No

Draft Local Plan Review

Representation ID: 4945

Received: 17/02/2017

Respondent: UK Land Development (UKLD)

Agent: Savills

Representation Summary:

Delivery of 1000 dwellings is optimistic in plan period up to 2031 (sic).
Residential development could only commence once HS2 opened in 2026.
143 dpa over 7 years would require 3 outlets per annum.
May be pushed back further if delivery of HS2 is delayed.
Delivery of housing before HS2 would mean construction issues, undesirable location and lack of facilities in close proximity.
If site not come forward, will require other sites. SHELAA Site 207 is suitabile alternative.

Full text:

Draft Local Plan Representations - UKLD Smiths Lane Bentley Heath Knowle