Object

Draft Local Plan - Supplementary Consultation

Representation ID: 8731

Received: 15/03/2019

Respondent: Mrs Collette Higgins

Representation Summary:

The infrastructure within Hockley Heath is not sufficiently capable of supporting a development of this size; 100 homes is a 12% increase (approximately)

Full text:

The infrastructure within Hockley Heath is not sufficiently capable of supporting a development of this size; 100 homes is a 12% increase (approximately).
Hockley Heath does not have a large range of shops and there are no medical facilities (Doctors or Pharmacy) within the Village.
The local primary school does not have the capacity to accommodate the potential numbers of children from 100-150 properties (should sites 49 and 328 also be released from the green belt).


The NP survey, published in June 2018, had 87% of respondents indicating it was very important for highway changes to School Road to prevent excessive vehicle use arising from additional Blythe Valley Park development (it was accepted that this will be used as a short-cut). This finding was in advance of any consultation associated with the release of green belt land on School Road. The A3400 is used as a diversion for both the M40 and M42 and as such Hockley Heath experiences frequent congestion along the A3400 and connecting routes, with School Road being used to bypass congestion on the A3400.


Hockley Heath, and specifically the A3400, suffers from regular ponding following even moderate sustained rainfall. HHPC is engaging with Severn Trent Water and SMBC Highways to identify improvement works across the entire system (from storm drains to river outlet) but there is clear evidence that the drainage infrastructure in the Village is struggling.