Object

Draft Local Plan - Supplementary Consultation

Representation ID: 8616

Received: 15/03/2019

Respondent: Sarah Wood

Representation Summary:

The current infrastructure in the village is lacking already and cannot sustain an increased population of 12%.Flooding is an issue on the A3400, traffic from the motorway network and cut throughs via School Road has turned these roads into mini by passes; water pressure is an issue for houses on Blackberry Avenue as well as major flooding in the fields; inadequate shops for anything but a small village; the school is over subscribed, the site lacks the room to support an additional intake. Bus services are poor and irregular and no specific medical surgeries support the village.

Full text:

The current infrastructure in the village is lacking already and cannot sustain an increased population of 12%.Flooding is an issue on the A3400, traffic from the motorway network and cut throughs via School Road has turned these roads into mini by passes; water pressure is an issue for houses on Blackberry Avenue as well as major flooding in the fields; inadequate shops for anything but a small village; the school is over subscribed, the site lacks the room to support an additional intake. Bus services are poor and irregular and no specific medical surgeries support the village.