Question 37 - Compensatory Provision for removal of land from Green Belt.
Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 6537
Received: 30/01/2019
Respondent: Mrs Katie Wilson
- If green belt is gone & high density developments in their place a compensation as described would not make up at all for the space to be built on.
- Wider issue is schools, roads all of which are wholly inadequate for the area as it is.
- Each new house generally has at least 2 cars x how every many new properties will be disastrous on the environment and the infrastructure.
If green belt is gone & high density drvelopments in their place a compensation as described would not make up at all for the space to be built on. Also a wider issue is schools,roads all of which are wholly inadequate for the area as it is. Each new house generally has at least 2 cars x how every many new properties will be disastrous on the environment and the infrastructure.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 6628
Received: 06/02/2019
Respondent: Mr Harry Siggs
Lost land cannot be replaced. The green belt should be protected.
There is no need for compensation, just rigorous observation of green belt rules
Lost land cannot be replaced. The green belt should be protected.
There is no need for compensation, just rigorous observation of green belt rules
Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 6720
Received: 18/02/2019
Respondent: Mr Steven Webb
Site 16 has a very thin Coppice planted around 1990 between the rear of Pinfold Road houses, it would be nice to extend this, make it wider and extend it so that it around the side of the final house at the end of the road and between the orchard field and the end of the road. This would offer more separation between the existing properties and the fields, it would increase the wildlife corridor and would offer more line of sight protection between existing housing and new properties.
Site 16 has a very thin Coppice planted around 1990 between the rear of Pinfold Road houses, it would be nice to extend this, make it wider and extend it so that it around the side of the final house at the end of the road and between the orchard field and the end of the road. This would offer more separation between the existing properties and the fields, it would increase the wildlife corridor and would offer more line of sight protection between existing housing and new properties.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 6874
Received: 28/02/2019
Respondent: CGA Taylor
Development of Site 3 would create the narrowest gap between settlements.
Objection to the allocation of site 3, Windmill Lane, Balsall Common
I wish to register my objection to the on-going proposal, in the Draft Local Plan, to build 220 housing units on the greenbelt, greenfield land between Windmill Lane and the Kenilworth Road in Balsall Common known as Site 3.
I understand that the council has recently decided, in line with government policy, to develop three brownfield sites in Balsall Common at Wootton Green Lane, Lavender Hall Farm and Pheasant Oak farm. These sites were suggested by residents to the council as alternatives to site 3 (and site 2, Frog Lane) in the last consultation in 2017. However, rather than developing these sites instead of the greenfield sites, they are to be developed in addition. Our village of circa 3900 homes is now expected to grow by a further 1755, 460 coming from the brownfield sites. In contrast, other settlements within the borough are seeing a big reduction in the proposed housing numbers (South Shirley and Dickins Heath) and Dorridge has not been allocated any housing sites at all. This does not seem to be a fair distribution, particularly with our village also having to deal with the disruption of HS2. The council would appear to be paying lip service to residents' concerns and efforts to assist in finding alternative sites to build on.
To manage any significant expansion of the village needs careful planning, in terms of schooling, traffic, housing sites and amenities, alongside HS2. There is no timing plan within the Draft Local Plan to give residents the confidence that any growth will be managed. The primary school is already full at 4 form-entry. There is no capacity to take any more children until a new school is built. Public transport is inadequate with infrequent bus services and there are only 2 trains every hour during peak times, so people depend on their cars. As yet, there has been no assessment done of the Highways to ensure the road network can cope, at least until such time that the bypass is built. The Kenilworth Road, in particular, has long queues of traffic at peak times. All this affects the air quality in our village and the health of the residents. Given that many of the proposed sites are in open countryside, it is also worrying that no Ecological Assessments have been made available to the public. I understand that there is a proposal to build a new settlement to the north of Balsall Common and I would urge the council to seriously look at that as an alternative to imposing any significant level of new housing on Balsall Common, a village which is already clearly "bursting at the seams".
Turning to site 3 itself, this is a greenfield, greenbelt site in the Meriden Gap. Mayor Andy Street and Leader of the Council, Bob Sleigh, have both pledged to protect this precious area. The development of site 3 would create the narrowest gap yet so, as residents, we do not understand why the site is being included. The council has also assessed the sustainability of the site and it scores very poorly (9 negatives and only 2 positives), not least because it stretches so far out from the village boundary that you would need to drive to the village shops, the medical centre, the train station and the primary school. Just because there are two housing estates now built in the vicinity should not provide a "shoo- in" to build on the rest. The area is rich in wildlife - owls, red kites, woodpeckers, deer, hawks, numerous insects, bats, amphibians and the protected Great Crested Newts, to name but a few. As there are no plans to include nature reserves, unlike the other two greenfield sites at Frog Lane and Barrett's Farm, the habitat and feeding grounds for these creatures will be destroyed. There is also the danger of light pollution from street lights having a detrimental effect on nocturnal creatures. Although there are areas protected for the newts, these are to be crossed over by roads, clearly putting the lives of the newts at risk.
Furthermore, the only additional access point onto the road network will be onto Windmill Lane opposite Hob Lane. Otherwise new residents will be expected to access their homes through the Meer Stones Road estate. This means that drivers from 280 dwellings (including Meer Stones Road residents) will be trying to access the road network from two points, one of which is the busy Kenilworth Road and the other Windmill Lane. This lane is already turning into a fast "rat run" as drivers try to avoid the congestion in the village. This is not sustainable.
Last, but by no means least, there is the harm that development in this area would have on the magnificent Grade 2* Listed Berkswell Windmill opposite. This is an historic monument of local, regional, national and international significance and is part of our heritage which attracts many visitors into the area. Not only will building houses nearby harm the setting of this unique tower mill, but also the wind flow will be interfered with, which will stop the sails from turning. Given that this is one of the few remaining functional mills in the country, this would be an absolute travesty. This is a magnificent and iconic landmark, the heritage of which must be respected and preserved for generations to come.
All these are reasons to remove site 3 from the plan, but there is also the impact this site would have on current residents to consider. Although low density housing is proposed in some areas next to current properties, in other parts medium density housing is proposed with no "green buffer" to preserve any of the visual amenity currently enjoyed by residents. This is not respecting the local character of housing in this locality nor the people who currently live there.
Moreover, based on the recent housing estates, the ground conditions are such that these new homes would require pile driving. The impact of the relentless noise and vibrations from this building process on residents is indescribable. It is impossible to work from home, which many of us do and not always out of choice. Such invasive work in the vicinity of the Berkswell Windmill also risks causing long-term damage to this historic monument as well as disrupting the numerous species of local wildlife. This, in itself, should be justification for not developing site 3, or indeed any site with similar ground conditions. Balsall Common residents will be under significant stress from the impact of HS2 construction as well as housing development, not least with the never-ending temporary traffic lights and road closures. We should not be expected to have to deal with this noise as well.
In summary, I would urge that the council take note of this response and remove Site 3 from the Draft Local Plan. There is no doubt, based on SMBC's criteria, that the site is neither sustainable nor accessible. Given the number of housing units available on the brownfield sites, it is unnecessary and incomprehensible as to why the site has not been taken out already. There is no need to build here.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 6884
Received: 01/03/2019
Respondent: Mr Alexander Hamilton
The development of site 3 would create the narrowest green belt gap yet so, as residents, we do not understand why the site is being included.
Objection to the allocation of site 3, Windmill Lane, Balsall Common
I wish to register my objection to the on-going proposal, in the Draft Local Plan, to build 220 housing units on the greenbelt, greenfield land between Windmill Lane and the Kenilworth Road in Balsall Common known as Site 3.
I understand that the council has recently decided, in line with government policy, to develop three brownfield sites in Balsall Common at Wootton Green Lane, Lavender Hall Farm and Pheasant Oak farm. These sites were suggested by residents to the council as alternatives to site 3 (and also site 2, Frog Lane) in the last consultation in 2017. However, rather than developing these sites instead of the greenfield sites, they are to be developed in addition. Our village of circa 3900 homes is now expected to grow by a further 1755, 460 coming from the brownfield sites. In contrast, other settlements within the borough are seeing a big reduction in the proposed housing numbers (South Shirley and Dickins Heath) and Dorridge has not been allocated any housing sites at all. This does not seem to be a fair distribution, particularly with our village also having to deal with the disruption of HS2. The council would appear to be paying lip service to residents' concerns and efforts to assist in finding alternative sites to build on.
To manage any significant expansion of the village needs careful planning, in terms of schooling, traffic, housing sites and amenities, alongside HS2. There is no timing plan within the Draft Local Plan to give residents the confidence that any growth will be managed. The primary school is already full at 4 form-entry. There is no capacity to take any more children until a new school is built. Public transport is inadequate with infrequent bus services and there are only 2 trains every hour during peak times, so people depend on their cars. As yet, there has been no assessment done of the Highways to ensure the road network can cope, at least until such time that the bypass is built. The Kenilworth Road, in particular, has long queues of traffic at peak times. All this affects the air quality in our village and the health of the residents. Given that many of the proposed sites are in open countryside, it is also worrying that no Ecological Assessments have been made available to the public. I understand that there is a proposal to build a new settlement to the north of Balsall Common and I would urge the council to seriously look at that as an alternative to imposing any significant level of new housing on Balsall Common, a village which is already clearly "bursting at the seams".
Turning to site 3 itself, this is a greenfield, greenbelt site in the Meriden Gap. Mayor Andy Street and Leader of the Council, Bob Sleigh, have both pledged to protect this precious area. The development of site 3 would create the narrowest gap yet so, as residents, we do not understand why the site is being included. The council has also assessed the sustainability of the site and it scores very poorly (9 negatives and only 2 positives), not least because it stretches so far out from the village boundary that you would need to drive to the village shops, the medical centre, the train station and the primary school. Just because there are two housing estates now built in the vicinity should not provide a "shoo- in" to build on the rest. The area is rich in wildlife - owls, red kites, woodpeckers, deer, hawks, numerous insects, bats, amphibians and the protected Great Crested Newts, to name but a few. As there are no plans to include nature reserves, unlike the other two greenfield sites at Frog Lane and Barrett's Farm, the habitat and feeding grounds for these creatures will be destroyed. There is also the danger of light pollution from street lights having a detrimental effect on nocturnal creatures. Although there are areas protected for the newts, these are to be crossed over by roads, clearly putting the lives of the newts at risk.
Furthermore, the only additional access point onto the road network will be onto Windmill Lane opposite Hob Lane. Otherwise new residents will be expected to access their homes through the Meer Stones Road estate. This means that drivers from 280 dwellings (including Meer Stones Road residents) will be trying to access the road network from two points, one of which is the busy Kenilworth Road and the other Windmill Lane. This lane is already turning into a fast "rat run" as drivers try to avoid the congestion in the village. This is not sustainable.
Last, but by no means least, there is the harm that development in this area would have on the magnificent Grade 2* Listed Berkswell Windmill opposite. This is an historic monument of local, regional, national and international significance and is part of our heritage which attracts many visitors into the area. Not only will building houses nearby harm the setting of this unique tower mill, but also the wind flow will be interfered with, which will stop the sails from turning. Given that this is one of the few remaining functional mills in the country, this would be an absolute travesty. This is a magnificent and iconic landmark, the heritage of which must be respected and preserved for generations to come.
All these are reasons to remove site 3 from the plan, but there is also the impact this site would have on current residents to consider. Although low density housing is proposed in some areas next to current properties, in other parts medium density housing is proposed with no "green buffer" to preserve any of the visual amenity currently enjoyed by residents. This is not respecting the local character of housing in this locality nor the people who currently live there.
Moreover, based on the recent housing estates, the ground conditions are such that these new homes would require pile driving. The impact of the relentless noise and vibrations from this building process on residents is indescribable. It is impossible to work from home, which many of us do and not always out of choice. Such invasive work in the vicinity of the Berkswell Windmill also risks causing long-term damage to this historic monument as well as disrupting the numerous species of local wildlife. This, in itself, should be justification for not developing site 3, or indeed any site with similar ground conditions. Balsall Common residents will be under significant stress from the impact of HS2 construction as well as housing development, not least with the never-ending temporary traffic lights and road closures. We should not be expected to have to deal with this noise as well.
In summary, I would urge that the council take note of this response and remove Site 3 from the Draft Local Plan. There is no doubt, based on SMBC's criteria, that the site is neither sustainable nor accessible. Given the number of housing units available on the brownfield sites, it is unnecessary and incomprehensible as to why the site has not been taken out already. There is no need to build here.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 6888
Received: 01/03/2019
Respondent: Mrs Elspeth Hamilton
Development of Site 3 would create the narrowest gap between settlements.
Objection to the allocation of site 3, Windmill Lane, Balsall Common
I wish to register my objection to the on-going proposal, in the Draft Local Plan, to build 220 housing units on the greenbelt, greenfield land between Windmill Lane and the Kenilworth Road in Balsall Common known as Site 3.
I understand that the council has recently decided, in line with government policy, to develop three brownfield sites in Balsall Common at Wootton Green Lane, Lavender Hall Farm and Pheasant Oak farm. These sites were suggested by residents to the council as alternatives to site 3 (and also site 2, Frog Lane) in the last consultation in 2017. However, rather than developing these sites instead of the greenfield sites, they are to be developed in addition. Our village of circa 3900 homes is now expected to grow by a further 1755, 460 coming from the brownfield sites. In contrast, other settlements within the borough are seeing a big reduction in the proposed housing numbers (South Shirley and Dickins Heath) and Dorridge has not been allocated any housing sites at all. This does not seem to be a fair distribution, particularly with our village also having to deal with the disruption of HS2. The council would appear to be paying lip service to residents' concerns and efforts to assist in finding alternative sites to build on.
To manage any significant expansion of the village needs careful planning, in terms of schooling, traffic, housing sites and amenities, alongside HS2. There is no timing plan within the Draft Local Plan to give residents the confidence that any growth will be managed. The primary school is already full at 4 form-entry. There is no capacity to take any more children until a new school is built. Public transport is inadequate with infrequent bus services and there are only 2 trains every hour during peak times, so people depend on their cars. As yet, there has been no assessment done of the Highways to ensure the road network can cope, at least until such time that the bypass is built. The Kenilworth Road, in particular, has long queues of traffic at peak times. All this affects the air quality in our village and the health of the residents. Given that many of the proposed sites are in open countryside, it is also worrying that no Ecological Assessments have been made available to the public. I understand that there is a proposal to build a new settlement to the north of Balsall Common and I would urge the council to seriously look at that as an alternative to imposing any significant level of new housing on Balsall Common, a village which is already clearly "bursting at the seams".
Turning to site 3 itself, this is a greenfield, greenbelt site in the Meriden Gap. Mayor Andy Street and Leader of the Council, Bob Sleigh, have both pledged to protect this precious area. The development of site 3 would create the narrowest gap yet so, as residents, we do not understand why the site is being included. The council has also assessed the sustainability of the site and it scores very poorly (9 negatives and only 2 positives), not least because it stretches so far out from the village boundary that you would need to drive to the village shops, the medical centre, the train station and the primary school. Just because there are two housing estates now built in the vicinity should not provide a "shoo- in" to build on the rest. The area is rich in wildlife - owls, red kites, woodpeckers, deer, hawks, numerous insects, bats, amphibians and the protected Great Crested Newts, to name but a few. As there are no plans to include nature reserves, unlike the other two greenfield sites at Frog Lane and Barrett's Farm, the habitat and feeding grounds for these creatures will be destroyed. There is also the danger of light pollution from street lights having a detrimental effect on nocturnal creatures. Although there are areas protected for the newts, these are to be crossed over by roads, clearly putting the lives of the newts at risk.
Furthermore, the only additional access point onto the road network will be onto Windmill Lane opposite Hob Lane. Otherwise new residents will be expected to access their homes through the Meer Stones Road estate. This means that drivers from 280 dwellings (including Meer Stones Road residents) will be trying to access the road network from two points, one of which is the busy Kenilworth Road and the other Windmill Lane. This lane is already turning into a fast "rat run" as drivers try to avoid the congestion in the village. This is not sustainable.
Last, but by no means least, there is the harm that development in this area would have on the magnificent Grade 2* Listed Berkswell Windmill opposite. This is an historic monument of local, regional, national and international significance and is part of our heritage which attracts many visitors into the area. Not only will building houses nearby harm the setting of this unique tower mill, but also the wind flow will be interfered with, which will stop the sails from turning. Given that this is one of the few remaining functional mills in the country, this would be an absolute travesty. This is a magnificent and iconic landmark, the heritage of which must be respected and preserved for generations to come.
All these are reasons to remove site 3 from the plan, but there is also the impact this site would have on current residents to consider. Although low density housing is proposed in some areas next to current properties, in other parts medium density housing is proposed with no "green buffer" to preserve any of the visual amenity currently enjoyed by residents. This is not respecting the local character of housing in this locality nor the people who currently live there.
Moreover, based on the recent housing estates, the ground conditions are such that these new homes would require pile driving. The impact of the relentless noise and vibrations from this building process on residents is indescribable. It is impossible to work from home, which many of us do and not always out of choice. Such invasive work in the vicinity of the Berkswell Windmill also risks causing long-term damage to this historic monument as well as disrupting the numerous species of local wildlife. This, in itself, should be justification for not developing site 3, or indeed any site with similar ground conditions. Balsall Common residents will be under significant stress from the impact of HS2 construction as well as housing development, not least with the never-ending temporary traffic lights and road closures. We should not be expected to have to deal with this noise as well.
In summary, I would urge that the council take note of this response and remove Site 3 from the Draft Local Plan. There is no doubt, based on SMBC's criteria, that the site is neither sustainable nor accessible. Given the number of housing units available on the brownfield sites, it is unnecessary and incomprehensible as to why the site has not been taken out already. There is no need to build here.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 6948
Received: 03/03/2019
Respondent: Catherine Langton
The development of site 3 would create the narrowest green belt gap yet.
Objection to the allocation of site 3, Windmill Lane, Balsall Common
I wish to register my objection to the on-going proposal, in the Draft Local Plan, to build 220 housing units on the greenbelt, greenfield land between Windmill Lane and the Kenilworth Road in Balsall Common known as Site 3.
I understand that the council has recently decided, in line with government policy, to develop three brownfield sites in Balsall Common at Wootton Green Lane, Lavender Hall Farm and Pheasant Oak farm. These sites were suggested by residents to the council as alternatives to site 3 (and also site 2, Frog Lane) in the last consultation in 2017. However, rather than developing these sites instead of the greenfield sites, they are to be developed in addition. Our village of circa 3900 homes is now expected to grow by a further 1755, 460 coming from the brownfield sites. In contrast, other settlements within the borough are seeing a big reduction in the proposed housing numbers (South Shirley and Dickins Heath) and Dorridge has not been allocated any housing sites at all. This does not seem to be a fair distribution, particularly with our village also having to deal with the disruption of HS2. The council would appear to be paying lip service to residents' concerns and efforts to assist in finding alternative sites to build on.
To manage any significant expansion of the village needs careful planning, in terms of schooling, traffic, housing sites and amenities, alongside HS2. There is no timing plan within the Draft Local Plan to give residents the confidence that any growth will be managed. The primary school is already full at 4 form-entry. There is no capacity to take any more children until a new school is built. Public transport is inadequate with infrequent bus services and there are only 2 trains every hour during peak times, so people depend on their cars. As yet, there has been no assessment done of the Highways to ensure the road network can cope, at least until such time that the bypass is built. The Kenilworth Road, in particular, has long queues of traffic at peak times. All this affects the air quality in our village and the health of the residents. Given that many of the proposed sites are in open countryside, it is also worrying that no Ecological Assessments have been made available to the public. I understand that there is a proposal to build a new settlement to the north of Balsall Common and I would urge the council to seriously look at that as an alternative to imposing any significant level of new housing on Balsall Common, a village which is already clearly "bursting at the seams".
Turning to site 3 itself, this is a greenfield, greenbelt site in the Meriden Gap. Mayor Andy Street and Leader of the Council, Bob Sleigh, have both pledged to protect this precious area. The development of site 3 would create the narrowest gap yet so, as residents, we do not understand why the site is being included. The council has also assessed the sustainability of the site and it scores very poorly (9 negatives and only 2 positives), not least because it stretches so far out from the village boundary that you would need to drive to the village shops, the medical centre, the train station and the primary school. Just because there are two housing estates now built in the vicinity should not provide a "shoo- in" to build on the rest. The area is rich in wildlife - owls, red kites, woodpeckers, deer, hawks, numerous insects, bats, amphibians and the protected Great Crested Newts, to name but a few. As there are no plans to include nature reserves, unlike the other two greenfield sites at Frog Lane and Barrett's Farm, the habitat and feeding grounds for these creatures will be destroyed. There is also the danger of light pollution from street lights having a detrimental effect on nocturnal creatures. Although there are areas protected for the newts, these are to be crossed over by roads, clearly putting the lives of the newts at risk.
Furthermore, the only additional access point onto the road network will be onto Windmill Lane opposite Hob Lane. Otherwise new residents will be expected to access their homes through the Meer Stones Road estate. This means that drivers from 280 dwellings (including Meer Stones Road residents) will be trying to access the road network from two points, one of which is the busy Kenilworth Road and the other Windmill Lane. This lane is already turning into a fast "rat run" as drivers try to avoid the congestion in the village. This is not sustainable.
Last, but by no means least, there is the harm that development in this area would have on the magnificent Grade 2* Listed Berkswell Windmill opposite. This is an historic monument of local, regional, national and international significance and is part of our heritage which attracts many visitors into the area. Not only will building houses nearby harm the setting of this unique tower mill, but also the wind flow will be interfered with, which will stop the sails from turning. Given that this is one of the few remaining functional mills in the country, this would be an absolute travesty. This is a magnificent and iconic landmark, the heritage of which must be respected and preserved for generations to come.
All these are reasons to remove site 3 from the plan, but there is also the impact this site would have on current residents to consider. Although low density housing is proposed in some areas next to current properties, in other parts medium density housing is proposed with no "green buffer" to preserve any of the visual amenity currently enjoyed by residents. This is not respecting the local character of housing in this locality nor the people who currently live there.
Moreover, based on the recent housing estates, the ground conditions are such that these new homes would require pile driving. The impact of the relentless noise and vibrations from this building process on residents is indescribable. It is impossible to work from home, which many of us do and not always out of choice. Such invasive work in the vicinity of the Berkswell Windmill also risks causing long-term damage to this historic monument as well as disrupting the numerous species of local wildlife. This, in itself, should be justification for not developing site 3, or indeed any site with similar ground conditions. Balsall Common residents will be under significant stress from the impact of HS2 construction as well as housing development, not least with the never-ending temporary traffic lights and road closures. We should not be expected to have to deal with this noise as well.
In summary, I would urge that the council take note of this response and remove Site 3 from the Draft Local Plan. There is no doubt, based on SMBC's criteria, that the site is neither sustainable nor accessible. Given the number of housing units available on the brownfield sites, it is unnecessary and incomprehensible as to why the site has not been taken out already. There is no need to build here.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 6955
Received: 03/03/2019
Respondent: David Langton
The development of site 3 would create the narrowest green belt gap yet.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 6959
Received: 03/03/2019
Respondent: Diane Langton
The development of site 3 would create the narrowest green belt gap yet.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 6963
Received: 03/03/2019
Respondent: Mr John Wilson
The development of site 3 would create the narrowest gap yet.
See letter
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 7003
Received: 04/03/2019
Respondent: Andy Wilson
The development of site 3 would create the narrowest green belt gap yet
Objection to the allocation of site 3, Windmill Lane, Balsall Common
I wish to register my objection to the on-going proposal, in the Draft Local Plan, to build 220 housing units on the greenbelt, greenfield land between Windmill Lane and the Kenilworth Road in Balsall Common known as Site 3.
I understand that the council has recently decided, in line with government policy, to develop three brownfield sites in Balsall Common at Wootton Green Lane, Lavender Hall Farm and Pheasant Oak farm. These sites were suggested by residents to the council as alternatives to site 3 (and also site 2, Frog Lane) in the last consultation in 2017. However, rather than developing these sites instead of the greenfield sites, they are to be developed in addition. Our village of circa 3900 homes is now expected to grow by a further 1755, 460 coming from the brownfield sites. In contrast, other settlements within the borough are seeing a big reduction in the proposed housing numbers (South Shirley and Dickins Heath) and Dorridge has not been allocated any housing sites at all. This does not seem to be a fair distribution, particularly with our village also having to deal with the disruption of HS2. The council would appear to be paying lip service to residents' concerns and efforts to assist in finding alternative sites to build on.
To manage any significant expansion of the village needs careful planning, in terms of schooling, traffic, housing sites and amenities, alongside HS2. There is no timing plan within the Draft Local Plan to give residents the confidence that anygrowth will be managed. The primary school is already full at 4 form-entry. There is no capacity to take any more children until a new school is built. Public transport is inadequate with infrequent bus services and there are only 2 trains every hourduring peak times, so people depend on their cars. As yet, there has been no assessment done of the Highways to ensure the road network can cope, at least until such time that the bypass is built. The Kenilworth Road, in particular, has long queues of traffic at peak times. All this affects the air quality in our village and the health of the residents. Given that many of the proposed sites are in open countryside, it is also worrying that no Ecological Assessments have been made available to the public. I understand that there is a proposal to build a new settlement to the north of Balsall Common and I would urge the council to seriously look at that as an alternative to imposing any significant level of new housing on Balsall Common, a village which is already clearly "bursting at the seams".
Turning to site 3 itself, this is a greenfield, greenbelt site in the Meriden Gap. Mayor Andy Street and Leader of the Council, Bob Sleigh, have both pledged to protect this precious area. The development of site 3 would create the narrowest gap yet so, as residents, we do not understand why the site is being included. The council has also assessed the sustainability of the site and it scores very poorly (9 negatives and only 2 positives), not least because it stretches so far out from the village boundary that you would need to drive to the village shops, the medical centre, the train station and the primary school. Just because there are two housing estates now built in the vicinity should not provide a "shoo- in" to build on the rest. The area is rich in wildlife - owls, red kites, woodpeckers, deer, hawks, numerous insects, bats, amphibians and the protected Great Crested Newts, to name but a few. As there are no plans to include nature reserves, unlike the other two greenfield sites at Frog Lane and Barrett's Farm, the habitat and feeding grounds for these creatures will be destroyed. There is also the danger of light pollution from street lights having a detrimental effect onnocturnal creatures. Although there are areas protected for the newts, these are to be crossed over by roads, clearly puttingthe lives of the newts at risk.
Furthermore, the only additional access point onto the road network will be onto Windmill Lane opposite Hob Lane. Otherwise new residents will be expected to access their homes through the Meer Stones Road estate. This means that drivers from 280 dwellings (including Meer Stones Roadresidents) will be trying to access the road network from two points, one of which is the busy Kenilworth Road and the other Windmill Lane. This lane is already turning into a fast "rat run" as drivers try to avoid the congestion in the village. This is not sustainable.
Last, but by no means least, there is the harm that development in this area would have on the magnificent Grade 2* Listed Berkswell Windmill opposite. This is an historic monument of local, regional, national and international significance and is part of our heritage which attracts many visitors into the area. Not only will building houses nearby harm the setting of this unique tower mill, but also the wind flow will be interfered with, which will stop the sails from turning. Given that this is one of the few remaining functional mills in the country, this would be an absolute travesty. This is a magnificent and iconic landmark, the heritage of which must be respected and preserved for generations to come.
All these are reasons to remove site 3 from the plan, but there is also the impact this site would have on current residents to consider. Although low density housing is proposed in some areas next to current properties, in other parts medium density housing is proposed with no "green buffer" to preserve any of the visual amenity currently enjoyed by residents. This is not respecting the local character of housing in this locality nor the people who currently live there.
Moreover, based on the recent housing estates, the ground conditions are such that these new homes would require pile driving. The impact of the relentless noise and vibrations from this building process on residents is indescribable. It is impossible to work from home, which many of us do and not always out of choice. Such invasive work in the vicinity of the Berkswell Windmill also risks causing long-term damage to this historic monument as well as disrupting the numerous species of local wildlife. This, in itself, should be justification for not developing site 3, or indeed any site with similar ground conditions. Balsall Common residents will be under significant stress from the impact of HS2 construction as well as housing development, not least with the never-ending temporary traffic lights and road closures. We should not be expected to have to deal with this noise as well.
In summary, I would urge that the council take note of this response and remove Site 3 from the Draft Local Plan. There is no doubt, based on SMBC's criteria, that the site is neither sustainable nor accessible. Given the number of housing units available on the brownfield sites, it is unnecessary and incomprehensible as to why the site has not been taken out already. There is no need to build here.
Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 7019
Received: 05/03/2019
Respondent: Kate Riemer
With reference to the wider Barratt's Farm site : Site 169 Blessed Robert Griswold Site, the Recreation Ground off Meeting House Lane, a long established and valuable recreational space, must be designated as a Local Green Space (as detailed in the Berkswell Parish Neighbourhood Development Plan) in addition to any compensatory provision planned for the Barratt's Farm site
With reference to the wider Barratt's Farm site : Site 169 Blessed Robert Griswold Site, the Recreation Ground off Meeting House Lane, a long established and valuable recreational space, must be designated as a Local Green Space (as detailed in the Berkswell Parish Neighbourhood Development Plan) in addition to any compensatory provision planned for the Barratt's Farm site
Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 7106
Received: 07/03/2019
Respondent: Mr Alex Lukeman
Former Site 13 (land south of Shirley between Whitlock's End Farm and Dickens Heath Road).
This site has been removed from potential development but its future requires protection for the continued enjoyment of residents. In view of its sensitivity, ancient trees, hedgerows, ecology, and ancient historical interest this needs to be developed as a nature reserve. It is well used and should be protected for future generations as recommended in the National Planning Policy Framework as offsetting to mitigate loss of greenbelt. Concerns are that this site may be affected by wash over from Site 26 unless protection is afforded.
Former Site 13 (land south of Shirley between Whitlock's End Farm and Dickens Heath Road).
This site has been removed from potential development but its future requires protection for the continued enjoyment of residents. In view of its sensitivity, ancient trees, hedgerows, ecology, and ancient historical interest this needs to be developed as a nature reserve. It is well used and should be protected for future generations as recommended in the National Planning Policy Framework as offsetting to mitigate loss of greenbelt. Concerns are that this site may be affected by wash over from Site 26 unless protection is afforded.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 7165
Received: 07/03/2019
Respondent: Jean Fleming
The development of site 3 would create the narrowest green belt gap yet.
Objection to the allocation of site 3, Windmill Lane, Balsall Common
I wish to register my objection to the on-going proposal, in the Draft Local Plan, to build 220 housing units on the greenbelt, greenfield land between Windmill Lane and the Kenilworth Road in Balsall Common known as Site 3.
I understand that the council has recently decided, in line with government policy, to develop three brownfield sites in Balsall Common at Wootton Green Lane, Lavender Hall Farm and Pheasant Oak farm. These sites were suggested by residents to the council as alternatives to site 3 (and also site 2, Frog Lane) in the last consultation in 2017. However, rather than developing these sites instead of the greenfield sites, they are to be developed in addition. Our village of circa 3900 homes is now expected to grow by a further 1755, 460 coming from the brownfield sites. In contrast, other settlements within the borough are seeing a big reduction in the proposed housing numbers (South Shirley and Dickins Heath) and Dorridge has not been allocated any housing sites at all. This does not seem to be a fair distribution, particularly with our village also having to deal with the disruption of HS2. The council do not appear to be truly listening to residents' concerns and efforts to assist in finding alternative sites to build on.
To manage any significant expansion of the village needs careful planning, in terms of schooling, traffic, housing sites and amenities, alongside HS2. There is no timing plan within the Draft Local Plan to give residents the confidence that anygrowth will be managed.
There is a lack of infrastructure to support such growth.
School
The primary school is already full at 4 form-entry. There is no capacity to take any more children until a new school is built.
Public Transport
Public transport is inadequate with infrequent bus services and there are only 2 trains every hourduring peak times, so people depend on their cars. As yet, there has been no assessment done of the Highways to ensure the road network can cope, at least until such time that the bypass is built.
Along the road I live on, Kenilworth Road, in particular, has long queues of traffic at peak times. All this affects the air quality in our village and the health of the residents.
Environment
Given that many of the proposed sites are in open countryside, it is also worrying that no Ecological Assessments have been made available to the public. I understand that there is a proposal to build a new settlement to the north of Balsall Common and I would urge the council to seriously look at that as an alternative to imposing any significant level of new housing on Balsall Common, a village which is already clearly "bursting at the seams".
The Proposed Site
Turning to site 3 itself, this is a greenfield, greenbelt site in the Meriden Gap. Mayor Andy Street and Leader of the Council, Bob Sleigh, have both pledged to protect this precious area.
The development of site 3 would create the narrowest gap yet so, as residents, we do not understand why the site is being included. The council has also assessed the sustainability of the site and it scores very poorly (9 negatives and only 2 positives), not least because it stretches so far out from the village boundary that you would need to drive to the village shops, the medical centre, the train station and the primary school.
We have already had to endure the development of two housing estates now built in the vicinity. I do not believe a further one taking away the remaining green space should be considered.
The area is rich in wildlife - owls, red kites, woodpeckers, deer, hawks, numerous insects, bats, amphibians and the protected Great Crested Newts, to name but a few. As there are no plans to include nature reserves, unlike the other two greenfield sites at Frog Lane and Barrett's Farm, the habitat and feeding grounds for these creatures will be destroyed. There is also the danger of light pollution from street lights having a detrimental effect onnocturnal creatures. Although there are areas protected for the newts, these are to be crossed over by roads, clearly putting the lives of the newts at risk.
Road access
Furthermore, the only additional access point onto the road network will be onto Windmill Lane opposite Hob Lane. Otherwise new residents will be expected to access their homes through the Meer Stones Road estate. This means that drivers from 280 dwellings (including Meer Stones Roadresidents) will be trying to access the road network from two points, one of which is the busy Kenilworth Road and the other Windmill Lane. This lane is already turning into a fast "rat run" as drivers try to avoid the congestion in the village. This is not sustainable.
Berkswell Windmill
Last, but by no means least, there is the harm that development in this area would have on the magnificent Grade 2* Listed Berkswell Windmill opposite. This is an historic monument of local, regional, national and international significance and is part of our heritage which attracts many visitors into the area. Not only will building houses nearby harm the setting of this unique tower mill, but also the wind flow will be interfered with, which will stop the sails from turning. Given that this is one of the few remaining functional mills in the country, this would be an absolute travesty. This is a magnificent and iconic landmark, the heritage of which must be respected and preserved for generations to come.
All these are reasons to remove site 3 from the plan, but there is also the impact this site would have on current residents to consider. Although low density housing is proposed in some areas next to current properties, in other parts medium density housing is proposed with no "green buffer" to preserve any of the visual amenity currently enjoyed by residents. This is not respecting the local character of housing in this locality nor the people who currently live there.
Moreover, based on the recent housing estates, the ground conditions are such that these new homes would require pile driving. The impact of the relentless noise and vibrations from this building process on residents is indescribable. It is impossible to work from home, which many of us do and not always out of choice. Such invasive work in the vicinity of the Berkswell Windmill also risks causing long-term damage to this historic monument as well as disrupting the numerous species of local wildlife. This, in itself, should be justification for not developing site 3, or indeed any site with similar ground conditions. Balsall Common residents will be under significant stress from the impact of HS2 construction as well as housing development, not least with the never-ending temporary traffic lights and road closures. We should not be expected to have to deal with this noise as well.
In summary, I would urge that the council take note of this response and remove Site 3 from the Draft Local Plan. There is no doubt, based on SMBC's criteria, that the site is neither sustainable nor accessible. Given the number of housing units available on the brownfield sites, it is unnecessary and incomprehensible as to why the site has not been taken out already. There is no need to build here.
Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 7189
Received: 08/03/2019
Respondent: Hampton-in-Arden Parish Council and Catherine-de-Barnes Residents' Association
Hampton in Arden and Catherine de Barnes.
Plan should recognise the multiple threats posed against the Meriden Gap by HS2, M42 Junction 6 and MSA, which could increase pressure for further development and result in loss of gap between urban area and Catherine de Barnes.
See Letter
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 7257
Received: 09/03/2019
Respondent: Mrs Lisa Mitchell
Do not see how there could be compensatory provision for loss of Green Belt at Widney Manor Road.
Please see attached letter
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 7262
Received: 09/03/2019
Respondent: Joanne Liddiard- McGann
We need compensation to protect Site 13 as a nature reserve
We need compensation to protect Site 13 as a nature reserve
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 7278
Received: 10/03/2019
Respondent: Miss Susan Hillitt
What possible compensation will make up for loss of the very small amount of Green Belt the residents of Shirley still have?
What possible compensation will make up for loss of the very small amount of Green Belt the residents of Shirley still have?
Support
Draft Local Plan - Supplementary Consultation
Representation ID: 7284
Received: 10/03/2019
Respondent: Mr Trevor Vaisey
Site 13 should be protected as a nature reserve and compensation made available for this purpose
Site 13 should be protected as a nature reserve and compensation made available for this purpose
Support
Draft Local Plan - Supplementary Consultation
Representation ID: 7295
Received: 12/03/2019
Respondent: Mrs Sally Woodhall
Allocation 13 has been removed from the draft local plan, I believe that adjacent fields to this site should in mitigation for all the the local proposed building be made open to the public and turned into a nature reserve.
Allocation 13 has been removed from the draft local plan, I believe that adjacent fields to this site should in mitigation for all the the local proposed building be made open to the public and turned into a nature reserve.
Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 7322
Received: 10/03/2019
Respondent: Pauline Daniels
We need compensation to protect site 13 as a nature reserve.
We need compensation to protect site 13 as a nature reserve.
Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 7366
Received: 11/03/2019
Respondent: Mr Esak Shabudin
We need green belt compensation for all sites especially 13and 26
We need green belt compensation for all sites especially 13and 26
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 7381
Received: 11/03/2019
Respondent: Mr Bruce Richard
Do not see how there could be compensatory provision for loss of Green Belt at Widney Manor Road.
Please see attached letter
Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 7384
Received: 11/03/2019
Respondent: Ms Barbara Connah
We need compensation to protect Site 13 as a nature reserve.
We need compensation to protect Site 13 as a nature reserve.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 7399
Received: 11/03/2019
Respondent: Mrs Wendy Murphy
Compensation to protect site 13 as a nature reserve.
Compensation to protect site 13 as a nature reserve.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 7415
Received: 10/03/2019
Respondent: Eileen Lamb
The development of site 3 would create the narrowest gap between settlements.
I attended a meeting in Balsall Common Library on Saturday 16th February. I was disappointed to find that the representatives from Solihull Council were not able to answer many of the questions satisfactorily. There were many 'unknowns'. I moved into Meer Stones Road in October and am lucky to have a view over fields which I understand would be obscured by the proposed building on green field land in Windmill Lane. The thought of extra traffic having to use Meer Stones Road if the plans go ahead is frightening as the road outside my house is very narrow and on a sharp bend and an accident could easily occur. Have the planners visited this site before making such proposals?
I entirely endorse the views expressed in the attached letter from BCBARRAGE and trust that the points made in it are considered very carefully before permission to build on Site3 is given.
Balsall Common does not have the infrastructure to support such development and the disruption, together with that caused by HS2, would be intolerable. The effect on the environment caused by extra roads and traffic pollution would be great and not a legacy I would like to leave to future residents.
I trust that serious consideration will be given to the points made in the attached letter from BCBARRAGE. I am not usually a protester but feel very strongly about this issue.
See Letter
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 7431
Received: 10/03/2019
Respondent: Rebecca Clare
The development of site 3 would create the narrowest gap yet.
Objection to the allocation of site 3, Windmill Lane, Balsall Common
I wish to register my objection to the on-going proposal, in the Draft Local Plan, to build 220 housing units on the greenbelt, greenfield land between Windmill Lane and the Kenilworth Road in Balsall Common known as Site 3.
I understand that the council has recently decided, in line with government policy, to develop three brownfield sites in Balsall Common at Wootton Green Lane, Lavender Hall Farm and Pheasant Oak farm. These sites were suggested by residents to the council as alternatives to site 3 (and also site 2, Frog Lane) in the last consultation in 2017. However, rather than developing these sites instead of the greenfield sites, they are to be developed in addition. Our village of circa 3900 homes is now expected to grow by a further 1755, 460 coming from the brownfield sites. In contrast, other settlements within the borough are seeing a big reduction in the proposed housing numbers (South Shirley and Dickins Heath) and Dorridge has not been allocated any housing sites at all. This does not seem to be a fair distribution, particularly with our village also having to deal with the disruption of HS2. The council would appear to be paying lip service to residents' concerns and efforts to assist in finding alternative sites to build on.
To manage any significant expansion of the village needs careful planning, in terms of schooling, traffic, housing sites and amenities, alongside HS2. There is no timing plan within the Draft Local Plan to give residents the confidence that any growth will be managed. The primary school is already full at 4 form-entry. There is no capacity to take any more children until a new school is built. Public transport is inadequate with infrequent bus services and there are only 2 trains every hour during peak times, so people depend on their cars. As yet, there has been no assessment done of the Highways to ensure the road network can cope, at least until such time that the bypass is built. The Kenilworth Road, in particular, has long queues of traffic at peak times. All this affects the air quality in our village and the health of the residents. Given that many of the proposed sites are in open countryside, it is also worrying that no Ecological Assessments have been made available to the public. I understand that there is a proposal to build a new settlement to the north of Balsall Common and I would urge the council to seriously look at that as an alternative to imposing any significant level of new housing on Balsall Common, a village which is already clearly "bursting at the seams".
Turning to site 3 itself, this is a greenfield, greenbelt site in the Meriden Gap. Mayor Andy Street and Leader of the Council, Bob Sleigh, have both pledged to protect this precious area. The development of site 3 would create the narrowest gap yet so, as residents, we do not understand why the site is being included. The council has also assessed the sustainability of the site and it scores very poorly (9 negatives and only 2 positives), not least because it stretches so far out from the village boundary that you would need to drive to the village shops, the medical centre, the train station and the primary school. Just because there are two housing estates now built in the vicinity should not provide a "shoo- in" to build on the rest. The area is rich in wildlife - owls, red kites, woodpeckers, deer, hawks, numerous insects, bats, amphibians and the protected Great Crested Newts, to name but a few. As there are no plans to include nature reserves, unlike the other two greenfield sites at Frog Lane and Barrett's Farm, the habitat and feeding grounds for these creatures will be destroyed. There is also the danger of light pollution from street lights having a detrimental effect on nocturnal creatures. Although there are areas protected for the newts, these are to be crossed over by roads, clearly putting the lives of the newts at risk.
Furthermore, the only additional access point onto the road network will be onto Windmill Lane opposite Hob Lane. Otherwise new residents will be expected to access their homes through the Meer Stones Road estate. This means that drivers from 280 dwellings (including Meer Stones Road residents) will be trying to access the road network from two points, one of which is the busy Kenilworth Road and the other Windmill Lane. This lane is already turning into a fast "rat run" as drivers try to avoid the congestion in the village. This is not sustainable.
Last, but by no means least, there is the harm that development in this area would have on the magnificent Grade 2* Listed Berkswell Windmill opposite. This is an historic monument of local, regional, national and international significance and is part of our heritage which attracts many visitors into the area. Not only will building houses nearby harm the setting of this unique tower mill, but also the wind flow will be interfered with, which will stop the sails from turning. Given that this is one of the few remaining functional mills in the country, this would be an absolute travesty. This is a magnificent and iconic landmark, the heritage of which must be respected and preserved for generations to come.
All these are reasons to remove site 3 from the plan, but there is also the impact this site would have on current residents to consider. Although low density housing is proposed in some areas next to current properties, in other parts medium density housing is proposed with no "green buffer" to preserve any of the visual amenity currently enjoyed by residents. This is not respecting the local character of housing in this locality nor the people who currently live there.
Moreover, based on the recent housing estates, the ground conditions are such that these new homes would require pile driving. The impact of the relentless noise and vibrations from this building process on residents is indescribable. It is impossible to work from home, which many of us do and not always out of choice. Such invasive work in the vicinity of the Berkswell Windmill also risks causing long-term damage to this historic monument as well as disrupting the numerous species of local wildlife. This, in itself, should be justification for not developing site 3, or indeed any site with similar ground conditions. Balsall Common residents will be under significant stress from the impact of HS2 construction as well as housing development, not least with the never-ending temporary traffic lights and road closures. We should not be expected to have to deal with this noise as well.
In summary, I would urge that the council take note of this response and remove Site 3 from the Draft Local Plan. There is no doubt, based on SMBC's criteria, that the site is neither sustainable nor accessible. Given the number of housing units available on the brownfield sites, it is unnecessary and incomprehensible as to why the site has not been taken out already. There is no need to build here.
Object
Draft Local Plan - Supplementary Consultation
Representation ID: 7435
Received: 10/03/2019
Respondent: Simon Clare
The development of site 3 would create the narrowest gap yet.
Objection to the allocation of site 3, Windmill Lane, Balsall Common
I wish to register my objection to the on-going proposal, in the Draft Local Plan, to build 220 housing units on the greenbelt, greenfield land between Windmill Lane and the Kenilworth Road in Balsall Common known as Site 3.
I understand that the council has recently decided, in line with government policy, to develop three brownfield sites in Balsall Common at Wootton Green Lane, Lavender Hall Farm and Pheasant Oak farm. These sites were suggested by residents to the council as alternatives to site 3 (and also site 2, Frog Lane) in the last consultation in 2017. However, rather than developing these sites instead of the greenfield sites, they are to be developed in addition. Our village of circa 3900 homes is now expected to grow by a further 1755, 460 coming from the brownfield sites. In contrast, other settlements within the borough are seeing a big reduction in the proposed housing numbers (South Shirley and Dickins Heath) and Dorridge has not been allocated any housing sites at all. This does not seem to be a fair distribution, particularly with our village also having to deal with the disruption of HS2. The council would appear to be paying lip service to residents' concerns and efforts to assist in finding alternative sites to build on.
To manage any significant expansion of the village needs careful planning, in terms of schooling, traffic, housing sites and amenities, alongside HS2. There is no timing plan within the Draft Local Plan to give residents the confidence that any growth will be managed. The primary school is already full at 4 form-entry. There is no capacity to take any more children until a new school is built. Public transport is inadequate with infrequent bus services and there are only 2 trains every hour during peak times, so people depend on their cars. As yet, there has been no assessment done of the Highways to ensure the road network can cope, at least until such time that the bypass is built. The Kenilworth Road, in particular, has long queues of traffic at peak times. All this affects the air quality in our village and the health of the residents. Given that many of the proposed sites are in open countryside, it is also worrying that no Ecological Assessments have been made available to the public. I understand that there is a proposal to build a new settlement to the north of Balsall Common and I would urge the council to seriously look at that as an alternative to imposing any significant level of new housing on Balsall Common, a village which is already clearly "bursting at the seams".
Turning to site 3 itself, this is a greenfield, greenbelt site in the Meriden Gap. Mayor Andy Street and Leader of the Council, Bob Sleigh, have both pledged to protect this precious area. The development of site 3 would create the narrowest gap yet so, as residents, we do not understand why the site is being included. The council has also assessed the sustainability of the site and it scores very poorly (9 negatives and only 2 positives), not least because it stretches so far out from the village boundary that you would need to drive to the village shops, the medical centre, the train station and the primary school. Just because there are two housing estates now built in the vicinity should not provide a "shoo- in" to build on the rest. The area is rich in wildlife - owls, red kites, woodpeckers, deer, hawks, numerous insects, bats, amphibians and the protected Great Crested Newts, to name but a few. As there are no plans to include nature reserves, unlike the other two greenfield sites at Frog Lane and Barrett's Farm, the habitat and feeding grounds for these creatures will be destroyed. There is also the danger of light pollution from street lights having a detrimental effect on nocturnal creatures. Although there are areas protected for the newts, these are to be crossed over by roads, clearly putting the lives of the newts at risk.
Furthermore, the only additional access point onto the road network will be onto Windmill Lane opposite Hob Lane. Otherwise new residents will be expected to access their homes through the Meer Stones Road estate. This means that drivers from 280 dwellings (including Meer Stones Road residents) will be trying to access the road network from two points, one of which is the busy Kenilworth Road and the other Windmill Lane. This lane is already turning into a fast "rat run" as drivers try to avoid the congestion in the village. This is not sustainable.
Last, but by no means least, there is the harm that development in this area would have on the magnificent Grade 2* Listed Berkswell Windmill opposite. This is an historic monument of local, regional, national and international significance and is part of our heritage which attracts many visitors into the area. Not only will building houses nearby harm the setting of this unique tower mill, but also the wind flow will be interfered with, which will stop the sails from turning. Given that this is one of the few remaining functional mills in the country, this would be an absolute travesty. This is a magnificent and iconic landmark, the heritage of which must be respected and preserved for generations to come.
All these are reasons to remove site 3 from the plan, but there is also the impact this site would have on current residents to consider. Although low density housing is proposed in some areas next to current properties, in other parts medium density housing is proposed with no "green buffer" to preserve any of the visual amenity currently enjoyed by residents. This is not respecting the local character of housing in this locality nor the people who currently live there.
Moreover, based on the recent housing estates, the ground conditions are such that these new homes would require pile driving. The impact of the relentless noise and vibrations from this building process on residents is indescribable. It is impossible to work from home, which many of us do and not always out of choice. Such invasive work in the vicinity of the Berkswell Windmill also risks causing long-term damage to this historic monument as well as disrupting the numerous species of local wildlife. This, in itself, should be justification for not developing site 3, or indeed any site with similar ground conditions. Balsall Common residents will be under significant stress from the impact of HS2 construction as well as housing development, not least with the never-ending temporary traffic lights and road closures. We should not be expected to have to deal with this noise as well.
In summary, I would urge that the council take note of this response and remove Site 3 from the Draft Local Plan. There is no doubt, based on SMBC's criteria, that the site is neither sustainable nor accessible. Given the number of housing units available on the brownfield sites, it is unnecessary and incomprehensible as to why the site has not been taken out already. There is no need to build here.
Support
Draft Local Plan - Supplementary Consultation
Representation ID: 7479
Received: 11/03/2019
Respondent: Wendy Cairns
With so much green belt being savaged by Solihull compensatory development is essential
With so much green belt being savaged by Solihull compensatory development is essential
Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 7519
Received: 11/03/2019
Respondent: Mr Neil Jeffries
Site 13 should be protected as a nature reserve.
Site 13 should be protected as a nature reserve.