns us that the potential site options may not have been researched thoroughly - an example of this is the fact that our garden, along with 2 of our neighbours gardens, were included in the proposed plan, along with a shared paddock too. We can only hope that this has been done in error, but of course you can understand our worry that someone has just looked at a map and highlighted anything that looks like a field.

I hope that before any more development occurs in Balsall Common, members of the council will drive through the village either at the end of a school day or during rush hour and see how congested this stretch of road already is (and will be further increased once the new homes on the Kenilworth Road have reached completion) and how an increase in the number of vehicles and cars racing down side roads to find alternative routes, will pose a greater risk of an accident, particularly to the children from the primary and secondary schools, not to mention the nursery, that is also along the same road.

As a Mum and a teacher, I have huge concerns about the pressure on the local primary school, which is already over-subscribed (as are all of our other potential school options). I was told by a member of the council that new schools will be built but I wonder which action will come first - surely the infrastructure must be developed first in order to accommodate the many children that would move into any new homes?

I would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".


2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.


4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.


10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time asHS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3318

Received: 12/02/2017

Respondent: Nikki Burns

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

Kenilworth Road/Windmill Lane development

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.


The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.


1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to thecongestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.


5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to driverstrying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".


6) Site 3 scores poorly in relation to allaccessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.



10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport


2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2


4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3323

Received: 12/02/2017

Respondent: Louis Burns

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

I wish to object to the development of site 3

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"


I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.


The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.


1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to thecongestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.


5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to driverstrying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".


6) Site 3 scores poorly in relation to allaccessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.



10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport


2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2


4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3376

Received: 17/02/2017

Respondent: Nadia McGarry

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

see attached letter and site report

No

Draft Local Plan Review

Representation ID: 3384

Received: 17/02/2017

Respondent: Ella McGarry

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

see letter and report

No

Draft Local Plan Review

Representation ID: 3388

Received: 17/02/2017

Respondent: Jeanette McGarry

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

see letter & Report
Please find attached electronic copy of my letter of objection to the Draft Local Plan.
I should like to protect the Berkswell Windmill a Grade Two Star Listed Building, for generations to come. There are 14 PDL - brownfield sites within the village of Balsall Common that should be considered . The Greenbelt countryside needs to be protected for residents and visitors. It provides important habitat for rare wildlife. Eg Site 3 is home to protected Great Credted Newts, Red Kites, Barn Owls, bats and also Tawny Owls, Little Owls, frogs, toads, hedgehogs, badgers and Swallows.

Please note that Site 3 regularly floods on an annual basis, frequently more than twice a year ;So is unsuitable for housing.
Please see attached photograph and attached letter of objection.

No

Draft Local Plan Review

Representation ID: 3415

Received: 13/02/2017

Respondent: Mrs Jean Walters

Representation Summary:

Site 4 conflicts with the original masterplan and vision for Dickens Heath village.
Should be a specific policy to protect character and setting of Dickens Heath village, and limit further expansions.

Full text:

see attached letter

Yes

Draft Local Plan Review

Representation ID: 3463

Received: 17/02/2017

Respondent: Department for Education

Representation Summary:

It is suggested that the Local Plan sets out the mechanism through which sites for new schools will be identified and secured. This is particularly important for sites not forming part of comprehensive mixed use schemes.
Support a Planning for Schools Development Plan Document (DPD). The DPD provides policy direction and establishes the Council's approach to providing primary and secondary school places and helps to identify sites which may be suitable for providing them (including on Green Belt/MOL), whether by extension to existing schools or on new sites.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 3467

Received: 17/02/2017

Respondent: Dominique McGarry

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

see letter attached

No

Draft Local Plan Review

Representation ID: 3482

Received: 16/02/2017

Respondent: Barratt Developments

Agent: Avison Young

Representation Summary:

Critically, the Council's evidence, particularly in relation to economic growth underestimates the level of housing required to support the likely change in employment.

Full text:

see attached and online submission

No

Draft Local Plan Review

Representation ID: 3484

Received: 16/02/2017

Respondent: Barratt Developments

Agent: Avison Young

Representation Summary:

Have commissioned an alternative SHMA, with alternative figure of at least 25,023 dwellings for plan period.

Full text:

see attached and online submission

Yes

Draft Local Plan Review

Representation ID: 3505

Received: 16/03/2017

Respondent: BDW and Gallagher Estates Ltd

Agent: Avison Young

Representation Summary:

Council should identify reserve/safeguarded sites, which can be brought forward /released in certain circumstances.
large scale sites will risk the deliverability of the local plan and further risks the DLP not being able to achieve the housing in a manner which ensures a rolling five year supply over the plan period.

Full text:

see attached document to supplement online submissions

No

Draft Local Plan Review

Representation ID: 3544

Received: 16/02/2017

Respondent: Mrs Beverley Willacy

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 3562

Received: 16/02/2017

Respondent: Mrs Denise Hackworth

Representation Summary:

Firstly can I please say how difficult the process of forwarding a response on the above plan has proved to be. I am certain that most people will have given up trying to use the online portal and the complexity of all the items which have been included in the draft, far too many items for us all to digest and give appropriate responses to.

Full text:

Firstly can I please say how difficult the process of forwarding a response on the above plan has proved to be. I am certain that most people will have given up trying to use the online portal and the complexity of all the items which have been included in the draft, far too many items for us all to digest and give appropriate responses to.

However, in my case I would like to address the possibility of the release of green belt land to the west of Dickens Heath, Site No 4, but would also add that some of my comments apply to the whole of the proposed developments within Blythe ward.

Whilst I am aware that Solihull Council are looking for sites for some 15,000+ houses, it would appear that a great deal of this housing is being 'patched' onto existing settlements, what I do not understand is why when roads throughout Solihull are full to bursting with traffic, do we not look to create a new village with all the infrastructure, close to or with good roads to access motorway. If this was built somewhere along the M42 - whilst I appreciate it would most likely have to come from greenbelt, at least there would not be such significant impact on existing roads and factilities. Also with sufficient space for extending this new village should the future require even further housing. When you look at how much countryside/greenbelt in large swathes we have within this borough, surely a stand alone village is the way to move forward. I am sure most people would rather a new village than continual erosion of the greenbelt that protects our villages and their character.

If this is option is not viable then surely any further housing should have direct access to Motorway or main/major arterial roads, in order to eliminate further congestion on our minor roads.

The site which has my most concern is No 4, west of Dickens Heath - Birchy Leasowes, Tileshouse Lane, Tythebarn Lane with the possibility of 700+ houses. Firstly this site which has scored a high 7-8 in greenbelt analysis, does not fall into the exceptional circumstances as directed by the government for releasing from greenbelt, you have had many other sites offered for development of which do not have 7-8 greenbelt rating. This site protects the urban sprawl from Whitlocks End, Tidbury Green and Shirley and is the natural boundary for Dickens Heath, it should be protected. Any development of this site would mean further strain on the existing gridlock around Dickens Heath, and also would not provide easy access to the Dickens Heath amenities, so residents would have to drive to the library, school, shops etc. Although I appreciate there is some assumption that most of the residents would use the train????????? most homes now have 2 cars and not everyone works in Birmingham, infact most people I know actually head for the M42, which is the other way.

Dickens Heath as a village cannot sustain any further development, our facilities cannot cope at present, so a further 700 houses is unbeleivable, particularly this site as it does not have any direct access to major arterial roads, and the roads surrounding the site cannot cope at present.

Dickens Heath will completely lose its identity and become an urban sprawl, which is against the guidelines which the government states.

Notwithstanding the fact that Blythe ward is being made to take a disproportionate amount of housing.

Lastly, as a resident of Dickens Heath, site No 4 was given greenbelt status in order to protect the 'new village' how can you therefore substantiate releasing it for development?

No

Draft Local Plan Review

Representation ID: 3600

Received: 13/02/2017

Respondent: Sean Whitcroft

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

two emails re: Balsall Common sites - both received 13th February
The Solihull Plan -Windmill Lane - Save its Greenbelt status

I would strongly recommend that you listen to the voice of the residents of Balsall Common and have the proposed building of new houses on Brown belt sites and not destroy what is left of the green belt in Balsall Common.

You have stated in this consultation that you are open to suggestions from the residents 'if not here where?' but there are strong beliefs amongst the local people of Balsall Common that the property developers are dictating the sites so they can get a 'bang for their buck'.

There are plenty of alternatives to Windmill Lane and Frog Lane so why cannot these be used to meet the build program ?

Balsall Common has had it's fair share of new builds in that last 20 years and the infrastructure -: schools/Doctors and the roads cannot cope with a further increase as suggested in the Local Plan.

Furthermore, to surround a iconic monument like the Berkswell Windmill with modern housing is sacrilege, we should protect our heritage not destroy it.

I do hope that common sense prevails, once we have destroyed our greenbelt and monuments it is the irreparable .

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3632

Received: 13/02/2017

Respondent: Linda Whitcroft

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3634

Received: 13/02/2017

Respondent: Jordan Whitcroft

Representation Summary:

The phasing of any development in Balsall Common must recognise the impact and disruption of HS2.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

Yes

Draft Local Plan Review

Representation ID: 3706

Received: 14/02/2017

Respondent: Peter Bray

Representation Summary:

The comments above are my comments alone but I support 100% the response submission from Berkswell Parish Council. I believe their recommendations are genuine and to the point from people who know the area better than remote consultants. They listen to the community.
My major recommendation to SMBC is to read their submission in full and implement their recommendations especially their recommendations on site locations.
It is not too late to make amends and improve SMBC's standing in the community.

Full text:

see attached written rep

No

Draft Local Plan Review

Representation ID: 3709

Received: 14/02/2017

Respondent: David Smith

Representation Summary:

Concern about the limited distribution of information out by the Council regarding the proposals.

Full text:

see attached letter

Yes

Draft Local Plan Review

Representation ID: 3719

Received: 15/02/2017

Respondent: Derek Forsythe

Representation Summary:

Carry out a traffic flow survey in the Dickens Heath, Majors Green and Tidbury Green areas
Consider retaining the Amenities Area behind Badgers Estate
Encourage Centro to extend the Whitlocks End Railway Station Car Park asap.
Co-ordinate SMBC and BDC development plans
Ensure Richborough proposed plan for the Sports Hub has adequate parking spaces for those who will use the facilities.
Consider constructing a Park and Ride facility in a strategic location in order to limit the traffic flow through urban areas.
Developers should be required to fund necessary improvement to existing highways, new roads and pavement lighting.

Full text:

DRAFT LOCAL PLAN DECEMBER 2016
My understanding is that the SMBC Draft Local Plan dated December 2016 is a "non-statutory document" and hence residents will have the opportunity comment on the Final Local Plan when published, and at the Public Enquiry.
It's accepted that there is a growing need for the Borough Council to agree to the development of more residential properties in the area and this will, regrettably, mean building on Green Belt land. However, the prospect of using 85% green belt land, including an existing amenities area, is difficult to accept.
When you consider the existing construction sites, together with what's proposed by SMBC and Bromsgrove District Council (BDC), we are looking at just under 3800 new properties that border Wythall Parish, hence the already busy arterial route through the Majors Green and Tidbury Green will become even more heavily congested. Add the extension to the Whitlocks End Railway Station car park and the proposed new sports hub along Tilehouse Lane/Tythe Barn Lane and it's obvious that serious consideration must be given to the highways infrastructure.
You may not be aware that we've had 30 traffic accidents on a 300 metre stretch of Haslucks Green Road/Tilehouse Lane in Majors Green during the past 18 months, including one pedestrian badly injured as she walked along the pavement. Worcestershire County Council has made a number of improvements but long term a more practical solution must be found in order to negate the potential for a fatality.
During the next year, I am confident that SMBC will be addressing residents' concerns and undertaking many assessments in and around the proposed development sites including health care provisions, primary and secondary school capacity checks, ecological assessments, recreational considerations, road transport management, etc.
It is pleasing that SMBC intend constructing cycle/walking lanes in and around the construction sites, in particular, those leading to Whitlocks End Railway Station.
Consideration should be given to carrying out road traffic flow measurements and analyses of all roads affected and come up with a solution that will link the proposed development sites with the A435 and A3400 roads, therefore preventing excessive traffic congestion in the Dickens Heath, Tidbury Green and Wythall Parish areas. Looking at the roads in and around Dickens Heath, I urge SMBC to come up with a road system that will be an improvement on what can only be described as "shameful".
In addition to your Draft Local Plan, a further report, dated 16th Dec, has been issued by The Planning Inspectorate (Government) which looks at the pro and cons of housing development in the BDC area up to 2030. It refers to an additional 7000 properties for which they have land for 4700 only. The remainder may be built on Green Belt land. It does mention Wythall amongst other neighbouring areas (in Section 66 (Policy BDP5B) citing "large scale" settlements"
In summary, I trust that you will:
* Consider spreading the development sites more equally around the whole of the Borough rather than concentrate on Shirley and Dickens Heath areas.

* Seriously consider the impact on of constructing on Green Belt land

* Carry out a traffic flow survey in the Dickens Heath, Majors Green and Tidbury Green areas and undertake an analysis of the increase in traffic resulting from the ongoing and new developments

* Make it a condition that the development companies agree to fund the necessary improvements to existing highways, pavement lighting, and construction of new highways as required by your Final Plan

* Consider retaining the Amenities Area behind Badgers Estate

* Encourage Centro to extend the Whitlocks End Railway Station Car Park as soon as possible.

* Consider charging a parking fee at the existing and new Whitlocks End Railway Station to limit commuters from outlying areas using the facility

* Co-ordinate SMBC and BDC development plans

* Ensure Richborough proposed plan for the Sports Hub has adequate parking spaces for those who will use the facilities

* Consider constructing a Park and Ride facility in a strategic location in order to limit the traffic flow through urban areas

No

Draft Local Plan Review

Representation ID: 3737

Received: 15/02/2017

Respondent: Mrs Irene Thompson

Agent: Richard Cobb Planning

Representation Summary:

Consider the inclusion of their site (CfS 82) as part of parcel Aecom76 in the Sustainability Appraisal as being unfair.
The SHELAA is referenced is support of the above view.

Full text:

letter re: Call for Sites site 82