Showing comments and forms 511 to 540 of 845

No

Draft Local Plan Review

Representation ID: 5240

Received: 16/02/2017

Respondent: Matthew Quinn

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

Council Draft Plan - Site 3

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transportand therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as towhere housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5242

Received: 16/02/2017

Respondent: Matthew Quinn

Representation Summary:

In relation to Site 1 and 2 Objection.

20% of new housing development in Balsall Common, but settlement does not meet Council's own criteria on accessibility.
Limited employment opportunities, which encourages car travel. This adds pressure to road network and increases carbon. No proposals for SPRINT in this area.
No safe access via Meeting House Lane. Highway safety risk to children walking to school or cricket/tennis club.
Cul-de-sacs should not become through-routes.

Full text:

OBJECTION to site 1 , Catholic Church Land and Barrets Farm, Balsall Common

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 1. Barrets Farm and The Land Near there owned by the Catholic Church

The reasons for my objection are below.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) No access would be safe via Meeting House Lane. Lots of children walk to the school and cricket/tennis club and the proposed access via any part of meeting house lane would be dangerous.

5) Cul-de Sac roads should remain this way and would not be safe to transform any of
these.

No

Draft Local Plan Review

Representation ID: 5249

Received: 16/02/2017

Respondent: Mrs Melanie MacSkimming

Representation Summary:

Sites 1,2,3.

No mention is made of shopping, banking etc, as banks are withdrawing from Balsall Common.
Car parking facilities are limited in the village. Dangerous in some areas.
Impact on local amenities and services. No mention is made of shopping, banking etc, as banks are withdrawing from Balsall Common.
Car parking facilities are limited in the village, dangerous in some areas.
Drainage issues.
Noise from HS2.
Add to existing congestion.
Poor existing infrastructure.
Poor public sector connectivity with the local economic centres which are primarily to the East and South; this is the way traffic flows at peak times.

Full text:


Response to Solihull MBC 23 question extended consultation on the draft local plan
TO WHOM THIS MAY CONCERN
Responses to the questionnaire regarding extended consulatation on the draft local plan.
Question 1 are the right borough challenges identified
Will the impact of Brexit have a material effect on the total number of homes needed in the Borough?
Question 2 agreement with the Borough Vision
Only In a very small part yes, but it is clearly written from an urban Solihull-centric perspective, once more bringing into disrepute the belief that Solihull successfully combines a well-balanced combined Urban and Rural vision. Looked at from a holistic position, Solihull MBC in this draft proposal will not be satisfied with following their own policies until an urban jungle is built through the most vulnerable and narrow portion of the Green Belt between Balsall Common and Coventry City.
SMBC fought a huge battle at enormous cost to preserve this piece of land from a coal mine development; why is it now prepared to sacrifice this precious 'lung' between two major city conurbations?
Balsall Common is already a congested community with poor infrastructure and very poor public sector connectivity with the local economic centres which are primarily to the East and South ie NOT Solihull and this is the way traffic flows at peak times.
Further, no consideration has been given to considering sites to the South and West of the settlement toward the considerable economic development driven by JLR at their Fen End site, where they plan to site 2,000+ engineers. Many of these people will seek homes in Balsall Common and, therefore, to reduce cross-village traffic any major development should be on the West side of the village. Similarly, if a village bypass should ever be needed then consideration should be given to siting this on the West side.
Adding the proposed disproportionate housing and its resulting population to Balsall Common in sensitive and fragile Green Belt areas will simply make the problems worse and continue the belief that SMBC will ignore its own Policies when they do not suit political goals.
Question 3 agreement with Spatial Strategy?
The approach defined for sites being appropriate for development as written looks good with the right priorities, but unfortunately they have not been adhered to in this draft plan.
Barratt's Farm land is Greenfield land not Brownfield land and has significant drain off issues. Additionally, as stressed above, the village is virtually bereft of effective public transport.
The demolition of the Meriden Gap Green Belt and its impact on the local ecology of the green fields, ancient hedge rows and trees will directly affect the existing local residents and families who extensively use the area and its many crisscrossing footpaths for open air exercise and leisure activities. The additional traffic emanating from such a large increase in housing will add to the air pollution caused by poor control of the take-off and landing heights from Birmingham Airport, especially the northern turn over the settlement.
If this land is built on, then the drain off problem identified above will represent a risk to local adjoining properties to the north and south.
This area is already under severe threat of noise and Greenbelt erosion from HS2.
Piling in some 800 homes with shops, a school and other amenities with poor access to existing roads is a planning nightmare.
The site between Windmill Lane and the A452 Kenilworth Road to the South of the settlement is broadly a Brownfield site, BUT it is also proposed for a density of housing which is too high. This will generate traffic onto the narrow Windmill Lane that has poor visibility junctions at each end, or onto the A452 Trunk road with difficult North and South junctions.
Question 7 regarding sustainable Economic Development?
Good principles, but again not seriously considered in the draft plan with no consideration of the disproportionate building of houses on an already congested and ill planned village centre.
Question11 policy P2 providing homes for all
The total proposed housing numbers are grossly disproportionate to the size of the existing community and will have a very significant detrimental impact on the size, shape, character and environment of Balsall Common as a Rural Village. It is also noticed that while mention is made of affordable homes, no mention is made of homes for older members of the community.
Question 15 appropriateness of draft proposed sites.
As mentioned throughout this response, Solihull MBC have failed to follow their own Policies in establishing the appropriateness of the chosen sites and yet proposals for a new village on a brown field site development to the north of the region have been ignored. This is also true of potential sites to the South/East of Solihull toward Hampton in Arden and Catherin de Barnes, these being closer to the proposed new High Speed HS2 interchange.
Question 16 completeness of required supporting infrastructure to complement the proposed draft development?
While Doctors and Schooling infrastructure is mentioned, no mention is made of shopping, banking etc and banks are currently withdrawing from Balsall Common. A lack of action on the site to the rear of the Co-op shop has caused it to be isolated from other retail outlets and has exacerbated the lack of any sense of a cohesive village centre. Car parking facilities in the Village are very limited and in some areas dangerous.
Question18 sustainable Travel
Good ideals but difficult to execute when public transport, apart from Birmingham focused rail, is very, very poor in the area.
Question 22 Delivery
CIL payments for local development should be focussed in the local area for locally requested and agreed infrastructure improvements.
Question 23 Any other comment
No explanation has been given to the fact that a grossly disproportionate number of houses are proposed to be built in Balsall Common in important and sensitive Green Belt land compared with elsewhere in Solihull Borough. Areas such as Dorridge, Knowle, Chadwick End and Fen End to the South are in less sensitive and less pressured areas of Green Belt land.
There is a very strong perception in the Balsall Common area that Solihull MBC have abandoned the Greenbelt and consciously discarded their own policies and values and have consequently lost what trust they had as a result.
It also appears from the draft local development plan consultation information booklet that land belonging to Lynda Beasley (Wyer) and Michael Cooper has been included in the proposed Barratt's Farm development. We assume this error will be rectified. In the event this development does proceed we would expect a barrier to be put in place to protect livestock on the above mentioned fields.

No

Draft Local Plan Review

Representation ID: 5259

Received: 16/02/2017

Respondent: N Birtley

Representation Summary:

Site 1 Objection.

Generate high volume additional traffic. Already busy area. Inadequate parking in village; little or no opportunity to increase provision. Would create congestion at/near station roundabout.
Traffic flow towards Coventry already restricted by the light controlled light underpass.
Pressure on station car park. Many rail travellers already park on Hallwmeadow Road up to Lavender Hall Road roundabout, creating difficulty for passing traffic.
Pressure on oversubscribed schools and local health services.

Full text:


Response to draft housing plan, with reference to the Barratts Farm site


1. I do not agree that approx. 1500 houses should be built in Balsall Common, with particular reference to the above site ( & also to the Windmill Lane site )

2. Whilst recognising that the borough needs to increase housing provision I believe that brownfield sites should be considered as a priority, rather than use green belt land contrary to HM. Govt. reccomendations.

3. The Barratts Farm proposal alone would generate a great deal of additional traffic in a busy area which already has inadequate car parking in the village centre with little or no opportunity to increase this provision.
Congestion could become a major issue at or near the station roundabout as many residents of such a site would inevitably travel to work, shops etc. by car. Traffic flow towards Coventry is already restricted by the light controlled low underpass.
Any additional traffic would also put further pressure on the already inadequate station car park, with many rail travellers cars already parked daily on Hallmeadow road, frequently stretching from the station roundabout to the Lavender Hall Lane roundabout, often creating difficulty for passing traffic.

4. There would be greatly increased pressure on local health provision, which is quite stretched at present., also on school provision.

5. The proximity of HS2's path could aso be a problem whilst rail construction work is in progress with the conflicting access needs of HS2 and house builders and may well have a detrimental effect on developers sales opportunities and marketability.( or is the housing proposal reliant on the possible dropping of HS2 plans? ) I cannot help but feel the two requirements are not compatible.

6. What possibility exists of redeveloping the HS2 construction sites for housing on it's completion?

7. I think that a new settlement or village to the north of Balsall Common should definitely be considered, with opportunity being taken to use the moving of existing roads
for HS2 purposes as a springboard for such development.

No

Draft Local Plan Review

Representation ID: 5266

Received: 16/02/2017

Respondent: Yvonne Naylor

Representation Summary:

Site 1.

Increased traffic pressure on congested roads. Only 6% in area use public transport.
Routes to exit the village to the east is very restricted at Station Road and Lavender Hall Lane, with no room for expansion. Most traffic will be travelling north on the A452.
Inadequate parking provision in village for station or local services.
Doctors oversubscribed.
Put further strain on capacity.
Impact of construction traffic, added to HS2 construction.
Noise, congestion etc from new homes and proposed bypass.
Bypass only acting as access road to new houses and not easing congestion pressure in the village.

Full text:

Letter of opposition to proposed development of Barratts Farm in Balsall Common and construction of by-pass.

1. Pressure on the Village

a) With no clear access from the South neither Hallmeadow road nor Station Road could cope with the increased traffic this development will bring.

b) There is already a lack of car parking spaces in and around the village. Hallmeadow Road is consistently used for general parking for Berkswell Station and the medical centre. Parking for any of the shops, library and Jubilee centre are extremely hard to come by. In this area there is an average of 1.6 cars per household with 2.5% of households having 4 or more cars/vans. It is fair to assume that there will be upwards of an additional 1500 cars in the village and the pressure these additional 1500 cars would bring would be immense.

c) It is already difficult to obtain a doctor's appointment at the clinic. The feeling locally is that it is already at capacity in terms of providing an acceptable level of service. With an average of 2.4 people per household locally another 1900 patients will do nothing to ease this problem.

d) Building more houses in this location will create more unsustainable car traffic by encouraging more car commuters to live in Balsall Common. It is accepted that Balsall Common is an area where there is little in the way of job creation and many residents have to commute by car to work around the West Midlands. Only 6% of residents of this area travel to work using public transport (information from solihull.gov.uk) This is contrary to planning policy. Routes to exit the village to the east is very restricted under the low bridge at Station Road and the narrow bridge on Lavender Hall Lane with no room for expansion on these. To the west Balsall Street East is not a major thoroughfare and does not have the capacity to cope with a large increase in traffic, so virtually all traffic will be travelling north on the A452.

e) Brownfield sites to the north of the village would be far more suited to cope with the increase of traffic without adding strain to the village centre.

f) This land is greenbelt land. The NPPF identifies the 5 key Purposes of Green Belts as the following: 

i. to check the unrestricted sprawl of large built-up areas;

ii. to prevent neighbouring towns from merging into one another;
iii. to assist in safeguarding the countryside from encroachment;
iv. to preserve the setting and special character of historic towns; and,
v. to assist in urban regeneration, by encouraging the recycling of derelict and other urban land.

g) I understand that there are adequate brown field sites which could be used without using greenbelt land in order to fulfil the housing requirements. It is clear that the only reason the greenbelt site to the rear of my property has been highlighted is because it is the biggest site allowing for the maximum amount of housing possible including high density housing. With the above 5 points in mind it is clear that the availability of these brownfield sites would bring into question the adherence to the NPPF guidelines. The development would bring outlying areas of Solihull even closer to the outlying areas of Coventry.

h) The development of these houses in this site will do nothing to benefit the village, only to ruin the community feel of this village and put further strain on its capacity.

2. Consequence of the development to the immediate surrounding area

a) For the duration of the construction of the proposed development, estimated to take up to 4 years we will be subject to noise, HGV traffic, dust and general appearance of the area.

b) I live within the blighted area of the impending HS2 build. With the current housing and bypass development you are not taking into consideration any of the pressures HS2 will impose on surrounding property in this area and HS2 will not be taking into consideration any of the pressures you are looking to impose. We could possibly end up with the HS2, 900 new houses on the greenbelt land and a newly built bypass in close proximity to our homes.

c) Once the houses and bypass are built, there will then be the day to day noise, congestion and additional traffic that an additional 900 households will bring to our doorstep and with 73% of people travelling to work by car in this area that means in the region of 1100 cars will be commuting to work each day.

3. Personal quality of life

a) I am not against progress in general or for the good of the village and community, but this burden should be shared by all. This proposal on top of HS2 means that a small number of residents in this area are impacted twice as much as any other area and are therefore taking much more of the burden of 'progress'.

b) I appreciate that 'view' is not an acceptable reason for opposing a build of this nature but both 'view' and the 'right to light' law does absolutely play a part in me opposing this build. Should there be a large area of high density residential development or houses close to my property or any other that is adjacent to Barretts Farm then the uninterrupted views over green fields for, in my case, 400 years, and the amount of direct sunlight could be severely affected. Under this circumstance we would have a very strong case under the so-called 'right to light' law to impose an injunction on the commencement of building.

4. My objection and rejection of the proposed development of housing and the extension of the bypass.

I object in the strongest manner to the proposed building on land to the rear of my property on the Barratts Farm site and to the possibility of a 'bypass' across the same land.

Should the plan go ahead, I object strongly to Barretts Lane being used as a pathway to the houses especially as this will encroached on either side of my property. Barretts land is a narrow road which is already being blighted by fast through traffic on the Barretts Lane Farm site and is becoming dangerous for pedestrians.

Any 'high density' housing should to be moved directly to an area that is not blighting any existing housing bordering this greenbelt area.

Until further plans are seen, it does not appear that the bypass is not only a 'bypass' but an access road to serve the 900 proposed houses. This would not help in easing pressure on the village it would put much more strain on the village and Station Road due to the sheer amount of extra traffic therefore irrelevant where it is placed.

No

Draft Local Plan Review

Representation ID: 5269

Received: 16/02/2017

Respondent: Mrs Karen Hawcutt

Representation Summary:

Balsall Common not a suitable 'town centre'. Improving the centre has to be a priority before any new housing.
Settlement does not meet Council's own accessibility criteria.
More cars will increase carbon footprint.
Existing congestion and poor road network, e.g. roads around Barratt's Farm.

Full text:

My letter concerns the Local plan for Berkswell and Balsall Common. I fail to see how the addition of more than 1300 homes in this area is viable due to the fact that the centre of Balsall Common is not a suitable "town centre". Improving the centre has to be a priority PRIOR to any plans to build further residences.
The vision fails to mention any improvements to facilities for the residents let alone the addition of maybe up to 5000+ more people in this area.

I firmly believe that Brownfield sites should be thoroughly investigated before looking at green belt land. The priority should be areas with good infrastructure and transport facilities. The road system near to the Barretts farm plan is hideously in sufficient. If one thinks that there will be at least 2000 more road vehicles in addition to the vehicles already in the area.
I object particularly to the Barretts farm plan as the transport routes are not adequate to support all of the extra traffic.There is land between The George in Tree and the garage along the Kenilworth Road that already has some previous development (Brownfield) which would has a good road system and access to the railway station. I believe that a plan was submitted to Solihull but turned down.
Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations". If you ever want to to validate this statement a visit to the Kenilworth Road in the rush hour will confirm the point.

Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. .

I note that the plan does not mention the building of bungalows or indeed facilities for older residents.
I would recommend a re-assessment is made of the appropriateness of significantly expanding Balsall Common and Berkswell given its poor accessibility using public transport, its poor road system to the main site at Barretts Farm and as previously stated its limited employment possibilities.

No

Draft Local Plan Review

Representation ID: 5272

Received: 16/02/2017

Respondent: Jill Hubbleday

Representation Summary:

Phasing of the 3 sites in Balsall Common will take place in years 1 - 5 at the same time as HS2 and Riddings Hill. This will see a strain on the settlement in terms of already overstretched infrastructure and facilities e.g. primary school. It contravenes SMBC's stated intent to "manage the growth."
The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to previously developed land such as the fisheries located in Lavenderhall lane or other brownfield sites in Balsall common that have been suggested.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.Parking at the Berkswell train station is currently inadequate. A recent article in the Solihull observer outlining the resurfacing programme for the car park suggests that users of Berkswell train station should consider public transport to access the station rather than have no where to park their carss whilst resurfacing takes place is ridiculous . Public transport is very infrequent and does not have stops near the station. The Observer article serves to highlight the poor transport within Berkswell and Balsall common village.Extra housing in the village will only increase road useage by car and increase burden on the hot spot areas as described above.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".There is no footpath along Windmill lane which will prove hazardous for anyone trying to walk to the shops via windmill lane / meeting house lane.

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties in the village of Balsall common.

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development.

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5278

Received: 15/02/2017

Respondent: Mr David Bell

Representation Summary:

Balsall Common does not have adequate medical/welfare facilities, school places, shops, parking facilities at the library, rear of Tesco or at the station, reliable and practical public transport or road infrastructure to cope with the additional population from 1150 more houses.

Full text:


I am writing to formally record my feedback on the Solihull Draft Local Plan Review, so you may include my views along with all other feedback you have received.

I wish to comment specifically on the draft plans that affect Balsall Common and Berkswell.

Proposed Housing - General objections.
I object to the total of 1,150 proposed new houses for a number of reasons:-

1. The total is way in excess of what can sensibly be assimilated into the village without dramatically and detrimentally changing the village into what is effectively a town. The 2011 census reported a population in Balsall Common of 7,039. The same census recorded an average of 2.3 people per household. It can therefore be expected that 1,150 new homes would add around 2,645 residents. An increase of 37.5% over the 2011 census population. Even accepting the population of Balsall Common has grown since the 2011 census, this increase cannot be absorbed into an already overcrowded and under-resourced village.
2. I believe there are other locations within the Borough more suited to build new homes. Examination of the Draft Local Plan Review Map shows that the proposed distribution of new homes in Solihull is not spread proportionally to the existing centres of population. There are some villages where little or no new homes are planned, whilst Balsall Common has been identified for far more than it can accommodate. A fairer and better spread would reduce the impact on existing communities.
3. The village does not have adequate resources to serve a substantial increase in population.
a. Medical/Welfare Facilities - The existing medical centre does not have the staff or buildings capacity to copy with the increase in residents that would arise from the new homes.
b. Schools - there are not enough places, buildings or facilities to accommodate the resultant demand for primary or secondary school places.
c. Shops - the existing retail shops in the centre of Balsall Common are inadequate. Berkswell has no real shopping facilities.
d. Parking - lack of public parking is already a major problem in areas such as the library, rear of Tesco's and along the shops in Balsall Common. Parking at the station is almost impossible much of the time due to lack of spaces and excess demand. As a result more and more cars park on the adjacent roads, such as Hallmeadow Road
e. Public Transport - As mentioned, Berkswell station lacks adequate parking and is crowded during the rush hour. It is clear to everyone using it, that is barely copes with demand from the current resident population. Buses are not regarded by most residents as a reliable or practical alternative, hence most people drive to their destinations.
f. Roads - most houses in Balsall and Berkswell possess at least one car. The existing roads are busy but cope with current demand. Even the main Kenilworth Road only experiences delays during rush hours. The remainder of the day and at weekends, traffic flows freely. However, the addition of hundreds more cars onto local roads as a result of over a thousand new houses will create a traffic problem.
4. It is vital that the Green Belt surrounding Balsall Common and Berkswell and in particular the Meriden Gap is retained and preserved. Not just in the short-term, but for future generations too. I believe the Council has strong responsibilities to not sacrifice the Meriden Gap to accommodate housing development. Releasing Green Belt piece by piece is an erosion of a valuable asset that we need. It delivers important environmental and social benefits. The National Planning Policy Framework clearly states that "Green Belt boundaries should only be changed in a Local Plan under "exceptional circumstances" and only permit most forms of development in "very special circumstances". I believe that the Council has the choice to locate the required number of new homes elsewhere within the Borough and to preserve the Green Belt and in particular Meriden Gap.
5. We, along with many residents, chose to pay a premium to live in this village, so we can enjoy all the benefits living in a rural community offers. The impact of 1,150 new homes will remove many of the reasons we made that choice. We understand we have to accept our fair share of new homes, but not the huge volume planned.
6. Bypass by default. Having lived with the blight of the prosed Balsall Common bypass for many years, we, like many, were relieved when common sense prevailed and it was removed from the local plan. The bypass is not required to cope with traffic demand. That is one of the reasons it was removed from the existing plan. However, the proposed housing developments will establish a new village boundary that will encourage re-instatement of the planned bypass line. Many more years of blight for residents.

Proposed Housing - Specific Site Objections

Barratt's Farm

I object to the proposed development of 800 new homes at Barratt's Farm for the following reasons:-

1. This would be a Green Belt development.
2. The quantity of houses is far more than Balsall Common & Berkswell can accommodate without detrimental impact
3. There is no infrastructure on that side of the village. Everything would have to be built, whereas there are alternative sites (e.g. Grange Farm) where major roads, etc. are already nearby.
4. Development at Barratt's Farm will move the village boundary and effectively create a new, much bigger village (town). Moving the boundary into Green Belt in this way will make it difficult or even impossible to successfully resist future applications to develop that side of the village.
5. This development will effectively establish a line that will tempt planners to re-introduce the bypass plans.
6. The development is scheduled to be spread over 15 years. We are already blighted by HS2 construction lasting around 10 years. This means for many residents 15 years of disruption from continual construction and development.

Windmill Lane

I object to the proposed development of 200 new homes at Barratt's Farm for the following reasons:-

1. A further 200 houses, in addition to those already being built on greenfield sites at Elysian Gardens will result in the complete sacrifice of the rural aspect at the Windmill Lane end of the village. Effectively the village will have crept south along the Kenilworth Road and expanded substantially.
2. The roads infrastructure is inadequate. Due to the hill on this part of the Kenilworth road, more cars turning into or out of new housing estates on the busy Kenilworth Road will be dangerous and likely cause delays. If the answer is to allow access to the new houses via Windmill Lane, then this quiet, unlit country lane will become even more of a dangerous "rat-run" for drivers and pedestrians than it already is.
3. The historic and culturally important Windmill will become virtually inaccessible to visit, as parking on Windmill Lane will be too dangerous if not impossible.

Summary

I accept that Balsall Common and Berkswell may have to have some new housing development for Solihull to meet its obligations. However I object to the current plans because:-

a) Sacrifice of Green Belt.
b) Too many houses for this area to accommodate.
c) Lack of infrastructure and resources.
d) Barratt's Farm and Windmill Lane are not the most suitable sites.
e) There are more suitable sites, e.g. Grange Farm is less impact and near current roads infrastructure plus there are brownfield sites in the borough that have not been chosen and will remain brownfield, even after all this proposed development.
f) We do not want an unnecessary bypass by "stealth".

Thank you for the opportunity to submit my views.

No

Draft Local Plan Review

Representation ID: 5282

Received: 17/02/2017

Respondent: Fordbridge Town Council

Representation Summary:

Site 5 Objection.

Loss of green and open space. Already lost a lot in Fordbridge.
Would reduce size of Meriden Park.

Full text:

The Council wishes to object strongly to the proposal to develop land at the junction of Moorend Avenue and Chester Road following possible re-configuration of the road junction.

The proposal will inevitably lead to the further loss of valuable and increasingly rare open space in Fordbridge. The land to the western side of Moorend Avenue on the edge of Meriden Park offers visual and recreational amenity for the local community but it would disappear as part of this proposal. Meriden Park is the only park of any substance in the Fordbridge and Chelmsley Wood wards and it would be reduced in size and enclosed and restricted by the proposed development.

Fordbridge and North Solihull needs its green space and development such as that proposed at Moorend Avenue will sadly over intensify an already densely populated area.

No

Draft Local Plan Review

Representation ID: 5283

Received: 15/02/2017

Respondent: Richard Onions

Representation Summary:

The necessary infrastructure to support any significant expansion of Balsall Common must be identified and planned for alongside any development recognising that phasing all allocations at same time as HS2 will allow insufficient time for necessary improvements.

Full text:

Objection to site 3 in Balsall Common (Windmill Lane) on Solihull Council's draft Housing plan

As a resident of Balsall Common I would like to respond to the Council's Draft Local Plan with specific reference to Q15:
"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.
Having reviewed the draft plan, my objections are as follows:

a. The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated. If Balsall Common must be subjected to yet more unwanted development, it seems ridiculous that greenbelt can be released when there are so many other brownfield sites available.

b. Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

c. Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

d. To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

e. Site 3 is constantly used by a range of birds of prey, owls, herons, deer, a family of foxes, rabbits and bats along with many others that we haven't been privileged enough to see (such as the Great Crested Newt). The abundant wildlife in site 3 will be damaged under this proposal.

f. The addition of new housing on the Kenilworth Road has resulted in traffic jams and extra pressure on an already burdened infrastructure. To add to this on this side of the village seems absurd. The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to main employment centres.

g. The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

h. Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

i. The local primary school has already had to expand to take in more students and is already oversubscribed and bursting at its seams. As a result, the quality of education and care that the children are receiving is diminishing. Traffic around the school is a huge danger to the young children. Cars park all the way down Alder Lane towards the traffic lights, down Balsall Street East, Holly Lane, Gypsy Lane and throughout all of the housing estate near the school, resulting in cars being damaged and grid locked roads. There is often no crossing patrol and to cross the Kenilworth Road and Holly Road as an adult, you take your life into your own hands!

j. The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. I live two fields away from the current development on the A452 and have been astounded by the constant noise from the construction. The vibrations from the pile drilling can be felt and heard in the house with the windows closed and I can only imagine what this noise would be like if it was right next door. The quality of life for my family through this proposed building period would be greatly damaged.

k. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched

l. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would fully support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

I fully expect that the above objections will be taken into consideration and due process will be followed. I would expect Solihull council to make a stand and choose to protect green belt site and not be bribed by developers. Developers want to develop green belt sites as these are cheaper for them to develop on than PDL, which in my opinion is unethical and not in the interest of future generations.

No

Draft Local Plan Review

Representation ID: 5288

Received: 15/02/2017

Respondent: Mrs Victoria Onions

Representation Summary:

The necessary infrastructure to support any significant expansion of Balsall Common must be identified and planned for alongside any development recognising that phasing all allocations at same time as HS2 will allow insufficient time for necessary improvements.

Full text:

Objection to site 3 in Balsall Common (Windmill Lane) on Solihull Council's draft Housing plan

As a resident of Balsall Common I would like to respond to the Council's Draft Local Plan with specific reference to Q15:
"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.
Having reviewed the draft plan, my objections are as follows:

a. The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated. If Balsall Common must be subjected to yet more unwanted development, it seems ridiculous that greenbelt can be released when there are so many other brownfield sites available.

b. Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

c. Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

d. To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

e. Site 3 is constantly used by a range of birds of prey, owls, herons, deer, a family of foxes, rabbits and bats along with many others that we haven't been privileged enough to see (such as the Great Crested Newt). The abundant wildlife in site 3 will be damaged under this proposal.

f. The addition of new housing on the Kenilworth Road has resulted in traffic jams and extra pressure on an already burdened infrastructure. To add to this on this side of the village seems absurd. The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to main employment centres.

g. The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

h. Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

i. The local primary school has already had to expand to take in more students and is already oversubscribed and bursting at its seams. As a result, the quality of education and care that the children are receiving is diminishing. Traffic around the school is a huge danger to the young children. Cars park all the way down Alder Lane towards the traffic lights, down Balsall Street East, Holly Lane, Gypsy Lane and throughout all of the housing estate near the school, resulting in cars being damaged and grid locked roads. There is often no crossing patrol and to cross the Kenilworth Road and Holly Road as an adult, you take your life into your own hands!

j. The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. I live two fields away from the current development on the A452 and have been astounded by the constant noise from the construction. The vibrations from the pile drilling can be felt and heard in the house with the windows closed and I can only imagine what this noise would be like if it was right next door. The quality of life for my family through this proposed building period would be greatly damaged.

k. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched

l. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would fully support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

I fully expect that the above objections will be taken into consideration and due process will be followed. I would expect Solihull council to make a stand and choose to protect green belt site and not be bribed by developers. Developers want to develop green belt sites as these are cheaper for them to develop on than PDL, which in my opinion is unethical and not in the interest of future generations.

No

Draft Local Plan Review

Representation ID: 5290

Received: 16/02/2017

Respondent: Mr M A Bardsley

Representation Summary:

Site 18 Objection.

Unlikely to provide adequate parking, will exacerbate existing parking issues.
Loss of 75 spaces at Arden Club is unacceptable.
Existing drainage issues during heavy rain.
Development will increase hard surfacing.
Oversubscribed schools and medical centres.
Will create hazards for cyclists on designated cycle route.
Not comply with NPPF accessibility criteria.
Land should be safeguarded for sporting use as per freehold.

Full text:

LDP-Proposed Housing Allocation 18
I am writing to object to the proposed development of 100 houses on the rugby ground on Sharmans Cross Road on the following basis:-
The development is unsuitable as it is a high density proposal out of character with the rest of the neighbourhood. The surrounding area does not include any buildings more than 2 stories high and the development of 50 affordable homes by a housing association or other similar developer is highly likely to exceed 2 stories and be completely out of character in the area. The proposal will minimize garden space or exclude gardens altogether to individual properties which are completely out of character for the area known for its larger gardens, green spaces and wildlife.
New developments today always underestimate the amount of car parking required on new home developments. One space per house or affordable home is inadequate in this day and age. The majority of households today use two cars and need visitor parking in addition. The proposed development at this density is unlikely to provide enough parking spaces forcing the overflow into the surrounding roads which will cause congestion and safety problems particularly on Sharmans Cross road which is a bus route, cycle route and has a school nearby. There is a problem with cars parking in the surrounding roads at the moment particularly in Woodside Way during the day. There will be increased traffic and pollution moving in and out of the area particularly during peak times adding to the current congestion already taking place. The loss of 75 parking spaces at the Arden Club is completely unacceptable affecting safety and further congestion and will cause chaos on match days with supporters parking anywhere to the detriment of the existing householders.

Drainage is a problem on Sharmans Cross Road at the moment during heavy rain and the proposed development will exasperate the current problem because there will be less green space to absorb rain and flood water.

The current amenities for schools and medical centres are oversubscribed and this development will lead to additional demand which cannot be met without increased financial resources which are unlikely to be met in the current financial climate leading to a degradation of the existing services, for example even longer waits to get a G.P. appointment.

Sharmans Cross Road is a designated cycle route and the increased traffic will create additional hazards for those cyclists. Schools use this area for cycling proficiency training for young schoolchildren and the increase in traffic will prove an increased danger to these youngsters.

I believe the National Planning Policy Framework states that developments have to have access to local amenities within 800 metres. This requirement has not being met and therefore the development cannot be justified on this criterion alone.

Solihull Metropolitan Borough Council had previously confirmed that land would be used for sport and the council would not sell the freehold title and minuted this policy decision in 2013. This development is contrary to that policy and it is therefore inappropriate to include it in the Local Development Plan.

No

Draft Local Plan Review

Representation ID: 5291

Received: 17/02/2017

Respondent: Susan & Michael Avery

Representation Summary:

Site 16 Objection.

Upgrading local roads will not resolve ongoing traffic issues or accommodate 650 homes. Contrary to Policy P8.
Schools and GPs oversubscribed.
Bus services do not comply with Policy P7.
Seek guarantee that increased school places, health services and public transport will be provided.
Loss of sports facilities not accord with Challenge J.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 5292

Received: 16/02/2017

Respondent: Phil Leech

Representation Summary:

Site 18 Objection.

Impact on infrastructure; current utilities under pressure e.g. surface water flooding and foul drainage. Loss of green space will remove a natural soakaway.
Impact on oversubscribed schools and doctor surgeries.
Local traffic congestion at peak times and school run.
Loss of local sporting facilities.

Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 5301

Received: 16/02/2017

Respondent: Angela Perrett

Representation Summary:

Site 1 Objection and Bypass.

Does not require a bypass.
Real reason for bypass it to fulfil future road links for HS2 expansion.
Current proposal is not a bypass but an access road for Site 1.
Lack of parking spaces in the village.
Oversubscribed schools and medical centres.
Added pressure to congestion.
Poor public transport access.
Average 1.6 cars per household with 2.5% of households having 4+ cars/vans.
Only 6% of residents take public transport to work.
Development will generate 1500+ additional cars.
Loss of green space for recreation.
Already have disruption of flight path and HS2.



Full text:

see attached letter

No

Draft Local Plan Review

Representation ID: 5309

Received: 15/02/2017

Respondent: Karin Chessell

Representation Summary:

The necessary infrastructure to support any significant expansion of Balsall Common must be identified and planned for alongside any development recognising that phasing all allocations at same time as HS2 will allow insufficient time for necessary improvements.

Full text:

OBJECTION to site 3, Kenilworth Road/Windmill Lane, Balsall Common

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to strongly object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.


I hope and expect that the above objections and suggestions will be taken into consideration.

No

Draft Local Plan Review

Representation ID: 5317

Received: 17/02/2017

Respondent: Jaguar Land Rover

Agent: Mr Neil Tiley

Representation Summary:

EMPLOYMENT (not housing).
Industrial Strategy Green Paper (Jan 2017) identifies significant role the automotive sector plays in UK economic growth, and challenges posed by lack of infrastructure.
Appendix C of DLP does not include a strategic infrastructure plan.
Transport Assessment of new allocations and HS2 impact on the Borough should be a priority.
No mention of potential Highways England M42 J6 options in DLP; needs to be included.
Link road from M42 and/or branch line from East (sic) Coast Mainline would be beneficial to UKC Hub.
Strategic Infrastructure planning for transport, energy resilience and digital communications need to be addressed.

Full text:

see JLR letter via agent

Yes

Draft Local Plan Review

Representation ID: 5341

Received: 15/02/2017

Respondent: Marylyn Trowsdale

Representation Summary:

Infrastructure identified in the representation has been highlighted as required in the DLP.

Full text:

Site 18

I wish to record my objection to the proposed development on the Sports Ground behind Sharmans Cross Road most strongly.

1. With an ever increasing population if is wrong in principle to reduce any ground or facility that can be used for healthy sport & recreational activities

2. Any increase the density of housing and the subsequent residents in this area can only add to the problems we have with all support services & infrastructure. In this area of Solihull our schools & medical support services are already over stretched by the existing demands upon them

3 If you insert 100 homes, (some which may be 3 stories high) the roads & paved areas will increase the fast run off of rainwater in a road that already floods,making the situation worse.Sharmans Cross Road traffic locks solid nose to tail, Public transport has great difficulty in negotiating cars delivering children to school at present & any increase in traffic will only make this worse. Danger to pedestrians, unaccompanied children attending the Junior school & those making their way to the secondary schools on adjoining roads, either on foot or cycling (this is supposed to be an approved route) will be in increased danger. There is gridlock at the Streetsbrook Road junction at present during peak times.

4. Presently this area, including the open land is a well balanced marriage between residential development & recreation, this proposal would destroy that. It provides an environment for much wild life & many mature trees, some subject to preservation orders. We can develop this further for additional sporting activities, since it is accessible to surrounding residents & schools, promoting health giving exercise & reducing calls upon medical services

Please reject this proposed development.

Yes

Draft Local Plan Review

Representation ID: 5342

Received: 15/02/2017

Respondent: Laura Townsend

Representation Summary:

Infrastructure highlighted in the representation has been identified in the DLP

Full text:


I wish to register my objection to the proposed development at Allocation 13 in Shirley.

I strongly object to your plans on the grounds of loss of GREENBELT land, loss of amenity land for local people and loss of rich local wildlife.

I find it completely disproportionate that circa 41% of Solihull's additional housing needs should be concentrated in the Shirley South area. We know that more houses are needed but they need to be far more evenly allocated. I suggest that Solihull Council examines this aspect closely and re-visits the potential of other areas in the Borough that can absorb this volume of homes.

We have already been subjected to additional developments, including Cheswick Place off Tanworth Lane and further developments extending Dickens Heath and Tidbury Green, yet nothing has been done by the Council to improve local facilities and infrastructure to accommodate a vast increase of people moving into the area.

I commute via Dickens Heath to the M42 along Tanworth Lane and Dog Kennel Lane each morning and the traffic is already congested each morning without the addition of yet more new homes. These roads will need some serious improvements in order to cope with yet more traffic coming through the area, especially at rush hour. The Shirley area is already subject to a huge amount of congestion, which affects the whole of the Stratford Road from the M42 junction and all arterial routes, including Dog Kennel Lane, Tanworth Lane, Shakespeare Drive, Blackford Lane, Haslucks Green Road and Bills Lane. In addition, the main route out of Dickens Heath to the Miller and Carter Restaurant is a constant queue of traffic each morning.

The impact of yet more homes in this area will have a huge detrimental effect on the road network, let alone local services such as schools and doctors' surgeries. The school's in this area are already at full capacity, so I would be interested to know your plans for relieving pressure on these schools. Will you be building new schools? Will you be extending the existing schools?

The local rail stations are also not fit for purpose for this amount of extra homes, being very small and not large enough to serve the additional requirements of these large scale developments. There is already inadequate parking at Whitlocks End, Shirley, Earlswood and Solihull Stations.

Most importantly, this is also designated GREENBELT land. Greenbelt means an area of open land around a city, on which building is restricted yet you choose to ignore this!

The close proximity of this GREENBELT land to homes in the area, I know is a strong reason why homeowners chose to purchase their properties here - to enjoy the beautiful countryside on our doorstep. Why should you be allowed to take this away and concrete over beautiful rich, green land? I'm sure there are plenty of brownfield sites in the borough that are in desperate need of regeneration and could be redeveloped on instead to preserve this beautiful piece of GREENBELT land. Building on this GREENBELT land will mean it's beauty will be lost forever for the local community if your plans go ahead.

This GREENBELT land separates an already high density housing area. I, along with my friends and family, use this area extensively for much valued healthy walking exercise and enjoying the huge variety of wildlife, including owls, foxes, bats, birds of many species and more. The area is also used extensively by dog walkers and ramblers and I worry that you are not considering the impact the loss of this will have on the local community. Development of this GREENBELT land will ensure that all recreational land between Shirley and the M42 will be practically lost making the area a mass urban sprawl instead. Do you not value your local countryside?

Your plans also state that this new housing allocation should be developed to complement current and new infrastructure - in this case HS2. Well in fact HS2 will be running to the North of the borough and not stopping anywhere near to the proposed developments in Shirley. In fact we are surely positioned in one of the worst areas in the borough for actually getting to the new proposed station.

I strongly hope that you are taking the views of the local people into consideration before going ahead with this ill-advised plan for Allocation 13. One area of such a large borough should not be expected to absorb almost half of the housing needs for the borough, and especially not at the expense of GREENBELT land.

No

Draft Local Plan Review

Representation ID: 5347

Received: 17/02/2017

Respondent: Zoe Speed

Representation Summary:

The necessary infrastructure to support any significant expansion of Balsall Common must be identified and planned for alongside any development recognising that phasing all allocations at same time as HS2 will allow insufficient time for necessary improvements.

Full text:


I am responding to the Council's Draft Local Plan with specific reference to Q15:
"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"
I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.
The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.
4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.
5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".
6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties
7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.
10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots
3) The phasing of any development must recognise the impact and disruption of HS2
4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged
6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5356

Received: 17/02/2017

Respondent: Sarah Ravenscroft

Representation Summary:

The necessary infrastructure to support any significant expansion of Balsall Common must be identified and planned for alongside any development recognising that phasing all allocations at same time as HS2 will allow insufficient time for necessary improvements.

Full text:


I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are copied below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report. Please consider and register my objection and try your very best not to 'lose' this or other such objections.



1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. Carbon footprint growth is actually an UNDESIRABLE occurrence. I don't believe the planning office understands thiso to be the case.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated. However I am not sure that the Planning office understands the importance of greenfield sites to the public.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties.

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, I am informed that the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged.

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5361

Received: 17/02/2017

Respondent: Ayaz Mahmood

Representation Summary:

The necessary infrastructure to support any significant expansion of Balsall Common must be identified and planned for alongside any development recognising that phasing all allocations at same time as HS2 will allow insufficient time for necessary improvements.

Full text:


OBJECTION - BALSALL COMMON DEVELOPMENT SITE

I am responding to the Council's Draft Local Plan with specific reference to Q15:
"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"
I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.
The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.
1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.
4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.
5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".
6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties
7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.
8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.
9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.
10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."
In light of the above, I would support the recommendations from BARRAGE that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport
2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots
3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development
5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged
6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable

No

Draft Local Plan Review

Representation ID: 5366

Received: 17/02/2017

Respondent: Diane Mahmood

Representation Summary:

The necessary infrastructure to support any significant expansion of Balsall Common must be identified and planned for alongside any development recognising that phasing all allocations at same time as HS2 will allow insufficient time for necessary improvements.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the development of site 3 (Kenilworth Road, Balsall Common) and would propose that serious consideration be given to the development of site 240 (Wootton Green Lane, Balsall Common), as an alternative.

The reasons for my objection are below, based on the outcome of the investigations undertaken by the BARRAGE action group and as such the evidence and supporting information can be found in their report.

1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".

2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.

3) The proposed allocation of 3 greenfield sites in Balsall Common, when there are 14 PDL (Previously Developed Land) sites available, would strongly suggest that due consideration has not been given to these sites. As such, the "very special circumstances" to justify inappropriate development in the greenbelt have NOT been demonstrated.

4) The development of site 3, being in the south of Balsall Common, will add to the congestion hotspots on the A452 caused by northbound traffic heading to the main employment centres.

5) The development of site 3 (200 units), in addition to the two sites currently under construction on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase as drivers attempt to exit these sites in a situation even more difficult than it is today. Windmill Lane will become even more of a "rat run".

6) Site 3 scores poorly in relation to all accessibility criteria, as defined by SMBC, apart from the Primary School. As such most journeys to the shops, medical centre and railway station will have to be by car, adding to the existing congestion and parking difficulties

7) To alter the boundaries surrounding the Crest Nicholson developments on the Kenilworth Road (sites 22 and 23), in order to develop site 3, would directly contravene National policy, as these boundaries were regarded as permanent.

8) The existence of the Berkswell Windmill (Grade II* listed building), as well as Great Crested Newts, a European protected species, has been overlooked in the Council's assessment. As the setting of this iconic landmark will be harmed, the proposal is in breach of National policy.

9) Using the same criteria as the Council to assess sites, part- PDL site 240 outperforms site 3. Given that the area is larger than site 3, this site should be re-assessed by the Council with a view to allocation instead of site 3.

10) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."

In light of the above, I would support the recommendations from BARRAGE that:

1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) If there is justification for significantly expanding Balsall Common, then an holistic view is taken as to where housing is best located, with due consideration to be given to the re-use of PDL sites in preference to "greenfield" as well as congestion hot spots

3) The phasing of any development must recognise the impact and disruption of HS2

4) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

5) SMBC consults on ALL PDL SITES, which fall within or are adjacent to Balsall Common, with a view to potential allocation with immediate effect to ensure the community is fully engaged

6) Site 3 is removed from the Draft Local Plan as it is not compliant with both National and Borough planning policies and, as such, is not sustainable.

No

Draft Local Plan Review

Representation ID: 5371

Received: 16/02/2017

Respondent: Bethan Jackson Baker

Representation Summary:

The necessary infrastructure to support any significant expansion of Balsall Common must be identified and planned for alongside any development recognising that phasing all allocations at same time as HS2 will allow insufficient time for necessary improvements.

Full text:

I am responding to the Council's Draft Local Plan with specific reference to Q15:

"Do you believe we are planning to build homes in the right locations? If not why not, and which locations do you believe shouldn't be included? Are there any other locations that you think should be included?"

I wish to object to the scale of development proposed in Balsall Common and any potential future development of site 240 (Wootton Green Lane, Balsall Common).

The reasons for my objection are below.
1) Balsall Common fails to meet the Council's own specified criteria for high frequency public transport and therefore is not a settlement with good accessibility. As such, the allocation of circa 20% of new housing in the Borough to Balsall Common, is in breach of SMBC's policy that "all new development should be focused in the most accessible locations".
2) Moreover it is a settlement with limited employment opportunities and therefore most people have to commute to work by car. A significant expansion will add unnecessary pressure to the road network as well adding to the carbon footprint. There are no proposed Sprint Runs to mitigate for this.
I live in Dengate Drive which joins onto the Kenilworth Road in the north of Balsall Common. I frequently struggle to get out onto this road at peak times and in the morning and evening especially there is a crawling line of cars coming into the village from down past the roundabout where the George in the Tree restaurant is all the way into the village. This would only be made worse with increased cars on the roads due to increased housing in this area.
The development of more sites on top of the one already being developed on the Kenilworth Road (115 units), will inevitably cause delays to drivers trying to access the A452. As a consequence, the risk of accidents will increase.
3) There is already inadequate parking in the village centre and even driving through the existing parade of shops is an accident waiting to happen as cars pull in and pull out suddenly. Further development in Balsall Common is only going to add to the existing congestion and parking difficulties.
4) The phasing of all 3 proposed allocations for development to take place in years 1 - 5, at the same time as HS2 and the site at Riddings Hill, will place intolerable strain on the settlement. There will be insufficient time to effectively plan for and deliver the necessary improvements to both infrastructure and facilities, which are already overstretched. In particular, the current Primary School provision is wholly inadequate. This directly contravenes SMBC's stated intent to "manage the growth."
In light of the above, I would support that:
1) A re-assessment is made of the appropriateness of significantly expanding Balsall Common, given its poor accessibility using public transport

2) The phasing of any development must recognise the impact and disruption of HS2

3) The necessary infrastructure to support any significant expansion must be identified and planned for alongside any development

No

Draft Local Plan Review

Representation ID: 5376

Received: 15/02/2017

Respondent: James Rogers

Representation Summary:

infrastructure highlighted as a concern is not identified in the DLP for this stie

Full text:

SHARMANS CROSS PROPOSED DEVELOPMENT

I am writing to register my opposition to the planned building project detailed above.
My concerns are based on the effect such increases will have on the already severely stretched public services.
For example hospital waiting lists, doctors surgeries, dentists etc.
To get an appointment at an nhs surgery can take upwards of 2 weeks, A&E issues are well document and obtaining a NHS dentist is currently taking me 9 months.
Furthermore I am aware of the critical problems associated with day care in the community, this proposal will only exacerbate these issues
Has there been a thorough and detailed investigation into assessing the affects these increases will have as a result of an increased population in the area. Futhermore there are also a number of retirement homes being built which will also add to local pressures.
I am not aware of any extra NHS surgeries indeed the Solihull Walk in centre has recently closed. There are no new schools, and Solihull hospital now provides a much curtailed service.
Will the increases also be reflected in increases to front line service staff who undertake home visits to the old and infirm, I doubt that. Increased houses and population must be fully supported by a local support structure. Will there be extra doctors/dentist surgeries, extra school facilities and front line NHS staff.
Surely before pushing ahead with any major development a full and concise investigation must be undertaken into the above issues. This should then be communicated to Solihull residents in order for them to fully understand all the implications involved, and how Solihull Council will deal effectively with them.
I fear that without that we will experience increased problems, which will only serve as a detriment to Solihull residents.
I await your response

No

Draft Local Plan Review

Representation ID: 5386

Received: 17/02/2017

Respondent: Mr & Mrs Biddlecombe

Representation Summary:

Highlights need for increase in primary school facilities for new housing proposals in Knowle and Dickens Heath, in particular impact on St George and St Teresa school which has been unable to expand and is forced to exclude children in parish and with siblings at school, and whose catchment includes new developments at Balsall Common, Hockley Heath and Blythe Valley as well as Knowle/Dorridge, which should be addressed as a matter of priority.

Full text:

In response to the Draft Local Plan Review we would like to highlight the need for increase in primary education proposed in Items 4, 8 and 9.

This directly impacts on the education of my children at St George & St Teresa RC School and we request to be considered in the planning of this provision going forward.

During recent years local development has been substantial and whilst Local Authority Schools in the area have been increased to meet demand St George & St Teresa has not. We have been forced to exclude children in parish and with siblings in our school.

The size of our catchment area to include new developments at Balsall Common, Hockley Heath and additional potential impact from Blythe Valley, as well as Knowle & Dorridge demonstrates a need which should be addressed as a matter of highest priority.

No

Draft Local Plan Review

Representation ID: 5389

Received: 17/02/2017

Respondent: Mrs Cecilia O'Brien

Representation Summary:

Highlights need for increase in primary school facilities for new housing proposals in Knowle and Dickens Heath, in particular impact on St George and St Teresa school which has been unable to expand and is forced to exclude children in parish and with siblings at school, and whose catchment includes new developments at Balsall Common, Hockley Heath and Blythe Valley as well as Knowle/Dorridge, which should be addressed as a matter of priority.

Full text:

To whom it may concern

In response to the Draft Local Plan Review I/we would like to highlight the need for increase in primary education proposed in Items 4, 8 and 9.

This directly impacts on the education of my child/children at St George & St Teresa RC School and we request to be considered in the planning of this provision going forward.

During recent years local development has been substantial and whilst Local Authority Schools in the area have been increased to meet demand St George & St Teresa has not. We have been forced to exclude children in parish and with siblings in our school.

The size of our catchment area to include new developments at Balsall Common, Hockley Heath and additional potential impact from Blythe Valley, as well as Knowle & Dorridge demonstrates a need which should be addressed.

No

Draft Local Plan Review

Representation ID: 5392

Received: 17/02/2017

Respondent: Nick & Abby Fox

Representation Summary:

Highlights need for increase in primary school facilities for new housing proposals in Knowle and Dickens Heath, in particular impact on St George and St Teresa school which has been unable to expand and is forced to exclude children in parish and with siblings at school, and whose catchment includes new developments at Balsall Common, Hockley Heath and Blythe Valley as well as Knowle/Dorridge, which should be addressed as a matter of priority.

Full text:

In response to the Draft Local Plan Review we would like to highlight the need for an increase in primary education proposed in Items 4, 8 and 9.

This directly impacts on the education of my children at St George & St Teresa RC School and we request to be considered in the planning of this provision going forward.

During recent years local development has been substantial and whilst Local Authority Schools in the area have been increased to meet demand, St George & St Teresa has been ignored!! We have been forced to turn away children in the parish and with siblings in our school which causes huge problems for families that are split up as a result and unnecessary stress for children involved.

The size of our catchment area to include new developments at Balsall Common, Hockley Heath and additional potential impact from Blythe Valley, as well as Knowle & Dorridge demonstrates a need which should be addressed.

I trust that you will recognise the need to expand the current offering at St George & St Teresa.

No

Draft Local Plan Review

Representation ID: 5395

Received: 17/02/2017

Respondent: Miss Charlotte Drysdale

Representation Summary:

Highlights need for increase in primary school facilities for new housing proposals in Knowle and Dickens Heath, in particular impact on St George and St Teresa school which has been unable to expand and is forced to exclude children in parish and with siblings at school, and whose catchment includes new developments at Balsall Common, Hockley Heath and Blythe Valley as well as Knowle/Dorridge, which should be addressed as a matter of priority.

Full text:

In response to the Draft Local Plan Review we would like to highlight the need for increase in primary education proposed in Items 4, 8 and 9.

This directly impacts on the education of my child Keeley-May O'Sullivan at St George & St Teresa RC School and we request to be considered in the planning of this provision going forward.

During recent years local development has been substantial and whilst Local Authority Schools

in the area have been increased to meet demand St George & St Teresa has not. We have been forced to exclude children in parish and with siblings in our school.

The size of our catchment area to include new developments at Balsall Common, Hockley Heath and additional potential impact from Blythe Valley, as well as Knowle & Dorridge demonstrates a need which should be addressed.

No

Draft Local Plan Review

Representation ID: 5398

Received: 17/02/2017

Respondent: Lorraine Winn

Representation Summary:

Highlights need for increase in primary school facilities for new housing proposals in Knowle and Dickens Heath, in particular impact on St George and St Teresa school which has been unable to expand and is forced to exclude children in parish and with siblings at school, and whose catchment includes new developments at Balsall Common, Hockley Heath and Blythe Valley as well as Knowle/Dorridge, which should be addressed as a matter of priority.

Full text:

In response to the Draft Local Plan Review I would like to highlight the

need for increase in primary education proposed in Items 4, 8 and 9.

This directly impacts on the education of my children at St George & St Teresa RC School

and we request to be considered in the planning of this provision going forward.

During recent years local development has been substantial and whilst Local Authority Schools

in the area have been increased to meet demand St George & St Teresa has not. We have been forced to exclude children in parish and with siblings in our school.

The size of our catchment area to include new developments at Balsall Common, Hockley Heath

and additional potential impact from Blythe Valley, as well as Knowle & Dorridge demonstrates a need which should be addressed.