Alternative Site Suggested (Call for Sites)

Showing comments and forms 151 to 180 of 252

No

Draft Local Plan Review

Representation ID: 5339

Received: 15/02/2017

Respondent: Mrs Sally Woodhall

Representation Summary:

From the land availably map plots 195

Full text:

Reasons not to build on allocation 13 Shirley South
There is less than one kilometre of open green fields between Shirley and Dickens Heath at this moment, building on this land will leave a very narrow corridor/AIRFIELD of green belt land, with no public footpaths.
There is a clear boundary on the northern edge, a very well used public footpath, resurfaced by Solihull council after a local petition, and public amenity land.
As the only green space with public access in the south of Shirley, This land is very widely used by the local residents and is extremely important for the health and welfare of the local residents of all ages. I walk over these fields every morning on well-worn footpaths, along with many other local residents making it a very enjoyable social activity.
Concentrating 41% of housing in one area will greatly affect the local infrastructure, already overcapacity since the building of Dickens Heath. I understand the need new housing but, the allocation of sites needs to be much more evenly spread and be built in small pockets throughout the borough so as to not adversely impact on any one community. Why do Solihull Council want to build such a large concentration of houses in such a small area? It in no way benefits the local residents. I can only think of one beneficiary THE BUILDERS, please let me know if I am wrong. I though the Council were elected by the local residents for the local residents.
I do question decisions made by the council, why an island was removed from Blossomfield Road and replaced traffic lights is beyond belief, it will have cost a fortune, created chaos while the work was done, with no benefit.
I fully back the plan for a new dementia home on Tanworth Lane, just surprised it is not included in the Draft Local Plan.
There so little information given about possible access points to "Allocation 13" for this almost land locked site, could the council please let me know? If the information was available, I would be able to comment.
Future flood risk is of great concern as some of these fields are very water logged including 2 pools and a stream that feeds into the river Blyth. How will this affect ground water levels to existing homes in the area, I live off Neville Road that in recent years, has had installed a massive pumping station for storm water.
The wildlife on this site is extensive and diverse, taking so much habitat away in one go will decimate the eco system. Just to name a few, Woodpeckers, Bats Newts, Owls, Kingfishers and soon the Cuckoo will return.
I would like the council to demonstrate they have fully examined all other reasonable options for meeting their identified housing requirements before releasing Green Belt land using the ambiguous "exceptional circumstances" How many brownfield sites does Solihull council own? Powergen in Shirley has been empty for over 20 years.
Why are we taking on some of Birmingham's housing allocation, when they have extensive brownfield sites, all over the city? I am assuming this comes back to THE BUILDERS preferring greenfield sites. Why are the Builders put before the residents.
Alternatives
Move Lighthall school on to allocation 12, giving much better access. Leaving a brownfield site perfect for building houses.
The Draft Plan mentions getting ready for HS2. From the land availably map plots 23,128 and 195 are a much more logical choice as they are on the right side of Solihull to benefit from HS2.
The NEC has miles of car parks, if they were made into multi-storey car parks, this would free large amounts of brownfield sites for redevelopment, close to where we believe HS2 will have a station.

No

Draft Local Plan Review

Representation ID: 5345

Received: 17/02/2017

Respondent: Zoe Speed

Representation Summary:

Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3 and as larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

Full text:


I am responding to the Council's Draft Local Plan with specific reference to Q15:
"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"
I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.
The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.
4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.
5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".
6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties
7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.
10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots
3) The phasing of any development must recognise the impact and disruption of HS2
4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged
6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5354

Received: 17/02/2017

Respondent: Sarah Ravenscroft

Representation Summary:

Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3 and as larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

Full text:


I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are copied below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report. Please consider and register my objection and try your very best not to 'lose' this or other such objections.



1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. Carbon footprint growth is actually an UNDESIRABLE occurrence. I don't believe the planning office understands thiso to be the case.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated. However I am not sure that the Planning office understands the importance of greenfield sites to the public.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties.

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, I am informed that the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged.

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5359

Received: 17/02/2017

Respondent: Ayaz Mahmood

Representation Summary:

Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3 and as larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

Full text:


OBJECTION - BALSALL COMMON DEVELOPMENT SITE

I am responding to the Council's Draft Local Plan with specific reference to Q15:
"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"
I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.
The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.
1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.
4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.
5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".
6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties
7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.
8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.
9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.
10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."
In light of the above, I would support the recommendations from BARRAGE that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport
2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots
3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development
5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged
6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable

No

Draft Local Plan Review

Representation ID: 5364

Received: 17/02/2017

Respondent: Diane Mahmood

Representation Summary:

Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3 and as larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5375

Received: 15/02/2017

Respondent: Judith Dean

Representation Summary:

part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3

Full text:

Proposed Housing in Balsall Common

I am responding to the Council's Draft Local Plan with specific reference to Q15:
"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"
I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.
The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.
1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.
4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.
5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".
6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties
7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.
8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.
9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.
10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."
In light of the above, I would support the recommendations from BARRAGE that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport
2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots
3) The phasing of any development must recognise the impact and disruption of HS2
4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development
5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged
6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5412

Received: 17/02/2017

Respondent: Joanne Jones

Representation Summary:

Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3 and as larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

Full text:


I am responding to the Council's Draft Local Plan with specific reference to Q15:


"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"


I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.


The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.


1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to thecongestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.


5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".


6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.



10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport


2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2


4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5426

Received: 17/02/2017

Respondent: Michael Wylde

Representation Summary:

Object to level of new housing in Balsall Common and there are better sites for development which would minimise impact such as Oakes Farm and north of the village.

Full text:

Barratt's Lane Planning Application, Balsall Common

I am not the type of person who complains or moans, but I feel compelled to write to you to raise my concerns over the development of 800 houses on the Barratt's Farm site. This development will mean little or no green belt left on the east side of Balsall Common. These fields are used by both dog walkers and ramblers with public rights of way.

The current population of the village is approximately 8000. The proposed 1250 houses being built will turn Balsall Common from a rural village into a town. However, I see no plans proposed to cope with the increased traffic and increased footfall. The centre of the village is chaotic at times. The road network and public transport is insufficient to support a 5000 increase in population and 2000 extra vehicles. There is no proposed infrastructure in these plans.

Due to the centre of the village being surrounded by residents it cannot be expanded to absorb the extra demand, so why are more houses being built so close to the small centre of the village?

I recognise the Government pressure to build more new homes. However, there are better sites to build houses in this area, which will minimise the impact on the community of Balsall Common. Oakes farm on Balsall Street and the large green areas north of the village on the A452 could accommodate new builds with little or no impact to the community. I understand Oakes farm has been approached by Spitfire homes to develop houses on this site.

I urge the planning department of Solihull Borough Council to strongly consider the consequences of the current proposed plans and review viable alternatives. The current proposals may lead to a catastrophic outcome.

No

Draft Local Plan Review

Representation ID: 5435

Received: 17/02/2017

Respondent: Mrs Debra Wood

Representation Summary:

Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3 and as larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:


"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"


I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.


The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.


1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.


5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".


6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.



10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to bothinfrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."



11) Hallmeadow Road is utilised EVERY DAY as overflow parking for the Health Centre and Berkswell Train Station. This therefore reduces the traffic flow to ONE FUNCTIONAL LANE.
The additional volume of traffic along this access road will increase the likelihood of accidents, congestion and air pollution.



12) EVERY DAY the congestion on STATION ROAD (shops end), A452 KENILWORTH ROAD, BALSALL STREET, and ALDER LANE is extremely frustrating and results in poor driving discipline from exasperated commuters : children have been hurt, a cyclist knocked off his bike, and parked cars damaged.
Additional housing along these routes will add to existing problems.






In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport


2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2


4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5442

Received: 17/02/2017

Respondent: Philip Wood

Representation Summary:

Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3 and as larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

Full text:


Objection : Draft Local Plan - Balsall Common / Berkswell
I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"


I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.


The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.


1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.


5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".


6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.



10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to bothinfrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."



11) Hallmeadow Road is utilised EVERY DAY as overflow parking for the Health Centre and Berkswell Train Station. This therefore reduces the traffic flow to ONE FUNCTIONAL LANE.
The additional volume of traffic along this access road will increase the likelihood of accidents, congestion and air pollution.



12) EVERY DAY the congestion on STATION ROAD (shops end), A452 KENILWORTH ROAD, BALSALL STREET, and ALDER LANE is extremely frustrating and results in poor driving discipline from exasperated commuters : children have been hurt, a cyclist knocked off his bike, and parked cars damaged.
Additional housing along these routes will add to existing problems.






In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport


2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2


4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.




Yours sincerely,

No

Draft Local Plan Review

Representation ID: 5452

Received: 17/02/2017

Respondent: Paula Thomas

Representation Summary:

Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3 and as larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

Full text:


I am responding to the Council's Draft Local Plan with specific reference to Q15:


"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"


I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.


The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.


1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".


2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.


3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.


4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.


5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".


6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties


7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.


8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.


9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.



10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to bothinfrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:


1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport


2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2


4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development


5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5481

Received: 17/02/2017

Respondent: Karen Bell

Representation Summary:

There are brownfield sites in the Borough that have not been included but should be brought forward instead of building on green belt land in Balsall Common, and Grange Farm, Balsall Common would have current road infrastructure and less impact than Site 1 Barratts Farm.

Full text:

I am writing to formally record my feedback on the Solihull Draft Local Plan Review, so you may include my views along with all other feedback you have received.

I wish to comment specifically on the draft plans that affect Balsall Common and Berkswell.

Proposed Housing - General objections.
I object to the total of 1,150 proposed new houses for a number of reasons:-

1. The total is way in excess of what can sensibly be assimilated into the village without dramatically and detrimentally changing the village into what is effectively a town. The 2011 census reported a population in Balsall Common of 7,039. The same census recorded an average of 2.3 people per household. It can therefore be expected that 1,150 new homes would add around 2,645 residents. An increase of 37.5% over the 2011 census population. Even accepting the population of Balsall Common has grown since the 2011 census, this increase cannot be absorbed into an already overcrowded and under-resourced village.
2. I believe there are other locations within the Borough more suited to build new homes. Examination of the Draft Local Plan Review Map shows that the proposed distribution of new homes in Solihull is not spread proportionally to the existing centres of population. There are some villages where little or no new homes are planned, whilst Balsall Common has been identified for far more than it can accommodate. A fairer and better spread would reduce the impact on existing communities.
3. The village does not have adequate resources to serve a substantial increase in population.
a. Medical/Welfare Facilities - The existing medical centre does not have the staff or buildings capacity to copy with the increase in residents that would arise from the new homes.
b. Schools - there are not enough places, buildings or facilities to accommodate the resultant demand for primary or secondary school places.
c. Shops - the existing retail shops in the centre of Balsall Common are inadequate. Berkswell has no real shopping facilities.
d. Parking - lack of public parking is already a major problem in areas such as the library, rear of Tesco's and along the shops in Balsall Common. Parking at the station is almost impossible much of the time due to lack of spaces and excess demand. As a result more and more cars park on the adjacent roads, such as Hallmeadow Road
e. Public Transport - As mentioned, Berkswell station lacks adequate parking and is crowded during the rush hour. It is clear to everyone using it, that is barely copes with demand from the current resident population. Buses are not regarded by most residents as a reliable or practical alternative, hence most people drive to their destinations.
f. Roads - most houses in Balsall and Berkswell possess at least one car. The existing roads are busy but cope with current demand. Even the main Kenilworth Road only experiences delays during rush hours. The remainder of the day and at weekends, traffic flows freely. However, the addition of hundreds more cars onto local roads as a result of over a thousand new houses will create a traffic problem.
4. It is vital that the Green Belt surrounding Balsall Common and Berkswell and in particular the Meriden Gap is retained and preserved. Not just in the short-term, but for future generations too. I believe the Council has strong responsibilities to not sacrifice the Meriden Gap to accommodate housing development. Releasing Green Belt piece by piece is an erosion of a valuable asset that we need. It delivers important environmental and social benefits. The National Planning Policy Framework clearly states that "Green Belt boundaries should only be changed in a Local Plan under "exceptional circumstances" and only permit most forms of development in "very special circumstances". I believe that the Council has the choice to locate the required number of new homes elsewhere within the Borough and to preserve the Green Belt and in particular Meriden Gap.
5. We, along with many residents, chose to pay a premium to live in this village, so we can enjoy all the benefits living in a rural community offers. The impact of 1,150 new homes will remove many of the reasons we made that choice. We understand we have to accept our fair share of new homes, but not the huge volume planned.
6. Bypass by default. Having lived with the blight of the prosed Balsall Common bypass for many years, we, like many, were relieved when common sense prevailed and it was removed from the local plan. The bypass is not required to cope with traffic demand. That is one of the reasons it was removed from the existing plan. However, the proposed housing developments will establish a new village boundary that will encourage re-instatement of the planned bypass line. Many more years of blight for residents.

Proposed Housing - Specific Site Objections

Barratt's Farm

I object to the proposed development of 800 new homes at Barratt's Farm for the following reasons:-

1. This would be a Green Belt development.
2. The quantity of houses is far more than Balsall Common & Berkswell can accommodate without detrimental impact
3. There is no infrastructure on that side of the village. Everything would have to be built, whereas there are alternative sites (e.g. Grange Farm) where major roads, etc. are already nearby.
4. Development at Barratt's Farm will move the village boundary and effectively create a new, much bigger village (town). Moving the boundary into Green Belt in this way will make it difficult or even impossible to successfully resist future applications to develop that side of the village.
5. This development will effectively establish a line that will tempt planners to re-introduce the bypass plans.
6. The development is scheduled to be spread over 15 years. We are already blighted by HS2 construction lasting around 10 years. This means for many residents 15 years of disruption from continual construction and development.

Windmill Lane

I object to the proposed development of 200 new homes at Windmill Lane for the following reasons:-

1. A further 200 houses, in addition to those already being built on greenfield sites at Elysian Gardens will result in the complete sacrifice of the rural aspect at the Windmill Lane end of the village. Effectively the village will have crept south along the Kenilworth Road and expanded substantially.
2. The roads infrastructure is inadequate. Due to the hill on this part of the Kenilworth road, more cars turning into or out of new housing estates on the busy Kenilworth Road will be dangerous and likely cause delays. If the answer is to allow access to the new houses via Windmill Lane, then this quiet, unlit country lane will become even more of a dangerous "rat-run" for drivers and pedestrians than it already is.
3. The historic and culturally important Windmill will become virtually inaccessible to visit, as parking on Windmill Lane will be too dangerous if not impossible.

Summary

I accept that Balsall Common and Berkswell may have to have some new housing development for Solihull to meet its obligations. However I object to the current plans because:-

a) Sacrifice of Green Belt.
b) Too many houses for this area to accommodate.
c) Lack of infrastructure and resources.
d) Barratt's Farm and Windmill Lane are not the most suitable sites.
e) There are more suitable sites, e.g. Grange Farm is less impact and near current roads infrastructure plus there are brownfield sites in the borough that have not been chosen and will remain brownfield, even after all this proposed development.
f) We do not want an unnecessary bypass by "stealth".

Thank you for the opportunity to submit my views.

No

Draft Local Plan Review

Representation ID: 5505

Received: 17/02/2017

Respondent: Viv Smith

Representation Summary:

Sites proposed in Dorridge and Hockley Heath should be properly assessed and considered rather than concentrating development in Dickens Heath/Cheswick Green parishes.

Full text:

Please find attached

Kind regards

No

Draft Local Plan Review

Representation ID: 5535

Received: 17/02/2017

Respondent: Margaret Walls

Representation Summary:

Object to Site 1 as sufficient brownfield sites to the north of Balsall Common to fulfil housing requirement, no valid reason to take green belt land which contributes towards purpose of preventing settlements from merging, and brownfield sites would be better located for access to main areas of employment to north avoiding commuting through village.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5536

Received: 17/02/2017

Respondent: P A Henwood

Representation Summary:

Object to Site 1 as sufficient brownfield sites to the north of Balsall Common to fulfil housing requirement, no valid reason to take green belt land which contributes towards purpose of preventing settlements from merging, and brownfield sites would be better located for access to main areas of employment to north avoiding commuting through village.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5537

Received: 17/02/2017

Respondent: Tom Walls

Representation Summary:

Object to Site 1 as sufficient brownfield sites to the north of Balsall Common to fulfil housing requirement, no valid reason to take green belt land which contributes towards purpose of preventing settlements from merging, and brownfield sites would be better located for access to main areas of employment to north avoiding commuting through village.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5538

Received: 17/02/2017

Respondent: Mrs Alison Eccleston

Representation Summary:

Object to Site 1 as sufficient brownfield sites to the north of Balsall Common to fulfil housing requirement, no valid reason to take green belt land which contributes towards purpose of preventing settlements from merging, and brownfield sites would be better located for access to main areas of employment to north avoiding commuting through village.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5557

Received: 17/02/2017

Respondent: Richard Cobb Planning

Representation Summary:

Sites at the western periphery of Hockley Heath.
Land at Blue Lake Road / Norton Green, Dorridge.

Full text:

Please find attached my own general comments on the Draft Local Plan

No

Draft Local Plan Review

Representation ID: 5734

Received: 09/02/2017

Respondent: Councillor Mark Wilson

Representation Summary:

Alternative sites to Site 15 in the SHELAA that belong to SMBC and could be developed for housing:

Ref 220 - Chapelhouse Depot
Ref 226 - Land at Damson Parkway and Coventry Road
Ref 54 - Clopton Crescent Depot and British Legion Club

Full text:

Petition received re: Bosworth Wood sports Field - 97 signatures and additional petition 567 online signatures see rep 4502

No

Draft Local Plan Review

Representation ID: 5892

Received: 17/02/2017

Respondent: Liam Sawyer

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5895

Received: 17/02/2017

Respondent: Angela Lane

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5898

Received: 17/02/2017

Respondent: Tracy Jolly

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5901

Received: 17/02/2017

Respondent: Elaine Kell

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5904

Received: 17/02/2017

Respondent: David Shaw

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5907

Received: 17/02/2017

Respondent: G S Oliver

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5910

Received: 17/02/2017

Respondent: Peter Lowe

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5913

Received: 17/02/2017

Respondent: Philippa Lowe

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5916

Received: 17/02/2017

Respondent: Donald Lowe

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5919

Received: 17/02/2017

Respondent: Amrit Teja

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

See Attachment

No

Draft Local Plan Review

Representation ID: 5922

Received: 17/02/2017

Respondent: Mrs B Stanley

Representation Summary:

Object to Site 3. Site 240 should be allocated as an alternative. It outperforms Site 3 in terms of SMBC criteria.
Balsall Common does not have good accessibility and there are limited employment opportunities.
Due consideration not given to the 14 Previously Developed Land (PDL) sites in Balsall Common. "Very special circumstances" to justify inappropriate development in the greenbelt have not been demonstrated.
Should be a re-assessment of the appropriateness of significantly expanding Balsall Common. Consideration should be given to the re-use of all PDL falling within or adjacent to Balsall Common and these should be consulted on.

Full text:

See Attachment