Object

Draft Local Plan - Supplementary Consultation

Representation ID: 7956

Received: 13/03/2019

Respondent: Mr Graham Bowskill

Representation Summary:

The local road network south of Knowle is totally inadequate to handle the preposed number of houses
This coupled with a proposed additional developement in Blue Lake Road of 340 housed would further exasperate the problem.
Infrastructure should be assessed (capacity) before allocating the site
I also fail to notice any adequate provision for Doctors/dentists or extra secondary school places

Full text:

The local road network south of Knowle is totally inadequate to handle the preposed number of houses,the traffic which in the main would attempt to go down Knowle High Street at peak times.This coupled with a proposed additional developement in Blue Lake Road of 340 housed would further exasperate the problem.It is imperative in any planning, that interstructure is assessed as to what its capacity to cope with the traffic BEFORE asigning any house numbers for a particular site.
I also fail to notice any adequate provision for Doctors/dentists or extra secondary school places