No

Draft Local Plan Review

Representation ID: 5275

Received: 15/02/2017

Respondent: Mr David Bell

Representation Summary:

Object to total of 1150 new houses in Balsall Common as unfair, an increase of 37.5% over the 2011 Census which would turn already overcrowded and under-resourced village into a town and cannot be absorbed as existing infrastructure is inadequate,

Full text:


I am writing to formally record my feedback on the Solihull Draft Local Plan Review, so you may include my views along with all other feedback you have received.

I wish to comment specifically on the draft plans that affect Balsall Common and Berkswell.

Proposed Housing - General objections.
I object to the total of 1,150 proposed new houses for a number of reasons:-

1. The total is way in excess of what can sensibly be assimilated into the village without dramatically and detrimentally changing the village into what is effectively a town. The 2011 census reported a population in Balsall Common of 7,039. The same census recorded an average of 2.3 people per household. It can therefore be expected that 1,150 new homes would add around 2,645 residents. An increase of 37.5% over the 2011 census population. Even accepting the population of Balsall Common has grown since the 2011 census, this increase cannot be absorbed into an already overcrowded and under-resourced village.
2. I believe there are other locations within the Borough more suited to build new homes. Examination of the Draft Local Plan Review Map shows that the proposed distribution of new homes in Solihull is not spread proportionally to the existing centres of population. There are some villages where little or no new homes are planned, whilst Balsall Common has been identified for far more than it can accommodate. A fairer and better spread would reduce the impact on existing communities.
3. The village does not have adequate resources to serve a substantial increase in population.
a. Medical/Welfare Facilities - The existing medical centre does not have the staff or buildings capacity to copy with the increase in residents that would arise from the new homes.
b. Schools - there are not enough places, buildings or facilities to accommodate the resultant demand for primary or secondary school places.
c. Shops - the existing retail shops in the centre of Balsall Common are inadequate. Berkswell has no real shopping facilities.
d. Parking - lack of public parking is already a major problem in areas such as the library, rear of Tesco's and along the shops in Balsall Common. Parking at the station is almost impossible much of the time due to lack of spaces and excess demand. As a result more and more cars park on the adjacent roads, such as Hallmeadow Road
e. Public Transport - As mentioned, Berkswell station lacks adequate parking and is crowded during the rush hour. It is clear to everyone using it, that is barely copes with demand from the current resident population. Buses are not regarded by most residents as a reliable or practical alternative, hence most people drive to their destinations.
f. Roads - most houses in Balsall and Berkswell possess at least one car. The existing roads are busy but cope with current demand. Even the main Kenilworth Road only experiences delays during rush hours. The remainder of the day and at weekends, traffic flows freely. However, the addition of hundreds more cars onto local roads as a result of over a thousand new houses will create a traffic problem.
4. It is vital that the Green Belt surrounding Balsall Common and Berkswell and in particular the Meriden Gap is retained and preserved. Not just in the short-term, but for future generations too. I believe the Council has strong responsibilities to not sacrifice the Meriden Gap to accommodate housing development. Releasing Green Belt piece by piece is an erosion of a valuable asset that we need. It delivers important environmental and social benefits. The National Planning Policy Framework clearly states that "Green Belt boundaries should only be changed in a Local Plan under "exceptional circumstances" and only permit most forms of development in "very special circumstances". I believe that the Council has the choice to locate the required number of new homes elsewhere within the Borough and to preserve the Green Belt and in particular Meriden Gap.
5. We, along with many residents, chose to pay a premium to live in this village, so we can enjoy all the benefits living in a rural community offers. The impact of 1,150 new homes will remove many of the reasons we made that choice. We understand we have to accept our fair share of new homes, but not the huge volume planned.
6. Bypass by default. Having lived with the blight of the prosed Balsall Common bypass for many years, we, like many, were relieved when common sense prevailed and it was removed from the local plan. The bypass is not required to cope with traffic demand. That is one of the reasons it was removed from the existing plan. However, the proposed housing developments will establish a new village boundary that will encourage re-instatement of the planned bypass line. Many more years of blight for residents.

Proposed Housing - Specific Site Objections

Barratt's Farm

I object to the proposed development of 800 new homes at Barratt's Farm for the following reasons:-

1. This would be a Green Belt development.
2. The quantity of houses is far more than Balsall Common & Berkswell can accommodate without detrimental impact
3. There is no infrastructure on that side of the village. Everything would have to be built, whereas there are alternative sites (e.g. Grange Farm) where major roads, etc. are already nearby.
4. Development at Barratt's Farm will move the village boundary and effectively create a new, much bigger village (town). Moving the boundary into Green Belt in this way will make it difficult or even impossible to successfully resist future applications to develop that side of the village.
5. This development will effectively establish a line that will tempt planners to re-introduce the bypass plans.
6. The development is scheduled to be spread over 15 years. We are already blighted by HS2 construction lasting around 10 years. This means for many residents 15 years of disruption from continual construction and development.

Windmill Lane

I object to the proposed development of 200 new homes at Barratt's Farm for the following reasons:-

1. A further 200 houses, in addition to those already being built on greenfield sites at Elysian Gardens will result in the complete sacrifice of the rural aspect at the Windmill Lane end of the village. Effectively the village will have crept south along the Kenilworth Road and expanded substantially.
2. The roads infrastructure is inadequate. Due to the hill on this part of the Kenilworth road, more cars turning into or out of new housing estates on the busy Kenilworth Road will be dangerous and likely cause delays. If the answer is to allow access to the new houses via Windmill Lane, then this quiet, unlit country lane will become even more of a dangerous "rat-run" for drivers and pedestrians than it already is.
3. The historic and culturally important Windmill will become virtually inaccessible to visit, as parking on Windmill Lane will be too dangerous if not impossible.

Summary

I accept that Balsall Common and Berkswell may have to have some new housing development for Solihull to meet its obligations. However I object to the current plans because:-

a) Sacrifice of Green Belt.
b) Too many houses for this area to accommodate.
c) Lack of infrastructure and resources.
d) Barratt's Farm and Windmill Lane are not the most suitable sites.
e) There are more suitable sites, e.g. Grange Farm is less impact and near current roads infrastructure plus there are brownfield sites in the borough that have not been chosen and will remain brownfield, even after all this proposed development.
f) We do not want an unnecessary bypass by "stealth".

Thank you for the opportunity to submit my views.