Object

Draft Local Plan - Supplementary Consultation

Representation ID: 6896

Received: 01/03/2019

Respondent: Mrs Joanne Jackson

Representation Summary:

Infrastructure will not cope with additional development. The existing highway infrastructure is unsuitable and speeding traffic is already an issue.
There is already 1000 houses being built in Blythe Valley, therefore more infrastructure in the local area is not required.

Full text:

An increased infrastructure will have catastrophic issues on the village. Doctors, dentists and schools will be increased and not able to cope with the extra personnel. The roads around Hockley Heath are not suitable for even more heavy traffic, speeding is already an issue. The village has already increased in size significantly, therefore more infrastructure is not required. Speeding is a major issue - our house actually sits on the roadside and the impact of such of infrastructure will have a significant impact on our house. There is already 1000 houses being built in Blythe Valley, therefore more infrastructure in the local area is not required.