Dickens Heath / Tidbury Green. The proposed area to the West of Dickens Heath could be improved by shifting the boundary south, splitting site 176 in 2. This would divert traffic onto larger roads, move housing closer to existing facilities and preserve the businesses/amenities that currently operate to the North of this proposed area. Call for Sites ref 8 is currently categorised as a Local Nature Reserve but it hasn't been such for over 20 years when drainage alterations meant the ponds dried up. It is currently ugly scrubland which would be vastly improved if included.

Full text:

Dickens Heath / Tidbury Green. The proposed area to the West of Dickens Heath could be improved by shifting the boundary south, splitting site 176 in 2. This would divert traffic onto larger roads, move housing closer to existing facilities and preserve the businesses/amenities that currently operate to the North of this proposed area. Call for Sites ref 8 is currently categorised as a Local Nature Reserve but it hasn't been such for over 20 years when drainage alterations meant the ponds dried up. It is currently ugly scrubland which would be vastly improved if included.

No

Draft Local Plan Review

Representation ID: 687

Received: 02/02/2017

Respondent: James Neale

Representation Summary:

In support of alternative site at Oakes Farm Balsall Common (SHELAA site 204).

Full text:

My view on the Proposed sites for Balsall Common is that ..... : I used to live in Solihull and I have played cricket nearby at Berkswell CC for the past 8 years ... I think the idea is a good one and having driven around the area it would develop a part of the village that could have great benefit to the local area particularly that around Oakes Farm which would allow that local shop/cafe to develop too. I am aware of other Spitfire developments and they have been good quality and fit in to the local area well. No doubt they would do a similar job here, providing quality housing for the area

No

Draft Local Plan Review

Representation ID: 791

Received: 06/02/2017

Respondent: Amanda Miller

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:
"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"
I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.
The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.
1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.
4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.
5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".
6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties
7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.
9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.
10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."
In light of the above, I would support the recommendations from BARRAGE that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport
2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots
3) The phasing of any development must recognise the impact and disruption of HS2
4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development
5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged
6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 811

Received: 06/02/2017

Respondent: Andrea Baker

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties. Although the primary school is currently within walking distance, the email sent by Mr Graeme Burgess, Head teacher of the primary school Academy last week clearly indicates that the school will be moving to a purpose built site in the short term, and therefore this will add additional traffic difficulties during what is already a heavily congested period.

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 821

Received: 06/02/2017

Respondent: Mrs Catherine Kent

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 866

Received: 07/02/2017

Respondent: Paul Deane

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on

Full text:

OBJECTION to site 3, Kenilworth Road/Windmill Lane, Balsall Common
I am responding to the Council's Draft Local Plan with specific reference to Q15:


"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common) together with suitable brown field sites such as Site 1 which reduces the impact on true Green Belt fields, as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".


2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are14 PDL (Previously Developed Land) sites available, would strongly suggest thatdue consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.


4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well asGreat Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.


10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 906

Received: 07/02/2017

Respondent: Richard Coles

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

Balsall Common Draft Local Plan
I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 910

Received: 08/02/2017

Respondent: Sally Anne Coles

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

Balsall Common Draft Local Plan
I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 922

Received: 09/02/2017

Respondent: Nick Larkin

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:
"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"
I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.
The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.
1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.
4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.
5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".
6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties
7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.
9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.
10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."
In light of the above, I would support the recommendations from BARRAGE that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport
2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots
3) The phasing of any development must recognise the impact and disruption of HS2
4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development
5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged
6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 953

Received: 10/02/2017

Respondent: Mr Richard Drake

Representation Summary:

Disappointing that the suggestion of a new village north of Balsall Common has been ignored as has significant PDL sites in favour of Greenfield sites. Balsall Common is targeted with over 1000 homes with no proposal to upgrade it's centre.

Full text:

Disappointing that the suggestion of a new village north of Balsall Common has been ignored as has significant PDL sites in favour of Greenfield sites. Balsall Common is targeted with over 1000 homes with no proposal to upgrade it's centre.

No

Draft Local Plan Review

Representation ID: 1269

Received: 08/02/2017

Respondent: Lorna O'Regan

Representation Summary:

Call for Sites reference 240 should be allocated as an alternative, as it outperforms Sites 2 and 3 in terms of SMBC criteria.

Full text:


I am responding to the Council's Draft Local Plan with specific reference to Q15:


"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"


I wish to object to the development of site 2 (Frog Lane, Balsall Common) and site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.


The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.


1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of sites 2 and 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.


5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably causedelays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".


6) Sites 2 and 3 score poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 2 and 3. Given that the area is larger than site 2 and 3, this site should be re-assessed by the Council with a view to allocation instead of site 2 and 3.



10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time asHS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to bothinfrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to"manage the growth."


Further to the above


11) Loss of public open space by removing Holly Lane Playing fields from the greenbelt and adding it onto site 2 at Frog Lane. This public space is used by the whole community. Dog walkers, families with children, joggers, walkers and the Girl Guides and Brownies from The Scout Hut on Holly Lane, Local football teams and the nearby Holly Lane Nursery.


In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport


2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2


4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 2 and 3 are removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 1542

Received: 16/02/2017

Respondent: Balsall Common Properties

Representation Summary:

The North of Balsall Common (Wootton Green) is more suitable for homes. Good access to motorways for commuting to Birmingham, can help with the shortfall of new houses that has been identified in Birmingham and enable commuters to get many different places quickly without causing delays in village. There are defensible boundaries of HS2 and existing railway line. Building houses here is logical since it is on the edge of the village, historic sites will not be impacted, there are existing businesses so makes Brownfield use of the space, and the bypass gives an urban feel.

Full text:

The North of Balsall Common (Wootton Green) is more suitable for homes. Good access to motorways for commuting to Birmingham, etc;can help with the shortfall of new houses that has been identified in Birmingham and enable commuters to get many different places quickly without causing delays in the centre of the village. There are defensible boundaries of HS2 and existing railway line. Building houses here is logical since it is on the edge of the village. Historic sites will not be impacted.There are existing businesses here which make Brownfield use of the space and the bypass gives an urban feel.

No

Draft Local Plan Review

Representation ID: 1915

Received: 21/01/2017

Respondent: David Acton

Representation Summary:

SHLAA site 88 should be included as a site allocation as it has been wrongly identified and therefore incorrectly assessed.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 1928

Received: 30/01/2017

Respondent: William Gamble

Agent: Hancock Town Planning

Representation Summary:

site 79 is being proposed as an alternative or additional to preferred sites in BC

Full text:

see attached letter and appendices
Please find attached representations on behalf of my client William Gamble regarding the Draft LPR and relating to land at Waste Lane, Balsall Common

No

Draft Local Plan Review

Representation ID: 1932

Received: 31/01/2017

Respondent: Helen Blyth

Representation Summary:

Sites in Dorridge should be considered

Full text:

Proposed development on Whitlocks End Farm and Dickens Heath Road
As a local resident who would be adversely affected by the proposed developments I should like to forward my observations.

Between 7.30am and 9.00am on week days the traffic can queue back from Maxstoke Croft onto Tamworth Lane trying to merge onto Tamworth Lane. This is as a result of the heavy additional traffic from Dickens Heath and Cheswick Green developments where no additional road routes have been built to service either of these huge developments - this is before the current ongoing building developments have been finished.

Judging by the current poor state of local road repairs, potholes and congestion Solihull council is unable to afford to maintain current road provisions. Will there be any additional budget on top of that allocated for the house building to improve and increase road routes to service the additional car use that will inevitably occur BEFORE the houses are built?

Will additional doctor and hospital provisions be funded? My family have needed urgent care in past and have nothing but praise for the care we received, however, there were times when the ambulance did not know where to take the patient as no beds could be found in any of the Heartlands Trust hospital. The current hospital facilities are at breaking point now; if there are to be 6000 new homes in our borough a new hospital will have to be built BEFORE the influx of extra people. Will this be included in the plans?

All housing developments will clearly be unwanted by the local residents and so platitudes are often embraced by the developers to justify their plans, one of which is, 'we must provide more homes, particularly those who want to get on the housing ladder'. My understanding is that the current average wage is £26,500, if I suggest that a financial institution will lend 5 times the salary, (which I suspect is unrealistic as over generous) just how many of these houses will be £132,500 in price to give any young adult even a remote chance of 'getting on the housing ladder'? Building lots of lovely expensive houses (>£250k) do not help local people on average wages to buy property locally! Will the council have in-built stipulation or clauses to any prospective buyers of these new homes that they can only be purchased by people that are not property owners already?

I accept that new houses will have to be built somewhere, but on the current plans, there does appear to be a disproportionate amount of homes earmarked for the Whitlocks End Farm and Dickens Heath Road site, with, for example, no intention of building any homes in Dorridge? Which is my understanding? Therefore, can you give a guarantee that all local brownfield sites have been utilised before ploughing up our fields - which once developed can never be replaced.

Consider that, perhaps one reason that Solihull is such a desirable area is that it isn't totally over developed and congested and so building on all available open spaces will ruin its character.

Yes

Draft Local Plan Review

Representation ID: 1974

Received: 31/01/2017

Respondent: Mrs Salt

Representation Summary:

prefer Oakes Farm site

Full text:

My view on the Proposed sites for Balsall Common is that ..... : I support building new homes at Oakes Farm instead of Frog Lane.

No

Draft Local Plan Review

Representation ID: 2006

Received: 16/03/2017

Respondent: Mr. Andreas Welzel

Representation Summary:

SHELAA Site 84/1005 (part).

Not allowing small scale development in Green Belt has resulted in need for large scale Green Belt release in DLP.
Growth will be dominated by large housebuilders.
Opportunity for more local involvement.

Full text:

see attached pdf of email including maps

No

Draft Local Plan Review

Representation ID: 2012

Received: 17/02/2017

Respondent: Dickens Heath Parish Council

Representation Summary:

Illogical to take high scoring sites out of the Green Belt for development.
The Council could consider alternatives, which do not have such a high Atkins Green Belt score.
Residents drew attention to the following sites from SHELAA:
49, 82, 83, 87 (brownfield employment site), 89, 121, 132, 133, 136, 139, 175, 184 & 244.
Cannot agree with statement in Para. 229 that there are no alternative sites to justify release of Sites 4 and 13.

Full text:

see attachments

No

Draft Local Plan Review

Representation ID: 2026

Received: 16/02/2017

Respondent: William Davis Ltd

Agent: Define Planning & Design

Representation Summary:

SHELAA Site 6 - land off Old Station Road, Hampton in Arden.
Location and aspect mean that it is not a particularly sensitive part of the Green Belt.
Role considered incidental to the main purposes of the Green Belt around Birmingham and Solihull.
Screening by mature trees.
Bordered on two sides by existing development.
Infilling an existing gap in the suburban frontage.
2km from Catherine de Barnes.
Merits recognises in Green Belt Assessment.
Accessible location.
Would not affect Conservation Area.
Not in the floodplain.
No nature conservation designations.
Site can be appropriately accessed.
No issues with utilities.
Site deliverable.

Full text:

see attached letter and graphics

No

Draft Local Plan Review

Representation ID: 2043

Received: 16/02/2017

Respondent: Golden End Farms

Agent: Delta Planning

Representation Summary:

SHELAA Site 59: Land at Golden End Farms:
Closest site to the Knowle centre;
Sustainable growth opportunity as it is accessible, suitable, available and deliverable;
Opportunity for at least 250 dwellings to meet range of needs;
Includes 6 ha of new public open space;
Additional parking facilities for primary school;
High pedestrian connectivity;
Protect existing trees and hedgerows;
Protect views into countryside and Conservation Area;
Protect nature conservation area north of Kixley Lane.

Full text:

see attached letter and supporting statement

No

Draft Local Plan Review

Representation ID: 2045

Received: 16/02/2017

Respondent: Mr & Mrs J King

Agent: PRW Strategic Advice

Representation Summary:

SHELAA Site 69 -
Site of little strategic impact on character or openness of Green Belt.
Relatively close to Birmingham-Stratford rail line & stations.
Close to local services.
Underused land including a vacant house and commercial buildings.
Screened by vegetation.
Available immediately.
Could support public transport provision in area.
Contribute funding to proposed Earlswood Living Landscape.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 2055

Received: 17/02/2017

Respondent: Terra Strategic

Agent: Delta Planning

Representation Summary:

SHELAA Site 81 - Land at Fillongley Road.
Can provide 100 homes
Easy walking distance to centre of Meriden village and primary school.
Well contained site.
Limited ecological or landscape interest.
Long term defensible Green Belt boundaries
Available and deliverable.
No technical or land ownership constraints.
Sustainable location for new housing.

Full text:

see letter and supporting statement

No

Draft Local Plan Review

Representation ID: 2057

Received: 30/01/2017

Respondent: Karen Munton

Representation Summary:

SHELAA site 240 should be considered as an alternative to site 3.

Full text:

Having attended the meeting on Saturday 7th January regarding the Solihull Plan and how it may effect Balsall Common, I remain extremely concerned of the apparent lack of thought that has been invested into the Draft Local Plan and the irreversible damage the proposed developments will have. In particular, I would note the following significant concerns and would welcome your detailed responses;

1. Schooling - whilst we accept that in the medium to long term, measures could be put in place to accommodate the resulting need for increased school places, no detailed consideration whatsoever has been given to the existing circumstances and the short term impact any additional housing will have. The current schooling provision is already at absolute capacity and there is no opportunity to accommodate further pupils. With our children attending the local schools, we are acutely aware of the issues already created by over-population, including lessons being unable to be taken due to insufficient space, children sitting on the floor eating their lunch because there is insufficient room and last minute changes to timetable to accommodate basic provision. Only last week our daughter had PE cancelled owing to lack of available timetable space with regard to the school hall. The school hall is tiny and used by over 700 children for lunchtimes and PE. The situation is already far from acceptable and any additional pressure will only make things worse. Before any Plan is advanced, proper consideration must be given to this area.

2. Infrastructure - we find it astonishing that no detailed consideration has been given to the infrastructure changes required on the back of any new development. The village is already struggling to cope, there is insufficient parking and the major transport routes and nodes throughout the village already are clogged. We'd invite you to witness this yourselves during school drop up, pick up and rush hour times. Unfortunately and given the nature of HGV and bus traffic using the roads, it is only a matter of time before a serious accident occurs and your apparent neglect of this key area to date is shocking. We fail to understand why a sensible and balanced infrastructure plan is not formulated first, followed by the housing plan thereafter. By proceeding in this manner, we would expect far more sympathy and acceptance from the people living within the village.

3. Site selection - it was clear from the meeting that little thought had been given to this area - especially with regard to what would be best for the village and it's residents. Instead, the developers (who set to profit handsomely from any development) have ear marked the sites and the Council has done little diligence to challenge the proposals. We'd also note that perfectly adequate brownfield sites have seemingly been neglected; we'd ask that these are reconsidered as a matter of urgency.


Overall, the meeting on Saturday was very disappointing. The Council attendees were clearly ill-prepared, did little to acknowledge or respond to villagers' concerns and gave the very strong impression that regardless of any resistance, the decision had already been made. We'd also note that the communication of this meeting was very poor and the Council should accept its responsibility to better communicate future meetings to build awareness.

In summary, the Plan as it relates to Balsall Common is ill-conceived, has neglected the current issues within the Village and has completely ignored some significant challenges that must be addressed if any additional housing within the Village is going to work. Rather than rush this through, we'd urge the Council re-draft the draft Plan in light of resident's concerns as opposed to make a significant mistake that current and future generations living in the village will need to bear.

I would also like to to make the following points with regarding the Council's Draft Local Plan with specific reference to Q15:

I wish to object to the development of site 3 in particular (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The BARRAGE action group have provided a detailed review of this site as noted below. In addition to these points I would like to highlight that a significant area of private land which will not be available for development is included within the hatched area of greenbelt land as noted on the local plan. The gardens of Kerly Close and the Paddock are all privately owned and as such will not be available for development.

In addition the land behind these properties is an area of significant flooding and which currently includes a drainage ditch, the maintenance and upkeep of this would need to be taken into account in any planning permission given, as its removal could result in flooding of the existing properties.

Other reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 2058

Received: 17/02/2017

Respondent: Neil Sears

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 2 (Frog Lane, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane,Kenilworth Road), as an alternative.

The reasons for my objection are below:

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated. In light of the recent white paper on the future of house building across the country in which it is stated that Green Belt land should only be used in exceptional circumstances and when there is no alternative, surely the council must now look again at the 14 brownfield sites in and around Balsall Common that were submitted in the call for sites.

4) Solihull Councils latest transport strategy publication,Solihull Connected, acknowledges that the south of Balsall Common is the most congested part of the village. The development of site 2, being in the south of Balsall Common, will add to the congestion hotspots on the A452 and B4101 caused by northbound traffic heading to the main employment centres. Several of the 14 PDL sites available including site 240 (Wootton Green Lane/Kenilworth Road) are located in the less congested north of the village.

5) The development of site 2 (150 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units) and the proposed site 3 Windmill Lane/Kenilworth Road (200 units), will inevitably cause delays to drivers trying to access the A452 particularly past Balsall Common Primary School on Balsall Street East. In this area at school drop off and pick up times the congestion is severe at present with traffic often in grid lock. Accidents have already occurred due to this situation and with the additional traffic caused by these sites in the south of Balsall Common the risk of accidents will only increase.

6) Site 2 being 1.5 miles from local amenities scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties.

7) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 2. Given that the area is larger than site 2, this site should be re-assessed by the Council with a view to allocation instead of site 2.

8) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would request

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged.

6) Site 2 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 2059

Received: 30/01/2017

Respondent: David Munton

Representation Summary:

Site 240 should be considered as an alternative to site 3.

Full text:

Having attended the meeting on Saturday 7th January regarding the Solihull Plan and how it may effect Balsall Common, I remain extremely concerned of the apparent lack of thought that has been invested into the Draft Local Plan and the irreversible damage the proposed developments will have. In particular, I would note the following significant concerns and would welcome your detailed responses;

1. Schooling - whilst we accept that in the medium to long term, measures could be put in place to accommodate the resulting need for increased school places, no detailed consideration whatsoever has been given to the existing circumstances and the short term impact any additional housing will have. The current schooling provision is already at absolute capacity and there is no opportunity to accommodate further pupils. With our children attending the local schools, we are acutely aware of the issues already created by over-population, including lessons being unable to be taken due to insufficient space, children sitting on the floor eating their lunch because there is insufficient room and last minute changes to timetable to accommodate basic provision. Only last week our daughter had PE cancelled owing to lack of available timetable space with regard to the school hall. The school hall is tiny and used by over 700 children for lunchtimes and PE. The situation is already far from acceptable and any additional pressure will only make things worse. Before any Plan is advanced, proper consideration must be given to this area.

2. Infrastructure - we find it astonishing that no detailed consideration has been given to the infrastructure changes required on the back of any new development. The village is already struggling to cope, there is insufficient parking and the major transport routes and nodes throughout the village already are clogged. We'd invite you to witness this yourselves during school drop up, pick up and rush hour times. Unfortunately and given the nature of HGV and bus traffic using the roads, it is only a matter of time before a serious accident occurs and your apparent neglect of this key area to date is shocking. We fail to understand why a sensible and balanced infrastructure plan is not formulated first, followed by the housing plan thereafter. By proceeding in this manner, we would expect far more sympathy and acceptance from the people living within the village.

3. Site selection - it was clear from the meeting that little thought had been given to this area - especially with regard to what would be best for the village and it's residents. Instead, the developers (who set to profit handsomely from any development) have ear marked the sites and the Council has done little diligence to challenge the proposals. We'd also note that perfectly adequate brownfield sites have seemingly been neglected; we'd ask that these are reconsidered as a matter of urgency.


Overall, the meeting on Saturday was very disappointing. The Council attendees were clearly ill-prepared, did little to acknowledge or respond to villagers' concerns and gave the very strong impression that regardless of any resistance, the decision had already been made. We'd also note that the communication of this meeting was very poor and the Council should accept its responsibility to better communicate future meetings to build awareness.

In summary, the Plan as it relates to Balsall Common is ill-conceived, has neglected the current issues within the Village and has completely ignored some significant challenges that must be addressed if any additional housing within the Village is going to work. Rather than rush this through, we'd urge the Council re-draft the draft Plan in light of resident's concerns as opposed to make a significant mistake that current and future generations living in the village will need to bear.

I would also like to to make the following points with regarding the Council's Draft Local Plan with specific reference to Q15:

I wish to object to the development of site 3 in particular (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The BARRAGE action group have provided a detailed review of this site as noted below. In addition to these points I would like to highlight that a significant area of private land which will not be available for development is included within the hatched area of greenbelt land as noted on the local plan. The gardens of Kerly Close and the Paddock are all privately owned and as such will not be available for development.

In addition the land behind these properties is an area of significant flooding and which currently includes a drainage ditch, the maintenance and upkeep of this would need to be taken into account in any planning permission given, as its removal could result in flooding of the existing properties.

Other reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 2062

Received: 30/01/2017

Respondent: David Harvey

Representation Summary:

Site 240 should be considered as an alternative to site 3.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 2064

Received: 30/01/2017

Respondent: Diane Langton

Representation Summary:

SHELAA site 240 should be considered as an alternative.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 2065

Received: 30/01/2017

Respondent: David Langton

Representation Summary:

SHELAA site 240 should be considered as an alternative to site 3.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 2066

Received: 30/01/2017

Respondent: James Langton

Representation Summary:

SHELAA site 240 should be considered as an alternative to Site 3.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 2067

Received: 30/01/2017

Respondent: Catherine Langton

Representation Summary:

SHELAA site 240 should be considered as an alternative to Site 3.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.