Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 9541
Received: 15/03/2019
Respondent: Richard Lloyd
Representation Summary:
Only if HS2 is constructed. Cancellation of HS2 would remove the defensible Green Belt boundary that is required.
The opportunity should be taken to build at a higher density than shown on the masterplan.
A key infrastructure requirement is the provision of a segregated route for walkers, cyclists and horse-riders This could connect with a SW-NE route parallel to Hall Meadow Road, linking with the existing Kenilworth Greenway.
A new bridge for non-motorised users would be required across the Rugby and
Birmingham Railway, possibly adjacent to the aqueduct over the railway, which only
has pedestrian access for maintenance purposes.
Full text:
see letter