Support

Draft Local Plan - Supplementary Consultation

Representation ID: 7264

Received: 10/03/2019

Respondent: Mrs Jovana Chaplin

Representation Summary:

Option 2, the rebuilding of Arden away from it's current site, would be by far the better choice. 3 of my children have attended the school in recent times and we can affirm from experience that the school is bursting at the seams, the buildings grimy and demoralising and even the pavements on the way to school packed to overflowing. A radical rebuild is surely necessary. The present site is just far too small for the current school population, let alone the significantly larger one you envisage for the future.

Full text:

Option 2, the rebuilding of Arden away from it's current site, would be by far the better choice. 3 of my children have attended the school in recent times and we can affirm from experience that the school is bursting at the seams, the buildings grimy and demoralising and even the pavements on the way to school packed to overflowing. A radical rebuild is surely necessary. The present site is just far too small for the current school population, let alone the significantly larger one you envisage for the future.