Question 4 - Site 1 - Barratts Farm
Representation ID: 10320
Received: 02/05/2019
Respondent: Environment Agency
An ordinary watercourse flows through the site, however our 'Flood Map for Planning' only shows the flood risk from watercourses with a catchment area greater than 3km2, mapping of the risk from the watercourse has not been undertaken and as such this is the only reason the site is shown to lie in low risk Flood Zone 1. The assessment of flood risk and easement from the ordinary watercourse should be agreed with the LLFA, however we strongly recommend that hydraulic modelling of the watercourse is undertaken as part of a Level 2 SFRA to inform of the developable area and capacity of this potential allocation. Regardless of flood risk, we recommend an unobstructed green corridor is maintained along the banks of the watercourse for the purposes of protecting and maintaining green and blue infrastructure.
Thank you for referring the above consultation which we received on 30 January 2019. We apologise we have been unable to respond prior to now, and hope that you are still able to take our comments into account as the plan develops.
We have reviewed the above consultation document which is dated January 2019 and note the inclusion of additional sites for consideration for allocation.
We welcome the inclusion of Flood Risk as a potential 'Hard' issue in the site selection criteria as identified on page 18 and 19. We further recommend that Water Quality is added to the footnote in this section, with particular referenced to River Blythe's SSSI status. Further to this page 29 looks at what is required for the Blythe in the future and protection and enhancement of water quality should be included. Please see attached letter for our advice with regards to your site allocations, which incorporates comments previously provided, and adds additional comments in relation to your new sites. These comments should be used in preference to those previously provided as they have been updated
Comment
Draft Local Plan - Supplementary Consultation
Question 12 - Site 4 - Land West of Dickens Heath
Representation ID: 10321
Received: 02/05/2019
Respondent: Environment Agency
The site falls within Flood Zone 1, however there appears to be an ordinary watercourse near the western boundary of the site with its source at Betteridges Barn and then it is culverted under the Sport Pavilion Ground and Tythe Barn Lane. As our 'Flood Map for Planning' only shows the flood risk from watercourses with a catchment area greater than 3km2, mapping of the risk from the watercourse has not been undertaken and as such this is the only reason the site is shown to lie in low risk Flood Zone 1. The assessment of flood risk and easement from the ordinary watercourse should be agreed with the LLFA, however we strongly recommend that hydraulic modelling of the watercourse is undertaken as part of a Level 2 SFRA to inform of the developable area and capacity of this potential allocation. In addition, this area has known flooding issues and Solihull MBC as the LLFA are investigating potential options to reduce flood risk within Dickens Heath. As a result the LLFA should be allowed to comment further regarding this as any development in this location could provide flood storage and should help reduce flood risk downstream. We recommend that a Level 2 SFRA is undertaken to consider how development in this area could alleviate existing flood risk issues. Regardless of flood risk, we recommend an unobstructed green corridor is maintained along the banks of the watercourse for the purposes of protecting and maintaining green and blue infrastructure.
Thank you for referring the above consultation which we received on 30 January 2019. We apologise we have been unable to respond prior to now, and hope that you are still able to take our comments into account as the plan develops.
We have reviewed the above consultation document which is dated January 2019 and note the inclusion of additional sites for consideration for allocation.
We welcome the inclusion of Flood Risk as a potential 'Hard' issue in the site selection criteria as identified on page 18 and 19. We further recommend that Water Quality is added to the footnote in this section, with particular referenced to River Blythe's SSSI status. Further to this page 29 looks at what is required for the Blythe in the future and protection and enhancement of water quality should be included. Please see attached letter for our advice with regards to your site allocations, which incorporates comments previously provided, and adds additional comments in relation to your new sites. These comments should be used in preference to those previously provided as they have been updated
Comment
Draft Local Plan - Supplementary Consultation
Question 13 - Site 11 -The Green
Representation ID: 10322
Received: 02/05/2019
Respondent: Environment Agency
This area has known flooding issues and Solihull MBC as the LLFA are investigating potential options to reduce flood risk within Dickens Heath. As a result the LLFA should be allowed to comment further regarding this as any development in this location could provide flood storage and should help reduce flood risk downstream. We recommend that a Level 2 SFRA is undertaken to consider how development in this area could alleviate existing flood risk issues.
Thank you for referring the above consultation which we received on 30 January 2019. We apologise we have been unable to respond prior to now, and hope that you are still able to take our comments into account as the plan develops.
We have reviewed the above consultation document which is dated January 2019 and note the inclusion of additional sites for consideration for allocation.
We welcome the inclusion of Flood Risk as a potential 'Hard' issue in the site selection criteria as identified on page 18 and 19. We further recommend that Water Quality is added to the footnote in this section, with particular referenced to River Blythe's SSSI status. Further to this page 29 looks at what is required for the Blythe in the future and protection and enhancement of water quality should be included. Please see attached letter for our advice with regards to your site allocations, which incorporates comments previously provided, and adds additional comments in relation to your new sites. These comments should be used in preference to those previously provided as they have been updated
Comment
Draft Local Plan - Supplementary Consultation
Question 14 - Site 12 - Land South of Dog Kennel Lane
Representation ID: 10323
Received: 02/05/2019
Respondent: Environment Agency
This site lies partially within Flood Zones 2 and 3. In light of this the Sequential Test should be undertaken to demonstrate there are no alternative sites available at a lower risk of flooding. A level 2 SFRA should be undertaken to support this allocation. The Mount Brook (Main River) is a tributary of the River Blythe which flows through Cheswick Green. There are known flooding problems through the village. The recent residential development at Mount Dairy Farm provided some flood storage, however further upstream storage is required to reduce the risk in Cheswick Green. We therefore recommend that an additional requirement 'to provide flood attenuation to reduce the risk of flooding in Cheswick Green' is added to the Plan. This area has known flooding issues and Solihull MBC as the LLFA are investigating potential options to reduce flood risk within Cheswick Green, as a result the LLFA should be allowed to comment further regarding this as any development in this location could provide flood storage and should help reduce flood risk downstream. We recommend that a Level 2 SFRA is undertaken to consider how development in this area could alleviate existing flood risk issues.
Thank you for referring the above consultation which we received on 30 January 2019. We apologise we have been unable to respond prior to now, and hope that you are still able to take our comments into account as the plan develops.
We have reviewed the above consultation document which is dated January 2019 and note the inclusion of additional sites for consideration for allocation.
We welcome the inclusion of Flood Risk as a potential 'Hard' issue in the site selection criteria as identified on page 18 and 19. We further recommend that Water Quality is added to the footnote in this section, with particular referenced to River Blythe's SSSI status. Further to this page 29 looks at what is required for the Blythe in the future and protection and enhancement of water quality should be included. Please see attached letter for our advice with regards to your site allocations, which incorporates comments previously provided, and adds additional comments in relation to your new sites. These comments should be used in preference to those previously provided as they have been updated
Comment
Draft Local Plan - Supplementary Consultation
Question 15 - Site 26 - Whitlocks End Farm
Representation ID: 10324
Received: 02/05/2019
Respondent: Environment Agency
An ordinary watercourse is within the South Eastern corner of the site however our 'Flood Map for Planning' only shows the flood risk from watercourses with a catchment area greater than 3km2, mapping of the risk from the watercourse has not been undertaken and as such this is the only reason the site is shown to lie in low risk Flood Zone 1. The assessment of flood risk and easement from the ordinary watercourse should be agreed with the LLFA, however we strongly recommend that hydraulic modelling of the watercourse is undertaken as part of a Level 2 SFRA to inform of the developable area and capacity of this potential allocation. Regardless of flood risk, we recommend an unobstructed green corridor is maintained along the banks of the watercourse for the purposes of protecting and maintaining green and blue infrastructure. This area is being investigated by Solihull MBC to assess potential options to reduce flood risk within Dickens Heath and Cheswick Green, as a result the LLFA should be allowed to comment further regarding this as any development in this location could provide flood storage and should help reduce flood risk downstream. We recommend that a Level 2 SFRA is undertaken to consider how development in this area could alleviate existing flood risk issues.
Thank you for referring the above consultation which we received on 30 January 2019. We apologise we have been unable to respond prior to now, and hope that you are still able to take our comments into account as the plan develops.
We have reviewed the above consultation document which is dated January 2019 and note the inclusion of additional sites for consideration for allocation.
We welcome the inclusion of Flood Risk as a potential 'Hard' issue in the site selection criteria as identified on page 18 and 19. We further recommend that Water Quality is added to the footnote in this section, with particular referenced to River Blythe's SSSI status. Further to this page 29 looks at what is required for the Blythe in the future and protection and enhancement of water quality should be included. Please see attached letter for our advice with regards to your site allocations, which incorporates comments previously provided, and adds additional comments in relation to your new sites. These comments should be used in preference to those previously provided as they have been updated
Comment
Draft Local Plan - Supplementary Consultation
Question 17 - Site 6 - Meriden Road
Representation ID: 10325
Received: 02/05/2019
Respondent: Environment Agency
There is a culverted ordinary watercourse on the northern boundary of the site which is a tributary of the River Blythe, however our 'Flood Map for Planning' only shows the flood risk from watercourses with a catchment area greater than 3km2, mapping of the risk from the watercourse has not been undertaken and as such this is the only reason the site is shown to lie in low risk Flood Zone 1. The assessment of flood risk and easement from the ordinary watercourse should be agreed with the LLFA, however we strongly recommend that hydraulic modelling of the watercourse is undertaken as part of a Level 2 SFRA to inform of the developable area and capacity of this potential allocation. Regardless of flood risk, we recommend an unobstructed green corridor is maintained along the banks of the watercourse for the purposes of protecting and maintaining green and blue infrastructure.
Thank you for referring the above consultation which we received on 30 January 2019. We apologise we have been unable to respond prior to now, and hope that you are still able to take our comments into account as the plan develops.
We have reviewed the above consultation document which is dated January 2019 and note the inclusion of additional sites for consideration for allocation.
We welcome the inclusion of Flood Risk as a potential 'Hard' issue in the site selection criteria as identified on page 18 and 19. We further recommend that Water Quality is added to the footnote in this section, with particular referenced to River Blythe's SSSI status. Further to this page 29 looks at what is required for the Blythe in the future and protection and enhancement of water quality should be included. Please see attached letter for our advice with regards to your site allocations, which incorporates comments previously provided, and adds additional comments in relation to your new sites. These comments should be used in preference to those previously provided as they have been updated
Comment
Draft Local Plan - Supplementary Consultation
Question 23 - Site 8 - Hampton Road
Representation ID: 10326
Received: 02/05/2019
Respondent: Environment Agency
A Main River (Purnells Brook, tributary of the River Blythe) bisects the site, however our 'Flood Map for Planning' only shows the flood risk from watercourses with a catchment area greater than 3km2, mapping of the risk from the watercourse has not been undertaken and as such this is the only reason the site is shown to lie in low risk Flood Zone 1. We strongly recommend that hydraulic modelling of the watercourse is undertaken as part of a Level 2 SFRA to inform of the developable area and capacity of this potential allocation. As a Main River, a minimum 8m easement should be provided from each bank in order to allow for essential channel maintenance. This will serve the dual purpose of protecting and maintaining green and blue infrastructure. Should you chose not to undertake modelling as part of a Level 2 SFRA, we will require modelling to be undertaken as part of a site-specific Flood Risk Assessment in support of a planning application, and development will need to be located outside Flood Zone 2 and 3, and the 100 year plus climate change flood extent. Any numbers allocated for this site will need to have sufficient flexibility to ensure they can respond to unassessed flood risk issues so that the allocation is not compromised by inability to deliver the required scale of development whilst also meeting flood risk requirements.
Thank you for referring the above consultation which we received on 30 January 2019. We apologise we have been unable to respond prior to now, and hope that you are still able to take our comments into account as the plan develops.
We have reviewed the above consultation document which is dated January 2019 and note the inclusion of additional sites for consideration for allocation.
We welcome the inclusion of Flood Risk as a potential 'Hard' issue in the site selection criteria as identified on page 18 and 19. We further recommend that Water Quality is added to the footnote in this section, with particular referenced to River Blythe's SSSI status. Further to this page 29 looks at what is required for the Blythe in the future and protection and enhancement of water quality should be included. Please see attached letter for our advice with regards to your site allocations, which incorporates comments previously provided, and adds additional comments in relation to your new sites. These comments should be used in preference to those previously provided as they have been updated
Comment
Draft Local Plan - Supplementary Consultation
Question 24 - Site 9 - Land South of Knowle
Representation ID: 10327
Received: 02/05/2019
Respondent: Environment Agency
There are a number of ordinary watercourses (Cuttle Brook and unnamed) across the site, however our 'Flood Map for Planning' only shows the flood risk from watercourses with a catchment area greater than 3km2, mapping of the risk from the watercourse has not been undertaken and as such this is the only reason the site is shown to lie in low risk Flood Zone 1. The assessment of flood risk and easement from the ordinary watercourse should be agreed with the LLFA, however we strongly recommend that hydraulic modelling of the watercourse is undertaken as part of a Level 2 SFRA to inform of the developable area and capacity of this potential allocation. Regardless of flood risk, we recommend an unobstructed green corridor is maintained along the banks of the watercourse for the purposes of protecting and maintaining green and blue infrastructure.
Thank you for referring the above consultation which we received on 30 January 2019. We apologise we have been unable to respond prior to now, and hope that you are still able to take our comments into account as the plan develops.
We have reviewed the above consultation document which is dated January 2019 and note the inclusion of additional sites for consideration for allocation.
We welcome the inclusion of Flood Risk as a potential 'Hard' issue in the site selection criteria as identified on page 18 and 19. We further recommend that Water Quality is added to the footnote in this section, with particular referenced to River Blythe's SSSI status. Further to this page 29 looks at what is required for the Blythe in the future and protection and enhancement of water quality should be included. Please see attached letter for our advice with regards to your site allocations, which incorporates comments previously provided, and adds additional comments in relation to your new sites. These comments should be used in preference to those previously provided as they have been updated
Comment
Draft Local Plan - Supplementary Consultation
Question 30 - Site 10 - West of Meriden
Representation ID: 10328
Received: 02/05/2019
Respondent: Environment Agency
An ordinary watercourse forms the northern boundary of the site, however our 'Flood Map for Planning' only shows the flood risk from watercourses with a catchment area greater than 3km2, mapping of the risk from the watercourse has not been undertaken and as such this is the only reason the site is shown to lie in low risk Flood Zone 1. The assessment of flood risk and easement from the ordinary watercourse should be agreed with the LLFA, however we strongly recommend that hydraulic modelling of the watercourse is undertaken as part of a Level 2 SFRA to inform of the developable area and capacity of this potential allocation. Regardless of flood risk, we recommend an unobstructed green corridor is maintained along the banks of the watercourse for the purposes of protecting and maintaining green and blue infrastructure.
Thank you for referring the above consultation which we received on 30 January 2019. We apologise we have been unable to respond prior to now, and hope that you are still able to take our comments into account as the plan develops.
We have reviewed the above consultation document which is dated January 2019 and note the inclusion of additional sites for consideration for allocation.
We welcome the inclusion of Flood Risk as a potential 'Hard' issue in the site selection criteria as identified on page 18 and 19. We further recommend that Water Quality is added to the footnote in this section, with particular referenced to River Blythe's SSSI status. Further to this page 29 looks at what is required for the Blythe in the future and protection and enhancement of water quality should be included. Please see attached letter for our advice with regards to your site allocations, which incorporates comments previously provided, and adds additional comments in relation to your new sites. These comments should be used in preference to those previously provided as they have been updated
Comment
Draft Local Plan - Supplementary Consultation
Question 28 - Site 18 - Sharmans Cross Road
Representation ID: 10329
Received: 02/05/2019
Respondent: Environment Agency
An ordinary watercourse forms the western boundary of the site, however our 'Flood Map for Planning' only shows the flood risk from watercourses with a catchment area greater than 3km2, mapping of the risk from the watercourse has not been undertaken and as such this is the only reason the site is shown to lie in low risk Flood Zone 1. The assessment of flood risk and easement from the ordinary watercourse should be agreed with the LLFA, however we strongly recommend that hydraulic modelling of the watercourse is undertaken as part of a Level 2 SFRA to inform of the developable area and capacity of this potential allocation. Regardless of flood risk, we recommend an unobstructed green corridor is maintained along the banks of the watercourse for the purposes of protecting and maintaining green and blue infrastructure.
Thank you for referring the above consultation which we received on 30 January 2019. We apologise we have been unable to respond prior to now, and hope that you are still able to take our comments into account as the plan develops.
We have reviewed the above consultation document which is dated January 2019 and note the inclusion of additional sites for consideration for allocation.
We welcome the inclusion of Flood Risk as a potential 'Hard' issue in the site selection criteria as identified on page 18 and 19. We further recommend that Water Quality is added to the footnote in this section, with particular referenced to River Blythe's SSSI status. Further to this page 29 looks at what is required for the Blythe in the future and protection and enhancement of water quality should be included. Please see attached letter for our advice with regards to your site allocations, which incorporates comments previously provided, and adds additional comments in relation to your new sites. These comments should be used in preference to those previously provided as they have been updated