Given HS2 construction up to 2025 (and beyond?) before the construction on Barratts Farm can start (and the School and Parking spaces) will anything be built before the end of this plan period in 2028?

Any By-pass proposals or links between the A45/A46 will suffer the same delays.

Do you need alternative plans?

Full text:

Given HS2 construction up to 2025 (and beyond?) before the construction on Barratts Farm can start (and the School and Parking spaces) will anything be built before the end of this plan period in 2028?

Any By-pass proposals or links between the A45/A46 will suffer the same delays.

Do you need alternative plans?