No

Draft Local Plan Review

Representation ID: 5577

Received: 17/02/2017

Respondent: Arden Cross Consortium

Agent: Turley

Representation Summary:

Policy P3 fails to identify the total employment land required across the Borough over the plan period.
There is a significant under estimation of the potential scale of employment land that will be needed within the Borough to meet the wider strategic economic objectives of the GBSLEP and the WMCA.
It does not appear that the Employment Land Review has considered the level of economic growth identified in the Strategic Economic Plan, and by implication its impact on employment needs, which represents a deficiency that could affect the soundness of the LPR.

Full text:

On behalf of our client, the Arden Cross Consortium, please find attached a copy of representations submitted to the public consultation on the Solihull Draft Local Plan Review (November 2016) and Interim Sustainability Appraisal Report (January 2017).