Alternative Site Suggested (Call for Sites)

Showing comments and forms 61 to 90 of 252

No

Draft Local Plan Review

Representation ID: 2757

Received: 15/02/2017

Respondent: M Dunn

Agent: Sworders

Representation Summary:

proposed land rear 114 Kenilworth Road Knowle SHELAA ref 110

Full text:

see letter and supporting documents
Land rear of 114 Kenilworth Road Knowle

No

Draft Local Plan Review

Representation ID: 2785

Received: 17/02/2017

Respondent: Shirley Golf Club Ltd and IM Properties Ltd

Agent: Marrons Planning

Representation Summary:

- propose land adjacent to Stratford Road - SHELAA site 62 - is partially released for housing development
- Councils accessibility assessment reaches an incorrect conclusion.
- not clear how the results of the Strategic Green Belt Assessment have informed the selection of allocations.
- requested the Council attach significant weight to those opportunities that fall within Growth Option D and Area E, and allocate land adjacent to Stratford Road (SHLAA reference 62) in accordance with the Spatial Strategy and the Plan's evidence base

Full text:

see attached response on behalf of Shirley Golf Club Limited and IM Properties Limited in respect of land adjacent to Stratford Road.

No

Draft Local Plan Review

Representation ID: 2806

Received: 17/02/2017

Respondent: Copt Heath Golf Club

Agent: Richard Cobb Planning

Representation Summary:

requesting that council reconsider allocation of the site submitted (SHELAA site 244) as part of CfS exercise.

Full text:

see letter - land at Longden Road Tilehouse Green Knowle

No

Draft Local Plan Review

Representation ID: 2812

Received: 17/02/2017

Respondent: Catesby Estates Limited

Agent: WYG

Representation Summary:

putting forward land to the rear of Meriden C of E Primary School, Fillongley Road, Meriden (SHELAA 144) as a location that could appropriately accommodate sustainable residential development.

ability of part of the site identified in these representations to provide much needed additional education development through the provision of an extension to the existing primary school

proposed residential allocation will enable the school to expand and provide additional facilities including an all-weather pitch and a purpose built hall to ensure health and fitness requirements are met

Full text:

see 3 separate letters
1) Land to the rear of Meriden C of E Primary School, Fillongley Road, Meriden
2) Land Hampton Lane, Solihull
3) Land Windmill Lane / Kenilworth Rd, Balsall Common

No

Draft Local Plan Review

Representation ID: 2834

Received: 17/02/2017

Respondent: Catesby Estates Limited

Agent: WYG

Representation Summary:

Land to the south of Hampton Lane Solihull,(SHELAA site 20)

Full text:

see 3 separate letters
1) Land to the rear of Meriden C of E Primary School, Fillongley Road, Meriden
2) Land Hampton Lane, Solihull
3) Land Windmill Lane / Kenilworth Rd, Balsall Common

No

Draft Local Plan Review

Representation ID: 2885

Received: 16/02/2017

Respondent: IM Land

Agent: Stansgate Planning LLP

Representation Summary:

SHELAA Sites 187 & 211 (part)

Land should be allocated for 180 houses north of Main Road, Meriden.
Evidence base demonstrates this is a highly sustainable location. It is available now, offers a suitable location and is achievable without significant new infrastructure. There is a realistic prospect that housing can be
delivered in the short term.

Full text:

see attached documents
LPR Draft - Representations IM Land Meriden - this is the overarching document
LVA & Green Belt Review Feb 2017
Access and transport Appraisal 161208
Land North of Main Road, Meriden - The Vision

No

Draft Local Plan Review

Representation ID: 2886

Received: 16/02/2017

Respondent: IM Land

Agent: Stansgate Planning LLP

Representation Summary:

SHELAA Site 211 (part)
Seek removal of land north of the Site and south of Fillongley Road from Green Belt and its designation as 'safeguarded land' to meet longer-term development needs within and post the plan period.
Assessment of the Local Plan Review evidence base shows that the Site scores well and performs as well and better in many cases than the sites proposed to be allocated. It is highly accessible; has moderate impact on Green Belt; is not constrained by minerals safeguarding; is visually well contained; and has the maximum SHELAA score. There are no known technical constraints.

Full text:

see attached documents
LPR Draft - Representations IM Land Meriden - this is the overarching document
LVA & Green Belt Review Feb 2017
Access and transport Appraisal 161208
Land North of Main Road, Meriden - The Vision

Yes

Draft Local Plan Review

Representation ID: 2972

Received: 16/02/2017

Respondent: Councillor Max McLoughlin

Representation Summary:

viability of site immediately adjacent to site 16 should be assessed.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 3031

Received: 17/02/2017

Respondent: Stephen Joyce

Representation Summary:

Object to Site 3.
Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 3121

Received: 16/02/2017

Respondent: Balsall Parish Council

Representation Summary:

Alternative to Frog Lane that could be further investigated are SHELAA refs 135 and 104. These do not have significant negative SA impacts and the Green Belt performs poorly.

Full text:

see attached report
Balsall Parish Council resolved at the Council meeting on 15 February 2017 to submit this report in response to the Solihull Draft Local Plan Consultation ending 17 February 2017

No

Draft Local Plan Review

Representation ID: 3151

Received: 15/02/2017

Respondent: Michael & Lynda Beasley

Representation Summary:

As mentioned throughout this response, Solihull MBC have failed to follow their own Policies in establishing the appropriateness of the chosen sites and yet proposals for a new village on a brown field site development to the north of the region have been ignored. This is also true of potential sites to the South/East of Solihull toward Hampton in Arden and Catherin de Barnes, these being closer to the proposed new High Speed HS2 interchange.

Full text:

Response to Solihull MBC 23 question extended consultation on the draft local plan
Question 1 are the right borough challenges identified
Will the impact of Brexit have a material effect on the total number of homes needed in the Borough?
Question 2 agreement with the Borough Vision
Only In a very small part yes, but it is clearly written from an urban Solihull-centric perspective, once more bringing into disrepute the belief that Solihull successfully combines a well-balanced combined Urban and Rural vision. Looked at from a holistic position, Solihull MBC in this draft proposal will not be satisfied with following their own policies until an urban jungle is built through the most vulnerable and narrow portion of the Green Belt between Balsall Common and Coventry City.
SMBC fought a huge battle at enormous cost to preserve this piece of land from a coal mine development; why is it now prepared to sacrifice this precious 'lung' between two major city conurbations?
Balsall Common is already a congested community with poor infrastructure and very poor public sector connectivity with the local economic centres which are primarily to the East and South ie NOT Solihull and this is the way traffic flows at peak times.
Further, no consideration has been given to considering sites to the South and West of the settlement toward the considerable economic development driven by JLR at their Fen End site, where they plan to site 2,000+ engineers. Many of these people will seek homes in Balsall Common and, therefore, to reduce cross-village traffic any major development should be on the West side of the village. Similarly, if a village bypass should ever be needed then consideration should be given to siting this on the West side.
Adding the proposed disproportionate housing and its resulting population to Balsall Common in sensitive and fragile Green Belt areas will simply make the problems worse and continue the belief that SMBC will ignore its own Policies when they do not suit political goals.
Question 3 agreement with Spatial Strategy?
The approach defined for sites being appropriate for development as written looks good with the right priorities, but unfortunately they have not been adhered to in this draft plan.
Barratt's Farm land is Greenfield land not Brownfield land and has significant drain off issues. Additionally, as stressed above, the village is virtually bereft of effective public transport.
The demolition of the Meriden Gap Green Belt and its impact on the local ecology of the green fields, ancient hedge rows and trees will directly affect the existing local residents and families who extensively use the area and its many crisscrossing footpaths for open air exercise and leisure activities. The additional traffic emanating from such a large increase in housing will add to the air pollution caused by poor control of the take-off and landing heights from Birmingham Airport, especially the northern turn over the settlement.
If this land is built on, then the drain off problem identified above will represent a risk to local adjoining properties to the north and south.
This area is already under severe threat of noise and Greenbelt erosion from HS2.
Piling in some 800 homes with shops, a school and other amenities with poor access to existing roads is a planning nightmare.
The site between Windmill Lane and the A452 Kenilworth Road to the South of the settlement is broadly a Brownfield site, BUT it is also proposed for a density of housing which is too high. This will generate traffic onto the narrow Windmill Lane that has poor visibility junctions at each end, or onto the A452 Trunk road with difficult North and South junctions.
Question 7 regarding sustainable Economic Development?
Good principles, but again not seriously considered in the draft plan with no consideration of the disproportionate building of houses on an already congested and ill planned village centre.
Question11 policy P2 providing homes for all
The total proposed housing numbers are grossly disproportionate to the size of the existing community and will have a very significant detrimental impact on the size, shape, character and environment of Balsall Common as a Rural Village. It is also noticed that while mention is made of affordable homes, no mention is made of homes for older members of the community.
Question 15 appropriateness of draft proposed sites.
As mentioned throughout this response, Solihull MBC have failed to follow their own Policies in establishing the appropriateness of the chosen sites and yet proposals for a new village on a brown field site development to the north of the region have been ignored. This is also true of potential sites to the South/East of Solihull toward Hampton in Arden and Catherin de Barnes, these being closer to the proposed new High Speed HS2 interchange.
Question 16 completeness of required supporting infrastructure to complement the proposed draft development?
While Doctors and Schooling infrastructure is mentioned, no mention is made of shopping, banking etc and banks are currently withdrawing from Balsall Common. A lack of action on the site to the rear of the Co-op shop has caused it to be isolated from other retail outlets and has exacerbated the lack of any sense of a cohesive village centre. Car parking facilities in the Village are very limited and in some areas dangerous.
Question18 sustainable Travel
Good ideals but difficult to execute when public transport, apart from Birmingham focused rail, is very, very poor in the area.
Question 22 Delivery
CIL payments for local development should be focussed in the local area for locally requested and agreed infrastructure improvements.
Question 23 Any other comment
No explanation has been given to the fact that a grossly disproportionate number of houses are proposed to be built in Balsall Common in important and sensitive Green Belt land compared with elsewhere in Solihull Borough. Areas such as Dorridge, Knowle, Chadwick End and Fen End to the South are in less sensitive and less pressured areas of Green Belt land.
There is a very strong perception in the Balsall Common area that Solihull MBC have abandoned the Greenbelt and consciously discarded their own policies and values and have consequently lost what trust they had as a result.
It also appears from the draft local development plan consultation information booklet that land belonging to Lynda Beasley (Wyer) and Michael Cooper has been included in the proposed Barratt's Farm development. We assume this error will be rectified. In the event this development does proceed we would expect a barrier to be put in place to protect livestock on the above mentioned fields.

No

Draft Local Plan Review

Representation ID: 3162

Received: 15/02/2017

Respondent: Myran Larkin

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:
"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"
I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.
The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.
1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.
4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.
5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".
6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties
7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.
9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.
10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."
In light of the above, I would support the recommendations from BARRAGE that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport
2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots
3) The phasing of any development must recognise the impact and disruption of HS2
4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development
5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged
6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3258

Received: 16/02/2017

Respondent: Nigel & Robin Tarplin

Agent: Richard Cobb Planning

Representation Summary:

Support for SHELAA site 83.

PBA SHELAA indicates that site performs well in all 3 criteria.
AECOM50 Sustainability Appraisal indicates the site performs as well as others in that area.
Disagree with findings of Atkins Green Belt Assessment, i.e. the site only makes a limited contribution to restricting urban sprawl.
Site fits well with requirements of Housing White Paper.
Recommend Site is included in DLP.

Full text:

see letter re: land at Bickenhill Lane Catherine De Barnes

No

Draft Local Plan Review

Representation ID: 3272

Received: 17/02/2017

Respondent: Steve & Samantha Townsend & Cook

Representation Summary:

Support for settlement at Berkswell Quarry proposed by Berkswell Parish Council as an alternative to Sites 1 and 3.

Full text:

I'm writing regarding the proposed housing developments for Balsall Common and Berkswell.
We moved to Old Waste Lane just over a year ago (Nov 2015) in order to enjoy a village location. The proposed developments would completely change the look and feel of Balsall Common, and we feel are wholly inappropriate for a village.
Traffic is already a significant issue to the village, and adding 1350 more homes would be catastrophic in this respect. It's hard to imagine the increase from that being at all manageable in a small village. Parking in the village centre is scarce and difficult (someone reversed into me in October in the village centre). The village would be completely overrun.
Access to the Barrett's farm plot would be a complete disaster. Meeting house lane, one of the proposed access points is completely inappropriate for more traffic, being too narrow, and the junction of Windmill Lane/Kelsey Lane/Waste Lane is already dangerous which would be much multiplied with such an increase of traffic.
At our end of Old Waste Lane, which could be directly bordered by housing behind, even for a fit relatively young couple (we are early 40s) it's not really feasible to walk into the village centre to collect shopping etc. Any housing here, would be sufficiently far from the centre and public transport to preclude anything other than more traffic to an already overstretched area.
What would be the plan for the village centre? There doesn't seem to be one whatsoever.
We moved to this area because of its stunning natural beauty. The area of Barrett's Farm, and around the Windmill really are truly beautiful. These would be forever lost. Surely we could use all previously developed land before raping and pillaging our beautiful countryside and greenbelt?
When we visited The Church hall for a look at the proposals, the proposals all had more detail in them. Now, the boundaries of many of the sites have been changed and the details of what the developments would look like have completely vanished. It's impossible to have a fully informed view without significantly more knowledge of the proposals.
We already lack significant areas of park or green play areas. Taking away beautiful paths would further impacts on the quality of our family life.
We'd like to see the option to develop the formation of a new village, with new modern custom designed services, situated on previously developed land, rather than trying to bolt on and squeeze in massive developments on an already overstretched village. This was suggested in Berkswell Parish's response to the Solihull Housing Plan Review and a potential site suggested in reclaimed quarry land off Cornet's End Lane.
Or as a last resort, Oakes Farm or Pheasant Oaks farm would better balance the village, although many of the problems would still remain.
It is also our understanding that some of the landowners whose land would be needed for the extent of the developments have not even been contacted, and they've indicated that they would be unwilling to sell. Is this the best way to go about planning proposals? Proposing the use of land you don't know is available.
I would urge you to reconsider destroying this beautiful area (Barrett's Farm and Windmill Lane), which is enjoyed by all this side of the village and many outside and in Berkswell Parish. It is clearly not suitable for significant development due to the issues raised above.

No

Draft Local Plan Review

Representation ID: 3288

Received: 17/02/2017

Respondent: J Maddocks & family

Agent: Nigel Gough Associates

Representation Summary:

Should make further allocations and identify reserve sites, particularly in sustainable locations such as Dickens Heath/Tidbury Green.
Support the inclusion of SHELAA Site 192.
Land holding is available in early part of Plan period.
On opposite side of road to Bellway development, on the edge of the original Dickens Heath, with its existing services.

Full text:

see response by agent on behalf of J Maddock & family
Land fronting Dickens Heath Raod/Birchy Leasowes Lane & Tilehoue Lane

No

Draft Local Plan Review

Representation ID: 3310

Received: 12/02/2017

Respondent: Heidi Becker

Representation Summary:

Call for Sites reference 240 should be allocated as an alternative, as it outperforms Sites 2 and 3 in terms of SMBC criteria.

Full text:

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common)

My husband and I attended the consultation at Balsall Common library and were disappointed that despite a large number of valid objections and useful points being made, I didn't notice any members of the council actually making a note of anything the residents had said. I wonder what the point was of having such a consultation if it was not to gain information to be shared with other members of the planning committee? The man from the council that we spoke to said that he didn't even live locally and was only ever in Balsall Common about once a month, so how could he possibly know what it is like to live here when he doesn't know the areas as well as the residents do and clearly has no idea how bad the traffic and congestion already is and how stretched to the limit all of the current local services are.

It also concerns us that the potential site options may not have been researched thoroughly - an example of this is the fact that our garden, along with 2 of our neighbours gardens, were included in the proposed plan, along with a shared paddock too. We can only hope that this has been done in error, but of course you can understand our worry that someone has just looked at a map and highlighted anything that looks like a field.

I hope that before any more development occurs in Balsall Common, members of the council will drive through the village either at the end of a school day or during rush hour and see how congested this stretch of road already is (and will be further increased once the new homes on the Kenilworth Road have reached completion) and how an increase in the number of vehicles and cars racing down side roads to find alternative routes, will pose a greater risk of an accident, particularly to the children from the primary and secondary schools, not to mention the nursery, that is also along the same road.

As a Mum and a teacher, I have huge concerns about the pressure on the local primary school, which is already over-subscribed (as are all of our other potential school options). I was told by a member of the council that new schools will be built but I wonder which action will come first - surely the infrastructure must be developed first in order to accommodate the many children that would move into any new homes?

I would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".


2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.


4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.


10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time asHS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3315

Received: 12/02/2017

Respondent: Nikki Burns

Representation Summary:

Call for Sites reference 240 should be allocated as an alternative, as it outperforms Sites 2 and 3 in terms of SMBC criteria.

Full text:

Kenilworth Road/Windmill Lane development

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.


The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.


1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to thecongestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.


5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to driverstrying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".


6) Site 3 scores poorly in relation to allaccessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.



10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport


2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2


4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3320

Received: 12/02/2017

Respondent: Louis Burns

Representation Summary:

Call for Sites reference 240 should be allocated as an alternative, as it outperforms Sites 2 and 3 in terms of SMBC criteria.

Full text:

I wish to object to the development of site 3

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"


I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.


The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.


1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to thecongestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.


5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to driverstrying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".


6) Site 3 scores poorly in relation to allaccessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.



10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport


2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2


4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3374

Received: 17/02/2017

Respondent: Nadia McGarry

Representation Summary:

Object to Site 3.
Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

see attached letter and site report

No

Draft Local Plan Review

Representation ID: 3382

Received: 17/02/2017

Respondent: Ella McGarry

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

see letter and report

No

Draft Local Plan Review

Representation ID: 3385

Received: 17/02/2017

Respondent: Jeanette McGarry

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

see letter & Report
Please find attached electronic copy of my letter of objection to the Draft Local Plan.
I should like to protect the Berkswell Windmill a Grade Two Star Listed Building, for generations to come. There are 14 PDL - brownfield sites within the village of Balsall Common that should be considered . The Greenbelt countryside needs to be protected for residents and visitors. It provides important habitat for rare wildlife. Eg Site 3 is home to protected Great Credted Newts, Red Kites, Barn Owls, bats and also Tawny Owls, Little Owls, frogs, toads, hedgehogs, badgers and Swallows.

Please note that Site 3 regularly floods on an annual basis, frequently more than twice a year ;So is unsuitable for housing.
Please see attached photograph and attached letter of objection.

No

Draft Local Plan Review

Representation ID: 3410

Received: 14/02/2017

Respondent: Dr Carrie-Anne Johnson

Representation Summary:

Object to Site 3.
Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan (DLP).

In response to Q1:

"Do you agree that we've identified the right challenges facing the Borough? If not why not? Are there any additional challenges that should be addressed?"

I believe that improving the centre of Balsall Common has failed to be recognised as an additional key challenge that Solihull Council needs to address. The current facilities within Balsall Common centre struggle to support the existing populace so could not support up to an additional 1350 houses.

In response to Q2:

"Do you agree with the Borough Vision we have set out? If not why not, and what alternative would you suggest?"

I do not agree with the vision set out. It neither provides for improving the centre of Balsall Common nor outlines how it will need to change in order to cater for the needs of a growing local community. There is already insufficient parking for the current populace. The vision for Balsall Common fails to note the need for improvements to local facilities, services and public transport which would encourage more sustainable travel patterns and improved connectivity to surrounding communities.

The inclusion of a generic statement that 'Schools will have continued to thrive and grow' appears naive. The primary school is already at capacity and the required growth will not be possible at its current location. Relocation of this facility should be considered alongside the other significant developments which have been proposed.

I also do not agree with part of the vision which describes that 'an alternative route will have been provided to relieve traffic from the Kenilworth Road'. Any such alternative route will result in a further loss of greenbelt, an increase in traffic and act as a catalyst for additional development.

In response to Q3:

"Do you agree with the spatial strategy we have set out? If not why not, and what alternative would you suggest?"

I agree with a strategy and approach where areas of previously developed land (Brownfield) are selected ahead of non-developed land (Greenfield) and areas with good public transport links are considered ahead of those with poorer public transport links.

However, I do not agree that the appropriate growth opportunities have been correctly identified within DLP paragraph 108. I do not understand why Green Belt and Greenfield sites are identified as locations where growth should be focused when there are a number of Brownfield sites (e.g.part- PDL site 240 - Land north of Balsall Common) which do not feature within LPR proposed sites. This is contrary to the guidance as set out within:

a. The strategic objectives of this document (DLP paragraph 96), and
b. "Step 1: Planning for the right homes in the right places" of the Government's "Fixing our broken housing market" white paper by "maximising the contribution from brownfield and surplus public land" (https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/590043/Fixing_our_broken_housing_market_-_housing_white_paper.pdf)

In response to Q7:

"Do you agree with Policy P2? If not why not, and what alternative would you suggest?"

I do not agree with Policy P2 as I believe the challenges facing the centre of Balsall Common in light of the proposed housing growth have failed to be recognised and its own master plan is needed. Specifically there is a need to ensure that the provision of parking in the village centre meets the needs of retailers and residents, whilst not acting as a constraint to development.

In response to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In response to Q16

"Do you believe we have identified the infrastructure required to support these developments? If not why not? Are there any additional facilities you believe are required, if so what are they?"

No - parking facilities at Berkswell Station are already insufficient to support the current need. This results in vehicles needing to park elsewhere e.g. along Hallmeadow Road. An increase in the population would put further strain on this facility and as such I believe additional parking facilities are required.

In response to Q18

"Do you agree with the policies for improving accessibility and encouraging sustainable travel? If not why not, and what alternatives would you suggest?"

Policy 7 is only concerned with the proximity to and the frequency of bus services. A defining factor for commuters' transport mode choice is the destination or the appropriateness of the service. e.g. Whether a dwelling is within 400m of a bus stop is irrelevant if the service cannot deliver you to your destination in a timely manner.

In response to Q22

"Do you agree with the Policy P21? If not why not, and what alternatives would you suggest?"

Policy 21 does not specifically state that all CIL payments, new homes bonus or the profit on the sale of Council land for housing should be spent in the areas where the housing is built. I strongly believe that such payments received for a development should be allocated to the directly affected community.

In response to Q23

"Are there any other comments you wish to make on the Draft Local Plan?"

The proposed addition of up to 1350 houses to Balsall Common, representing a sizeable increase in population (>25%), will have a significant impact on the character of the village. It will remove the local distinctiveness of the area, characterised by its open countryside setting, sense of remoteness, distinctive fieldscapes and woodland assets. All of this is in direct conflict with the statement (DLP paragraph 86) that "the local distinctiveness of the area... ...will have been protected".

Furthermore, I support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable

No

Draft Local Plan Review

Representation ID: 3473

Received: 17/02/2017

Respondent: Steve & Samantha Townsend & Cook

Representation Summary:

SHELAA Sites Oakes Farm (sic)or Pheasant Oaks Farm (#170) would better balance the village than Sites 1 and 3.

Full text:

I'm writing regarding the proposed housing developments for Balsall Common and Berkswell.
We moved to Old Waste Lane just over a year ago (Nov 2015) in order to enjoy a village location. The proposed developments would completely change the look and feel of Balsall Common, and we feel are wholly inappropriate for a village.
Traffic is already a significant issue to the village, and adding 1350 more homes would be catastrophic in this respect. It's hard to imagine the increase from that being at all manageable in a small village. Parking in the village centre is scarce and difficult (someone reversed into me in October in the village centre). The village would be completely overrun.
Access to the Barrett's farm plot would be a complete disaster. Meeting house lane, one of the proposed access points is completely inappropriate for more traffic, being too narrow, and the junction of Windmill Lane/Kelsey Lane/Waste Lane is already dangerous which would be much multiplied with such an increase of traffic.
At our end of Old Waste Lane, which could be directly bordered by housing behind, even for a fit relatively young couple (we are early 40s) it's not really feasible to walk into the village centre to collect shopping etc. Any housing here, would be sufficiently far from the centre and public transport to preclude anything other than more traffic to an already overstretched area.
What would be the plan for the village centre? There doesn't seem to be one whatsoever.
We moved to this area because of its stunning natural beauty. The area of Barrett's Farm, and around the Windmill really are truly beautiful. These would be forever lost. Surely we could use all previously developed land before raping and pillaging our beautiful countryside and greenbelt?
When we visited The Church hall for a look at the proposals, the proposals all had more detail in them. Now, the boundaries of many of the sites have been changed and the details of what the developments would look like have completely vanished. It's impossible to have a fully informed view without significantly more knowledge of the proposals.
We already lack significant areas of park or green play areas. Taking away beautiful paths would further impacts on the quality of our family life.
We'd like to see the option to develop the formation of a new village, with new modern custom designed services, situated on previously developed land, rather than trying to bolt on and squeeze in massive developments on an already overstretched village. This was suggested in Berkswell Parish's response to the Solihull Housing Plan Review and a potential site suggested in reclaimed quarry land off Cornet's End Lane.
Or as a last resort, Oakes Farm or Pheasant Oaks farm would better balance the village, although many of the problems would still remain.
It is also our understanding that some of the landowners whose land would be needed for the extent of the developments have not even been contacted, and they've indicated that they would be unwilling to sell. Is this the best way to go about planning proposals? Proposing the use of land you don't know is available.
I would urge you to reconsider destroying this beautiful area (Barrett's Farm and Windmill Lane), which is enjoyed by all this side of the village and many outside and in Berkswell Parish. It is clearly not suitable for significant development due to the issues raised above.

No

Draft Local Plan Review

Representation ID: 3479

Received: 17/02/2017

Respondent: John Parker

Agent: DS Planning

Representation Summary:

Support for SHELAA Site 143, Land adj. to 161 Lugtrout Lane.
Lies immediately north to proposed Site 16.
Is brownfield land within the Green Belt.
Has firm defensible boundaries.
Could make substantial contribution to housing requirement, particularly in combination with SHELAA Sites 2 and 12.
Low landscape value.
SHELAA states site is suitable, achievable and available.
Performs lower in GB terms than proposed sites south of Shirley, and better in accessibility terms than proposed Site 16.

Full text:

see attached

No

Draft Local Plan Review

Representation ID: 3483

Received: 17/02/2017

Respondent: Ron Shiels

Agent: DS Planning

Representation Summary:

SHELAA Site 205 - Land at Norton Lane, Tidbury Green.
Close to recent planning approvals at Lowbrook Farm and Tidbury Green Farm.
DLP refers to minor changes to Green Belt boundary to address anomalies - this submission addresses such an anomaly.
Half of village will be in and half out of the Green Belt.
Needs to be inset.
Character can be protected in other ways.
Scores well in accessibility mapping.
Therefore land at Norton Lane together with village of Tidbury Green should be removed from the Green Belt.

Full text:

see attached

No

Draft Local Plan Review

Representation ID: 3598

Received: 13/02/2017

Respondent: Sean Whitcroft

Representation Summary:

Call for Sites reference 240 should be allocated as an alternative, as it outperforms Sites 2 and 3 in terms of SMBC criteria.

Full text:

two emails re: Balsall Common sites - both received 13th February
The Solihull Plan -Windmill Lane - Save its Greenbelt status

I would strongly recommend that you listen to the voice of the residents of Balsall Common and have the proposed building of new houses on Brown belt sites and not destroy what is left of the green belt in Balsall Common.

You have stated in this consultation that you are open to suggestions from the residents 'if not here where?' but there are strong beliefs amongst the local people of Balsall Common that the property developers are dictating the sites so they can get a 'bang for their buck'.

There are plenty of alternatives to Windmill Lane and Frog Lane so why cannot these be used to meet the build program ?

Balsall Common has had it's fair share of new builds in that last 20 years and the infrastructure -: schools/Doctors and the roads cannot cope with a further increase as suggested in the Local Plan.

Furthermore, to surround a iconic monument like the Berkswell Windmill with modern housing is sacrilege, we should protect our heritage not destroy it.

I do hope that common sense prevails, once we have destroyed our greenbelt and monuments it is the irreparable .

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3629

Received: 13/02/2017

Respondent: Linda Whitcroft

Representation Summary:

Call for Sites reference 240 should be allocated as an alternative, as it outperforms Sites 2 and 3 in terms of SMBC criteria.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3631

Received: 13/02/2017

Respondent: Jordan Whitcroft

Representation Summary:

Call for Sites reference 240 should be allocated as an alternative, as it outperforms Sites 2 and 3 in terms of SMBC criteria.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 3694

Received: 17/02/2017

Respondent: P Benton & T Neary

Agent: Tyler Parkes Partnership Ltd

Representation Summary:

Land to the rear of 146-152 Tilehouse Lane, Whitlocks End.
SHELAA Ref: 1013
Meets objectives of Growth Options A and F.
Sites are deliverable and developable.
Redevelopment of largely previously developed land within existing settlement.
Would result in clear, defensible Green Belt boundaries.
Compares favourably to proposed allocations: less Green Belt impact, less landscape character impact, higher accessibility, no loss of community facilities.
1.72ha site. Would not require on-site provision of community facilities and services; or loss of existing facilities.
See attached supporting evidence and studies.
Rejection of site not been justified.

Full text:

Please find attached representations to the Draft Solihull Local Plan Review for land at and to the rear of 146- 152 Tilehouse Lane, Whitlock's End, B90 1PW.

The submission comprises the
* letter of representations (10463 HRW LPR APP);
* a site plan (ref.no. 10463-01A) with the site edged red;
* an Illustrative layout (10463(10)M-101 prepared by Tyler-Parkes Partnership
* a Transport Statement prepared by ADL Traffic Engineering Ltd
* An updated Extended Phase I Habitat Survey prepared by Cotswold Wildlife Surveys
* Flood Risk Assessment and Drainage Strategy prepared by BWB

Yes

Draft Local Plan Review

Representation ID: 3697

Received: 14/02/2017

Respondent: Norman McKeown

Representation Summary:

Support for CfS 240 'Wotton Green Lane'

Full text:

see attached letter