Object

Draft Local Plan - Supplementary Consultation

Representation ID: 8150

Received: 14/03/2019

Respondent: Mr Ken Bridgwater

Representation Summary:

Site 25 should not be included. this would lead to higher volumes of traffic. School road is in urgent need of repair due to construction traffic using it as a shortcut. Congestion around the school is a hazard. no footpath around the proposed site would put children safety at risk. We do not support changes to Green Belt as this land is highly important for ecological reasons and human wellbeing. If Green Belt was released then the proposed 50 dwellings under 49 & 328 would be catastrophic for oak trees which provide essential oxygen & a haven for the wildlife.

Full text:

Site 25 should not be included. this would lead to higher volumes of traffic. School road is in urgent need of repair due to construction traffic using it as a shortcut. Congestion around the school is a hazard. no footpath around the proposed site would put children safety at risk. We do not support changes to Green Belt as this land is highly important for ecological reasons and human wellbeing. If Green Belt was released then the proposed 50 dwellings under 49 & 328 would be catastrophic for oak trees which provide essential oxygen & a haven for the wildlife.