Question 3 - Infrastructure Requirements at Balsall Common
Representation ID: 6677
Received: 12/02/2019
Respondent: BPA
Please note there is a buried high pressure fuel pipeline running through this area, and thus the easement (3m each side) needs to be kept protected.
Please note there is a buried high pressure fuel pipeline running through this area, and thus the easement (3m each side) needs to be kept protected.
Comment
Draft Local Plan - Supplementary Consultation
Question 4 - Site 1 - Barratts Farm
Representation ID: 6678
Received: 12/02/2019
Respondent: BPA
This land interacts with the buried high pressure pipeline in this location, and the easement (3m each side) needs to be protected.
This land interacts with the buried high pressure pipeline in this location, and the easement (3m each side) needs to be protected.