Solihull Local Plan (Draft Submission) 2020

Search representations

Results for Barratt David Wilson Homes - Land south of Broad Lane search

New search New search

Object

Solihull Local Plan (Draft Submission) 2020

Balsall Common

Representation ID: 13882

Received: 14/12/2020

Respondent: Barratt David Wilson Homes - Land south of Broad Lane

Agent: Barton Willmore Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Provision of 1,756 new homes in Balsall Common, a rural settlement with no significant employment is disproportionate. No assessment has been undertaken to demonstrate the ability of the settlement to deliver this level of growth. Expansion of Balsall Common is not supported by the Sustainability Appraisal due to the limited employment opportunities and the likelihood it will encourage commuting

Full text:

Introduction
Paragraph 18 sets out that the site allocations from the Solihull Local Plan (December 2013) will be brought forward. We consider that the automatic allocation of these sites which have been allocated for a number of years, without any justification as to their deliverability, is an incorrect approach. We address this in more detail under our comments in respect of Policy 4.
Finally, Paragraph 21 refers to neighbourhood plans and the importance SMBC places on these. Paragraph 30 of the National Planning Policy Framework (NPPF) sets the most recently adopted policies will take precedence. SMBC may wish to set this out within this section, to make it clear that the LPR will take precedence upon adoption over any currently adopted Neighbourhood Plans.
Soundness – The Plan is not:
- Justified
Change Sought:
- Existing allocations should be tested for deliverability prior to re-allocation
- The hierarchy of neighbourhood plans should be made clear
Vision
Given that paragraph 59 of the NPPF states that the Government’s objective is to significantly boost the supply of housing, the wording relating to meeting the needs of the housing market area should be more positively worded.
Paragraph 50 sets out that SMBC are seeking to protect the integrity of the Green Belt. Wording should be included setting out that lower performing parcels could be released to protect higher performing parcels while meeting identified and evidenced needs.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- The vision should be more positively worded in order to significantly boost the supply of housing
- The need to release lower performing green belt to meet identified needs, and preserve higher performing parcels, should be set out
Providing Homes for All
Policy P4C Meeting Housing Needs – Market Housing
We object to the inflexible market housing mix which is prescribed within this policy. The NPPF encourages provision of balanced and mixed communities catering for a wide range of the population.
Individual sites should cater for a wide range of housing types and sizes. Provision of such a significant proportion of only smaller (3 bed or fewer) dwellings on sites will not develop long term sustainable communities. Instead it will result in a transient community where people will not be able to form long term neighbourhoods as they will need to move on as their circumstances change if there are insufficient homes of the right size on a site to accommodate them. We do not consider that this represents good planning and consider that the focus should be on building strong healthy communities which can cater for all, rather than simply planning for short term ownership.
The inclusion of a prescribed housing mix runs counter to the criterion elsewhere within the policy which allow a number of factors to be taken into consideration. This plan has a significant lifespan and to prescribe a housing market mix which is to remain in place for the whole of plan period does not provide sufficient flexibility for adaptation to current housing need and demand. We have seen with the current pandemic the way external factors can influence people’s choice of lifestyle.
Soundness – The Plan is not:
• Justified
• Effective
Change Sought:
• Amendment of policy to allow for housing mix based on up to date market evidence
Policy P4D Meeting Housing Needs – Self and Custom Housebuilding
The latest Annual Monitoring Report (March 2020), covering the period 2018/19, sets out that for the period November 2018 – October 2019 there were 374 entries on the Self-build register.
As such, requiring all sites of over 100 houses to provide 5% of open market dwellings in the form of self-build plots is unreasonable and unjustified. Given provision is being made for 7,605 houses through allocations above 100 houses and the UK Central Hub area, this would equate to the 761 self and custom build plots to be provided from the draft allocations.
The Planning Practice Guidance (PPG) advises that the Council should engage with landowners who own sites that are suitable for housing and ‘encourage’ them to consider self-build and custom housing and who are interested in provision. Imposition of mandatory requirement goes beyond encouragement.
Following the example of Stratford District for example, the Council have specifically identified custom build sites which are discreet standalone small sites.
We also include extracts from the Bedford Local Plan Inspector’s Report (Appendix 4) where the Inspector recommended deletion the policy akin to that being proposed here as the policy was not justified with reference to the self-build register. The same principle applies here in that the amount being sought is over double that on the register.
Soundness – The Plan is not:
• Justified
• Consistent with national policy
Change Sought:
• Deletion of specific policy requirement and replacement with specific allocations or general support for self-build sites
Policy P5 Provision of Land for Housing
Policy P5 sets out the Council will allocate sufficient land for at least 5,270 net additional homes to ensure sufficient housing supply to deliver 15,017 additional homes in the plan period. This would result in an average annual housing land provision target of 938 net additional homes per year. This annualised target is made up of a stepped requirement with 851 homes per year delivered between 2020-2026 and 991 dwellings delivered between 2026-2036.
Demand
A Housing Need Technical Report has been provided (December 2020) (Appendix 5) and should be read in conjunction with our commentary on Policy P5. In summary, this Note makes the following key points:
• Planning Practice Guidance (PPG) states the Standard Method (SM) figure represents the minimum housing need, and there may be circumstances whereby need is higher;
• The Draft Plan identifies the clear economic growth aspirations for the Borough, including the nationally significant growth planned for the UK Central Hub. This is a circumstance where housing need may exceed the minimum need. If it does, housing delivery must be of a quantum to support these aspirations;
• The Council’s 2020 HEDNA confirms that the calculation of housing need is underpinned by the growth at the UK Central Hub. The Hub is projected to generate an additional 13,000 jobs to the baseline Experian job growth forecast (10,000 jobs) included in the HEDNA;
• The HEDNA tests several economic-led housing need scenarios. However, the UK Hub Scenario assumes only 25% of the additional 13,000 jobs created by the Hub are to be taken up by Solihull residents. This results in the housing need (816 dpa) underpinning the Plan;
• However, this ignores the ‘Growth A’ scenario which concludes that 908 dpa would be required based on the ‘Adjusted Local Growth’ scenario. This scenario assumes that strong industries in Solihull will outperform the baseline Experian forecast, resulting in an additional 5,680 jobs to the baseline (10,000 jobs) over the Plan period, with Solihull residents taking up these jobs;
• However, no scenario is presented to show what the housing need would be based on the UK Central Hub scenario being fulfilled in full by Solihull residents. It is important to understand this so that the duty to cooperate discussions referred to in the HEDNA are well informed;
Barton Willmore provide these sensitivity scenarios based on two approaches to commuting, and two approaches to underlying demographic rates (mortality, fertility, and migration);
• The results of our testing are summarised in Table 7.1:
Table 7.1: Solihull Borough – Barton Willmore Demographic Forecasting 2020-2036 Scenario Demographic rates Jobs per annum 2020-2036 Dwellings per annum 2020-2036
Dwelling-constrained:
Standard Method
2016 ONS rates
7721 – 8132
807
2018 ONS rates
1,0141 – 1,0682
Employment-constrained:
UK Central Hub
2016 ONS rates
1,437
1,1991 – 1,2482
2018 ONS rates
1,0361 – 1,0852
Source: Barton Willmore Development Economics
1 Commuting Ratio 0.98
2 Commuting Ratio 0.93
• Growth of between 1,036 and 1,248 dpa would be required to support the UK Central Hub scenario (between 16,576 and 19,968 dwellings in total);
• This represents an increase of between 220 dpa and 432 dpa on the housing need calculated by the HEDNA (816 dpa), or an additional 3,520 to 6,912 dwellings over the Plan period;
• Our analysis of historic levels of job growth in Solihull 1991-2019 shows a range of 1,225 and 1,650 jobs per annum (jpa). This highlights that the UK Central Hub scenario (1,437 jpa) is a realistic assumption;
• The HEDNA identifies an ‘acute’ situation in respect of affordable housing need. Our analysis suggests that the HEDNA’s conclusion on overall need (816 dpa) should be increased to meet as much affordable need as possible.
• Furthermore, our analysis of unmet need in the wider GBBCHMA suggests that the 2020 Position Statement’s conclusions under-estimate the remaining unmet housing need from Birmingham up to 2031, and for Birmingham alone the deficit in unmet need is between 11,294 and 13,101 dwellings up to 2031;
• In addition, there is significant unmet need up to 2031 based on the existing Standard Method coming from Birmingham City and the Black Country. This amounts to unmet need of between 25,543 and 27,350 dwellings up to 2031. If we were to assume the increased capacity for Birmingham City (65,400 dwellings 2011-2031) set out in the 2020 Position Statement the unmet need would still be between 11,243 and 13,050 dwellings up to 2031. This increases significantly based on the uncapped Standard Method figure for Birmingham City which would come into effect once Birmingham’s Local Plan becomes older than 5 years in 14 months’ time;
Adoption of the proposed changes to Standard Method consulted on by Government in summer 2020 would lead to there being unmet need against emerging/existing housing requirements in all but one of the GBBCHMA authorities;
• Furthermore, the unmet need post 2031 should be considered, as referenced to in the 2020 Position Statement. Based on data available at the present time and the most recent Local Plan figures, Barton Willmore calculate this to be a minimum 17,700 dwellings 2031-2040.
• In summary, the analysis in this report results in the following broad conclusions:
1. The SM’s minimum need for Solihull (807 dpa) will need to be increased to account for expected job growth from the UK Central Hub and the ‘acute’ need for affordable housing in the Borough;
2. Barton Willmore’s demographic modelling shows that between 1,036 and 1,248 dpa are required to support the UK Central Hub scenario;
3. Barton Willmore’s calculations suggest that the deficit in unmet housing need from Birmingham City being delivered by HMA Local Plans amounts to a minimum of between 11,294 and 13,101 dwellings up to 2031, a significant increase from the 2,597 dwellings concluded on by the 2020 Position Statement. This increases when the unmet need from the Black Country is considered. Additional unmet need will be created post 2031.
As such, in order to ensure the LPR is positively prepared, SMBC should seek to plan for more housing, and should allocate further sites.
SUPPLY
Further to the above, and as set out above, we also consider that some elements of the supply should be reviewed:
Dealing with the supply side of the equation, we make the following objections to the various components of supply:
‘Sites identified in land availability assessments’
It is unclear what is meant by ‘sites identified in land availability assessments’. Given these are sites which do not benefit from a draft allocation, then they are by definition, windfall sites which means that there is double counting from unknown sources of supply.
Solihull Local Plan sites
We question the automatic inclusion of Solihull Local Plan sites which have yet to be granted planning permission. The current Plan was adopted in 2013 and the Council cannot currently demonstrate a 5-year supply of housing. In this situation, the Council should be encouraging every suitable site to come forward. The fact that these sites have not come forward despite the housing shortfall, suggests that these should not be considered ‘deliverable’ housing sites without significant justification as to why they will now come forward when they have not to date.
Brownfield Land Register (BLR)
We query the separate identification of sites identified in the BLR – this BLR is subject to periodic review and thus will not be fixed as a permanent source of supply. We consider that any sites to be delivered in this way should be considered as windfall developments.
Lapse Rates
Whilst we support the use of a 10% lapse rates, it needs to be applied across the board i.e. it is equally application in relation to what is to come as to what has already gone before. If the Council accept that a 10% lapse rate is application to sites which already benefit from planning permission, then surely it should also accept that it is applicable to future planning consents which have yet to be granted.
Windfall allowance
The windfall allowance is justified by reference to past windfall rates however it fails to recognise that ‘ town centre sites’ (a traditional source of windfall supply) are allocated in the plan through the town centre masterplan and the Council have identified other sources of supply through the brownfield register. In the absence of any assessment / analysis of this component demonstrating the projected level of future windfall provision taking these factors in account, we consider that the level of windfall should be reviewed and adjusted accordingly.
UK Central Hub
We consider that given the scale of the UK Central Hub proposals, the rate of delivery assumed by the Council is overly optimistic. The Council have not provided any trajectory for the Site, and we note that the August 2020 consultation did not contain any firm commitments to delivery timescales or set out any delivery partners.
This assertion is supposed by the findings of the Lichfields’ Report1 that sets out the average time from outline planning application to the first delivery of homes is 8.4 years. The average build out rate is 160dpa.
As such, taking this into account, and based on a LPR adoption date of 20222, we consider the first completions will likely be C.2030. With an average build out rate of 160dpa, this means that approximately 960 dwellings will be delivered during the Plan Period, assuming that the housing is within the first delivery phases (the August 2020 consultation referenced a mix of uses coming forward). While more outlets may increase the speed of delivery, the amount of infrastructure required also needs to be taken into account. The type of supply also needs to be considered, with UK Central Hub likely to be geared towards apartments.
As such, we consider that 1,780 houses should be removed to take into account the likely delivery timescales.
Trajectory
We also note that SMBC are seeking to provide a stepped trajectory as some of the larger sites will not make a significant contribution to completions until the mid-delivery phase. The Inspector assessing the Guildford Local Plan set out:
39. In the submitted plan, the combined effect of the stepped trajectory in Policy S2 together with the “Liverpool” methodology (in which the delivery shortfall accumulated over the first 4 years of the plan (2015/16 to 2018/19) is spread over the whole plan period), would have deferred a significant proportion of the housing requirement to the later years of the plan. Set against the (then higher) housing requirement, this would not have met the Government’s objective to boost the supply of housing in the shorter term. (our emphasis)
We consider that SMBC should take the same approach as Guildford and allocate further sites to meet need early in the Plan Period. The existence of the UK Central Hub is not of a sufficient size to warrant a different approach (i.e. it is not akin to a new settlement).
Further, as with the withdrawn Uttlesford Local Plan, this stepped trajectory may create a fragile 5 year housing land supply position, taking into account the ambitious delivery targets of the UK Central Hub and the delivery concerns relating to the draft allocations set out below. The Inspectors’ letter relating to the withdrawn plan states:
29. This calculation relies on the use of a reduced annual requirement of 568 dpa for most of the years, as it is based on the stepped trajectory set out in Policy SP3. It is also based on what we consider to be unrealistic commencement/housing delivery dates for two of the Garden Communities (North Uttlesford and Easton Park, as set out above). So, whilst the Council can, in theory, demonstrate a 5.65 year HLS, we are concerned that if the housing delivery at North Uttlesford and Easton Park slips by just one year, as seems very likely, this would result in 100 less dwellings in this 5 year period. This would result in a very fragile 5 year HLS position.
There are comparisons that can be drawn here based on the stepped trajectory and the anticipated 5.37 year supply upon adoption.
The Inspectors for the withdrawn Uttlesford Local Plan also referenced the need to meet the full objectively assessed need for market and affordable housing in the housing market area (NPPF Paragraph 47). The HEDNA states there is a ‘clearly acute’ shortage of affordable housing. The proposed stepped trajectory therefore may worsen the affordability problem as it would delay the provision of housing until late years of the plan period.
Taking the above into account, we consider that the SMBC’s supply is actually 11,496 (rounded) before any reduction in windfall or the deletion of draft allocations which are unlikely to be delivered is taken into account.
This is a reduction of 3,521 and, as such, to meet the increased demand set out above, and take into account the concerns relating to a stepped trajectory, a review of the supply is required and additional sites allocated.
The Council should also ensure that a large number of these sites can be delivered early on in the Plan Period in order to take account of the likely later delivery of some other sites.
Soundness – The Plan is not:
• Positively prepared
• Justified
• Effective
• Consistent with national policy
Change Sought:
• Review of demand and amendment to the strategy
• Review of supply and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible
Improving Accessibility and Encouraging Sustainable Travel
Policy P7 Accessibility and Ease of Access
We consider that the requirement for major residential development should be clarified to set out that there may be other ways in which sustainable access options can be implemented. The distance to a bus stop/train station should not be seen as the only measure of sustainable access.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- Policy should be clarified that there are other ways of ensuring sustainable transport options are available
Policy P8 Managing Travel Demand and Reducing Congestion
Paragraph 109 of the NPPF states that development should only be prevented or refused on highway grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. Within point 2(ii), SMBC are seeking to bring in a further test which would not be in accordance with the NPPF. This should therefore be deleted.
Soundness – The Plan is not:
• Consistent with national policy
Change Sought:
• Point 2(ii) should be deleted
Protecting and Enhancing our Environment
Policy P11 Water and Flood Risk Management
With regards to point 6, the confirmation of discharge into a public sewer falls under Section 106 of the Water Industry Act 1991. As such, it should be made clear that planning permission can be granted prior to this being confirmed, as it falls within a different regulatory regime.
With regards to point 14, it should be clarified that contribution through a Section 106 Agreement is only required where it meets the tests set out in NPPF Paragraph 56.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Deletion of point relating to confirmation from relevant infrastructure owner
• Clarification as to obligation requirements and the necessary tests
Promoting Quality of Place
Policy P17 Countryside and Green Belt
Within Point 1 of the policy, SMBC is seeking to safeguard best and most versatile agricultural land (BMVAL) unless there is an overriding need for development that outweighs the loss. BMVAL is referenced within the NPPF at Paragraph 170 which states that planning policies should contribute to and enhance the natural and local environment by taking into account a number of criteria. One of these is:
b) recognising the intrinsic character and beauty of the countryside, and the wider benefits from natural capital and ecosystem services – including the economic and other benefits of the best and most versatile agricultural land, and of trees and woodland.
Firstly, we consider that including reference to BMVAL within a policy relating to Green Belt seeks to conflate two separate issues. Further, as can be seen above, the test set out by the NPPF does not require the safeguarding of BMVAL. Planning policies are required to contribute to and enhance natural and local environment by recognising economic and other benefits from BMVAL. As such, we consider this point should be deleted.
SMBC have set out, within Point 4, a number of different factors that may be taken into account when considering very special circumstances.
Further to this, point 5 sets out that development that is ‘conspicuous’ from the Green Belt must not harm the visual amenity of the Green Belt by reason of siting, materials or design. Given Green Belt is a spatial designation, designed to prevent sprawl, we consider that this requirement goes beyond the scope of the Green Belt, as set out in the NPPF. The LPR contains policies relating to protecting landscape, where necessary, and as such, this point should be deleted.
Soundness – The Plan is not:
• Positively prepared
• Consistent with National Policy
Change Sought:
• Deletion of point 1
• Inclusion of further factors which may create very special circumstances
• Deletion of point 5
Policy P17A Green Belt Compensation
Paragraph 138 of the NPPF sets out that ways in which the impact of removing land from the Green Belt can be offset through compensatory improvements to the environmental quality and accessibility of remaining Green Belt Land.
Policy P17 is seeking to require this by requiring development on sites removed from the Green Belt to provide appropriate compensatory improvements to environmental quality and accessibility of remaining Green Belt in the form of a Section 106 Agreement utilising the below hierarchy:
1. Compensatory requirements as set out as part of the Local Plan masterplans
2. Where no compensation has been set out within the Local Plan masterplan, improvements are provided as:
i. Improvements within the Green Belt adjacent to, or in close proximity to, the development site;
ii. Improvements within the Green Belt adjacent to, or in close proximity to, the settlement or area accommodating the development;
iii. Improvements within the Green Belt in an area identified for environmental improvements as part of the Council’s Green Infrastructure Opportunity Mapping.
3. In the event it is robustly demonstrated that none of the above options can be satisfied then the Council will accept a commuted sum.
Given none of the emerging masterplans show any compensatory improvements within the Green Belt, it would appear that the Policy is relying on there being additional land being available within the control of applicants (which may not be the case), or the payment of contributions.
SMBC’s viability evidence does not take this requirement into account, and no detail is provided as to how these contributions will be spent or what level of contribution is required. This therefore brings uncertainty, and the Policy should be reconsidered to ensure what is required is clear, and that it will not impact upon the viability of schemes.
Soundness – The Plan is not:
• Consistent with National Policy
Change Sought:
• Reconsideration of the policy to ensure that it is evidenced based, does not impact upon viability of schemes, and is in accordance with national policy
Delivery and Monitoring
Policy P21 Developer Contributions and Infrastructure Provision
Policy P21 expected major development to provide or contribute towards the provision of measures to directly mitigate its impact and physical, social, green and digital infrastructure.
SMBC’s viability testing does not take into account digital infrastructure within the testing and, as such, it should be evidenced that this will not render development unviable.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Confirmation that digital infrastructure provision allows for viable development
Settlement Chapters
Policy BC1 Barratt’s Farm, Balsall Common
We note that 1,756 new homes are proposed for Balsall Common across the plan period with the sole justification seemingly being that it contains both a primary and secondary school and has a full range of retail and associated facilities. However, it is still described as a rural settlement with no significant areas of employment and the distribution strategy remains one of “proportional distribution”. 1,756 dwellings to a single rural village would be completely disproportionate. There is discussion in the document regarding delivery of a by-pass; provision a station car park; improved public transport and a new primary school. However, there is no discussion as to how these are to be funded / delivered relative to the level of growth identified. In addition, there is discussion regarding the scope to enhance the existing local centre and the provision of a village centre masterplan. However, this land is in multiple ownerships and there are no proposals for what these enhancements could entail or how they could function – particularly with a by-pass in place which could actually draw trade away from the existing centre.
There is no assessment of the ability of Balsall Common to deliver this level of growth in such a small area. Whilst clearly some sites (i.e. Barratts Farm) will be able to have multiple outlets, the ability of the market to absorb and deliver multiple sites at any one time in a rural location should be reviewed; particular when Balsall Common will be acutely affected by HS2 – both in terms of the physical construction of the line and the disruption and uncertainty that this will bring; but also in terms of market desirability until such time as the line is constructed.
We also note that Barratts Farm is in multiple ownerships and these are described as “complex” in paragraph 541. This is the single largest site and the one which is proposed to deliver the by-pass. Within the previous draft of the Plan, it was stated that this site would only be taken forward if the landowners / promoters could demonstrate they are working on a collaborate and comprehensive basis. Reading paragraph 541, this collaborate working has clearly not been secured in the way it was envisaged and nothing additional is suggested to demonstrate that joint / collaborative working is possible.
The relief road is identified as being necessary for Barratts Farm in particular with the policy advising that is required early in the plan period. The road is provisionally to be funded via CIL payments; and grant funding which “may” be possible through the WMCA. Firstly, CIL payments can only be secured through those sites which will come forward in the future however these sites are Green Belt sites and cannot therefore be delivered until the Local Plan Review is completed and the subsequent CIL schedule is adopted. Secondly, there is no grant funding proposal in place to fund the road. As it currently stands this road is not deliverable. The road is required to be delivered early in the plan period i.e. before there are significant CIL funds in place and, potentially, at a point where, in order to receive grant funding, applications should be being made now / near future.
There has to be serious doubt over the ability of Barratts Farm to be delivered within the anticipated timeframes and therefore places serous doubt over the plan as a whole given the scale of this allocation.
The Sustainability Appraisal notes that there are limited employment opportunities within Balsall Common and that people travel outside of the settlement to work. As such, it is noted that the expansion of this settlement would fly in the face of sustainability objectives of reducing the need to travel to areas of employment. Whilst such a case could be made for the majority of the rural areas of the Borough, it is heightened especially here when such a large proportion of future growth is identified for one rural settlement.
At this stage, the level of growth attributed to Balsall Common is disproportionate and that inadequate research has been undertaken into the deliverability of this level of growth and the associated aspirations; and the ability of the market to deliver this level of growth in a rural area is considered to be unrealistic.
On the basis that we do not consider the sites identified to be deliverable and the significant shortfall in supply identified by the more realistic timescales we have identified for UK Central, we propose an alternative site – Land at Hawkshurst (Site 544) as an alternative to meeting part of this need. To date this site has been inappropriately assessment by the Council and a more appropriate evaluation of the site is given in the section below.
Policy BL1 – West of Dickens Heath
The policy requires that the proposal for BL1 secures the relocation of the existing sports provision to a suitable site in the local vicinity. Until such time as these facilities are relocated or a plan is in place to secure timely relocation (which should include the grant of planning permission in our view, given that any site will be in the Green Belt), then the site cannot come forward for development. Our key concern here relates to Site 4 (West of Dickens Heath). It is noted that the identification of a Local Wildlife Site within the site hampers re-provision within the site itself and therefore alternative options will need to be pursued outside of the site. We consider that these alternatives should be considered now as clearly, as it currently stands, the pitches will be lost with no alternative in place (and therefore no guarantee of any re-provision). This is all the more important given that the land in the area is all located within the Green Belt and therefore any proposals which may, for example, include floodlighting, will have to be carefully considered against the Green Belt ‘tests’. We understand that the loss of these facilities is causing significant local concern particularly with no proposals for replacement.
The Council have had ample time to identify and secure alternative provision and therefore the fact that this is not identified within the plan, suggests that there are currently no alternative sites. This calls into question the delivery of this site and with no evidence and no proposals in place, we consider that proposal BL1 should be deleted from the plan.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Policy KN1 Hampton Road, Knowle
As with the Site West of Dickens Heath, this draft allocation requires the reprovision of sports pitches. In this instance, the re-provided pitches are currently shown within the Green Belt to the north of the allocation.
The Council, within Paragraphs 713-715 state that it’s likely that very special circumstances will exist to support development in this location and, as such, the reprovision will likely be acceptable. However, this pre-judges any application, for which the detail is not known, and as such cannot be relied upon. Therefore the housing that would be provided on the sports pitches should not be included until the reprovision of the sports pitches is secured.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Site Assessment Criteria
We consider that a more dispersed growth option should be considered and, as set out previously, consider that the land at Broad Lane, Hawkshurst (Site 544) is ideally suited to make an important contribution to the Council’s housing need. Following the Council’s own site selection criteria, we set out why this site is a suitable and deliverable alternative site which can be delivered utilising existing infrastructure:
We object strongly to the manner in which Site 544 has been assessed in the site selection process for the reasons which are set out below – and on that basis, object to the inconsistent application of the methodology.
Firstly, in assessing Site 544, the Council deemed that the site did not pass ‘Step 1’ – which is the initial, high-level sieving process. Sites which are not taken forward at this stage are then not subject to the more refined ‘Step 2’ analysis. We consider the manner in which the process was applied is fundamentally flawed and have carried out our own assessment (using the Council’s own analysis) to demonstrate that the site should not have been discounted at Step 1 and should have been included in Step 2.
STEP 1
The first stage in the sieving process is a high-level look at the following:
(i) Brownfield vs greenfield
(ii) Urban areas vs Green Belt
(iii) Accessibility
Sites can be rated from Priority 1 (brownfield in urban area or settlement) to Priority 10 (greenfield in isolated highly performing Green Belt location). A traffic light rating is then applied – sites which falls within Priority 1 to Priority 4 are green sites; Priority 5 sites are yellow; Priority 6, 6b and 7 sites are blue; and Priority 8, 9 and 10 sites are red. Red sites fail Step 1 and are not taken forward to Step 2 for assessment. Site 544 was incorrectly identified as a Priority 9 red site and was not therefore taken forward to Step 2.
In summary, Site 544 is a greenfield and Green Belt site. However, it is accessible (being on the edge of the Coventry urban area) and also within an area with a low GB score of 5. Therefore, it should be allocated a Priority score of no higher than 5 (yellow). We review below the manner in which this initial sieving assessment was flawed - taking Site 544 step by step through the same assessment process as the Council.
Green Belt
In the Green Belt Assessment 2016, Site 544 is identified as part of Refined Parcel RP83:5 which has a combined score of 5, within a range from the highest performing Green Belt sites (12) to the lowest performing sites, scoring as low as 0. With a score of 5, site 544 is clearly a lower performing site. The starting point for consideration as a Priority 5 site is a score of 5 or lower in the Green Belt––Site 544 falls into that category. The results of this assessment are backed up by our own Green Belt assessment which is included with this submission.
Accessibility
The second part of the criteria relates to accessibility and to achieve a Priority 5 ranking, the site is required to be in an accessible location. This is defined as:
(a) On the edge of the urban area or
(b) On the edge of a settlement which has a wide range of services and facilities including a primary school and a range of retail facilities.
Site 544 adjoins the urban edge of Coventry – indeed in the Council’s Site Assessment, the site is identified as possibly being an extension to Coventry.
It should be noted that in relation to the Publication Draft Plan, the Council have updated the Accessibility Study to take account of retail / surgery provision in adjoining LPA areas, however they have then not used this information to re-visit first principles and determine whether sites have been appropriately assessed from the start. Therefore, whilst this site now scores more positively, its ‘priority 9’ status has not been re-evaluated despite an Addendum to the Site Assessments being produced and the Accessibility Study being revisited. It appears that despite the site being on the urban edge of Coventry this has been discounted due to the sites geographical relationship with Coventry as opposed to Solihull. However, accessibility should be based upon spatial location rather than boundaries. The fact that the retail offer is in Coventry will not prevent residents of Hawkshurst using it.
For the absolute avoidance of doubt therefore, we enclose our own submission produced by Phil Jones Associates which demonstrates that the site is in a suitable and sustainable location.
It is fundamentally incorrect for Site 544 to have been ‘sieved out’ at Step 1. The site should have been correctly assessed as a Priority 5 yellow site as it meets the two necessary criteria. The site, therefore, should have been taken forward for a more detailed analysis in Step 2.
On the basis that the site does pass Step 1 – we have carried out the Step 2 assessment using the same table and criteria as the Council. There are no scorings or weightings attributed to the Step 2 analysis – it assessed on a qualitative basis.
STEP 2 – REFINEMENT CRITERIA
FACTORS IN FAVOUR
In accordance with the spatial strategy
(including only proportional additions to lower order settlements (i.e. those without a secondary school or not located close to the urban edge).
The preferred spatial strategy would be to locate development needs close to where they arise. However the Plan identifies that there is limited land available to achieve this and therefore the Council has had to look at alternative options, which includes land released from the Green Belt in the form of urban extensions and also followed a more dispersed strategy for development. They have sought to focus development in locations that are, or can be made, accessible and sustainable. Such locations are identified as typically being on the edge of urban areas (or within ruralsettlements) that have a greater range of services. Potential locations for development include adjoining the urban edge or a highly accessible settlement. This will have the benefit of focusing on urban areas and sustainable urban extensions to provide the best opportunity for achieving accessibility and delivering public transport improvements.
It is abundantly clear that geographically Site 544 adjoins the urban edge of Coventry – Coventry is the second largest City in the West Midlands, after Birmingham. Site 544, as confirmed in the SHELAA assessment, would be viewed as an urban extension to Coventry and there is, therefore, no doubt that Site 544 is in accordance with the Spatial Strategy, which seeks to locate development in the most accessible locations. Coventry is clearly such a location and there is nothing within the Spatial Strategy which would rule against this.
Therefore, it can only be concluded that the development of Site 544 would be in accordance with the Spatial Strategy.
Any hard constraints only affect a small proportion of the site and/or can be mitigated.
The SHELAA does not identify any hard constraints – we concur with this assessment.
The site would not breach a strong defensible boundary to the Green Belt.
There are no strong existing defensible Green Belt boundaries that would be breached. The existing boundaries to Bannerbrook Park comprise simply hedgerows, some of which were planted in conjunction with the existing development. The same form of boundary treatment can therefore be replicated on this site and indeed is proposed within the masterplan included with this submission.
Any identified wider planning gain over and above that which would normally be expected.
Following discussions with local undertakers regarding the lack of burial space available within the Borough, the landowners are willing to offer land for a multi faith burial space which will provide a much needed facility for the Borough and also secure the long term permanence of the Green Belt boundary in this location.
Sites that would use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
See above.
If finer grain accessibility analysis (including output from the Accessibility Study) shows the site (or the part to be included) is accessible.
The Accessibility Study is flawed when it comes to assessment of sites on the Solihull / Coventry boundary. The Study provides a scoring for accessibility for facilities within 1,200m of a site, however when assessing facilities beyond the administrative area of Solihull only facilities within 800m of the boundary are assessed, this is despite an updated assessment being provided in 2020 which proposed to apply some adjustment of standards and yet makes no sensible adjustment to standards for cross boundary provision. Sites in such locations are not therefore being assessed on a comparable basis. Furthermore, the assessment is only being undertaken of walking distances and makes no allowance for accessing facilities by bike. The document references ‘shared cycle’ routes but then makes no consideration of people actually using them for cycling. Clearly were cycling to be factored in, especially for those sites, which adjoin major settlements and therefore have access to a good cycleway network (such as Site 544) then their accessibility criteria would be much improved.
Whilst it is noted that some provision is now taken off cross boundary retail provision and public transport which has moved Site 544 to a higher scoring position; it is still not being assessed on a comparable basis.
There is a shared footway/cycleway through the Bannerbrook Park development which can be extended into Site 544. Furthermore, opportunities will be considered to accommodate a bus route through Site 544 and on through Bannerbrook Park.
It is therefore clear that the proposal can only be defined as being in an ‘accessible location’.
FACTORS AGAINST
Not in accordance with the Spatial Strategy
As set out above, the development of this site is in accordance with the Spatial Strategy
Overriding hard constraints that cannot be mitigated.
There are no hard constraints identified.
SHELAA Category 3 sites unless demonstrated that concerns can be overcome.
The site is not identified as a Category 3 site in the SHELAA. We make comments below in respect of the flaws of SHELAA assessment and carry out our own assessment.
Sites that would not use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
As already confirmed, the site uses existing defensible boundaries and proposes to strengthen the defensible boundary and strengthen existing hedgerow planting.
If finer grain analysis shows the site (or the part to be included) is not accessible.
As previously confirmed, the Council have failed to consider the proximity of services in Coventry on a fair basis and because of this, it is not possible to determine how detailed the assessment has been. However, given that the site adjoins a major urban area is it simply not feasible to draw a conclusion that the site is inaccessible.
If the site is in a landscape character area that has a very low landscape capacity rating.
It is wholly unreasonable if the Council have used this criterion to discount this site. According to the Council’s Landscape Character Study (December 2016) this site falls within Landscape Character Area (LCA) 26 – which covers the eastern fringe of the Borough – yet significant Green Belt release is proposed in other areas of the Borough which are in an identical LCA. With one blanket ‘very low’ landscape capacity conclusion for such wide areas it cannot be used to discount some sites and not others – there must be parity in assessment. Furthermore, the study itself (page 49 – text adjoining Table 24) confirmed that it is not possible to establish a baseline sensitivity to change without having details of a given development proposal and therefore the conclusions should be taken as a guide only. On this basis, we do not consider it appropriate to use this criterion as a basis to discount sites given sites with the same assessment have been given a ‘green’ score’.
We enclose with this submission our own detailed, site specific, landscape and visual appraisal which confirms that the site has the ability to accommodate development of scale which is comparable to the surrounding area without compromising the function of the surrounding Green Belt.
If the SA appraisal identifies significant harmful impacts.
The SA identified 2 harmful impacts:
(i) The site contains over 20ha of Grade 1 – 3 agricultural land.
The site is wholly Grade 3 agricultural land – clearly within Grade 3, the site could in fact be Grade 3b land which would mean it is not BMVL. Furthermore, the Regional ALC mapping, which was last updated in November 2018, shows this to be the prevailing land type across the Borough which is not unsurprising. As a result, a number of proposed allocated sites have the same classification. It is not therefore appropriate to identify this as a harmful impact when a consistent approach has not been applied across the board.
(ii) The distance to jobs is identified as 8km within the SA
This is clearly incorrect as the SA treats the administrative boundary between Coventry and Solihull as a line which people will not cross. This is clearly incorrect. As already stated, there is for example a good bus connection to Warwick University which is a key local employer as well as Coventry city centre which offers multiple employment opportunities. The SA has applied the same approach to all services and facilities – relating its conclusions only to Solihull Borough and thus the distances to shops / schooling / healthcare are distorted. In addition, we highlight that this is a specific issue related to Balsall Common also (which is also further away from Coventry) and yet the Council has seen fit to allocate in excess of 1,700 dwellings in Balsall Common.
In summary:
• The site has medium / high accessibility – at the same level as the other ‘green sites’ identified in the Draft Plan.
• The site is in lower performing Green Belt than other ‘green sites’ in the plan.
• The site has existing defensible Green Belt boundaries which can be strengthened.
• The site has no constraints within the development area which cannot be mitigated in the normal way.
• The site has the same landscape character as other ‘green sites’.
• It is not, therefore, credible for Site 544 to be categorised as a ‘red’ site.
• For this reason, we consider the score for Site 544 should be corrected and the Council should re-visit their assessments from first principles.
As is evidenced from the corrected SHELAA commentary the site is rated as a Category 1 – Deliverable Site. Such sites are deemed to be available now, offer a suitable location for housing now and there is a reasonable prospect that housing will be delivered on site within 5 years from the date of adoption of the plan.

Object

Solihull Local Plan (Draft Submission) 2020

Blythe

Representation ID: 13883

Received: 14/12/2020

Respondent: Barratt David Wilson Homes - Land south of Broad Lane

Agent: Barton Willmore Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

There are serious doubts about the delivery of Site BC1 as no evidence of necessary collaborative working by multiple landowners and significant infrastructure requirements mean it is not deliverable within the stated time frame or the Plan period

Change suggested by respondent:

Alternative site 544 Broad Lane proposed to meet part of need proposed at Balsall Common

Full text:

Introduction
Paragraph 18 sets out that the site allocations from the Solihull Local Plan (December 2013) will be brought forward. We consider that the automatic allocation of these sites which have been allocated for a number of years, without any justification as to their deliverability, is an incorrect approach. We address this in more detail under our comments in respect of Policy 4.
Finally, Paragraph 21 refers to neighbourhood plans and the importance SMBC places on these. Paragraph 30 of the National Planning Policy Framework (NPPF) sets the most recently adopted policies will take precedence. SMBC may wish to set this out within this section, to make it clear that the LPR will take precedence upon adoption over any currently adopted Neighbourhood Plans.
Soundness – The Plan is not:
- Justified
Change Sought:
- Existing allocations should be tested for deliverability prior to re-allocation
- The hierarchy of neighbourhood plans should be made clear
Vision
Given that paragraph 59 of the NPPF states that the Government’s objective is to significantly boost the supply of housing, the wording relating to meeting the needs of the housing market area should be more positively worded.
Paragraph 50 sets out that SMBC are seeking to protect the integrity of the Green Belt. Wording should be included setting out that lower performing parcels could be released to protect higher performing parcels while meeting identified and evidenced needs.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- The vision should be more positively worded in order to significantly boost the supply of housing
- The need to release lower performing green belt to meet identified needs, and preserve higher performing parcels, should be set out
Providing Homes for All
Policy P4C Meeting Housing Needs – Market Housing
We object to the inflexible market housing mix which is prescribed within this policy. The NPPF encourages provision of balanced and mixed communities catering for a wide range of the population.
Individual sites should cater for a wide range of housing types and sizes. Provision of such a significant proportion of only smaller (3 bed or fewer) dwellings on sites will not develop long term sustainable communities. Instead it will result in a transient community where people will not be able to form long term neighbourhoods as they will need to move on as their circumstances change if there are insufficient homes of the right size on a site to accommodate them. We do not consider that this represents good planning and consider that the focus should be on building strong healthy communities which can cater for all, rather than simply planning for short term ownership.
The inclusion of a prescribed housing mix runs counter to the criterion elsewhere within the policy which allow a number of factors to be taken into consideration. This plan has a significant lifespan and to prescribe a housing market mix which is to remain in place for the whole of plan period does not provide sufficient flexibility for adaptation to current housing need and demand. We have seen with the current pandemic the way external factors can influence people’s choice of lifestyle.
Soundness – The Plan is not:
• Justified
• Effective
Change Sought:
• Amendment of policy to allow for housing mix based on up to date market evidence
Policy P4D Meeting Housing Needs – Self and Custom Housebuilding
The latest Annual Monitoring Report (March 2020), covering the period 2018/19, sets out that for the period November 2018 – October 2019 there were 374 entries on the Self-build register.
As such, requiring all sites of over 100 houses to provide 5% of open market dwellings in the form of self-build plots is unreasonable and unjustified. Given provision is being made for 7,605 houses through allocations above 100 houses and the UK Central Hub area, this would equate to the 761 self and custom build plots to be provided from the draft allocations.
The Planning Practice Guidance (PPG) advises that the Council should engage with landowners who own sites that are suitable for housing and ‘encourage’ them to consider self-build and custom housing and who are interested in provision. Imposition of mandatory requirement goes beyond encouragement.
Following the example of Stratford District for example, the Council have specifically identified custom build sites which are discreet standalone small sites.
We also include extracts from the Bedford Local Plan Inspector’s Report (Appendix 4) where the Inspector recommended deletion the policy akin to that being proposed here as the policy was not justified with reference to the self-build register. The same principle applies here in that the amount being sought is over double that on the register.
Soundness – The Plan is not:
• Justified
• Consistent with national policy
Change Sought:
• Deletion of specific policy requirement and replacement with specific allocations or general support for self-build sites
Policy P5 Provision of Land for Housing
Policy P5 sets out the Council will allocate sufficient land for at least 5,270 net additional homes to ensure sufficient housing supply to deliver 15,017 additional homes in the plan period. This would result in an average annual housing land provision target of 938 net additional homes per year. This annualised target is made up of a stepped requirement with 851 homes per year delivered between 2020-2026 and 991 dwellings delivered between 2026-2036.
Demand
A Housing Need Technical Report has been provided (December 2020) (Appendix 5) and should be read in conjunction with our commentary on Policy P5. In summary, this Note makes the following key points:
• Planning Practice Guidance (PPG) states the Standard Method (SM) figure represents the minimum housing need, and there may be circumstances whereby need is higher;
• The Draft Plan identifies the clear economic growth aspirations for the Borough, including the nationally significant growth planned for the UK Central Hub. This is a circumstance where housing need may exceed the minimum need. If it does, housing delivery must be of a quantum to support these aspirations;
• The Council’s 2020 HEDNA confirms that the calculation of housing need is underpinned by the growth at the UK Central Hub. The Hub is projected to generate an additional 13,000 jobs to the baseline Experian job growth forecast (10,000 jobs) included in the HEDNA;
• The HEDNA tests several economic-led housing need scenarios. However, the UK Hub Scenario assumes only 25% of the additional 13,000 jobs created by the Hub are to be taken up by Solihull residents. This results in the housing need (816 dpa) underpinning the Plan;
• However, this ignores the ‘Growth A’ scenario which concludes that 908 dpa would be required based on the ‘Adjusted Local Growth’ scenario. This scenario assumes that strong industries in Solihull will outperform the baseline Experian forecast, resulting in an additional 5,680 jobs to the baseline (10,000 jobs) over the Plan period, with Solihull residents taking up these jobs;
• However, no scenario is presented to show what the housing need would be based on the UK Central Hub scenario being fulfilled in full by Solihull residents. It is important to understand this so that the duty to cooperate discussions referred to in the HEDNA are well informed;
Barton Willmore provide these sensitivity scenarios based on two approaches to commuting, and two approaches to underlying demographic rates (mortality, fertility, and migration);
• The results of our testing are summarised in Table 7.1:
Table 7.1: Solihull Borough – Barton Willmore Demographic Forecasting 2020-2036 Scenario Demographic rates Jobs per annum 2020-2036 Dwellings per annum 2020-2036
Dwelling-constrained:
Standard Method
2016 ONS rates
7721 – 8132
807
2018 ONS rates
1,0141 – 1,0682
Employment-constrained:
UK Central Hub
2016 ONS rates
1,437
1,1991 – 1,2482
2018 ONS rates
1,0361 – 1,0852
Source: Barton Willmore Development Economics
1 Commuting Ratio 0.98
2 Commuting Ratio 0.93
• Growth of between 1,036 and 1,248 dpa would be required to support the UK Central Hub scenario (between 16,576 and 19,968 dwellings in total);
• This represents an increase of between 220 dpa and 432 dpa on the housing need calculated by the HEDNA (816 dpa), or an additional 3,520 to 6,912 dwellings over the Plan period;
• Our analysis of historic levels of job growth in Solihull 1991-2019 shows a range of 1,225 and 1,650 jobs per annum (jpa). This highlights that the UK Central Hub scenario (1,437 jpa) is a realistic assumption;
• The HEDNA identifies an ‘acute’ situation in respect of affordable housing need. Our analysis suggests that the HEDNA’s conclusion on overall need (816 dpa) should be increased to meet as much affordable need as possible.
• Furthermore, our analysis of unmet need in the wider GBBCHMA suggests that the 2020 Position Statement’s conclusions under-estimate the remaining unmet housing need from Birmingham up to 2031, and for Birmingham alone the deficit in unmet need is between 11,294 and 13,101 dwellings up to 2031;
• In addition, there is significant unmet need up to 2031 based on the existing Standard Method coming from Birmingham City and the Black Country. This amounts to unmet need of between 25,543 and 27,350 dwellings up to 2031. If we were to assume the increased capacity for Birmingham City (65,400 dwellings 2011-2031) set out in the 2020 Position Statement the unmet need would still be between 11,243 and 13,050 dwellings up to 2031. This increases significantly based on the uncapped Standard Method figure for Birmingham City which would come into effect once Birmingham’s Local Plan becomes older than 5 years in 14 months’ time;
Adoption of the proposed changes to Standard Method consulted on by Government in summer 2020 would lead to there being unmet need against emerging/existing housing requirements in all but one of the GBBCHMA authorities;
• Furthermore, the unmet need post 2031 should be considered, as referenced to in the 2020 Position Statement. Based on data available at the present time and the most recent Local Plan figures, Barton Willmore calculate this to be a minimum 17,700 dwellings 2031-2040.
• In summary, the analysis in this report results in the following broad conclusions:
1. The SM’s minimum need for Solihull (807 dpa) will need to be increased to account for expected job growth from the UK Central Hub and the ‘acute’ need for affordable housing in the Borough;
2. Barton Willmore’s demographic modelling shows that between 1,036 and 1,248 dpa are required to support the UK Central Hub scenario;
3. Barton Willmore’s calculations suggest that the deficit in unmet housing need from Birmingham City being delivered by HMA Local Plans amounts to a minimum of between 11,294 and 13,101 dwellings up to 2031, a significant increase from the 2,597 dwellings concluded on by the 2020 Position Statement. This increases when the unmet need from the Black Country is considered. Additional unmet need will be created post 2031.
As such, in order to ensure the LPR is positively prepared, SMBC should seek to plan for more housing, and should allocate further sites.
SUPPLY
Further to the above, and as set out above, we also consider that some elements of the supply should be reviewed:
Dealing with the supply side of the equation, we make the following objections to the various components of supply:
‘Sites identified in land availability assessments’
It is unclear what is meant by ‘sites identified in land availability assessments’. Given these are sites which do not benefit from a draft allocation, then they are by definition, windfall sites which means that there is double counting from unknown sources of supply.
Solihull Local Plan sites
We question the automatic inclusion of Solihull Local Plan sites which have yet to be granted planning permission. The current Plan was adopted in 2013 and the Council cannot currently demonstrate a 5-year supply of housing. In this situation, the Council should be encouraging every suitable site to come forward. The fact that these sites have not come forward despite the housing shortfall, suggests that these should not be considered ‘deliverable’ housing sites without significant justification as to why they will now come forward when they have not to date.
Brownfield Land Register (BLR)
We query the separate identification of sites identified in the BLR – this BLR is subject to periodic review and thus will not be fixed as a permanent source of supply. We consider that any sites to be delivered in this way should be considered as windfall developments.
Lapse Rates
Whilst we support the use of a 10% lapse rates, it needs to be applied across the board i.e. it is equally application in relation to what is to come as to what has already gone before. If the Council accept that a 10% lapse rate is application to sites which already benefit from planning permission, then surely it should also accept that it is applicable to future planning consents which have yet to be granted.
Windfall allowance
The windfall allowance is justified by reference to past windfall rates however it fails to recognise that ‘ town centre sites’ (a traditional source of windfall supply) are allocated in the plan through the town centre masterplan and the Council have identified other sources of supply through the brownfield register. In the absence of any assessment / analysis of this component demonstrating the projected level of future windfall provision taking these factors in account, we consider that the level of windfall should be reviewed and adjusted accordingly.
UK Central Hub
We consider that given the scale of the UK Central Hub proposals, the rate of delivery assumed by the Council is overly optimistic. The Council have not provided any trajectory for the Site, and we note that the August 2020 consultation did not contain any firm commitments to delivery timescales or set out any delivery partners.
This assertion is supposed by the findings of the Lichfields’ Report1 that sets out the average time from outline planning application to the first delivery of homes is 8.4 years. The average build out rate is 160dpa.
As such, taking this into account, and based on a LPR adoption date of 20222, we consider the first completions will likely be C.2030. With an average build out rate of 160dpa, this means that approximately 960 dwellings will be delivered during the Plan Period, assuming that the housing is within the first delivery phases (the August 2020 consultation referenced a mix of uses coming forward). While more outlets may increase the speed of delivery, the amount of infrastructure required also needs to be taken into account. The type of supply also needs to be considered, with UK Central Hub likely to be geared towards apartments.
As such, we consider that 1,780 houses should be removed to take into account the likely delivery timescales.
Trajectory
We also note that SMBC are seeking to provide a stepped trajectory as some of the larger sites will not make a significant contribution to completions until the mid-delivery phase. The Inspector assessing the Guildford Local Plan set out:
39. In the submitted plan, the combined effect of the stepped trajectory in Policy S2 together with the “Liverpool” methodology (in which the delivery shortfall accumulated over the first 4 years of the plan (2015/16 to 2018/19) is spread over the whole plan period), would have deferred a significant proportion of the housing requirement to the later years of the plan. Set against the (then higher) housing requirement, this would not have met the Government’s objective to boost the supply of housing in the shorter term. (our emphasis)
We consider that SMBC should take the same approach as Guildford and allocate further sites to meet need early in the Plan Period. The existence of the UK Central Hub is not of a sufficient size to warrant a different approach (i.e. it is not akin to a new settlement).
Further, as with the withdrawn Uttlesford Local Plan, this stepped trajectory may create a fragile 5 year housing land supply position, taking into account the ambitious delivery targets of the UK Central Hub and the delivery concerns relating to the draft allocations set out below. The Inspectors’ letter relating to the withdrawn plan states:
29. This calculation relies on the use of a reduced annual requirement of 568 dpa for most of the years, as it is based on the stepped trajectory set out in Policy SP3. It is also based on what we consider to be unrealistic commencement/housing delivery dates for two of the Garden Communities (North Uttlesford and Easton Park, as set out above). So, whilst the Council can, in theory, demonstrate a 5.65 year HLS, we are concerned that if the housing delivery at North Uttlesford and Easton Park slips by just one year, as seems very likely, this would result in 100 less dwellings in this 5 year period. This would result in a very fragile 5 year HLS position.
There are comparisons that can be drawn here based on the stepped trajectory and the anticipated 5.37 year supply upon adoption.
The Inspectors for the withdrawn Uttlesford Local Plan also referenced the need to meet the full objectively assessed need for market and affordable housing in the housing market area (NPPF Paragraph 47). The HEDNA states there is a ‘clearly acute’ shortage of affordable housing. The proposed stepped trajectory therefore may worsen the affordability problem as it would delay the provision of housing until late years of the plan period.
Taking the above into account, we consider that the SMBC’s supply is actually 11,496 (rounded) before any reduction in windfall or the deletion of draft allocations which are unlikely to be delivered is taken into account.
This is a reduction of 3,521 and, as such, to meet the increased demand set out above, and take into account the concerns relating to a stepped trajectory, a review of the supply is required and additional sites allocated.
The Council should also ensure that a large number of these sites can be delivered early on in the Plan Period in order to take account of the likely later delivery of some other sites.
Soundness – The Plan is not:
• Positively prepared
• Justified
• Effective
• Consistent with national policy
Change Sought:
• Review of demand and amendment to the strategy
• Review of supply and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible
Improving Accessibility and Encouraging Sustainable Travel
Policy P7 Accessibility and Ease of Access
We consider that the requirement for major residential development should be clarified to set out that there may be other ways in which sustainable access options can be implemented. The distance to a bus stop/train station should not be seen as the only measure of sustainable access.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- Policy should be clarified that there are other ways of ensuring sustainable transport options are available
Policy P8 Managing Travel Demand and Reducing Congestion
Paragraph 109 of the NPPF states that development should only be prevented or refused on highway grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. Within point 2(ii), SMBC are seeking to bring in a further test which would not be in accordance with the NPPF. This should therefore be deleted.
Soundness – The Plan is not:
• Consistent with national policy
Change Sought:
• Point 2(ii) should be deleted
Protecting and Enhancing our Environment
Policy P11 Water and Flood Risk Management
With regards to point 6, the confirmation of discharge into a public sewer falls under Section 106 of the Water Industry Act 1991. As such, it should be made clear that planning permission can be granted prior to this being confirmed, as it falls within a different regulatory regime.
With regards to point 14, it should be clarified that contribution through a Section 106 Agreement is only required where it meets the tests set out in NPPF Paragraph 56.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Deletion of point relating to confirmation from relevant infrastructure owner
• Clarification as to obligation requirements and the necessary tests
Promoting Quality of Place
Policy P17 Countryside and Green Belt
Within Point 1 of the policy, SMBC is seeking to safeguard best and most versatile agricultural land (BMVAL) unless there is an overriding need for development that outweighs the loss. BMVAL is referenced within the NPPF at Paragraph 170 which states that planning policies should contribute to and enhance the natural and local environment by taking into account a number of criteria. One of these is:
b) recognising the intrinsic character and beauty of the countryside, and the wider benefits from natural capital and ecosystem services – including the economic and other benefits of the best and most versatile agricultural land, and of trees and woodland.
Firstly, we consider that including reference to BMVAL within a policy relating to Green Belt seeks to conflate two separate issues. Further, as can be seen above, the test set out by the NPPF does not require the safeguarding of BMVAL. Planning policies are required to contribute to and enhance natural and local environment by recognising economic and other benefits from BMVAL. As such, we consider this point should be deleted.
SMBC have set out, within Point 4, a number of different factors that may be taken into account when considering very special circumstances.
Further to this, point 5 sets out that development that is ‘conspicuous’ from the Green Belt must not harm the visual amenity of the Green Belt by reason of siting, materials or design. Given Green Belt is a spatial designation, designed to prevent sprawl, we consider that this requirement goes beyond the scope of the Green Belt, as set out in the NPPF. The LPR contains policies relating to protecting landscape, where necessary, and as such, this point should be deleted.
Soundness – The Plan is not:
• Positively prepared
• Consistent with National Policy
Change Sought:
• Deletion of point 1
• Inclusion of further factors which may create very special circumstances
• Deletion of point 5
Policy P17A Green Belt Compensation
Paragraph 138 of the NPPF sets out that ways in which the impact of removing land from the Green Belt can be offset through compensatory improvements to the environmental quality and accessibility of remaining Green Belt Land.
Policy P17 is seeking to require this by requiring development on sites removed from the Green Belt to provide appropriate compensatory improvements to environmental quality and accessibility of remaining Green Belt in the form of a Section 106 Agreement utilising the below hierarchy:
1. Compensatory requirements as set out as part of the Local Plan masterplans
2. Where no compensation has been set out within the Local Plan masterplan, improvements are provided as:
i. Improvements within the Green Belt adjacent to, or in close proximity to, the development site;
ii. Improvements within the Green Belt adjacent to, or in close proximity to, the settlement or area accommodating the development;
iii. Improvements within the Green Belt in an area identified for environmental improvements as part of the Council’s Green Infrastructure Opportunity Mapping.
3. In the event it is robustly demonstrated that none of the above options can be satisfied then the Council will accept a commuted sum.
Given none of the emerging masterplans show any compensatory improvements within the Green Belt, it would appear that the Policy is relying on there being additional land being available within the control of applicants (which may not be the case), or the payment of contributions.
SMBC’s viability evidence does not take this requirement into account, and no detail is provided as to how these contributions will be spent or what level of contribution is required. This therefore brings uncertainty, and the Policy should be reconsidered to ensure what is required is clear, and that it will not impact upon the viability of schemes.
Soundness – The Plan is not:
• Consistent with National Policy
Change Sought:
• Reconsideration of the policy to ensure that it is evidenced based, does not impact upon viability of schemes, and is in accordance with national policy
Delivery and Monitoring
Policy P21 Developer Contributions and Infrastructure Provision
Policy P21 expected major development to provide or contribute towards the provision of measures to directly mitigate its impact and physical, social, green and digital infrastructure.
SMBC’s viability testing does not take into account digital infrastructure within the testing and, as such, it should be evidenced that this will not render development unviable.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Confirmation that digital infrastructure provision allows for viable development
Settlement Chapters
Policy BC1 Barratt’s Farm, Balsall Common
We note that 1,756 new homes are proposed for Balsall Common across the plan period with the sole justification seemingly being that it contains both a primary and secondary school and has a full range of retail and associated facilities. However, it is still described as a rural settlement with no significant areas of employment and the distribution strategy remains one of “proportional distribution”. 1,756 dwellings to a single rural village would be completely disproportionate. There is discussion in the document regarding delivery of a by-pass; provision a station car park; improved public transport and a new primary school. However, there is no discussion as to how these are to be funded / delivered relative to the level of growth identified. In addition, there is discussion regarding the scope to enhance the existing local centre and the provision of a village centre masterplan. However, this land is in multiple ownerships and there are no proposals for what these enhancements could entail or how they could function – particularly with a by-pass in place which could actually draw trade away from the existing centre.
There is no assessment of the ability of Balsall Common to deliver this level of growth in such a small area. Whilst clearly some sites (i.e. Barratts Farm) will be able to have multiple outlets, the ability of the market to absorb and deliver multiple sites at any one time in a rural location should be reviewed; particular when Balsall Common will be acutely affected by HS2 – both in terms of the physical construction of the line and the disruption and uncertainty that this will bring; but also in terms of market desirability until such time as the line is constructed.
We also note that Barratts Farm is in multiple ownerships and these are described as “complex” in paragraph 541. This is the single largest site and the one which is proposed to deliver the by-pass. Within the previous draft of the Plan, it was stated that this site would only be taken forward if the landowners / promoters could demonstrate they are working on a collaborate and comprehensive basis. Reading paragraph 541, this collaborate working has clearly not been secured in the way it was envisaged and nothing additional is suggested to demonstrate that joint / collaborative working is possible.
The relief road is identified as being necessary for Barratts Farm in particular with the policy advising that is required early in the plan period. The road is provisionally to be funded via CIL payments; and grant funding which “may” be possible through the WMCA. Firstly, CIL payments can only be secured through those sites which will come forward in the future however these sites are Green Belt sites and cannot therefore be delivered until the Local Plan Review is completed and the subsequent CIL schedule is adopted. Secondly, there is no grant funding proposal in place to fund the road. As it currently stands this road is not deliverable. The road is required to be delivered early in the plan period i.e. before there are significant CIL funds in place and, potentially, at a point where, in order to receive grant funding, applications should be being made now / near future.
There has to be serious doubt over the ability of Barratts Farm to be delivered within the anticipated timeframes and therefore places serous doubt over the plan as a whole given the scale of this allocation.
The Sustainability Appraisal notes that there are limited employment opportunities within Balsall Common and that people travel outside of the settlement to work. As such, it is noted that the expansion of this settlement would fly in the face of sustainability objectives of reducing the need to travel to areas of employment. Whilst such a case could be made for the majority of the rural areas of the Borough, it is heightened especially here when such a large proportion of future growth is identified for one rural settlement.
At this stage, the level of growth attributed to Balsall Common is disproportionate and that inadequate research has been undertaken into the deliverability of this level of growth and the associated aspirations; and the ability of the market to deliver this level of growth in a rural area is considered to be unrealistic.
On the basis that we do not consider the sites identified to be deliverable and the significant shortfall in supply identified by the more realistic timescales we have identified for UK Central, we propose an alternative site – Land at Hawkshurst (Site 544) as an alternative to meeting part of this need. To date this site has been inappropriately assessment by the Council and a more appropriate evaluation of the site is given in the section below.
Policy BL1 – West of Dickens Heath
The policy requires that the proposal for BL1 secures the relocation of the existing sports provision to a suitable site in the local vicinity. Until such time as these facilities are relocated or a plan is in place to secure timely relocation (which should include the grant of planning permission in our view, given that any site will be in the Green Belt), then the site cannot come forward for development. Our key concern here relates to Site 4 (West of Dickens Heath). It is noted that the identification of a Local Wildlife Site within the site hampers re-provision within the site itself and therefore alternative options will need to be pursued outside of the site. We consider that these alternatives should be considered now as clearly, as it currently stands, the pitches will be lost with no alternative in place (and therefore no guarantee of any re-provision). This is all the more important given that the land in the area is all located within the Green Belt and therefore any proposals which may, for example, include floodlighting, will have to be carefully considered against the Green Belt ‘tests’. We understand that the loss of these facilities is causing significant local concern particularly with no proposals for replacement.
The Council have had ample time to identify and secure alternative provision and therefore the fact that this is not identified within the plan, suggests that there are currently no alternative sites. This calls into question the delivery of this site and with no evidence and no proposals in place, we consider that proposal BL1 should be deleted from the plan.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Policy KN1 Hampton Road, Knowle
As with the Site West of Dickens Heath, this draft allocation requires the reprovision of sports pitches. In this instance, the re-provided pitches are currently shown within the Green Belt to the north of the allocation.
The Council, within Paragraphs 713-715 state that it’s likely that very special circumstances will exist to support development in this location and, as such, the reprovision will likely be acceptable. However, this pre-judges any application, for which the detail is not known, and as such cannot be relied upon. Therefore the housing that would be provided on the sports pitches should not be included until the reprovision of the sports pitches is secured.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Site Assessment Criteria
We consider that a more dispersed growth option should be considered and, as set out previously, consider that the land at Broad Lane, Hawkshurst (Site 544) is ideally suited to make an important contribution to the Council’s housing need. Following the Council’s own site selection criteria, we set out why this site is a suitable and deliverable alternative site which can be delivered utilising existing infrastructure:
We object strongly to the manner in which Site 544 has been assessed in the site selection process for the reasons which are set out below – and on that basis, object to the inconsistent application of the methodology.
Firstly, in assessing Site 544, the Council deemed that the site did not pass ‘Step 1’ – which is the initial, high-level sieving process. Sites which are not taken forward at this stage are then not subject to the more refined ‘Step 2’ analysis. We consider the manner in which the process was applied is fundamentally flawed and have carried out our own assessment (using the Council’s own analysis) to demonstrate that the site should not have been discounted at Step 1 and should have been included in Step 2.
STEP 1
The first stage in the sieving process is a high-level look at the following:
(i) Brownfield vs greenfield
(ii) Urban areas vs Green Belt
(iii) Accessibility
Sites can be rated from Priority 1 (brownfield in urban area or settlement) to Priority 10 (greenfield in isolated highly performing Green Belt location). A traffic light rating is then applied – sites which falls within Priority 1 to Priority 4 are green sites; Priority 5 sites are yellow; Priority 6, 6b and 7 sites are blue; and Priority 8, 9 and 10 sites are red. Red sites fail Step 1 and are not taken forward to Step 2 for assessment. Site 544 was incorrectly identified as a Priority 9 red site and was not therefore taken forward to Step 2.
In summary, Site 544 is a greenfield and Green Belt site. However, it is accessible (being on the edge of the Coventry urban area) and also within an area with a low GB score of 5. Therefore, it should be allocated a Priority score of no higher than 5 (yellow). We review below the manner in which this initial sieving assessment was flawed - taking Site 544 step by step through the same assessment process as the Council.
Green Belt
In the Green Belt Assessment 2016, Site 544 is identified as part of Refined Parcel RP83:5 which has a combined score of 5, within a range from the highest performing Green Belt sites (12) to the lowest performing sites, scoring as low as 0. With a score of 5, site 544 is clearly a lower performing site. The starting point for consideration as a Priority 5 site is a score of 5 or lower in the Green Belt––Site 544 falls into that category. The results of this assessment are backed up by our own Green Belt assessment which is included with this submission.
Accessibility
The second part of the criteria relates to accessibility and to achieve a Priority 5 ranking, the site is required to be in an accessible location. This is defined as:
(a) On the edge of the urban area or
(b) On the edge of a settlement which has a wide range of services and facilities including a primary school and a range of retail facilities.
Site 544 adjoins the urban edge of Coventry – indeed in the Council’s Site Assessment, the site is identified as possibly being an extension to Coventry.
It should be noted that in relation to the Publication Draft Plan, the Council have updated the Accessibility Study to take account of retail / surgery provision in adjoining LPA areas, however they have then not used this information to re-visit first principles and determine whether sites have been appropriately assessed from the start. Therefore, whilst this site now scores more positively, its ‘priority 9’ status has not been re-evaluated despite an Addendum to the Site Assessments being produced and the Accessibility Study being revisited. It appears that despite the site being on the urban edge of Coventry this has been discounted due to the sites geographical relationship with Coventry as opposed to Solihull. However, accessibility should be based upon spatial location rather than boundaries. The fact that the retail offer is in Coventry will not prevent residents of Hawkshurst using it.
For the absolute avoidance of doubt therefore, we enclose our own submission produced by Phil Jones Associates which demonstrates that the site is in a suitable and sustainable location.
It is fundamentally incorrect for Site 544 to have been ‘sieved out’ at Step 1. The site should have been correctly assessed as a Priority 5 yellow site as it meets the two necessary criteria. The site, therefore, should have been taken forward for a more detailed analysis in Step 2.
On the basis that the site does pass Step 1 – we have carried out the Step 2 assessment using the same table and criteria as the Council. There are no scorings or weightings attributed to the Step 2 analysis – it assessed on a qualitative basis.
STEP 2 – REFINEMENT CRITERIA
FACTORS IN FAVOUR
In accordance with the spatial strategy
(including only proportional additions to lower order settlements (i.e. those without a secondary school or not located close to the urban edge).
The preferred spatial strategy would be to locate development needs close to where they arise. However the Plan identifies that there is limited land available to achieve this and therefore the Council has had to look at alternative options, which includes land released from the Green Belt in the form of urban extensions and also followed a more dispersed strategy for development. They have sought to focus development in locations that are, or can be made, accessible and sustainable. Such locations are identified as typically being on the edge of urban areas (or within ruralsettlements) that have a greater range of services. Potential locations for development include adjoining the urban edge or a highly accessible settlement. This will have the benefit of focusing on urban areas and sustainable urban extensions to provide the best opportunity for achieving accessibility and delivering public transport improvements.
It is abundantly clear that geographically Site 544 adjoins the urban edge of Coventry – Coventry is the second largest City in the West Midlands, after Birmingham. Site 544, as confirmed in the SHELAA assessment, would be viewed as an urban extension to Coventry and there is, therefore, no doubt that Site 544 is in accordance with the Spatial Strategy, which seeks to locate development in the most accessible locations. Coventry is clearly such a location and there is nothing within the Spatial Strategy which would rule against this.
Therefore, it can only be concluded that the development of Site 544 would be in accordance with the Spatial Strategy.
Any hard constraints only affect a small proportion of the site and/or can be mitigated.
The SHELAA does not identify any hard constraints – we concur with this assessment.
The site would not breach a strong defensible boundary to the Green Belt.
There are no strong existing defensible Green Belt boundaries that would be breached. The existing boundaries to Bannerbrook Park comprise simply hedgerows, some of which were planted in conjunction with the existing development. The same form of boundary treatment can therefore be replicated on this site and indeed is proposed within the masterplan included with this submission.
Any identified wider planning gain over and above that which would normally be expected.
Following discussions with local undertakers regarding the lack of burial space available within the Borough, the landowners are willing to offer land for a multi faith burial space which will provide a much needed facility for the Borough and also secure the long term permanence of the Green Belt boundary in this location.
Sites that would use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
See above.
If finer grain accessibility analysis (including output from the Accessibility Study) shows the site (or the part to be included) is accessible.
The Accessibility Study is flawed when it comes to assessment of sites on the Solihull / Coventry boundary. The Study provides a scoring for accessibility for facilities within 1,200m of a site, however when assessing facilities beyond the administrative area of Solihull only facilities within 800m of the boundary are assessed, this is despite an updated assessment being provided in 2020 which proposed to apply some adjustment of standards and yet makes no sensible adjustment to standards for cross boundary provision. Sites in such locations are not therefore being assessed on a comparable basis. Furthermore, the assessment is only being undertaken of walking distances and makes no allowance for accessing facilities by bike. The document references ‘shared cycle’ routes but then makes no consideration of people actually using them for cycling. Clearly were cycling to be factored in, especially for those sites, which adjoin major settlements and therefore have access to a good cycleway network (such as Site 544) then their accessibility criteria would be much improved.
Whilst it is noted that some provision is now taken off cross boundary retail provision and public transport which has moved Site 544 to a higher scoring position; it is still not being assessed on a comparable basis.
There is a shared footway/cycleway through the Bannerbrook Park development which can be extended into Site 544. Furthermore, opportunities will be considered to accommodate a bus route through Site 544 and on through Bannerbrook Park.
It is therefore clear that the proposal can only be defined as being in an ‘accessible location’.
FACTORS AGAINST
Not in accordance with the Spatial Strategy
As set out above, the development of this site is in accordance with the Spatial Strategy
Overriding hard constraints that cannot be mitigated.
There are no hard constraints identified.
SHELAA Category 3 sites unless demonstrated that concerns can be overcome.
The site is not identified as a Category 3 site in the SHELAA. We make comments below in respect of the flaws of SHELAA assessment and carry out our own assessment.
Sites that would not use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
As already confirmed, the site uses existing defensible boundaries and proposes to strengthen the defensible boundary and strengthen existing hedgerow planting.
If finer grain analysis shows the site (or the part to be included) is not accessible.
As previously confirmed, the Council have failed to consider the proximity of services in Coventry on a fair basis and because of this, it is not possible to determine how detailed the assessment has been. However, given that the site adjoins a major urban area is it simply not feasible to draw a conclusion that the site is inaccessible.
If the site is in a landscape character area that has a very low landscape capacity rating.
It is wholly unreasonable if the Council have used this criterion to discount this site. According to the Council’s Landscape Character Study (December 2016) this site falls within Landscape Character Area (LCA) 26 – which covers the eastern fringe of the Borough – yet significant Green Belt release is proposed in other areas of the Borough which are in an identical LCA. With one blanket ‘very low’ landscape capacity conclusion for such wide areas it cannot be used to discount some sites and not others – there must be parity in assessment. Furthermore, the study itself (page 49 – text adjoining Table 24) confirmed that it is not possible to establish a baseline sensitivity to change without having details of a given development proposal and therefore the conclusions should be taken as a guide only. On this basis, we do not consider it appropriate to use this criterion as a basis to discount sites given sites with the same assessment have been given a ‘green’ score’.
We enclose with this submission our own detailed, site specific, landscape and visual appraisal which confirms that the site has the ability to accommodate development of scale which is comparable to the surrounding area without compromising the function of the surrounding Green Belt.
If the SA appraisal identifies significant harmful impacts.
The SA identified 2 harmful impacts:
(i) The site contains over 20ha of Grade 1 – 3 agricultural land.
The site is wholly Grade 3 agricultural land – clearly within Grade 3, the site could in fact be Grade 3b land which would mean it is not BMVL. Furthermore, the Regional ALC mapping, which was last updated in November 2018, shows this to be the prevailing land type across the Borough which is not unsurprising. As a result, a number of proposed allocated sites have the same classification. It is not therefore appropriate to identify this as a harmful impact when a consistent approach has not been applied across the board.
(ii) The distance to jobs is identified as 8km within the SA
This is clearly incorrect as the SA treats the administrative boundary between Coventry and Solihull as a line which people will not cross. This is clearly incorrect. As already stated, there is for example a good bus connection to Warwick University which is a key local employer as well as Coventry city centre which offers multiple employment opportunities. The SA has applied the same approach to all services and facilities – relating its conclusions only to Solihull Borough and thus the distances to shops / schooling / healthcare are distorted. In addition, we highlight that this is a specific issue related to Balsall Common also (which is also further away from Coventry) and yet the Council has seen fit to allocate in excess of 1,700 dwellings in Balsall Common.
In summary:
• The site has medium / high accessibility – at the same level as the other ‘green sites’ identified in the Draft Plan.
• The site is in lower performing Green Belt than other ‘green sites’ in the plan.
• The site has existing defensible Green Belt boundaries which can be strengthened.
• The site has no constraints within the development area which cannot be mitigated in the normal way.
• The site has the same landscape character as other ‘green sites’.
• It is not, therefore, credible for Site 544 to be categorised as a ‘red’ site.
• For this reason, we consider the score for Site 544 should be corrected and the Council should re-visit their assessments from first principles.
As is evidenced from the corrected SHELAA commentary the site is rated as a Category 1 – Deliverable Site. Such sites are deemed to be available now, offer a suitable location for housing now and there is a reasonable prospect that housing will be delivered on site within 5 years from the date of adoption of the plan.

Object

Solihull Local Plan (Draft Submission) 2020

Balsall Common

Representation ID: 13884

Received: 14/12/2020

Respondent: Barratt David Wilson Homes - Land south of Broad Lane

Agent: Barton Willmore Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

There is no explanation how the infrastructure requirements for Balsall Common would be funded or the land for the enhancement of the local centre delivered. The Relief Road is not deliverable as required early in the Plan period as this will be before CIL receipts are available

Full text:

Introduction
Paragraph 18 sets out that the site allocations from the Solihull Local Plan (December 2013) will be brought forward. We consider that the automatic allocation of these sites which have been allocated for a number of years, without any justification as to their deliverability, is an incorrect approach. We address this in more detail under our comments in respect of Policy 4.
Finally, Paragraph 21 refers to neighbourhood plans and the importance SMBC places on these. Paragraph 30 of the National Planning Policy Framework (NPPF) sets the most recently adopted policies will take precedence. SMBC may wish to set this out within this section, to make it clear that the LPR will take precedence upon adoption over any currently adopted Neighbourhood Plans.
Soundness – The Plan is not:
- Justified
Change Sought:
- Existing allocations should be tested for deliverability prior to re-allocation
- The hierarchy of neighbourhood plans should be made clear
Vision
Given that paragraph 59 of the NPPF states that the Government’s objective is to significantly boost the supply of housing, the wording relating to meeting the needs of the housing market area should be more positively worded.
Paragraph 50 sets out that SMBC are seeking to protect the integrity of the Green Belt. Wording should be included setting out that lower performing parcels could be released to protect higher performing parcels while meeting identified and evidenced needs.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- The vision should be more positively worded in order to significantly boost the supply of housing
- The need to release lower performing green belt to meet identified needs, and preserve higher performing parcels, should be set out
Providing Homes for All
Policy P4C Meeting Housing Needs – Market Housing
We object to the inflexible market housing mix which is prescribed within this policy. The NPPF encourages provision of balanced and mixed communities catering for a wide range of the population.
Individual sites should cater for a wide range of housing types and sizes. Provision of such a significant proportion of only smaller (3 bed or fewer) dwellings on sites will not develop long term sustainable communities. Instead it will result in a transient community where people will not be able to form long term neighbourhoods as they will need to move on as their circumstances change if there are insufficient homes of the right size on a site to accommodate them. We do not consider that this represents good planning and consider that the focus should be on building strong healthy communities which can cater for all, rather than simply planning for short term ownership.
The inclusion of a prescribed housing mix runs counter to the criterion elsewhere within the policy which allow a number of factors to be taken into consideration. This plan has a significant lifespan and to prescribe a housing market mix which is to remain in place for the whole of plan period does not provide sufficient flexibility for adaptation to current housing need and demand. We have seen with the current pandemic the way external factors can influence people’s choice of lifestyle.
Soundness – The Plan is not:
• Justified
• Effective
Change Sought:
• Amendment of policy to allow for housing mix based on up to date market evidence
Policy P4D Meeting Housing Needs – Self and Custom Housebuilding
The latest Annual Monitoring Report (March 2020), covering the period 2018/19, sets out that for the period November 2018 – October 2019 there were 374 entries on the Self-build register.
As such, requiring all sites of over 100 houses to provide 5% of open market dwellings in the form of self-build plots is unreasonable and unjustified. Given provision is being made for 7,605 houses through allocations above 100 houses and the UK Central Hub area, this would equate to the 761 self and custom build plots to be provided from the draft allocations.
The Planning Practice Guidance (PPG) advises that the Council should engage with landowners who own sites that are suitable for housing and ‘encourage’ them to consider self-build and custom housing and who are interested in provision. Imposition of mandatory requirement goes beyond encouragement.
Following the example of Stratford District for example, the Council have specifically identified custom build sites which are discreet standalone small sites.
We also include extracts from the Bedford Local Plan Inspector’s Report (Appendix 4) where the Inspector recommended deletion the policy akin to that being proposed here as the policy was not justified with reference to the self-build register. The same principle applies here in that the amount being sought is over double that on the register.
Soundness – The Plan is not:
• Justified
• Consistent with national policy
Change Sought:
• Deletion of specific policy requirement and replacement with specific allocations or general support for self-build sites
Policy P5 Provision of Land for Housing
Policy P5 sets out the Council will allocate sufficient land for at least 5,270 net additional homes to ensure sufficient housing supply to deliver 15,017 additional homes in the plan period. This would result in an average annual housing land provision target of 938 net additional homes per year. This annualised target is made up of a stepped requirement with 851 homes per year delivered between 2020-2026 and 991 dwellings delivered between 2026-2036.
Demand
A Housing Need Technical Report has been provided (December 2020) (Appendix 5) and should be read in conjunction with our commentary on Policy P5. In summary, this Note makes the following key points:
• Planning Practice Guidance (PPG) states the Standard Method (SM) figure represents the minimum housing need, and there may be circumstances whereby need is higher;
• The Draft Plan identifies the clear economic growth aspirations for the Borough, including the nationally significant growth planned for the UK Central Hub. This is a circumstance where housing need may exceed the minimum need. If it does, housing delivery must be of a quantum to support these aspirations;
• The Council’s 2020 HEDNA confirms that the calculation of housing need is underpinned by the growth at the UK Central Hub. The Hub is projected to generate an additional 13,000 jobs to the baseline Experian job growth forecast (10,000 jobs) included in the HEDNA;
• The HEDNA tests several economic-led housing need scenarios. However, the UK Hub Scenario assumes only 25% of the additional 13,000 jobs created by the Hub are to be taken up by Solihull residents. This results in the housing need (816 dpa) underpinning the Plan;
• However, this ignores the ‘Growth A’ scenario which concludes that 908 dpa would be required based on the ‘Adjusted Local Growth’ scenario. This scenario assumes that strong industries in Solihull will outperform the baseline Experian forecast, resulting in an additional 5,680 jobs to the baseline (10,000 jobs) over the Plan period, with Solihull residents taking up these jobs;
• However, no scenario is presented to show what the housing need would be based on the UK Central Hub scenario being fulfilled in full by Solihull residents. It is important to understand this so that the duty to cooperate discussions referred to in the HEDNA are well informed;
Barton Willmore provide these sensitivity scenarios based on two approaches to commuting, and two approaches to underlying demographic rates (mortality, fertility, and migration);
• The results of our testing are summarised in Table 7.1:
Table 7.1: Solihull Borough – Barton Willmore Demographic Forecasting 2020-2036 Scenario Demographic rates Jobs per annum 2020-2036 Dwellings per annum 2020-2036
Dwelling-constrained:
Standard Method
2016 ONS rates
7721 – 8132
807
2018 ONS rates
1,0141 – 1,0682
Employment-constrained:
UK Central Hub
2016 ONS rates
1,437
1,1991 – 1,2482
2018 ONS rates
1,0361 – 1,0852
Source: Barton Willmore Development Economics
1 Commuting Ratio 0.98
2 Commuting Ratio 0.93
• Growth of between 1,036 and 1,248 dpa would be required to support the UK Central Hub scenario (between 16,576 and 19,968 dwellings in total);
• This represents an increase of between 220 dpa and 432 dpa on the housing need calculated by the HEDNA (816 dpa), or an additional 3,520 to 6,912 dwellings over the Plan period;
• Our analysis of historic levels of job growth in Solihull 1991-2019 shows a range of 1,225 and 1,650 jobs per annum (jpa). This highlights that the UK Central Hub scenario (1,437 jpa) is a realistic assumption;
• The HEDNA identifies an ‘acute’ situation in respect of affordable housing need. Our analysis suggests that the HEDNA’s conclusion on overall need (816 dpa) should be increased to meet as much affordable need as possible.
• Furthermore, our analysis of unmet need in the wider GBBCHMA suggests that the 2020 Position Statement’s conclusions under-estimate the remaining unmet housing need from Birmingham up to 2031, and for Birmingham alone the deficit in unmet need is between 11,294 and 13,101 dwellings up to 2031;
• In addition, there is significant unmet need up to 2031 based on the existing Standard Method coming from Birmingham City and the Black Country. This amounts to unmet need of between 25,543 and 27,350 dwellings up to 2031. If we were to assume the increased capacity for Birmingham City (65,400 dwellings 2011-2031) set out in the 2020 Position Statement the unmet need would still be between 11,243 and 13,050 dwellings up to 2031. This increases significantly based on the uncapped Standard Method figure for Birmingham City which would come into effect once Birmingham’s Local Plan becomes older than 5 years in 14 months’ time;
Adoption of the proposed changes to Standard Method consulted on by Government in summer 2020 would lead to there being unmet need against emerging/existing housing requirements in all but one of the GBBCHMA authorities;
• Furthermore, the unmet need post 2031 should be considered, as referenced to in the 2020 Position Statement. Based on data available at the present time and the most recent Local Plan figures, Barton Willmore calculate this to be a minimum 17,700 dwellings 2031-2040.
• In summary, the analysis in this report results in the following broad conclusions:
1. The SM’s minimum need for Solihull (807 dpa) will need to be increased to account for expected job growth from the UK Central Hub and the ‘acute’ need for affordable housing in the Borough;
2. Barton Willmore’s demographic modelling shows that between 1,036 and 1,248 dpa are required to support the UK Central Hub scenario;
3. Barton Willmore’s calculations suggest that the deficit in unmet housing need from Birmingham City being delivered by HMA Local Plans amounts to a minimum of between 11,294 and 13,101 dwellings up to 2031, a significant increase from the 2,597 dwellings concluded on by the 2020 Position Statement. This increases when the unmet need from the Black Country is considered. Additional unmet need will be created post 2031.
As such, in order to ensure the LPR is positively prepared, SMBC should seek to plan for more housing, and should allocate further sites.
SUPPLY
Further to the above, and as set out above, we also consider that some elements of the supply should be reviewed:
Dealing with the supply side of the equation, we make the following objections to the various components of supply:
‘Sites identified in land availability assessments’
It is unclear what is meant by ‘sites identified in land availability assessments’. Given these are sites which do not benefit from a draft allocation, then they are by definition, windfall sites which means that there is double counting from unknown sources of supply.
Solihull Local Plan sites
We question the automatic inclusion of Solihull Local Plan sites which have yet to be granted planning permission. The current Plan was adopted in 2013 and the Council cannot currently demonstrate a 5-year supply of housing. In this situation, the Council should be encouraging every suitable site to come forward. The fact that these sites have not come forward despite the housing shortfall, suggests that these should not be considered ‘deliverable’ housing sites without significant justification as to why they will now come forward when they have not to date.
Brownfield Land Register (BLR)
We query the separate identification of sites identified in the BLR – this BLR is subject to periodic review and thus will not be fixed as a permanent source of supply. We consider that any sites to be delivered in this way should be considered as windfall developments.
Lapse Rates
Whilst we support the use of a 10% lapse rates, it needs to be applied across the board i.e. it is equally application in relation to what is to come as to what has already gone before. If the Council accept that a 10% lapse rate is application to sites which already benefit from planning permission, then surely it should also accept that it is applicable to future planning consents which have yet to be granted.
Windfall allowance
The windfall allowance is justified by reference to past windfall rates however it fails to recognise that ‘ town centre sites’ (a traditional source of windfall supply) are allocated in the plan through the town centre masterplan and the Council have identified other sources of supply through the brownfield register. In the absence of any assessment / analysis of this component demonstrating the projected level of future windfall provision taking these factors in account, we consider that the level of windfall should be reviewed and adjusted accordingly.
UK Central Hub
We consider that given the scale of the UK Central Hub proposals, the rate of delivery assumed by the Council is overly optimistic. The Council have not provided any trajectory for the Site, and we note that the August 2020 consultation did not contain any firm commitments to delivery timescales or set out any delivery partners.
This assertion is supposed by the findings of the Lichfields’ Report1 that sets out the average time from outline planning application to the first delivery of homes is 8.4 years. The average build out rate is 160dpa.
As such, taking this into account, and based on a LPR adoption date of 20222, we consider the first completions will likely be C.2030. With an average build out rate of 160dpa, this means that approximately 960 dwellings will be delivered during the Plan Period, assuming that the housing is within the first delivery phases (the August 2020 consultation referenced a mix of uses coming forward). While more outlets may increase the speed of delivery, the amount of infrastructure required also needs to be taken into account. The type of supply also needs to be considered, with UK Central Hub likely to be geared towards apartments.
As such, we consider that 1,780 houses should be removed to take into account the likely delivery timescales.
Trajectory
We also note that SMBC are seeking to provide a stepped trajectory as some of the larger sites will not make a significant contribution to completions until the mid-delivery phase. The Inspector assessing the Guildford Local Plan set out:
39. In the submitted plan, the combined effect of the stepped trajectory in Policy S2 together with the “Liverpool” methodology (in which the delivery shortfall accumulated over the first 4 years of the plan (2015/16 to 2018/19) is spread over the whole plan period), would have deferred a significant proportion of the housing requirement to the later years of the plan. Set against the (then higher) housing requirement, this would not have met the Government’s objective to boost the supply of housing in the shorter term. (our emphasis)
We consider that SMBC should take the same approach as Guildford and allocate further sites to meet need early in the Plan Period. The existence of the UK Central Hub is not of a sufficient size to warrant a different approach (i.e. it is not akin to a new settlement).
Further, as with the withdrawn Uttlesford Local Plan, this stepped trajectory may create a fragile 5 year housing land supply position, taking into account the ambitious delivery targets of the UK Central Hub and the delivery concerns relating to the draft allocations set out below. The Inspectors’ letter relating to the withdrawn plan states:
29. This calculation relies on the use of a reduced annual requirement of 568 dpa for most of the years, as it is based on the stepped trajectory set out in Policy SP3. It is also based on what we consider to be unrealistic commencement/housing delivery dates for two of the Garden Communities (North Uttlesford and Easton Park, as set out above). So, whilst the Council can, in theory, demonstrate a 5.65 year HLS, we are concerned that if the housing delivery at North Uttlesford and Easton Park slips by just one year, as seems very likely, this would result in 100 less dwellings in this 5 year period. This would result in a very fragile 5 year HLS position.
There are comparisons that can be drawn here based on the stepped trajectory and the anticipated 5.37 year supply upon adoption.
The Inspectors for the withdrawn Uttlesford Local Plan also referenced the need to meet the full objectively assessed need for market and affordable housing in the housing market area (NPPF Paragraph 47). The HEDNA states there is a ‘clearly acute’ shortage of affordable housing. The proposed stepped trajectory therefore may worsen the affordability problem as it would delay the provision of housing until late years of the plan period.
Taking the above into account, we consider that the SMBC’s supply is actually 11,496 (rounded) before any reduction in windfall or the deletion of draft allocations which are unlikely to be delivered is taken into account.
This is a reduction of 3,521 and, as such, to meet the increased demand set out above, and take into account the concerns relating to a stepped trajectory, a review of the supply is required and additional sites allocated.
The Council should also ensure that a large number of these sites can be delivered early on in the Plan Period in order to take account of the likely later delivery of some other sites.
Soundness – The Plan is not:
• Positively prepared
• Justified
• Effective
• Consistent with national policy
Change Sought:
• Review of demand and amendment to the strategy
• Review of supply and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible
Improving Accessibility and Encouraging Sustainable Travel
Policy P7 Accessibility and Ease of Access
We consider that the requirement for major residential development should be clarified to set out that there may be other ways in which sustainable access options can be implemented. The distance to a bus stop/train station should not be seen as the only measure of sustainable access.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- Policy should be clarified that there are other ways of ensuring sustainable transport options are available
Policy P8 Managing Travel Demand and Reducing Congestion
Paragraph 109 of the NPPF states that development should only be prevented or refused on highway grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. Within point 2(ii), SMBC are seeking to bring in a further test which would not be in accordance with the NPPF. This should therefore be deleted.
Soundness – The Plan is not:
• Consistent with national policy
Change Sought:
• Point 2(ii) should be deleted
Protecting and Enhancing our Environment
Policy P11 Water and Flood Risk Management
With regards to point 6, the confirmation of discharge into a public sewer falls under Section 106 of the Water Industry Act 1991. As such, it should be made clear that planning permission can be granted prior to this being confirmed, as it falls within a different regulatory regime.
With regards to point 14, it should be clarified that contribution through a Section 106 Agreement is only required where it meets the tests set out in NPPF Paragraph 56.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Deletion of point relating to confirmation from relevant infrastructure owner
• Clarification as to obligation requirements and the necessary tests
Promoting Quality of Place
Policy P17 Countryside and Green Belt
Within Point 1 of the policy, SMBC is seeking to safeguard best and most versatile agricultural land (BMVAL) unless there is an overriding need for development that outweighs the loss. BMVAL is referenced within the NPPF at Paragraph 170 which states that planning policies should contribute to and enhance the natural and local environment by taking into account a number of criteria. One of these is:
b) recognising the intrinsic character and beauty of the countryside, and the wider benefits from natural capital and ecosystem services – including the economic and other benefits of the best and most versatile agricultural land, and of trees and woodland.
Firstly, we consider that including reference to BMVAL within a policy relating to Green Belt seeks to conflate two separate issues. Further, as can be seen above, the test set out by the NPPF does not require the safeguarding of BMVAL. Planning policies are required to contribute to and enhance natural and local environment by recognising economic and other benefits from BMVAL. As such, we consider this point should be deleted.
SMBC have set out, within Point 4, a number of different factors that may be taken into account when considering very special circumstances.
Further to this, point 5 sets out that development that is ‘conspicuous’ from the Green Belt must not harm the visual amenity of the Green Belt by reason of siting, materials or design. Given Green Belt is a spatial designation, designed to prevent sprawl, we consider that this requirement goes beyond the scope of the Green Belt, as set out in the NPPF. The LPR contains policies relating to protecting landscape, where necessary, and as such, this point should be deleted.
Soundness – The Plan is not:
• Positively prepared
• Consistent with National Policy
Change Sought:
• Deletion of point 1
• Inclusion of further factors which may create very special circumstances
• Deletion of point 5
Policy P17A Green Belt Compensation
Paragraph 138 of the NPPF sets out that ways in which the impact of removing land from the Green Belt can be offset through compensatory improvements to the environmental quality and accessibility of remaining Green Belt Land.
Policy P17 is seeking to require this by requiring development on sites removed from the Green Belt to provide appropriate compensatory improvements to environmental quality and accessibility of remaining Green Belt in the form of a Section 106 Agreement utilising the below hierarchy:
1. Compensatory requirements as set out as part of the Local Plan masterplans
2. Where no compensation has been set out within the Local Plan masterplan, improvements are provided as:
i. Improvements within the Green Belt adjacent to, or in close proximity to, the development site;
ii. Improvements within the Green Belt adjacent to, or in close proximity to, the settlement or area accommodating the development;
iii. Improvements within the Green Belt in an area identified for environmental improvements as part of the Council’s Green Infrastructure Opportunity Mapping.
3. In the event it is robustly demonstrated that none of the above options can be satisfied then the Council will accept a commuted sum.
Given none of the emerging masterplans show any compensatory improvements within the Green Belt, it would appear that the Policy is relying on there being additional land being available within the control of applicants (which may not be the case), or the payment of contributions.
SMBC’s viability evidence does not take this requirement into account, and no detail is provided as to how these contributions will be spent or what level of contribution is required. This therefore brings uncertainty, and the Policy should be reconsidered to ensure what is required is clear, and that it will not impact upon the viability of schemes.
Soundness – The Plan is not:
• Consistent with National Policy
Change Sought:
• Reconsideration of the policy to ensure that it is evidenced based, does not impact upon viability of schemes, and is in accordance with national policy
Delivery and Monitoring
Policy P21 Developer Contributions and Infrastructure Provision
Policy P21 expected major development to provide or contribute towards the provision of measures to directly mitigate its impact and physical, social, green and digital infrastructure.
SMBC’s viability testing does not take into account digital infrastructure within the testing and, as such, it should be evidenced that this will not render development unviable.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Confirmation that digital infrastructure provision allows for viable development
Settlement Chapters
Policy BC1 Barratt’s Farm, Balsall Common
We note that 1,756 new homes are proposed for Balsall Common across the plan period with the sole justification seemingly being that it contains both a primary and secondary school and has a full range of retail and associated facilities. However, it is still described as a rural settlement with no significant areas of employment and the distribution strategy remains one of “proportional distribution”. 1,756 dwellings to a single rural village would be completely disproportionate. There is discussion in the document regarding delivery of a by-pass; provision a station car park; improved public transport and a new primary school. However, there is no discussion as to how these are to be funded / delivered relative to the level of growth identified. In addition, there is discussion regarding the scope to enhance the existing local centre and the provision of a village centre masterplan. However, this land is in multiple ownerships and there are no proposals for what these enhancements could entail or how they could function – particularly with a by-pass in place which could actually draw trade away from the existing centre.
There is no assessment of the ability of Balsall Common to deliver this level of growth in such a small area. Whilst clearly some sites (i.e. Barratts Farm) will be able to have multiple outlets, the ability of the market to absorb and deliver multiple sites at any one time in a rural location should be reviewed; particular when Balsall Common will be acutely affected by HS2 – both in terms of the physical construction of the line and the disruption and uncertainty that this will bring; but also in terms of market desirability until such time as the line is constructed.
We also note that Barratts Farm is in multiple ownerships and these are described as “complex” in paragraph 541. This is the single largest site and the one which is proposed to deliver the by-pass. Within the previous draft of the Plan, it was stated that this site would only be taken forward if the landowners / promoters could demonstrate they are working on a collaborate and comprehensive basis. Reading paragraph 541, this collaborate working has clearly not been secured in the way it was envisaged and nothing additional is suggested to demonstrate that joint / collaborative working is possible.
The relief road is identified as being necessary for Barratts Farm in particular with the policy advising that is required early in the plan period. The road is provisionally to be funded via CIL payments; and grant funding which “may” be possible through the WMCA. Firstly, CIL payments can only be secured through those sites which will come forward in the future however these sites are Green Belt sites and cannot therefore be delivered until the Local Plan Review is completed and the subsequent CIL schedule is adopted. Secondly, there is no grant funding proposal in place to fund the road. As it currently stands this road is not deliverable. The road is required to be delivered early in the plan period i.e. before there are significant CIL funds in place and, potentially, at a point where, in order to receive grant funding, applications should be being made now / near future.
There has to be serious doubt over the ability of Barratts Farm to be delivered within the anticipated timeframes and therefore places serous doubt over the plan as a whole given the scale of this allocation.
The Sustainability Appraisal notes that there are limited employment opportunities within Balsall Common and that people travel outside of the settlement to work. As such, it is noted that the expansion of this settlement would fly in the face of sustainability objectives of reducing the need to travel to areas of employment. Whilst such a case could be made for the majority of the rural areas of the Borough, it is heightened especially here when such a large proportion of future growth is identified for one rural settlement.
At this stage, the level of growth attributed to Balsall Common is disproportionate and that inadequate research has been undertaken into the deliverability of this level of growth and the associated aspirations; and the ability of the market to deliver this level of growth in a rural area is considered to be unrealistic.
On the basis that we do not consider the sites identified to be deliverable and the significant shortfall in supply identified by the more realistic timescales we have identified for UK Central, we propose an alternative site – Land at Hawkshurst (Site 544) as an alternative to meeting part of this need. To date this site has been inappropriately assessment by the Council and a more appropriate evaluation of the site is given in the section below.
Policy BL1 – West of Dickens Heath
The policy requires that the proposal for BL1 secures the relocation of the existing sports provision to a suitable site in the local vicinity. Until such time as these facilities are relocated or a plan is in place to secure timely relocation (which should include the grant of planning permission in our view, given that any site will be in the Green Belt), then the site cannot come forward for development. Our key concern here relates to Site 4 (West of Dickens Heath). It is noted that the identification of a Local Wildlife Site within the site hampers re-provision within the site itself and therefore alternative options will need to be pursued outside of the site. We consider that these alternatives should be considered now as clearly, as it currently stands, the pitches will be lost with no alternative in place (and therefore no guarantee of any re-provision). This is all the more important given that the land in the area is all located within the Green Belt and therefore any proposals which may, for example, include floodlighting, will have to be carefully considered against the Green Belt ‘tests’. We understand that the loss of these facilities is causing significant local concern particularly with no proposals for replacement.
The Council have had ample time to identify and secure alternative provision and therefore the fact that this is not identified within the plan, suggests that there are currently no alternative sites. This calls into question the delivery of this site and with no evidence and no proposals in place, we consider that proposal BL1 should be deleted from the plan.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Policy KN1 Hampton Road, Knowle
As with the Site West of Dickens Heath, this draft allocation requires the reprovision of sports pitches. In this instance, the re-provided pitches are currently shown within the Green Belt to the north of the allocation.
The Council, within Paragraphs 713-715 state that it’s likely that very special circumstances will exist to support development in this location and, as such, the reprovision will likely be acceptable. However, this pre-judges any application, for which the detail is not known, and as such cannot be relied upon. Therefore the housing that would be provided on the sports pitches should not be included until the reprovision of the sports pitches is secured.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Site Assessment Criteria
We consider that a more dispersed growth option should be considered and, as set out previously, consider that the land at Broad Lane, Hawkshurst (Site 544) is ideally suited to make an important contribution to the Council’s housing need. Following the Council’s own site selection criteria, we set out why this site is a suitable and deliverable alternative site which can be delivered utilising existing infrastructure:
We object strongly to the manner in which Site 544 has been assessed in the site selection process for the reasons which are set out below – and on that basis, object to the inconsistent application of the methodology.
Firstly, in assessing Site 544, the Council deemed that the site did not pass ‘Step 1’ – which is the initial, high-level sieving process. Sites which are not taken forward at this stage are then not subject to the more refined ‘Step 2’ analysis. We consider the manner in which the process was applied is fundamentally flawed and have carried out our own assessment (using the Council’s own analysis) to demonstrate that the site should not have been discounted at Step 1 and should have been included in Step 2.
STEP 1
The first stage in the sieving process is a high-level look at the following:
(i) Brownfield vs greenfield
(ii) Urban areas vs Green Belt
(iii) Accessibility
Sites can be rated from Priority 1 (brownfield in urban area or settlement) to Priority 10 (greenfield in isolated highly performing Green Belt location). A traffic light rating is then applied – sites which falls within Priority 1 to Priority 4 are green sites; Priority 5 sites are yellow; Priority 6, 6b and 7 sites are blue; and Priority 8, 9 and 10 sites are red. Red sites fail Step 1 and are not taken forward to Step 2 for assessment. Site 544 was incorrectly identified as a Priority 9 red site and was not therefore taken forward to Step 2.
In summary, Site 544 is a greenfield and Green Belt site. However, it is accessible (being on the edge of the Coventry urban area) and also within an area with a low GB score of 5. Therefore, it should be allocated a Priority score of no higher than 5 (yellow). We review below the manner in which this initial sieving assessment was flawed - taking Site 544 step by step through the same assessment process as the Council.
Green Belt
In the Green Belt Assessment 2016, Site 544 is identified as part of Refined Parcel RP83:5 which has a combined score of 5, within a range from the highest performing Green Belt sites (12) to the lowest performing sites, scoring as low as 0. With a score of 5, site 544 is clearly a lower performing site. The starting point for consideration as a Priority 5 site is a score of 5 or lower in the Green Belt––Site 544 falls into that category. The results of this assessment are backed up by our own Green Belt assessment which is included with this submission.
Accessibility
The second part of the criteria relates to accessibility and to achieve a Priority 5 ranking, the site is required to be in an accessible location. This is defined as:
(a) On the edge of the urban area or
(b) On the edge of a settlement which has a wide range of services and facilities including a primary school and a range of retail facilities.
Site 544 adjoins the urban edge of Coventry – indeed in the Council’s Site Assessment, the site is identified as possibly being an extension to Coventry.
It should be noted that in relation to the Publication Draft Plan, the Council have updated the Accessibility Study to take account of retail / surgery provision in adjoining LPA areas, however they have then not used this information to re-visit first principles and determine whether sites have been appropriately assessed from the start. Therefore, whilst this site now scores more positively, its ‘priority 9’ status has not been re-evaluated despite an Addendum to the Site Assessments being produced and the Accessibility Study being revisited. It appears that despite the site being on the urban edge of Coventry this has been discounted due to the sites geographical relationship with Coventry as opposed to Solihull. However, accessibility should be based upon spatial location rather than boundaries. The fact that the retail offer is in Coventry will not prevent residents of Hawkshurst using it.
For the absolute avoidance of doubt therefore, we enclose our own submission produced by Phil Jones Associates which demonstrates that the site is in a suitable and sustainable location.
It is fundamentally incorrect for Site 544 to have been ‘sieved out’ at Step 1. The site should have been correctly assessed as a Priority 5 yellow site as it meets the two necessary criteria. The site, therefore, should have been taken forward for a more detailed analysis in Step 2.
On the basis that the site does pass Step 1 – we have carried out the Step 2 assessment using the same table and criteria as the Council. There are no scorings or weightings attributed to the Step 2 analysis – it assessed on a qualitative basis.
STEP 2 – REFINEMENT CRITERIA
FACTORS IN FAVOUR
In accordance with the spatial strategy
(including only proportional additions to lower order settlements (i.e. those without a secondary school or not located close to the urban edge).
The preferred spatial strategy would be to locate development needs close to where they arise. However the Plan identifies that there is limited land available to achieve this and therefore the Council has had to look at alternative options, which includes land released from the Green Belt in the form of urban extensions and also followed a more dispersed strategy for development. They have sought to focus development in locations that are, or can be made, accessible and sustainable. Such locations are identified as typically being on the edge of urban areas (or within ruralsettlements) that have a greater range of services. Potential locations for development include adjoining the urban edge or a highly accessible settlement. This will have the benefit of focusing on urban areas and sustainable urban extensions to provide the best opportunity for achieving accessibility and delivering public transport improvements.
It is abundantly clear that geographically Site 544 adjoins the urban edge of Coventry – Coventry is the second largest City in the West Midlands, after Birmingham. Site 544, as confirmed in the SHELAA assessment, would be viewed as an urban extension to Coventry and there is, therefore, no doubt that Site 544 is in accordance with the Spatial Strategy, which seeks to locate development in the most accessible locations. Coventry is clearly such a location and there is nothing within the Spatial Strategy which would rule against this.
Therefore, it can only be concluded that the development of Site 544 would be in accordance with the Spatial Strategy.
Any hard constraints only affect a small proportion of the site and/or can be mitigated.
The SHELAA does not identify any hard constraints – we concur with this assessment.
The site would not breach a strong defensible boundary to the Green Belt.
There are no strong existing defensible Green Belt boundaries that would be breached. The existing boundaries to Bannerbrook Park comprise simply hedgerows, some of which were planted in conjunction with the existing development. The same form of boundary treatment can therefore be replicated on this site and indeed is proposed within the masterplan included with this submission.
Any identified wider planning gain over and above that which would normally be expected.
Following discussions with local undertakers regarding the lack of burial space available within the Borough, the landowners are willing to offer land for a multi faith burial space which will provide a much needed facility for the Borough and also secure the long term permanence of the Green Belt boundary in this location.
Sites that would use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
See above.
If finer grain accessibility analysis (including output from the Accessibility Study) shows the site (or the part to be included) is accessible.
The Accessibility Study is flawed when it comes to assessment of sites on the Solihull / Coventry boundary. The Study provides a scoring for accessibility for facilities within 1,200m of a site, however when assessing facilities beyond the administrative area of Solihull only facilities within 800m of the boundary are assessed, this is despite an updated assessment being provided in 2020 which proposed to apply some adjustment of standards and yet makes no sensible adjustment to standards for cross boundary provision. Sites in such locations are not therefore being assessed on a comparable basis. Furthermore, the assessment is only being undertaken of walking distances and makes no allowance for accessing facilities by bike. The document references ‘shared cycle’ routes but then makes no consideration of people actually using them for cycling. Clearly were cycling to be factored in, especially for those sites, which adjoin major settlements and therefore have access to a good cycleway network (such as Site 544) then their accessibility criteria would be much improved.
Whilst it is noted that some provision is now taken off cross boundary retail provision and public transport which has moved Site 544 to a higher scoring position; it is still not being assessed on a comparable basis.
There is a shared footway/cycleway through the Bannerbrook Park development which can be extended into Site 544. Furthermore, opportunities will be considered to accommodate a bus route through Site 544 and on through Bannerbrook Park.
It is therefore clear that the proposal can only be defined as being in an ‘accessible location’.
FACTORS AGAINST
Not in accordance with the Spatial Strategy
As set out above, the development of this site is in accordance with the Spatial Strategy
Overriding hard constraints that cannot be mitigated.
There are no hard constraints identified.
SHELAA Category 3 sites unless demonstrated that concerns can be overcome.
The site is not identified as a Category 3 site in the SHELAA. We make comments below in respect of the flaws of SHELAA assessment and carry out our own assessment.
Sites that would not use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
As already confirmed, the site uses existing defensible boundaries and proposes to strengthen the defensible boundary and strengthen existing hedgerow planting.
If finer grain analysis shows the site (or the part to be included) is not accessible.
As previously confirmed, the Council have failed to consider the proximity of services in Coventry on a fair basis and because of this, it is not possible to determine how detailed the assessment has been. However, given that the site adjoins a major urban area is it simply not feasible to draw a conclusion that the site is inaccessible.
If the site is in a landscape character area that has a very low landscape capacity rating.
It is wholly unreasonable if the Council have used this criterion to discount this site. According to the Council’s Landscape Character Study (December 2016) this site falls within Landscape Character Area (LCA) 26 – which covers the eastern fringe of the Borough – yet significant Green Belt release is proposed in other areas of the Borough which are in an identical LCA. With one blanket ‘very low’ landscape capacity conclusion for such wide areas it cannot be used to discount some sites and not others – there must be parity in assessment. Furthermore, the study itself (page 49 – text adjoining Table 24) confirmed that it is not possible to establish a baseline sensitivity to change without having details of a given development proposal and therefore the conclusions should be taken as a guide only. On this basis, we do not consider it appropriate to use this criterion as a basis to discount sites given sites with the same assessment have been given a ‘green’ score’.
We enclose with this submission our own detailed, site specific, landscape and visual appraisal which confirms that the site has the ability to accommodate development of scale which is comparable to the surrounding area without compromising the function of the surrounding Green Belt.
If the SA appraisal identifies significant harmful impacts.
The SA identified 2 harmful impacts:
(i) The site contains over 20ha of Grade 1 – 3 agricultural land.
The site is wholly Grade 3 agricultural land – clearly within Grade 3, the site could in fact be Grade 3b land which would mean it is not BMVL. Furthermore, the Regional ALC mapping, which was last updated in November 2018, shows this to be the prevailing land type across the Borough which is not unsurprising. As a result, a number of proposed allocated sites have the same classification. It is not therefore appropriate to identify this as a harmful impact when a consistent approach has not been applied across the board.
(ii) The distance to jobs is identified as 8km within the SA
This is clearly incorrect as the SA treats the administrative boundary between Coventry and Solihull as a line which people will not cross. This is clearly incorrect. As already stated, there is for example a good bus connection to Warwick University which is a key local employer as well as Coventry city centre which offers multiple employment opportunities. The SA has applied the same approach to all services and facilities – relating its conclusions only to Solihull Borough and thus the distances to shops / schooling / healthcare are distorted. In addition, we highlight that this is a specific issue related to Balsall Common also (which is also further away from Coventry) and yet the Council has seen fit to allocate in excess of 1,700 dwellings in Balsall Common.
In summary:
• The site has medium / high accessibility – at the same level as the other ‘green sites’ identified in the Draft Plan.
• The site is in lower performing Green Belt than other ‘green sites’ in the plan.
• The site has existing defensible Green Belt boundaries which can be strengthened.
• The site has no constraints within the development area which cannot be mitigated in the normal way.
• The site has the same landscape character as other ‘green sites’.
• It is not, therefore, credible for Site 544 to be categorised as a ‘red’ site.
• For this reason, we consider the score for Site 544 should be corrected and the Council should re-visit their assessments from first principles.
As is evidenced from the corrected SHELAA commentary the site is rated as a Category 1 – Deliverable Site. Such sites are deemed to be available now, offer a suitable location for housing now and there is a reasonable prospect that housing will be delivered on site within 5 years from the date of adoption of the plan.

Object

Solihull Local Plan (Draft Submission) 2020

Policy BL1 - West of Dickens Heath

Representation ID: 13885

Received: 14/12/2020

Respondent: Barratt David Wilson Homes - Land south of Broad Lane

Agent: Barton Willmore Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Council has had ample time to identify and secure alternative sports provision for the loss of playing pitches at Site BL1 and the fact that this is not identified within the plan suggests that there are currently no alternative sites. This calls into question the delivery of this site and with no evidence and no proposals in place, we consider that proposal BL1 should be deleted from the plan.

Change suggested by respondent:

Reprovision of the sports pitches should be secured prior to allocation and Policy BL1 should be deleted from the plan.

Full text:

Introduction
Paragraph 18 sets out that the site allocations from the Solihull Local Plan (December 2013) will be brought forward. We consider that the automatic allocation of these sites which have been allocated for a number of years, without any justification as to their deliverability, is an incorrect approach. We address this in more detail under our comments in respect of Policy 4.
Finally, Paragraph 21 refers to neighbourhood plans and the importance SMBC places on these. Paragraph 30 of the National Planning Policy Framework (NPPF) sets the most recently adopted policies will take precedence. SMBC may wish to set this out within this section, to make it clear that the LPR will take precedence upon adoption over any currently adopted Neighbourhood Plans.
Soundness – The Plan is not:
- Justified
Change Sought:
- Existing allocations should be tested for deliverability prior to re-allocation
- The hierarchy of neighbourhood plans should be made clear
Vision
Given that paragraph 59 of the NPPF states that the Government’s objective is to significantly boost the supply of housing, the wording relating to meeting the needs of the housing market area should be more positively worded.
Paragraph 50 sets out that SMBC are seeking to protect the integrity of the Green Belt. Wording should be included setting out that lower performing parcels could be released to protect higher performing parcels while meeting identified and evidenced needs.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- The vision should be more positively worded in order to significantly boost the supply of housing
- The need to release lower performing green belt to meet identified needs, and preserve higher performing parcels, should be set out
Providing Homes for All
Policy P4C Meeting Housing Needs – Market Housing
We object to the inflexible market housing mix which is prescribed within this policy. The NPPF encourages provision of balanced and mixed communities catering for a wide range of the population.
Individual sites should cater for a wide range of housing types and sizes. Provision of such a significant proportion of only smaller (3 bed or fewer) dwellings on sites will not develop long term sustainable communities. Instead it will result in a transient community where people will not be able to form long term neighbourhoods as they will need to move on as their circumstances change if there are insufficient homes of the right size on a site to accommodate them. We do not consider that this represents good planning and consider that the focus should be on building strong healthy communities which can cater for all, rather than simply planning for short term ownership.
The inclusion of a prescribed housing mix runs counter to the criterion elsewhere within the policy which allow a number of factors to be taken into consideration. This plan has a significant lifespan and to prescribe a housing market mix which is to remain in place for the whole of plan period does not provide sufficient flexibility for adaptation to current housing need and demand. We have seen with the current pandemic the way external factors can influence people’s choice of lifestyle.
Soundness – The Plan is not:
• Justified
• Effective
Change Sought:
• Amendment of policy to allow for housing mix based on up to date market evidence
Policy P4D Meeting Housing Needs – Self and Custom Housebuilding
The latest Annual Monitoring Report (March 2020), covering the period 2018/19, sets out that for the period November 2018 – October 2019 there were 374 entries on the Self-build register.
As such, requiring all sites of over 100 houses to provide 5% of open market dwellings in the form of self-build plots is unreasonable and unjustified. Given provision is being made for 7,605 houses through allocations above 100 houses and the UK Central Hub area, this would equate to the 761 self and custom build plots to be provided from the draft allocations.
The Planning Practice Guidance (PPG) advises that the Council should engage with landowners who own sites that are suitable for housing and ‘encourage’ them to consider self-build and custom housing and who are interested in provision. Imposition of mandatory requirement goes beyond encouragement.
Following the example of Stratford District for example, the Council have specifically identified custom build sites which are discreet standalone small sites.
We also include extracts from the Bedford Local Plan Inspector’s Report (Appendix 4) where the Inspector recommended deletion the policy akin to that being proposed here as the policy was not justified with reference to the self-build register. The same principle applies here in that the amount being sought is over double that on the register.
Soundness – The Plan is not:
• Justified
• Consistent with national policy
Change Sought:
• Deletion of specific policy requirement and replacement with specific allocations or general support for self-build sites
Policy P5 Provision of Land for Housing
Policy P5 sets out the Council will allocate sufficient land for at least 5,270 net additional homes to ensure sufficient housing supply to deliver 15,017 additional homes in the plan period. This would result in an average annual housing land provision target of 938 net additional homes per year. This annualised target is made up of a stepped requirement with 851 homes per year delivered between 2020-2026 and 991 dwellings delivered between 2026-2036.
Demand
A Housing Need Technical Report has been provided (December 2020) (Appendix 5) and should be read in conjunction with our commentary on Policy P5. In summary, this Note makes the following key points:
• Planning Practice Guidance (PPG) states the Standard Method (SM) figure represents the minimum housing need, and there may be circumstances whereby need is higher;
• The Draft Plan identifies the clear economic growth aspirations for the Borough, including the nationally significant growth planned for the UK Central Hub. This is a circumstance where housing need may exceed the minimum need. If it does, housing delivery must be of a quantum to support these aspirations;
• The Council’s 2020 HEDNA confirms that the calculation of housing need is underpinned by the growth at the UK Central Hub. The Hub is projected to generate an additional 13,000 jobs to the baseline Experian job growth forecast (10,000 jobs) included in the HEDNA;
• The HEDNA tests several economic-led housing need scenarios. However, the UK Hub Scenario assumes only 25% of the additional 13,000 jobs created by the Hub are to be taken up by Solihull residents. This results in the housing need (816 dpa) underpinning the Plan;
• However, this ignores the ‘Growth A’ scenario which concludes that 908 dpa would be required based on the ‘Adjusted Local Growth’ scenario. This scenario assumes that strong industries in Solihull will outperform the baseline Experian forecast, resulting in an additional 5,680 jobs to the baseline (10,000 jobs) over the Plan period, with Solihull residents taking up these jobs;
• However, no scenario is presented to show what the housing need would be based on the UK Central Hub scenario being fulfilled in full by Solihull residents. It is important to understand this so that the duty to cooperate discussions referred to in the HEDNA are well informed;
Barton Willmore provide these sensitivity scenarios based on two approaches to commuting, and two approaches to underlying demographic rates (mortality, fertility, and migration);
• The results of our testing are summarised in Table 7.1:
Table 7.1: Solihull Borough – Barton Willmore Demographic Forecasting 2020-2036 Scenario Demographic rates Jobs per annum 2020-2036 Dwellings per annum 2020-2036
Dwelling-constrained:
Standard Method
2016 ONS rates
7721 – 8132
807
2018 ONS rates
1,0141 – 1,0682
Employment-constrained:
UK Central Hub
2016 ONS rates
1,437
1,1991 – 1,2482
2018 ONS rates
1,0361 – 1,0852
Source: Barton Willmore Development Economics
1 Commuting Ratio 0.98
2 Commuting Ratio 0.93
• Growth of between 1,036 and 1,248 dpa would be required to support the UK Central Hub scenario (between 16,576 and 19,968 dwellings in total);
• This represents an increase of between 220 dpa and 432 dpa on the housing need calculated by the HEDNA (816 dpa), or an additional 3,520 to 6,912 dwellings over the Plan period;
• Our analysis of historic levels of job growth in Solihull 1991-2019 shows a range of 1,225 and 1,650 jobs per annum (jpa). This highlights that the UK Central Hub scenario (1,437 jpa) is a realistic assumption;
• The HEDNA identifies an ‘acute’ situation in respect of affordable housing need. Our analysis suggests that the HEDNA’s conclusion on overall need (816 dpa) should be increased to meet as much affordable need as possible.
• Furthermore, our analysis of unmet need in the wider GBBCHMA suggests that the 2020 Position Statement’s conclusions under-estimate the remaining unmet housing need from Birmingham up to 2031, and for Birmingham alone the deficit in unmet need is between 11,294 and 13,101 dwellings up to 2031;
• In addition, there is significant unmet need up to 2031 based on the existing Standard Method coming from Birmingham City and the Black Country. This amounts to unmet need of between 25,543 and 27,350 dwellings up to 2031. If we were to assume the increased capacity for Birmingham City (65,400 dwellings 2011-2031) set out in the 2020 Position Statement the unmet need would still be between 11,243 and 13,050 dwellings up to 2031. This increases significantly based on the uncapped Standard Method figure for Birmingham City which would come into effect once Birmingham’s Local Plan becomes older than 5 years in 14 months’ time;
Adoption of the proposed changes to Standard Method consulted on by Government in summer 2020 would lead to there being unmet need against emerging/existing housing requirements in all but one of the GBBCHMA authorities;
• Furthermore, the unmet need post 2031 should be considered, as referenced to in the 2020 Position Statement. Based on data available at the present time and the most recent Local Plan figures, Barton Willmore calculate this to be a minimum 17,700 dwellings 2031-2040.
• In summary, the analysis in this report results in the following broad conclusions:
1. The SM’s minimum need for Solihull (807 dpa) will need to be increased to account for expected job growth from the UK Central Hub and the ‘acute’ need for affordable housing in the Borough;
2. Barton Willmore’s demographic modelling shows that between 1,036 and 1,248 dpa are required to support the UK Central Hub scenario;
3. Barton Willmore’s calculations suggest that the deficit in unmet housing need from Birmingham City being delivered by HMA Local Plans amounts to a minimum of between 11,294 and 13,101 dwellings up to 2031, a significant increase from the 2,597 dwellings concluded on by the 2020 Position Statement. This increases when the unmet need from the Black Country is considered. Additional unmet need will be created post 2031.
As such, in order to ensure the LPR is positively prepared, SMBC should seek to plan for more housing, and should allocate further sites.
SUPPLY
Further to the above, and as set out above, we also consider that some elements of the supply should be reviewed:
Dealing with the supply side of the equation, we make the following objections to the various components of supply:
‘Sites identified in land availability assessments’
It is unclear what is meant by ‘sites identified in land availability assessments’. Given these are sites which do not benefit from a draft allocation, then they are by definition, windfall sites which means that there is double counting from unknown sources of supply.
Solihull Local Plan sites
We question the automatic inclusion of Solihull Local Plan sites which have yet to be granted planning permission. The current Plan was adopted in 2013 and the Council cannot currently demonstrate a 5-year supply of housing. In this situation, the Council should be encouraging every suitable site to come forward. The fact that these sites have not come forward despite the housing shortfall, suggests that these should not be considered ‘deliverable’ housing sites without significant justification as to why they will now come forward when they have not to date.
Brownfield Land Register (BLR)
We query the separate identification of sites identified in the BLR – this BLR is subject to periodic review and thus will not be fixed as a permanent source of supply. We consider that any sites to be delivered in this way should be considered as windfall developments.
Lapse Rates
Whilst we support the use of a 10% lapse rates, it needs to be applied across the board i.e. it is equally application in relation to what is to come as to what has already gone before. If the Council accept that a 10% lapse rate is application to sites which already benefit from planning permission, then surely it should also accept that it is applicable to future planning consents which have yet to be granted.
Windfall allowance
The windfall allowance is justified by reference to past windfall rates however it fails to recognise that ‘ town centre sites’ (a traditional source of windfall supply) are allocated in the plan through the town centre masterplan and the Council have identified other sources of supply through the brownfield register. In the absence of any assessment / analysis of this component demonstrating the projected level of future windfall provision taking these factors in account, we consider that the level of windfall should be reviewed and adjusted accordingly.
UK Central Hub
We consider that given the scale of the UK Central Hub proposals, the rate of delivery assumed by the Council is overly optimistic. The Council have not provided any trajectory for the Site, and we note that the August 2020 consultation did not contain any firm commitments to delivery timescales or set out any delivery partners.
This assertion is supposed by the findings of the Lichfields’ Report1 that sets out the average time from outline planning application to the first delivery of homes is 8.4 years. The average build out rate is 160dpa.
As such, taking this into account, and based on a LPR adoption date of 20222, we consider the first completions will likely be C.2030. With an average build out rate of 160dpa, this means that approximately 960 dwellings will be delivered during the Plan Period, assuming that the housing is within the first delivery phases (the August 2020 consultation referenced a mix of uses coming forward). While more outlets may increase the speed of delivery, the amount of infrastructure required also needs to be taken into account. The type of supply also needs to be considered, with UK Central Hub likely to be geared towards apartments.
As such, we consider that 1,780 houses should be removed to take into account the likely delivery timescales.
Trajectory
We also note that SMBC are seeking to provide a stepped trajectory as some of the larger sites will not make a significant contribution to completions until the mid-delivery phase. The Inspector assessing the Guildford Local Plan set out:
39. In the submitted plan, the combined effect of the stepped trajectory in Policy S2 together with the “Liverpool” methodology (in which the delivery shortfall accumulated over the first 4 years of the plan (2015/16 to 2018/19) is spread over the whole plan period), would have deferred a significant proportion of the housing requirement to the later years of the plan. Set against the (then higher) housing requirement, this would not have met the Government’s objective to boost the supply of housing in the shorter term. (our emphasis)
We consider that SMBC should take the same approach as Guildford and allocate further sites to meet need early in the Plan Period. The existence of the UK Central Hub is not of a sufficient size to warrant a different approach (i.e. it is not akin to a new settlement).
Further, as with the withdrawn Uttlesford Local Plan, this stepped trajectory may create a fragile 5 year housing land supply position, taking into account the ambitious delivery targets of the UK Central Hub and the delivery concerns relating to the draft allocations set out below. The Inspectors’ letter relating to the withdrawn plan states:
29. This calculation relies on the use of a reduced annual requirement of 568 dpa for most of the years, as it is based on the stepped trajectory set out in Policy SP3. It is also based on what we consider to be unrealistic commencement/housing delivery dates for two of the Garden Communities (North Uttlesford and Easton Park, as set out above). So, whilst the Council can, in theory, demonstrate a 5.65 year HLS, we are concerned that if the housing delivery at North Uttlesford and Easton Park slips by just one year, as seems very likely, this would result in 100 less dwellings in this 5 year period. This would result in a very fragile 5 year HLS position.
There are comparisons that can be drawn here based on the stepped trajectory and the anticipated 5.37 year supply upon adoption.
The Inspectors for the withdrawn Uttlesford Local Plan also referenced the need to meet the full objectively assessed need for market and affordable housing in the housing market area (NPPF Paragraph 47). The HEDNA states there is a ‘clearly acute’ shortage of affordable housing. The proposed stepped trajectory therefore may worsen the affordability problem as it would delay the provision of housing until late years of the plan period.
Taking the above into account, we consider that the SMBC’s supply is actually 11,496 (rounded) before any reduction in windfall or the deletion of draft allocations which are unlikely to be delivered is taken into account.
This is a reduction of 3,521 and, as such, to meet the increased demand set out above, and take into account the concerns relating to a stepped trajectory, a review of the supply is required and additional sites allocated.
The Council should also ensure that a large number of these sites can be delivered early on in the Plan Period in order to take account of the likely later delivery of some other sites.
Soundness – The Plan is not:
• Positively prepared
• Justified
• Effective
• Consistent with national policy
Change Sought:
• Review of demand and amendment to the strategy
• Review of supply and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible
Improving Accessibility and Encouraging Sustainable Travel
Policy P7 Accessibility and Ease of Access
We consider that the requirement for major residential development should be clarified to set out that there may be other ways in which sustainable access options can be implemented. The distance to a bus stop/train station should not be seen as the only measure of sustainable access.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- Policy should be clarified that there are other ways of ensuring sustainable transport options are available
Policy P8 Managing Travel Demand and Reducing Congestion
Paragraph 109 of the NPPF states that development should only be prevented or refused on highway grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. Within point 2(ii), SMBC are seeking to bring in a further test which would not be in accordance with the NPPF. This should therefore be deleted.
Soundness – The Plan is not:
• Consistent with national policy
Change Sought:
• Point 2(ii) should be deleted
Protecting and Enhancing our Environment
Policy P11 Water and Flood Risk Management
With regards to point 6, the confirmation of discharge into a public sewer falls under Section 106 of the Water Industry Act 1991. As such, it should be made clear that planning permission can be granted prior to this being confirmed, as it falls within a different regulatory regime.
With regards to point 14, it should be clarified that contribution through a Section 106 Agreement is only required where it meets the tests set out in NPPF Paragraph 56.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Deletion of point relating to confirmation from relevant infrastructure owner
• Clarification as to obligation requirements and the necessary tests
Promoting Quality of Place
Policy P17 Countryside and Green Belt
Within Point 1 of the policy, SMBC is seeking to safeguard best and most versatile agricultural land (BMVAL) unless there is an overriding need for development that outweighs the loss. BMVAL is referenced within the NPPF at Paragraph 170 which states that planning policies should contribute to and enhance the natural and local environment by taking into account a number of criteria. One of these is:
b) recognising the intrinsic character and beauty of the countryside, and the wider benefits from natural capital and ecosystem services – including the economic and other benefits of the best and most versatile agricultural land, and of trees and woodland.
Firstly, we consider that including reference to BMVAL within a policy relating to Green Belt seeks to conflate two separate issues. Further, as can be seen above, the test set out by the NPPF does not require the safeguarding of BMVAL. Planning policies are required to contribute to and enhance natural and local environment by recognising economic and other benefits from BMVAL. As such, we consider this point should be deleted.
SMBC have set out, within Point 4, a number of different factors that may be taken into account when considering very special circumstances.
Further to this, point 5 sets out that development that is ‘conspicuous’ from the Green Belt must not harm the visual amenity of the Green Belt by reason of siting, materials or design. Given Green Belt is a spatial designation, designed to prevent sprawl, we consider that this requirement goes beyond the scope of the Green Belt, as set out in the NPPF. The LPR contains policies relating to protecting landscape, where necessary, and as such, this point should be deleted.
Soundness – The Plan is not:
• Positively prepared
• Consistent with National Policy
Change Sought:
• Deletion of point 1
• Inclusion of further factors which may create very special circumstances
• Deletion of point 5
Policy P17A Green Belt Compensation
Paragraph 138 of the NPPF sets out that ways in which the impact of removing land from the Green Belt can be offset through compensatory improvements to the environmental quality and accessibility of remaining Green Belt Land.
Policy P17 is seeking to require this by requiring development on sites removed from the Green Belt to provide appropriate compensatory improvements to environmental quality and accessibility of remaining Green Belt in the form of a Section 106 Agreement utilising the below hierarchy:
1. Compensatory requirements as set out as part of the Local Plan masterplans
2. Where no compensation has been set out within the Local Plan masterplan, improvements are provided as:
i. Improvements within the Green Belt adjacent to, or in close proximity to, the development site;
ii. Improvements within the Green Belt adjacent to, or in close proximity to, the settlement or area accommodating the development;
iii. Improvements within the Green Belt in an area identified for environmental improvements as part of the Council’s Green Infrastructure Opportunity Mapping.
3. In the event it is robustly demonstrated that none of the above options can be satisfied then the Council will accept a commuted sum.
Given none of the emerging masterplans show any compensatory improvements within the Green Belt, it would appear that the Policy is relying on there being additional land being available within the control of applicants (which may not be the case), or the payment of contributions.
SMBC’s viability evidence does not take this requirement into account, and no detail is provided as to how these contributions will be spent or what level of contribution is required. This therefore brings uncertainty, and the Policy should be reconsidered to ensure what is required is clear, and that it will not impact upon the viability of schemes.
Soundness – The Plan is not:
• Consistent with National Policy
Change Sought:
• Reconsideration of the policy to ensure that it is evidenced based, does not impact upon viability of schemes, and is in accordance with national policy
Delivery and Monitoring
Policy P21 Developer Contributions and Infrastructure Provision
Policy P21 expected major development to provide or contribute towards the provision of measures to directly mitigate its impact and physical, social, green and digital infrastructure.
SMBC’s viability testing does not take into account digital infrastructure within the testing and, as such, it should be evidenced that this will not render development unviable.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Confirmation that digital infrastructure provision allows for viable development
Settlement Chapters
Policy BC1 Barratt’s Farm, Balsall Common
We note that 1,756 new homes are proposed for Balsall Common across the plan period with the sole justification seemingly being that it contains both a primary and secondary school and has a full range of retail and associated facilities. However, it is still described as a rural settlement with no significant areas of employment and the distribution strategy remains one of “proportional distribution”. 1,756 dwellings to a single rural village would be completely disproportionate. There is discussion in the document regarding delivery of a by-pass; provision a station car park; improved public transport and a new primary school. However, there is no discussion as to how these are to be funded / delivered relative to the level of growth identified. In addition, there is discussion regarding the scope to enhance the existing local centre and the provision of a village centre masterplan. However, this land is in multiple ownerships and there are no proposals for what these enhancements could entail or how they could function – particularly with a by-pass in place which could actually draw trade away from the existing centre.
There is no assessment of the ability of Balsall Common to deliver this level of growth in such a small area. Whilst clearly some sites (i.e. Barratts Farm) will be able to have multiple outlets, the ability of the market to absorb and deliver multiple sites at any one time in a rural location should be reviewed; particular when Balsall Common will be acutely affected by HS2 – both in terms of the physical construction of the line and the disruption and uncertainty that this will bring; but also in terms of market desirability until such time as the line is constructed.
We also note that Barratts Farm is in multiple ownerships and these are described as “complex” in paragraph 541. This is the single largest site and the one which is proposed to deliver the by-pass. Within the previous draft of the Plan, it was stated that this site would only be taken forward if the landowners / promoters could demonstrate they are working on a collaborate and comprehensive basis. Reading paragraph 541, this collaborate working has clearly not been secured in the way it was envisaged and nothing additional is suggested to demonstrate that joint / collaborative working is possible.
The relief road is identified as being necessary for Barratts Farm in particular with the policy advising that is required early in the plan period. The road is provisionally to be funded via CIL payments; and grant funding which “may” be possible through the WMCA. Firstly, CIL payments can only be secured through those sites which will come forward in the future however these sites are Green Belt sites and cannot therefore be delivered until the Local Plan Review is completed and the subsequent CIL schedule is adopted. Secondly, there is no grant funding proposal in place to fund the road. As it currently stands this road is not deliverable. The road is required to be delivered early in the plan period i.e. before there are significant CIL funds in place and, potentially, at a point where, in order to receive grant funding, applications should be being made now / near future.
There has to be serious doubt over the ability of Barratts Farm to be delivered within the anticipated timeframes and therefore places serous doubt over the plan as a whole given the scale of this allocation.
The Sustainability Appraisal notes that there are limited employment opportunities within Balsall Common and that people travel outside of the settlement to work. As such, it is noted that the expansion of this settlement would fly in the face of sustainability objectives of reducing the need to travel to areas of employment. Whilst such a case could be made for the majority of the rural areas of the Borough, it is heightened especially here when such a large proportion of future growth is identified for one rural settlement.
At this stage, the level of growth attributed to Balsall Common is disproportionate and that inadequate research has been undertaken into the deliverability of this level of growth and the associated aspirations; and the ability of the market to deliver this level of growth in a rural area is considered to be unrealistic.
On the basis that we do not consider the sites identified to be deliverable and the significant shortfall in supply identified by the more realistic timescales we have identified for UK Central, we propose an alternative site – Land at Hawkshurst (Site 544) as an alternative to meeting part of this need. To date this site has been inappropriately assessment by the Council and a more appropriate evaluation of the site is given in the section below.
Policy BL1 – West of Dickens Heath
The policy requires that the proposal for BL1 secures the relocation of the existing sports provision to a suitable site in the local vicinity. Until such time as these facilities are relocated or a plan is in place to secure timely relocation (which should include the grant of planning permission in our view, given that any site will be in the Green Belt), then the site cannot come forward for development. Our key concern here relates to Site 4 (West of Dickens Heath). It is noted that the identification of a Local Wildlife Site within the site hampers re-provision within the site itself and therefore alternative options will need to be pursued outside of the site. We consider that these alternatives should be considered now as clearly, as it currently stands, the pitches will be lost with no alternative in place (and therefore no guarantee of any re-provision). This is all the more important given that the land in the area is all located within the Green Belt and therefore any proposals which may, for example, include floodlighting, will have to be carefully considered against the Green Belt ‘tests’. We understand that the loss of these facilities is causing significant local concern particularly with no proposals for replacement.
The Council have had ample time to identify and secure alternative provision and therefore the fact that this is not identified within the plan, suggests that there are currently no alternative sites. This calls into question the delivery of this site and with no evidence and no proposals in place, we consider that proposal BL1 should be deleted from the plan.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Policy KN1 Hampton Road, Knowle
As with the Site West of Dickens Heath, this draft allocation requires the reprovision of sports pitches. In this instance, the re-provided pitches are currently shown within the Green Belt to the north of the allocation.
The Council, within Paragraphs 713-715 state that it’s likely that very special circumstances will exist to support development in this location and, as such, the reprovision will likely be acceptable. However, this pre-judges any application, for which the detail is not known, and as such cannot be relied upon. Therefore the housing that would be provided on the sports pitches should not be included until the reprovision of the sports pitches is secured.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Site Assessment Criteria
We consider that a more dispersed growth option should be considered and, as set out previously, consider that the land at Broad Lane, Hawkshurst (Site 544) is ideally suited to make an important contribution to the Council’s housing need. Following the Council’s own site selection criteria, we set out why this site is a suitable and deliverable alternative site which can be delivered utilising existing infrastructure:
We object strongly to the manner in which Site 544 has been assessed in the site selection process for the reasons which are set out below – and on that basis, object to the inconsistent application of the methodology.
Firstly, in assessing Site 544, the Council deemed that the site did not pass ‘Step 1’ – which is the initial, high-level sieving process. Sites which are not taken forward at this stage are then not subject to the more refined ‘Step 2’ analysis. We consider the manner in which the process was applied is fundamentally flawed and have carried out our own assessment (using the Council’s own analysis) to demonstrate that the site should not have been discounted at Step 1 and should have been included in Step 2.
STEP 1
The first stage in the sieving process is a high-level look at the following:
(i) Brownfield vs greenfield
(ii) Urban areas vs Green Belt
(iii) Accessibility
Sites can be rated from Priority 1 (brownfield in urban area or settlement) to Priority 10 (greenfield in isolated highly performing Green Belt location). A traffic light rating is then applied – sites which falls within Priority 1 to Priority 4 are green sites; Priority 5 sites are yellow; Priority 6, 6b and 7 sites are blue; and Priority 8, 9 and 10 sites are red. Red sites fail Step 1 and are not taken forward to Step 2 for assessment. Site 544 was incorrectly identified as a Priority 9 red site and was not therefore taken forward to Step 2.
In summary, Site 544 is a greenfield and Green Belt site. However, it is accessible (being on the edge of the Coventry urban area) and also within an area with a low GB score of 5. Therefore, it should be allocated a Priority score of no higher than 5 (yellow). We review below the manner in which this initial sieving assessment was flawed - taking Site 544 step by step through the same assessment process as the Council.
Green Belt
In the Green Belt Assessment 2016, Site 544 is identified as part of Refined Parcel RP83:5 which has a combined score of 5, within a range from the highest performing Green Belt sites (12) to the lowest performing sites, scoring as low as 0. With a score of 5, site 544 is clearly a lower performing site. The starting point for consideration as a Priority 5 site is a score of 5 or lower in the Green Belt––Site 544 falls into that category. The results of this assessment are backed up by our own Green Belt assessment which is included with this submission.
Accessibility
The second part of the criteria relates to accessibility and to achieve a Priority 5 ranking, the site is required to be in an accessible location. This is defined as:
(a) On the edge of the urban area or
(b) On the edge of a settlement which has a wide range of services and facilities including a primary school and a range of retail facilities.
Site 544 adjoins the urban edge of Coventry – indeed in the Council’s Site Assessment, the site is identified as possibly being an extension to Coventry.
It should be noted that in relation to the Publication Draft Plan, the Council have updated the Accessibility Study to take account of retail / surgery provision in adjoining LPA areas, however they have then not used this information to re-visit first principles and determine whether sites have been appropriately assessed from the start. Therefore, whilst this site now scores more positively, its ‘priority 9’ status has not been re-evaluated despite an Addendum to the Site Assessments being produced and the Accessibility Study being revisited. It appears that despite the site being on the urban edge of Coventry this has been discounted due to the sites geographical relationship with Coventry as opposed to Solihull. However, accessibility should be based upon spatial location rather than boundaries. The fact that the retail offer is in Coventry will not prevent residents of Hawkshurst using it.
For the absolute avoidance of doubt therefore, we enclose our own submission produced by Phil Jones Associates which demonstrates that the site is in a suitable and sustainable location.
It is fundamentally incorrect for Site 544 to have been ‘sieved out’ at Step 1. The site should have been correctly assessed as a Priority 5 yellow site as it meets the two necessary criteria. The site, therefore, should have been taken forward for a more detailed analysis in Step 2.
On the basis that the site does pass Step 1 – we have carried out the Step 2 assessment using the same table and criteria as the Council. There are no scorings or weightings attributed to the Step 2 analysis – it assessed on a qualitative basis.
STEP 2 – REFINEMENT CRITERIA
FACTORS IN FAVOUR
In accordance with the spatial strategy
(including only proportional additions to lower order settlements (i.e. those without a secondary school or not located close to the urban edge).
The preferred spatial strategy would be to locate development needs close to where they arise. However the Plan identifies that there is limited land available to achieve this and therefore the Council has had to look at alternative options, which includes land released from the Green Belt in the form of urban extensions and also followed a more dispersed strategy for development. They have sought to focus development in locations that are, or can be made, accessible and sustainable. Such locations are identified as typically being on the edge of urban areas (or within ruralsettlements) that have a greater range of services. Potential locations for development include adjoining the urban edge or a highly accessible settlement. This will have the benefit of focusing on urban areas and sustainable urban extensions to provide the best opportunity for achieving accessibility and delivering public transport improvements.
It is abundantly clear that geographically Site 544 adjoins the urban edge of Coventry – Coventry is the second largest City in the West Midlands, after Birmingham. Site 544, as confirmed in the SHELAA assessment, would be viewed as an urban extension to Coventry and there is, therefore, no doubt that Site 544 is in accordance with the Spatial Strategy, which seeks to locate development in the most accessible locations. Coventry is clearly such a location and there is nothing within the Spatial Strategy which would rule against this.
Therefore, it can only be concluded that the development of Site 544 would be in accordance with the Spatial Strategy.
Any hard constraints only affect a small proportion of the site and/or can be mitigated.
The SHELAA does not identify any hard constraints – we concur with this assessment.
The site would not breach a strong defensible boundary to the Green Belt.
There are no strong existing defensible Green Belt boundaries that would be breached. The existing boundaries to Bannerbrook Park comprise simply hedgerows, some of which were planted in conjunction with the existing development. The same form of boundary treatment can therefore be replicated on this site and indeed is proposed within the masterplan included with this submission.
Any identified wider planning gain over and above that which would normally be expected.
Following discussions with local undertakers regarding the lack of burial space available within the Borough, the landowners are willing to offer land for a multi faith burial space which will provide a much needed facility for the Borough and also secure the long term permanence of the Green Belt boundary in this location.
Sites that would use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
See above.
If finer grain accessibility analysis (including output from the Accessibility Study) shows the site (or the part to be included) is accessible.
The Accessibility Study is flawed when it comes to assessment of sites on the Solihull / Coventry boundary. The Study provides a scoring for accessibility for facilities within 1,200m of a site, however when assessing facilities beyond the administrative area of Solihull only facilities within 800m of the boundary are assessed, this is despite an updated assessment being provided in 2020 which proposed to apply some adjustment of standards and yet makes no sensible adjustment to standards for cross boundary provision. Sites in such locations are not therefore being assessed on a comparable basis. Furthermore, the assessment is only being undertaken of walking distances and makes no allowance for accessing facilities by bike. The document references ‘shared cycle’ routes but then makes no consideration of people actually using them for cycling. Clearly were cycling to be factored in, especially for those sites, which adjoin major settlements and therefore have access to a good cycleway network (such as Site 544) then their accessibility criteria would be much improved.
Whilst it is noted that some provision is now taken off cross boundary retail provision and public transport which has moved Site 544 to a higher scoring position; it is still not being assessed on a comparable basis.
There is a shared footway/cycleway through the Bannerbrook Park development which can be extended into Site 544. Furthermore, opportunities will be considered to accommodate a bus route through Site 544 and on through Bannerbrook Park.
It is therefore clear that the proposal can only be defined as being in an ‘accessible location’.
FACTORS AGAINST
Not in accordance with the Spatial Strategy
As set out above, the development of this site is in accordance with the Spatial Strategy
Overriding hard constraints that cannot be mitigated.
There are no hard constraints identified.
SHELAA Category 3 sites unless demonstrated that concerns can be overcome.
The site is not identified as a Category 3 site in the SHELAA. We make comments below in respect of the flaws of SHELAA assessment and carry out our own assessment.
Sites that would not use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
As already confirmed, the site uses existing defensible boundaries and proposes to strengthen the defensible boundary and strengthen existing hedgerow planting.
If finer grain analysis shows the site (or the part to be included) is not accessible.
As previously confirmed, the Council have failed to consider the proximity of services in Coventry on a fair basis and because of this, it is not possible to determine how detailed the assessment has been. However, given that the site adjoins a major urban area is it simply not feasible to draw a conclusion that the site is inaccessible.
If the site is in a landscape character area that has a very low landscape capacity rating.
It is wholly unreasonable if the Council have used this criterion to discount this site. According to the Council’s Landscape Character Study (December 2016) this site falls within Landscape Character Area (LCA) 26 – which covers the eastern fringe of the Borough – yet significant Green Belt release is proposed in other areas of the Borough which are in an identical LCA. With one blanket ‘very low’ landscape capacity conclusion for such wide areas it cannot be used to discount some sites and not others – there must be parity in assessment. Furthermore, the study itself (page 49 – text adjoining Table 24) confirmed that it is not possible to establish a baseline sensitivity to change without having details of a given development proposal and therefore the conclusions should be taken as a guide only. On this basis, we do not consider it appropriate to use this criterion as a basis to discount sites given sites with the same assessment have been given a ‘green’ score’.
We enclose with this submission our own detailed, site specific, landscape and visual appraisal which confirms that the site has the ability to accommodate development of scale which is comparable to the surrounding area without compromising the function of the surrounding Green Belt.
If the SA appraisal identifies significant harmful impacts.
The SA identified 2 harmful impacts:
(i) The site contains over 20ha of Grade 1 – 3 agricultural land.
The site is wholly Grade 3 agricultural land – clearly within Grade 3, the site could in fact be Grade 3b land which would mean it is not BMVL. Furthermore, the Regional ALC mapping, which was last updated in November 2018, shows this to be the prevailing land type across the Borough which is not unsurprising. As a result, a number of proposed allocated sites have the same classification. It is not therefore appropriate to identify this as a harmful impact when a consistent approach has not been applied across the board.
(ii) The distance to jobs is identified as 8km within the SA
This is clearly incorrect as the SA treats the administrative boundary between Coventry and Solihull as a line which people will not cross. This is clearly incorrect. As already stated, there is for example a good bus connection to Warwick University which is a key local employer as well as Coventry city centre which offers multiple employment opportunities. The SA has applied the same approach to all services and facilities – relating its conclusions only to Solihull Borough and thus the distances to shops / schooling / healthcare are distorted. In addition, we highlight that this is a specific issue related to Balsall Common also (which is also further away from Coventry) and yet the Council has seen fit to allocate in excess of 1,700 dwellings in Balsall Common.
In summary:
• The site has medium / high accessibility – at the same level as the other ‘green sites’ identified in the Draft Plan.
• The site is in lower performing Green Belt than other ‘green sites’ in the plan.
• The site has existing defensible Green Belt boundaries which can be strengthened.
• The site has no constraints within the development area which cannot be mitigated in the normal way.
• The site has the same landscape character as other ‘green sites’.
• It is not, therefore, credible for Site 544 to be categorised as a ‘red’ site.
• For this reason, we consider the score for Site 544 should be corrected and the Council should re-visit their assessments from first principles.
As is evidenced from the corrected SHELAA commentary the site is rated as a Category 1 – Deliverable Site. Such sites are deemed to be available now, offer a suitable location for housing now and there is a reasonable prospect that housing will be delivered on site within 5 years from the date of adoption of the plan.

Object

Solihull Local Plan (Draft Submission) 2020

Policy KN1 - Hampton Road, Knowle

Representation ID: 13886

Received: 14/12/2020

Respondent: Barratt David Wilson Homes - Land south of Broad Lane

Agent: Barton Willmore Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Draft allocation KN1 requires the reprovision of sports pitches. In this instance, the re-provided pitches are currently shown within the Green Belt to the north of the allocation. Paragraphs 713-715 state that it’s likely that very special circumstances will exist to support development in this location and, as such, the reprovision will likely be acceptable. However, this pre-judges any application, for which the detail is not known, and as such cannot be relied upon. Therefore the housing that would be provided on the sports pitches should not be included until the reprovision of the sports pitches is secured.

Change suggested by respondent:

Reprovision of the sports pitches should be secured prior to allocation

Full text:

Introduction
Paragraph 18 sets out that the site allocations from the Solihull Local Plan (December 2013) will be brought forward. We consider that the automatic allocation of these sites which have been allocated for a number of years, without any justification as to their deliverability, is an incorrect approach. We address this in more detail under our comments in respect of Policy 4.
Finally, Paragraph 21 refers to neighbourhood plans and the importance SMBC places on these. Paragraph 30 of the National Planning Policy Framework (NPPF) sets the most recently adopted policies will take precedence. SMBC may wish to set this out within this section, to make it clear that the LPR will take precedence upon adoption over any currently adopted Neighbourhood Plans.
Soundness – The Plan is not:
- Justified
Change Sought:
- Existing allocations should be tested for deliverability prior to re-allocation
- The hierarchy of neighbourhood plans should be made clear
Vision
Given that paragraph 59 of the NPPF states that the Government’s objective is to significantly boost the supply of housing, the wording relating to meeting the needs of the housing market area should be more positively worded.
Paragraph 50 sets out that SMBC are seeking to protect the integrity of the Green Belt. Wording should be included setting out that lower performing parcels could be released to protect higher performing parcels while meeting identified and evidenced needs.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- The vision should be more positively worded in order to significantly boost the supply of housing
- The need to release lower performing green belt to meet identified needs, and preserve higher performing parcels, should be set out
Providing Homes for All
Policy P4C Meeting Housing Needs – Market Housing
We object to the inflexible market housing mix which is prescribed within this policy. The NPPF encourages provision of balanced and mixed communities catering for a wide range of the population.
Individual sites should cater for a wide range of housing types and sizes. Provision of such a significant proportion of only smaller (3 bed or fewer) dwellings on sites will not develop long term sustainable communities. Instead it will result in a transient community where people will not be able to form long term neighbourhoods as they will need to move on as their circumstances change if there are insufficient homes of the right size on a site to accommodate them. We do not consider that this represents good planning and consider that the focus should be on building strong healthy communities which can cater for all, rather than simply planning for short term ownership.
The inclusion of a prescribed housing mix runs counter to the criterion elsewhere within the policy which allow a number of factors to be taken into consideration. This plan has a significant lifespan and to prescribe a housing market mix which is to remain in place for the whole of plan period does not provide sufficient flexibility for adaptation to current housing need and demand. We have seen with the current pandemic the way external factors can influence people’s choice of lifestyle.
Soundness – The Plan is not:
• Justified
• Effective
Change Sought:
• Amendment of policy to allow for housing mix based on up to date market evidence
Policy P4D Meeting Housing Needs – Self and Custom Housebuilding
The latest Annual Monitoring Report (March 2020), covering the period 2018/19, sets out that for the period November 2018 – October 2019 there were 374 entries on the Self-build register.
As such, requiring all sites of over 100 houses to provide 5% of open market dwellings in the form of self-build plots is unreasonable and unjustified. Given provision is being made for 7,605 houses through allocations above 100 houses and the UK Central Hub area, this would equate to the 761 self and custom build plots to be provided from the draft allocations.
The Planning Practice Guidance (PPG) advises that the Council should engage with landowners who own sites that are suitable for housing and ‘encourage’ them to consider self-build and custom housing and who are interested in provision. Imposition of mandatory requirement goes beyond encouragement.
Following the example of Stratford District for example, the Council have specifically identified custom build sites which are discreet standalone small sites.
We also include extracts from the Bedford Local Plan Inspector’s Report (Appendix 4) where the Inspector recommended deletion the policy akin to that being proposed here as the policy was not justified with reference to the self-build register. The same principle applies here in that the amount being sought is over double that on the register.
Soundness – The Plan is not:
• Justified
• Consistent with national policy
Change Sought:
• Deletion of specific policy requirement and replacement with specific allocations or general support for self-build sites
Policy P5 Provision of Land for Housing
Policy P5 sets out the Council will allocate sufficient land for at least 5,270 net additional homes to ensure sufficient housing supply to deliver 15,017 additional homes in the plan period. This would result in an average annual housing land provision target of 938 net additional homes per year. This annualised target is made up of a stepped requirement with 851 homes per year delivered between 2020-2026 and 991 dwellings delivered between 2026-2036.
Demand
A Housing Need Technical Report has been provided (December 2020) (Appendix 5) and should be read in conjunction with our commentary on Policy P5. In summary, this Note makes the following key points:
• Planning Practice Guidance (PPG) states the Standard Method (SM) figure represents the minimum housing need, and there may be circumstances whereby need is higher;
• The Draft Plan identifies the clear economic growth aspirations for the Borough, including the nationally significant growth planned for the UK Central Hub. This is a circumstance where housing need may exceed the minimum need. If it does, housing delivery must be of a quantum to support these aspirations;
• The Council’s 2020 HEDNA confirms that the calculation of housing need is underpinned by the growth at the UK Central Hub. The Hub is projected to generate an additional 13,000 jobs to the baseline Experian job growth forecast (10,000 jobs) included in the HEDNA;
• The HEDNA tests several economic-led housing need scenarios. However, the UK Hub Scenario assumes only 25% of the additional 13,000 jobs created by the Hub are to be taken up by Solihull residents. This results in the housing need (816 dpa) underpinning the Plan;
• However, this ignores the ‘Growth A’ scenario which concludes that 908 dpa would be required based on the ‘Adjusted Local Growth’ scenario. This scenario assumes that strong industries in Solihull will outperform the baseline Experian forecast, resulting in an additional 5,680 jobs to the baseline (10,000 jobs) over the Plan period, with Solihull residents taking up these jobs;
• However, no scenario is presented to show what the housing need would be based on the UK Central Hub scenario being fulfilled in full by Solihull residents. It is important to understand this so that the duty to cooperate discussions referred to in the HEDNA are well informed;
Barton Willmore provide these sensitivity scenarios based on two approaches to commuting, and two approaches to underlying demographic rates (mortality, fertility, and migration);
• The results of our testing are summarised in Table 7.1:
Table 7.1: Solihull Borough – Barton Willmore Demographic Forecasting 2020-2036 Scenario Demographic rates Jobs per annum 2020-2036 Dwellings per annum 2020-2036
Dwelling-constrained:
Standard Method
2016 ONS rates
7721 – 8132
807
2018 ONS rates
1,0141 – 1,0682
Employment-constrained:
UK Central Hub
2016 ONS rates
1,437
1,1991 – 1,2482
2018 ONS rates
1,0361 – 1,0852
Source: Barton Willmore Development Economics
1 Commuting Ratio 0.98
2 Commuting Ratio 0.93
• Growth of between 1,036 and 1,248 dpa would be required to support the UK Central Hub scenario (between 16,576 and 19,968 dwellings in total);
• This represents an increase of between 220 dpa and 432 dpa on the housing need calculated by the HEDNA (816 dpa), or an additional 3,520 to 6,912 dwellings over the Plan period;
• Our analysis of historic levels of job growth in Solihull 1991-2019 shows a range of 1,225 and 1,650 jobs per annum (jpa). This highlights that the UK Central Hub scenario (1,437 jpa) is a realistic assumption;
• The HEDNA identifies an ‘acute’ situation in respect of affordable housing need. Our analysis suggests that the HEDNA’s conclusion on overall need (816 dpa) should be increased to meet as much affordable need as possible.
• Furthermore, our analysis of unmet need in the wider GBBCHMA suggests that the 2020 Position Statement’s conclusions under-estimate the remaining unmet housing need from Birmingham up to 2031, and for Birmingham alone the deficit in unmet need is between 11,294 and 13,101 dwellings up to 2031;
• In addition, there is significant unmet need up to 2031 based on the existing Standard Method coming from Birmingham City and the Black Country. This amounts to unmet need of between 25,543 and 27,350 dwellings up to 2031. If we were to assume the increased capacity for Birmingham City (65,400 dwellings 2011-2031) set out in the 2020 Position Statement the unmet need would still be between 11,243 and 13,050 dwellings up to 2031. This increases significantly based on the uncapped Standard Method figure for Birmingham City which would come into effect once Birmingham’s Local Plan becomes older than 5 years in 14 months’ time;
Adoption of the proposed changes to Standard Method consulted on by Government in summer 2020 would lead to there being unmet need against emerging/existing housing requirements in all but one of the GBBCHMA authorities;
• Furthermore, the unmet need post 2031 should be considered, as referenced to in the 2020 Position Statement. Based on data available at the present time and the most recent Local Plan figures, Barton Willmore calculate this to be a minimum 17,700 dwellings 2031-2040.
• In summary, the analysis in this report results in the following broad conclusions:
1. The SM’s minimum need for Solihull (807 dpa) will need to be increased to account for expected job growth from the UK Central Hub and the ‘acute’ need for affordable housing in the Borough;
2. Barton Willmore’s demographic modelling shows that between 1,036 and 1,248 dpa are required to support the UK Central Hub scenario;
3. Barton Willmore’s calculations suggest that the deficit in unmet housing need from Birmingham City being delivered by HMA Local Plans amounts to a minimum of between 11,294 and 13,101 dwellings up to 2031, a significant increase from the 2,597 dwellings concluded on by the 2020 Position Statement. This increases when the unmet need from the Black Country is considered. Additional unmet need will be created post 2031.
As such, in order to ensure the LPR is positively prepared, SMBC should seek to plan for more housing, and should allocate further sites.
SUPPLY
Further to the above, and as set out above, we also consider that some elements of the supply should be reviewed:
Dealing with the supply side of the equation, we make the following objections to the various components of supply:
‘Sites identified in land availability assessments’
It is unclear what is meant by ‘sites identified in land availability assessments’. Given these are sites which do not benefit from a draft allocation, then they are by definition, windfall sites which means that there is double counting from unknown sources of supply.
Solihull Local Plan sites
We question the automatic inclusion of Solihull Local Plan sites which have yet to be granted planning permission. The current Plan was adopted in 2013 and the Council cannot currently demonstrate a 5-year supply of housing. In this situation, the Council should be encouraging every suitable site to come forward. The fact that these sites have not come forward despite the housing shortfall, suggests that these should not be considered ‘deliverable’ housing sites without significant justification as to why they will now come forward when they have not to date.
Brownfield Land Register (BLR)
We query the separate identification of sites identified in the BLR – this BLR is subject to periodic review and thus will not be fixed as a permanent source of supply. We consider that any sites to be delivered in this way should be considered as windfall developments.
Lapse Rates
Whilst we support the use of a 10% lapse rates, it needs to be applied across the board i.e. it is equally application in relation to what is to come as to what has already gone before. If the Council accept that a 10% lapse rate is application to sites which already benefit from planning permission, then surely it should also accept that it is applicable to future planning consents which have yet to be granted.
Windfall allowance
The windfall allowance is justified by reference to past windfall rates however it fails to recognise that ‘ town centre sites’ (a traditional source of windfall supply) are allocated in the plan through the town centre masterplan and the Council have identified other sources of supply through the brownfield register. In the absence of any assessment / analysis of this component demonstrating the projected level of future windfall provision taking these factors in account, we consider that the level of windfall should be reviewed and adjusted accordingly.
UK Central Hub
We consider that given the scale of the UK Central Hub proposals, the rate of delivery assumed by the Council is overly optimistic. The Council have not provided any trajectory for the Site, and we note that the August 2020 consultation did not contain any firm commitments to delivery timescales or set out any delivery partners.
This assertion is supposed by the findings of the Lichfields’ Report1 that sets out the average time from outline planning application to the first delivery of homes is 8.4 years. The average build out rate is 160dpa.
As such, taking this into account, and based on a LPR adoption date of 20222, we consider the first completions will likely be C.2030. With an average build out rate of 160dpa, this means that approximately 960 dwellings will be delivered during the Plan Period, assuming that the housing is within the first delivery phases (the August 2020 consultation referenced a mix of uses coming forward). While more outlets may increase the speed of delivery, the amount of infrastructure required also needs to be taken into account. The type of supply also needs to be considered, with UK Central Hub likely to be geared towards apartments.
As such, we consider that 1,780 houses should be removed to take into account the likely delivery timescales.
Trajectory
We also note that SMBC are seeking to provide a stepped trajectory as some of the larger sites will not make a significant contribution to completions until the mid-delivery phase. The Inspector assessing the Guildford Local Plan set out:
39. In the submitted plan, the combined effect of the stepped trajectory in Policy S2 together with the “Liverpool” methodology (in which the delivery shortfall accumulated over the first 4 years of the plan (2015/16 to 2018/19) is spread over the whole plan period), would have deferred a significant proportion of the housing requirement to the later years of the plan. Set against the (then higher) housing requirement, this would not have met the Government’s objective to boost the supply of housing in the shorter term. (our emphasis)
We consider that SMBC should take the same approach as Guildford and allocate further sites to meet need early in the Plan Period. The existence of the UK Central Hub is not of a sufficient size to warrant a different approach (i.e. it is not akin to a new settlement).
Further, as with the withdrawn Uttlesford Local Plan, this stepped trajectory may create a fragile 5 year housing land supply position, taking into account the ambitious delivery targets of the UK Central Hub and the delivery concerns relating to the draft allocations set out below. The Inspectors’ letter relating to the withdrawn plan states:
29. This calculation relies on the use of a reduced annual requirement of 568 dpa for most of the years, as it is based on the stepped trajectory set out in Policy SP3. It is also based on what we consider to be unrealistic commencement/housing delivery dates for two of the Garden Communities (North Uttlesford and Easton Park, as set out above). So, whilst the Council can, in theory, demonstrate a 5.65 year HLS, we are concerned that if the housing delivery at North Uttlesford and Easton Park slips by just one year, as seems very likely, this would result in 100 less dwellings in this 5 year period. This would result in a very fragile 5 year HLS position.
There are comparisons that can be drawn here based on the stepped trajectory and the anticipated 5.37 year supply upon adoption.
The Inspectors for the withdrawn Uttlesford Local Plan also referenced the need to meet the full objectively assessed need for market and affordable housing in the housing market area (NPPF Paragraph 47). The HEDNA states there is a ‘clearly acute’ shortage of affordable housing. The proposed stepped trajectory therefore may worsen the affordability problem as it would delay the provision of housing until late years of the plan period.
Taking the above into account, we consider that the SMBC’s supply is actually 11,496 (rounded) before any reduction in windfall or the deletion of draft allocations which are unlikely to be delivered is taken into account.
This is a reduction of 3,521 and, as such, to meet the increased demand set out above, and take into account the concerns relating to a stepped trajectory, a review of the supply is required and additional sites allocated.
The Council should also ensure that a large number of these sites can be delivered early on in the Plan Period in order to take account of the likely later delivery of some other sites.
Soundness – The Plan is not:
• Positively prepared
• Justified
• Effective
• Consistent with national policy
Change Sought:
• Review of demand and amendment to the strategy
• Review of supply and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible
Improving Accessibility and Encouraging Sustainable Travel
Policy P7 Accessibility and Ease of Access
We consider that the requirement for major residential development should be clarified to set out that there may be other ways in which sustainable access options can be implemented. The distance to a bus stop/train station should not be seen as the only measure of sustainable access.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- Policy should be clarified that there are other ways of ensuring sustainable transport options are available
Policy P8 Managing Travel Demand and Reducing Congestion
Paragraph 109 of the NPPF states that development should only be prevented or refused on highway grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. Within point 2(ii), SMBC are seeking to bring in a further test which would not be in accordance with the NPPF. This should therefore be deleted.
Soundness – The Plan is not:
• Consistent with national policy
Change Sought:
• Point 2(ii) should be deleted
Protecting and Enhancing our Environment
Policy P11 Water and Flood Risk Management
With regards to point 6, the confirmation of discharge into a public sewer falls under Section 106 of the Water Industry Act 1991. As such, it should be made clear that planning permission can be granted prior to this being confirmed, as it falls within a different regulatory regime.
With regards to point 14, it should be clarified that contribution through a Section 106 Agreement is only required where it meets the tests set out in NPPF Paragraph 56.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Deletion of point relating to confirmation from relevant infrastructure owner
• Clarification as to obligation requirements and the necessary tests
Promoting Quality of Place
Policy P17 Countryside and Green Belt
Within Point 1 of the policy, SMBC is seeking to safeguard best and most versatile agricultural land (BMVAL) unless there is an overriding need for development that outweighs the loss. BMVAL is referenced within the NPPF at Paragraph 170 which states that planning policies should contribute to and enhance the natural and local environment by taking into account a number of criteria. One of these is:
b) recognising the intrinsic character and beauty of the countryside, and the wider benefits from natural capital and ecosystem services – including the economic and other benefits of the best and most versatile agricultural land, and of trees and woodland.
Firstly, we consider that including reference to BMVAL within a policy relating to Green Belt seeks to conflate two separate issues. Further, as can be seen above, the test set out by the NPPF does not require the safeguarding of BMVAL. Planning policies are required to contribute to and enhance natural and local environment by recognising economic and other benefits from BMVAL. As such, we consider this point should be deleted.
SMBC have set out, within Point 4, a number of different factors that may be taken into account when considering very special circumstances.
Further to this, point 5 sets out that development that is ‘conspicuous’ from the Green Belt must not harm the visual amenity of the Green Belt by reason of siting, materials or design. Given Green Belt is a spatial designation, designed to prevent sprawl, we consider that this requirement goes beyond the scope of the Green Belt, as set out in the NPPF. The LPR contains policies relating to protecting landscape, where necessary, and as such, this point should be deleted.
Soundness – The Plan is not:
• Positively prepared
• Consistent with National Policy
Change Sought:
• Deletion of point 1
• Inclusion of further factors which may create very special circumstances
• Deletion of point 5
Policy P17A Green Belt Compensation
Paragraph 138 of the NPPF sets out that ways in which the impact of removing land from the Green Belt can be offset through compensatory improvements to the environmental quality and accessibility of remaining Green Belt Land.
Policy P17 is seeking to require this by requiring development on sites removed from the Green Belt to provide appropriate compensatory improvements to environmental quality and accessibility of remaining Green Belt in the form of a Section 106 Agreement utilising the below hierarchy:
1. Compensatory requirements as set out as part of the Local Plan masterplans
2. Where no compensation has been set out within the Local Plan masterplan, improvements are provided as:
i. Improvements within the Green Belt adjacent to, or in close proximity to, the development site;
ii. Improvements within the Green Belt adjacent to, or in close proximity to, the settlement or area accommodating the development;
iii. Improvements within the Green Belt in an area identified for environmental improvements as part of the Council’s Green Infrastructure Opportunity Mapping.
3. In the event it is robustly demonstrated that none of the above options can be satisfied then the Council will accept a commuted sum.
Given none of the emerging masterplans show any compensatory improvements within the Green Belt, it would appear that the Policy is relying on there being additional land being available within the control of applicants (which may not be the case), or the payment of contributions.
SMBC’s viability evidence does not take this requirement into account, and no detail is provided as to how these contributions will be spent or what level of contribution is required. This therefore brings uncertainty, and the Policy should be reconsidered to ensure what is required is clear, and that it will not impact upon the viability of schemes.
Soundness – The Plan is not:
• Consistent with National Policy
Change Sought:
• Reconsideration of the policy to ensure that it is evidenced based, does not impact upon viability of schemes, and is in accordance with national policy
Delivery and Monitoring
Policy P21 Developer Contributions and Infrastructure Provision
Policy P21 expected major development to provide or contribute towards the provision of measures to directly mitigate its impact and physical, social, green and digital infrastructure.
SMBC’s viability testing does not take into account digital infrastructure within the testing and, as such, it should be evidenced that this will not render development unviable.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Confirmation that digital infrastructure provision allows for viable development
Settlement Chapters
Policy BC1 Barratt’s Farm, Balsall Common
We note that 1,756 new homes are proposed for Balsall Common across the plan period with the sole justification seemingly being that it contains both a primary and secondary school and has a full range of retail and associated facilities. However, it is still described as a rural settlement with no significant areas of employment and the distribution strategy remains one of “proportional distribution”. 1,756 dwellings to a single rural village would be completely disproportionate. There is discussion in the document regarding delivery of a by-pass; provision a station car park; improved public transport and a new primary school. However, there is no discussion as to how these are to be funded / delivered relative to the level of growth identified. In addition, there is discussion regarding the scope to enhance the existing local centre and the provision of a village centre masterplan. However, this land is in multiple ownerships and there are no proposals for what these enhancements could entail or how they could function – particularly with a by-pass in place which could actually draw trade away from the existing centre.
There is no assessment of the ability of Balsall Common to deliver this level of growth in such a small area. Whilst clearly some sites (i.e. Barratts Farm) will be able to have multiple outlets, the ability of the market to absorb and deliver multiple sites at any one time in a rural location should be reviewed; particular when Balsall Common will be acutely affected by HS2 – both in terms of the physical construction of the line and the disruption and uncertainty that this will bring; but also in terms of market desirability until such time as the line is constructed.
We also note that Barratts Farm is in multiple ownerships and these are described as “complex” in paragraph 541. This is the single largest site and the one which is proposed to deliver the by-pass. Within the previous draft of the Plan, it was stated that this site would only be taken forward if the landowners / promoters could demonstrate they are working on a collaborate and comprehensive basis. Reading paragraph 541, this collaborate working has clearly not been secured in the way it was envisaged and nothing additional is suggested to demonstrate that joint / collaborative working is possible.
The relief road is identified as being necessary for Barratts Farm in particular with the policy advising that is required early in the plan period. The road is provisionally to be funded via CIL payments; and grant funding which “may” be possible through the WMCA. Firstly, CIL payments can only be secured through those sites which will come forward in the future however these sites are Green Belt sites and cannot therefore be delivered until the Local Plan Review is completed and the subsequent CIL schedule is adopted. Secondly, there is no grant funding proposal in place to fund the road. As it currently stands this road is not deliverable. The road is required to be delivered early in the plan period i.e. before there are significant CIL funds in place and, potentially, at a point where, in order to receive grant funding, applications should be being made now / near future.
There has to be serious doubt over the ability of Barratts Farm to be delivered within the anticipated timeframes and therefore places serous doubt over the plan as a whole given the scale of this allocation.
The Sustainability Appraisal notes that there are limited employment opportunities within Balsall Common and that people travel outside of the settlement to work. As such, it is noted that the expansion of this settlement would fly in the face of sustainability objectives of reducing the need to travel to areas of employment. Whilst such a case could be made for the majority of the rural areas of the Borough, it is heightened especially here when such a large proportion of future growth is identified for one rural settlement.
At this stage, the level of growth attributed to Balsall Common is disproportionate and that inadequate research has been undertaken into the deliverability of this level of growth and the associated aspirations; and the ability of the market to deliver this level of growth in a rural area is considered to be unrealistic.
On the basis that we do not consider the sites identified to be deliverable and the significant shortfall in supply identified by the more realistic timescales we have identified for UK Central, we propose an alternative site – Land at Hawkshurst (Site 544) as an alternative to meeting part of this need. To date this site has been inappropriately assessment by the Council and a more appropriate evaluation of the site is given in the section below.
Policy BL1 – West of Dickens Heath
The policy requires that the proposal for BL1 secures the relocation of the existing sports provision to a suitable site in the local vicinity. Until such time as these facilities are relocated or a plan is in place to secure timely relocation (which should include the grant of planning permission in our view, given that any site will be in the Green Belt), then the site cannot come forward for development. Our key concern here relates to Site 4 (West of Dickens Heath). It is noted that the identification of a Local Wildlife Site within the site hampers re-provision within the site itself and therefore alternative options will need to be pursued outside of the site. We consider that these alternatives should be considered now as clearly, as it currently stands, the pitches will be lost with no alternative in place (and therefore no guarantee of any re-provision). This is all the more important given that the land in the area is all located within the Green Belt and therefore any proposals which may, for example, include floodlighting, will have to be carefully considered against the Green Belt ‘tests’. We understand that the loss of these facilities is causing significant local concern particularly with no proposals for replacement.
The Council have had ample time to identify and secure alternative provision and therefore the fact that this is not identified within the plan, suggests that there are currently no alternative sites. This calls into question the delivery of this site and with no evidence and no proposals in place, we consider that proposal BL1 should be deleted from the plan.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Policy KN1 Hampton Road, Knowle
As with the Site West of Dickens Heath, this draft allocation requires the reprovision of sports pitches. In this instance, the re-provided pitches are currently shown within the Green Belt to the north of the allocation.
The Council, within Paragraphs 713-715 state that it’s likely that very special circumstances will exist to support development in this location and, as such, the reprovision will likely be acceptable. However, this pre-judges any application, for which the detail is not known, and as such cannot be relied upon. Therefore the housing that would be provided on the sports pitches should not be included until the reprovision of the sports pitches is secured.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Site Assessment Criteria
We consider that a more dispersed growth option should be considered and, as set out previously, consider that the land at Broad Lane, Hawkshurst (Site 544) is ideally suited to make an important contribution to the Council’s housing need. Following the Council’s own site selection criteria, we set out why this site is a suitable and deliverable alternative site which can be delivered utilising existing infrastructure:
We object strongly to the manner in which Site 544 has been assessed in the site selection process for the reasons which are set out below – and on that basis, object to the inconsistent application of the methodology.
Firstly, in assessing Site 544, the Council deemed that the site did not pass ‘Step 1’ – which is the initial, high-level sieving process. Sites which are not taken forward at this stage are then not subject to the more refined ‘Step 2’ analysis. We consider the manner in which the process was applied is fundamentally flawed and have carried out our own assessment (using the Council’s own analysis) to demonstrate that the site should not have been discounted at Step 1 and should have been included in Step 2.
STEP 1
The first stage in the sieving process is a high-level look at the following:
(i) Brownfield vs greenfield
(ii) Urban areas vs Green Belt
(iii) Accessibility
Sites can be rated from Priority 1 (brownfield in urban area or settlement) to Priority 10 (greenfield in isolated highly performing Green Belt location). A traffic light rating is then applied – sites which falls within Priority 1 to Priority 4 are green sites; Priority 5 sites are yellow; Priority 6, 6b and 7 sites are blue; and Priority 8, 9 and 10 sites are red. Red sites fail Step 1 and are not taken forward to Step 2 for assessment. Site 544 was incorrectly identified as a Priority 9 red site and was not therefore taken forward to Step 2.
In summary, Site 544 is a greenfield and Green Belt site. However, it is accessible (being on the edge of the Coventry urban area) and also within an area with a low GB score of 5. Therefore, it should be allocated a Priority score of no higher than 5 (yellow). We review below the manner in which this initial sieving assessment was flawed - taking Site 544 step by step through the same assessment process as the Council.
Green Belt
In the Green Belt Assessment 2016, Site 544 is identified as part of Refined Parcel RP83:5 which has a combined score of 5, within a range from the highest performing Green Belt sites (12) to the lowest performing sites, scoring as low as 0. With a score of 5, site 544 is clearly a lower performing site. The starting point for consideration as a Priority 5 site is a score of 5 or lower in the Green Belt––Site 544 falls into that category. The results of this assessment are backed up by our own Green Belt assessment which is included with this submission.
Accessibility
The second part of the criteria relates to accessibility and to achieve a Priority 5 ranking, the site is required to be in an accessible location. This is defined as:
(a) On the edge of the urban area or
(b) On the edge of a settlement which has a wide range of services and facilities including a primary school and a range of retail facilities.
Site 544 adjoins the urban edge of Coventry – indeed in the Council’s Site Assessment, the site is identified as possibly being an extension to Coventry.
It should be noted that in relation to the Publication Draft Plan, the Council have updated the Accessibility Study to take account of retail / surgery provision in adjoining LPA areas, however they have then not used this information to re-visit first principles and determine whether sites have been appropriately assessed from the start. Therefore, whilst this site now scores more positively, its ‘priority 9’ status has not been re-evaluated despite an Addendum to the Site Assessments being produced and the Accessibility Study being revisited. It appears that despite the site being on the urban edge of Coventry this has been discounted due to the sites geographical relationship with Coventry as opposed to Solihull. However, accessibility should be based upon spatial location rather than boundaries. The fact that the retail offer is in Coventry will not prevent residents of Hawkshurst using it.
For the absolute avoidance of doubt therefore, we enclose our own submission produced by Phil Jones Associates which demonstrates that the site is in a suitable and sustainable location.
It is fundamentally incorrect for Site 544 to have been ‘sieved out’ at Step 1. The site should have been correctly assessed as a Priority 5 yellow site as it meets the two necessary criteria. The site, therefore, should have been taken forward for a more detailed analysis in Step 2.
On the basis that the site does pass Step 1 – we have carried out the Step 2 assessment using the same table and criteria as the Council. There are no scorings or weightings attributed to the Step 2 analysis – it assessed on a qualitative basis.
STEP 2 – REFINEMENT CRITERIA
FACTORS IN FAVOUR
In accordance with the spatial strategy
(including only proportional additions to lower order settlements (i.e. those without a secondary school or not located close to the urban edge).
The preferred spatial strategy would be to locate development needs close to where they arise. However the Plan identifies that there is limited land available to achieve this and therefore the Council has had to look at alternative options, which includes land released from the Green Belt in the form of urban extensions and also followed a more dispersed strategy for development. They have sought to focus development in locations that are, or can be made, accessible and sustainable. Such locations are identified as typically being on the edge of urban areas (or within ruralsettlements) that have a greater range of services. Potential locations for development include adjoining the urban edge or a highly accessible settlement. This will have the benefit of focusing on urban areas and sustainable urban extensions to provide the best opportunity for achieving accessibility and delivering public transport improvements.
It is abundantly clear that geographically Site 544 adjoins the urban edge of Coventry – Coventry is the second largest City in the West Midlands, after Birmingham. Site 544, as confirmed in the SHELAA assessment, would be viewed as an urban extension to Coventry and there is, therefore, no doubt that Site 544 is in accordance with the Spatial Strategy, which seeks to locate development in the most accessible locations. Coventry is clearly such a location and there is nothing within the Spatial Strategy which would rule against this.
Therefore, it can only be concluded that the development of Site 544 would be in accordance with the Spatial Strategy.
Any hard constraints only affect a small proportion of the site and/or can be mitigated.
The SHELAA does not identify any hard constraints – we concur with this assessment.
The site would not breach a strong defensible boundary to the Green Belt.
There are no strong existing defensible Green Belt boundaries that would be breached. The existing boundaries to Bannerbrook Park comprise simply hedgerows, some of which were planted in conjunction with the existing development. The same form of boundary treatment can therefore be replicated on this site and indeed is proposed within the masterplan included with this submission.
Any identified wider planning gain over and above that which would normally be expected.
Following discussions with local undertakers regarding the lack of burial space available within the Borough, the landowners are willing to offer land for a multi faith burial space which will provide a much needed facility for the Borough and also secure the long term permanence of the Green Belt boundary in this location.
Sites that would use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
See above.
If finer grain accessibility analysis (including output from the Accessibility Study) shows the site (or the part to be included) is accessible.
The Accessibility Study is flawed when it comes to assessment of sites on the Solihull / Coventry boundary. The Study provides a scoring for accessibility for facilities within 1,200m of a site, however when assessing facilities beyond the administrative area of Solihull only facilities within 800m of the boundary are assessed, this is despite an updated assessment being provided in 2020 which proposed to apply some adjustment of standards and yet makes no sensible adjustment to standards for cross boundary provision. Sites in such locations are not therefore being assessed on a comparable basis. Furthermore, the assessment is only being undertaken of walking distances and makes no allowance for accessing facilities by bike. The document references ‘shared cycle’ routes but then makes no consideration of people actually using them for cycling. Clearly were cycling to be factored in, especially for those sites, which adjoin major settlements and therefore have access to a good cycleway network (such as Site 544) then their accessibility criteria would be much improved.
Whilst it is noted that some provision is now taken off cross boundary retail provision and public transport which has moved Site 544 to a higher scoring position; it is still not being assessed on a comparable basis.
There is a shared footway/cycleway through the Bannerbrook Park development which can be extended into Site 544. Furthermore, opportunities will be considered to accommodate a bus route through Site 544 and on through Bannerbrook Park.
It is therefore clear that the proposal can only be defined as being in an ‘accessible location’.
FACTORS AGAINST
Not in accordance with the Spatial Strategy
As set out above, the development of this site is in accordance with the Spatial Strategy
Overriding hard constraints that cannot be mitigated.
There are no hard constraints identified.
SHELAA Category 3 sites unless demonstrated that concerns can be overcome.
The site is not identified as a Category 3 site in the SHELAA. We make comments below in respect of the flaws of SHELAA assessment and carry out our own assessment.
Sites that would not use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
As already confirmed, the site uses existing defensible boundaries and proposes to strengthen the defensible boundary and strengthen existing hedgerow planting.
If finer grain analysis shows the site (or the part to be included) is not accessible.
As previously confirmed, the Council have failed to consider the proximity of services in Coventry on a fair basis and because of this, it is not possible to determine how detailed the assessment has been. However, given that the site adjoins a major urban area is it simply not feasible to draw a conclusion that the site is inaccessible.
If the site is in a landscape character area that has a very low landscape capacity rating.
It is wholly unreasonable if the Council have used this criterion to discount this site. According to the Council’s Landscape Character Study (December 2016) this site falls within Landscape Character Area (LCA) 26 – which covers the eastern fringe of the Borough – yet significant Green Belt release is proposed in other areas of the Borough which are in an identical LCA. With one blanket ‘very low’ landscape capacity conclusion for such wide areas it cannot be used to discount some sites and not others – there must be parity in assessment. Furthermore, the study itself (page 49 – text adjoining Table 24) confirmed that it is not possible to establish a baseline sensitivity to change without having details of a given development proposal and therefore the conclusions should be taken as a guide only. On this basis, we do not consider it appropriate to use this criterion as a basis to discount sites given sites with the same assessment have been given a ‘green’ score’.
We enclose with this submission our own detailed, site specific, landscape and visual appraisal which confirms that the site has the ability to accommodate development of scale which is comparable to the surrounding area without compromising the function of the surrounding Green Belt.
If the SA appraisal identifies significant harmful impacts.
The SA identified 2 harmful impacts:
(i) The site contains over 20ha of Grade 1 – 3 agricultural land.
The site is wholly Grade 3 agricultural land – clearly within Grade 3, the site could in fact be Grade 3b land which would mean it is not BMVL. Furthermore, the Regional ALC mapping, which was last updated in November 2018, shows this to be the prevailing land type across the Borough which is not unsurprising. As a result, a number of proposed allocated sites have the same classification. It is not therefore appropriate to identify this as a harmful impact when a consistent approach has not been applied across the board.
(ii) The distance to jobs is identified as 8km within the SA
This is clearly incorrect as the SA treats the administrative boundary between Coventry and Solihull as a line which people will not cross. This is clearly incorrect. As already stated, there is for example a good bus connection to Warwick University which is a key local employer as well as Coventry city centre which offers multiple employment opportunities. The SA has applied the same approach to all services and facilities – relating its conclusions only to Solihull Borough and thus the distances to shops / schooling / healthcare are distorted. In addition, we highlight that this is a specific issue related to Balsall Common also (which is also further away from Coventry) and yet the Council has seen fit to allocate in excess of 1,700 dwellings in Balsall Common.
In summary:
• The site has medium / high accessibility – at the same level as the other ‘green sites’ identified in the Draft Plan.
• The site is in lower performing Green Belt than other ‘green sites’ in the plan.
• The site has existing defensible Green Belt boundaries which can be strengthened.
• The site has no constraints within the development area which cannot be mitigated in the normal way.
• The site has the same landscape character as other ‘green sites’.
• It is not, therefore, credible for Site 544 to be categorised as a ‘red’ site.
• For this reason, we consider the score for Site 544 should be corrected and the Council should re-visit their assessments from first principles.
As is evidenced from the corrected SHELAA commentary the site is rated as a Category 1 – Deliverable Site. Such sites are deemed to be available now, offer a suitable location for housing now and there is a reasonable prospect that housing will be delivered on site within 5 years from the date of adoption of the plan.

Object

Solihull Local Plan (Draft Submission) 2020

Blythe

Representation ID: 13887

Received: 14/12/2020

Respondent: Barratt David Wilson Homes - Land south of Broad Lane

Agent: Barton Willmore Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Omission site – Land at Hawkshurst, Broad Lane (Site 544) should be allocated to meet part of housing need not deliverable at Balsall Common or UK1. Site has been inappropriately assessed as should be 5Y, not 9R in step 1, as accessible on edge/extension of Coventry. Step 2 should have been undertaken. Accords with Spatial Strategy, no hard constraints, does not breach defensible Green Belt boundary, potential for burial space to meet needs. Accessibility study flawed as does not assess facilities within 1,200m of site outside Borough and makes no allowance for cycling. Similar landscape character rating has not precluded allocations elsewhere and inappropriate to use LCA to discount sites. SA identifies 2 harmful effects; agricultural land which is mostly grade 3, so may not be best & most versatile and has not precluded allocations elsewhere, and distance to jobs which is incorrect as accessible to Warwick University and Coventry City Centre

Change suggested by respondent:

Site 544 Broad Lane should be allocated for housing as is appropriate using site assessment criteria and deliverable

Full text:

Introduction
Paragraph 18 sets out that the site allocations from the Solihull Local Plan (December 2013) will be brought forward. We consider that the automatic allocation of these sites which have been allocated for a number of years, without any justification as to their deliverability, is an incorrect approach. We address this in more detail under our comments in respect of Policy 4.
Finally, Paragraph 21 refers to neighbourhood plans and the importance SMBC places on these. Paragraph 30 of the National Planning Policy Framework (NPPF) sets the most recently adopted policies will take precedence. SMBC may wish to set this out within this section, to make it clear that the LPR will take precedence upon adoption over any currently adopted Neighbourhood Plans.
Soundness – The Plan is not:
- Justified
Change Sought:
- Existing allocations should be tested for deliverability prior to re-allocation
- The hierarchy of neighbourhood plans should be made clear
Vision
Given that paragraph 59 of the NPPF states that the Government’s objective is to significantly boost the supply of housing, the wording relating to meeting the needs of the housing market area should be more positively worded.
Paragraph 50 sets out that SMBC are seeking to protect the integrity of the Green Belt. Wording should be included setting out that lower performing parcels could be released to protect higher performing parcels while meeting identified and evidenced needs.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- The vision should be more positively worded in order to significantly boost the supply of housing
- The need to release lower performing green belt to meet identified needs, and preserve higher performing parcels, should be set out
Providing Homes for All
Policy P4C Meeting Housing Needs – Market Housing
We object to the inflexible market housing mix which is prescribed within this policy. The NPPF encourages provision of balanced and mixed communities catering for a wide range of the population.
Individual sites should cater for a wide range of housing types and sizes. Provision of such a significant proportion of only smaller (3 bed or fewer) dwellings on sites will not develop long term sustainable communities. Instead it will result in a transient community where people will not be able to form long term neighbourhoods as they will need to move on as their circumstances change if there are insufficient homes of the right size on a site to accommodate them. We do not consider that this represents good planning and consider that the focus should be on building strong healthy communities which can cater for all, rather than simply planning for short term ownership.
The inclusion of a prescribed housing mix runs counter to the criterion elsewhere within the policy which allow a number of factors to be taken into consideration. This plan has a significant lifespan and to prescribe a housing market mix which is to remain in place for the whole of plan period does not provide sufficient flexibility for adaptation to current housing need and demand. We have seen with the current pandemic the way external factors can influence people’s choice of lifestyle.
Soundness – The Plan is not:
• Justified
• Effective
Change Sought:
• Amendment of policy to allow for housing mix based on up to date market evidence
Policy P4D Meeting Housing Needs – Self and Custom Housebuilding
The latest Annual Monitoring Report (March 2020), covering the period 2018/19, sets out that for the period November 2018 – October 2019 there were 374 entries on the Self-build register.
As such, requiring all sites of over 100 houses to provide 5% of open market dwellings in the form of self-build plots is unreasonable and unjustified. Given provision is being made for 7,605 houses through allocations above 100 houses and the UK Central Hub area, this would equate to the 761 self and custom build plots to be provided from the draft allocations.
The Planning Practice Guidance (PPG) advises that the Council should engage with landowners who own sites that are suitable for housing and ‘encourage’ them to consider self-build and custom housing and who are interested in provision. Imposition of mandatory requirement goes beyond encouragement.
Following the example of Stratford District for example, the Council have specifically identified custom build sites which are discreet standalone small sites.
We also include extracts from the Bedford Local Plan Inspector’s Report (Appendix 4) where the Inspector recommended deletion the policy akin to that being proposed here as the policy was not justified with reference to the self-build register. The same principle applies here in that the amount being sought is over double that on the register.
Soundness – The Plan is not:
• Justified
• Consistent with national policy
Change Sought:
• Deletion of specific policy requirement and replacement with specific allocations or general support for self-build sites
Policy P5 Provision of Land for Housing
Policy P5 sets out the Council will allocate sufficient land for at least 5,270 net additional homes to ensure sufficient housing supply to deliver 15,017 additional homes in the plan period. This would result in an average annual housing land provision target of 938 net additional homes per year. This annualised target is made up of a stepped requirement with 851 homes per year delivered between 2020-2026 and 991 dwellings delivered between 2026-2036.
Demand
A Housing Need Technical Report has been provided (December 2020) (Appendix 5) and should be read in conjunction with our commentary on Policy P5. In summary, this Note makes the following key points:
• Planning Practice Guidance (PPG) states the Standard Method (SM) figure represents the minimum housing need, and there may be circumstances whereby need is higher;
• The Draft Plan identifies the clear economic growth aspirations for the Borough, including the nationally significant growth planned for the UK Central Hub. This is a circumstance where housing need may exceed the minimum need. If it does, housing delivery must be of a quantum to support these aspirations;
• The Council’s 2020 HEDNA confirms that the calculation of housing need is underpinned by the growth at the UK Central Hub. The Hub is projected to generate an additional 13,000 jobs to the baseline Experian job growth forecast (10,000 jobs) included in the HEDNA;
• The HEDNA tests several economic-led housing need scenarios. However, the UK Hub Scenario assumes only 25% of the additional 13,000 jobs created by the Hub are to be taken up by Solihull residents. This results in the housing need (816 dpa) underpinning the Plan;
• However, this ignores the ‘Growth A’ scenario which concludes that 908 dpa would be required based on the ‘Adjusted Local Growth’ scenario. This scenario assumes that strong industries in Solihull will outperform the baseline Experian forecast, resulting in an additional 5,680 jobs to the baseline (10,000 jobs) over the Plan period, with Solihull residents taking up these jobs;
• However, no scenario is presented to show what the housing need would be based on the UK Central Hub scenario being fulfilled in full by Solihull residents. It is important to understand this so that the duty to cooperate discussions referred to in the HEDNA are well informed;
Barton Willmore provide these sensitivity scenarios based on two approaches to commuting, and two approaches to underlying demographic rates (mortality, fertility, and migration);
• The results of our testing are summarised in Table 7.1:
Table 7.1: Solihull Borough – Barton Willmore Demographic Forecasting 2020-2036 Scenario Demographic rates Jobs per annum 2020-2036 Dwellings per annum 2020-2036
Dwelling-constrained:
Standard Method
2016 ONS rates
7721 – 8132
807
2018 ONS rates
1,0141 – 1,0682
Employment-constrained:
UK Central Hub
2016 ONS rates
1,437
1,1991 – 1,2482
2018 ONS rates
1,0361 – 1,0852
Source: Barton Willmore Development Economics
1 Commuting Ratio 0.98
2 Commuting Ratio 0.93
• Growth of between 1,036 and 1,248 dpa would be required to support the UK Central Hub scenario (between 16,576 and 19,968 dwellings in total);
• This represents an increase of between 220 dpa and 432 dpa on the housing need calculated by the HEDNA (816 dpa), or an additional 3,520 to 6,912 dwellings over the Plan period;
• Our analysis of historic levels of job growth in Solihull 1991-2019 shows a range of 1,225 and 1,650 jobs per annum (jpa). This highlights that the UK Central Hub scenario (1,437 jpa) is a realistic assumption;
• The HEDNA identifies an ‘acute’ situation in respect of affordable housing need. Our analysis suggests that the HEDNA’s conclusion on overall need (816 dpa) should be increased to meet as much affordable need as possible.
• Furthermore, our analysis of unmet need in the wider GBBCHMA suggests that the 2020 Position Statement’s conclusions under-estimate the remaining unmet housing need from Birmingham up to 2031, and for Birmingham alone the deficit in unmet need is between 11,294 and 13,101 dwellings up to 2031;
• In addition, there is significant unmet need up to 2031 based on the existing Standard Method coming from Birmingham City and the Black Country. This amounts to unmet need of between 25,543 and 27,350 dwellings up to 2031. If we were to assume the increased capacity for Birmingham City (65,400 dwellings 2011-2031) set out in the 2020 Position Statement the unmet need would still be between 11,243 and 13,050 dwellings up to 2031. This increases significantly based on the uncapped Standard Method figure for Birmingham City which would come into effect once Birmingham’s Local Plan becomes older than 5 years in 14 months’ time;
Adoption of the proposed changes to Standard Method consulted on by Government in summer 2020 would lead to there being unmet need against emerging/existing housing requirements in all but one of the GBBCHMA authorities;
• Furthermore, the unmet need post 2031 should be considered, as referenced to in the 2020 Position Statement. Based on data available at the present time and the most recent Local Plan figures, Barton Willmore calculate this to be a minimum 17,700 dwellings 2031-2040.
• In summary, the analysis in this report results in the following broad conclusions:
1. The SM’s minimum need for Solihull (807 dpa) will need to be increased to account for expected job growth from the UK Central Hub and the ‘acute’ need for affordable housing in the Borough;
2. Barton Willmore’s demographic modelling shows that between 1,036 and 1,248 dpa are required to support the UK Central Hub scenario;
3. Barton Willmore’s calculations suggest that the deficit in unmet housing need from Birmingham City being delivered by HMA Local Plans amounts to a minimum of between 11,294 and 13,101 dwellings up to 2031, a significant increase from the 2,597 dwellings concluded on by the 2020 Position Statement. This increases when the unmet need from the Black Country is considered. Additional unmet need will be created post 2031.
As such, in order to ensure the LPR is positively prepared, SMBC should seek to plan for more housing, and should allocate further sites.
SUPPLY
Further to the above, and as set out above, we also consider that some elements of the supply should be reviewed:
Dealing with the supply side of the equation, we make the following objections to the various components of supply:
‘Sites identified in land availability assessments’
It is unclear what is meant by ‘sites identified in land availability assessments’. Given these are sites which do not benefit from a draft allocation, then they are by definition, windfall sites which means that there is double counting from unknown sources of supply.
Solihull Local Plan sites
We question the automatic inclusion of Solihull Local Plan sites which have yet to be granted planning permission. The current Plan was adopted in 2013 and the Council cannot currently demonstrate a 5-year supply of housing. In this situation, the Council should be encouraging every suitable site to come forward. The fact that these sites have not come forward despite the housing shortfall, suggests that these should not be considered ‘deliverable’ housing sites without significant justification as to why they will now come forward when they have not to date.
Brownfield Land Register (BLR)
We query the separate identification of sites identified in the BLR – this BLR is subject to periodic review and thus will not be fixed as a permanent source of supply. We consider that any sites to be delivered in this way should be considered as windfall developments.
Lapse Rates
Whilst we support the use of a 10% lapse rates, it needs to be applied across the board i.e. it is equally application in relation to what is to come as to what has already gone before. If the Council accept that a 10% lapse rate is application to sites which already benefit from planning permission, then surely it should also accept that it is applicable to future planning consents which have yet to be granted.
Windfall allowance
The windfall allowance is justified by reference to past windfall rates however it fails to recognise that ‘ town centre sites’ (a traditional source of windfall supply) are allocated in the plan through the town centre masterplan and the Council have identified other sources of supply through the brownfield register. In the absence of any assessment / analysis of this component demonstrating the projected level of future windfall provision taking these factors in account, we consider that the level of windfall should be reviewed and adjusted accordingly.
UK Central Hub
We consider that given the scale of the UK Central Hub proposals, the rate of delivery assumed by the Council is overly optimistic. The Council have not provided any trajectory for the Site, and we note that the August 2020 consultation did not contain any firm commitments to delivery timescales or set out any delivery partners.
This assertion is supposed by the findings of the Lichfields’ Report1 that sets out the average time from outline planning application to the first delivery of homes is 8.4 years. The average build out rate is 160dpa.
As such, taking this into account, and based on a LPR adoption date of 20222, we consider the first completions will likely be C.2030. With an average build out rate of 160dpa, this means that approximately 960 dwellings will be delivered during the Plan Period, assuming that the housing is within the first delivery phases (the August 2020 consultation referenced a mix of uses coming forward). While more outlets may increase the speed of delivery, the amount of infrastructure required also needs to be taken into account. The type of supply also needs to be considered, with UK Central Hub likely to be geared towards apartments.
As such, we consider that 1,780 houses should be removed to take into account the likely delivery timescales.
Trajectory
We also note that SMBC are seeking to provide a stepped trajectory as some of the larger sites will not make a significant contribution to completions until the mid-delivery phase. The Inspector assessing the Guildford Local Plan set out:
39. In the submitted plan, the combined effect of the stepped trajectory in Policy S2 together with the “Liverpool” methodology (in which the delivery shortfall accumulated over the first 4 years of the plan (2015/16 to 2018/19) is spread over the whole plan period), would have deferred a significant proportion of the housing requirement to the later years of the plan. Set against the (then higher) housing requirement, this would not have met the Government’s objective to boost the supply of housing in the shorter term. (our emphasis)
We consider that SMBC should take the same approach as Guildford and allocate further sites to meet need early in the Plan Period. The existence of the UK Central Hub is not of a sufficient size to warrant a different approach (i.e. it is not akin to a new settlement).
Further, as with the withdrawn Uttlesford Local Plan, this stepped trajectory may create a fragile 5 year housing land supply position, taking into account the ambitious delivery targets of the UK Central Hub and the delivery concerns relating to the draft allocations set out below. The Inspectors’ letter relating to the withdrawn plan states:
29. This calculation relies on the use of a reduced annual requirement of 568 dpa for most of the years, as it is based on the stepped trajectory set out in Policy SP3. It is also based on what we consider to be unrealistic commencement/housing delivery dates for two of the Garden Communities (North Uttlesford and Easton Park, as set out above). So, whilst the Council can, in theory, demonstrate a 5.65 year HLS, we are concerned that if the housing delivery at North Uttlesford and Easton Park slips by just one year, as seems very likely, this would result in 100 less dwellings in this 5 year period. This would result in a very fragile 5 year HLS position.
There are comparisons that can be drawn here based on the stepped trajectory and the anticipated 5.37 year supply upon adoption.
The Inspectors for the withdrawn Uttlesford Local Plan also referenced the need to meet the full objectively assessed need for market and affordable housing in the housing market area (NPPF Paragraph 47). The HEDNA states there is a ‘clearly acute’ shortage of affordable housing. The proposed stepped trajectory therefore may worsen the affordability problem as it would delay the provision of housing until late years of the plan period.
Taking the above into account, we consider that the SMBC’s supply is actually 11,496 (rounded) before any reduction in windfall or the deletion of draft allocations which are unlikely to be delivered is taken into account.
This is a reduction of 3,521 and, as such, to meet the increased demand set out above, and take into account the concerns relating to a stepped trajectory, a review of the supply is required and additional sites allocated.
The Council should also ensure that a large number of these sites can be delivered early on in the Plan Period in order to take account of the likely later delivery of some other sites.
Soundness – The Plan is not:
• Positively prepared
• Justified
• Effective
• Consistent with national policy
Change Sought:
• Review of demand and amendment to the strategy
• Review of supply and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible
Improving Accessibility and Encouraging Sustainable Travel
Policy P7 Accessibility and Ease of Access
We consider that the requirement for major residential development should be clarified to set out that there may be other ways in which sustainable access options can be implemented. The distance to a bus stop/train station should not be seen as the only measure of sustainable access.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- Policy should be clarified that there are other ways of ensuring sustainable transport options are available
Policy P8 Managing Travel Demand and Reducing Congestion
Paragraph 109 of the NPPF states that development should only be prevented or refused on highway grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. Within point 2(ii), SMBC are seeking to bring in a further test which would not be in accordance with the NPPF. This should therefore be deleted.
Soundness – The Plan is not:
• Consistent with national policy
Change Sought:
• Point 2(ii) should be deleted
Protecting and Enhancing our Environment
Policy P11 Water and Flood Risk Management
With regards to point 6, the confirmation of discharge into a public sewer falls under Section 106 of the Water Industry Act 1991. As such, it should be made clear that planning permission can be granted prior to this being confirmed, as it falls within a different regulatory regime.
With regards to point 14, it should be clarified that contribution through a Section 106 Agreement is only required where it meets the tests set out in NPPF Paragraph 56.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Deletion of point relating to confirmation from relevant infrastructure owner
• Clarification as to obligation requirements and the necessary tests
Promoting Quality of Place
Policy P17 Countryside and Green Belt
Within Point 1 of the policy, SMBC is seeking to safeguard best and most versatile agricultural land (BMVAL) unless there is an overriding need for development that outweighs the loss. BMVAL is referenced within the NPPF at Paragraph 170 which states that planning policies should contribute to and enhance the natural and local environment by taking into account a number of criteria. One of these is:
b) recognising the intrinsic character and beauty of the countryside, and the wider benefits from natural capital and ecosystem services – including the economic and other benefits of the best and most versatile agricultural land, and of trees and woodland.
Firstly, we consider that including reference to BMVAL within a policy relating to Green Belt seeks to conflate two separate issues. Further, as can be seen above, the test set out by the NPPF does not require the safeguarding of BMVAL. Planning policies are required to contribute to and enhance natural and local environment by recognising economic and other benefits from BMVAL. As such, we consider this point should be deleted.
SMBC have set out, within Point 4, a number of different factors that may be taken into account when considering very special circumstances.
Further to this, point 5 sets out that development that is ‘conspicuous’ from the Green Belt must not harm the visual amenity of the Green Belt by reason of siting, materials or design. Given Green Belt is a spatial designation, designed to prevent sprawl, we consider that this requirement goes beyond the scope of the Green Belt, as set out in the NPPF. The LPR contains policies relating to protecting landscape, where necessary, and as such, this point should be deleted.
Soundness – The Plan is not:
• Positively prepared
• Consistent with National Policy
Change Sought:
• Deletion of point 1
• Inclusion of further factors which may create very special circumstances
• Deletion of point 5
Policy P17A Green Belt Compensation
Paragraph 138 of the NPPF sets out that ways in which the impact of removing land from the Green Belt can be offset through compensatory improvements to the environmental quality and accessibility of remaining Green Belt Land.
Policy P17 is seeking to require this by requiring development on sites removed from the Green Belt to provide appropriate compensatory improvements to environmental quality and accessibility of remaining Green Belt in the form of a Section 106 Agreement utilising the below hierarchy:
1. Compensatory requirements as set out as part of the Local Plan masterplans
2. Where no compensation has been set out within the Local Plan masterplan, improvements are provided as:
i. Improvements within the Green Belt adjacent to, or in close proximity to, the development site;
ii. Improvements within the Green Belt adjacent to, or in close proximity to, the settlement or area accommodating the development;
iii. Improvements within the Green Belt in an area identified for environmental improvements as part of the Council’s Green Infrastructure Opportunity Mapping.
3. In the event it is robustly demonstrated that none of the above options can be satisfied then the Council will accept a commuted sum.
Given none of the emerging masterplans show any compensatory improvements within the Green Belt, it would appear that the Policy is relying on there being additional land being available within the control of applicants (which may not be the case), or the payment of contributions.
SMBC’s viability evidence does not take this requirement into account, and no detail is provided as to how these contributions will be spent or what level of contribution is required. This therefore brings uncertainty, and the Policy should be reconsidered to ensure what is required is clear, and that it will not impact upon the viability of schemes.
Soundness – The Plan is not:
• Consistent with National Policy
Change Sought:
• Reconsideration of the policy to ensure that it is evidenced based, does not impact upon viability of schemes, and is in accordance with national policy
Delivery and Monitoring
Policy P21 Developer Contributions and Infrastructure Provision
Policy P21 expected major development to provide or contribute towards the provision of measures to directly mitigate its impact and physical, social, green and digital infrastructure.
SMBC’s viability testing does not take into account digital infrastructure within the testing and, as such, it should be evidenced that this will not render development unviable.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Confirmation that digital infrastructure provision allows for viable development
Settlement Chapters
Policy BC1 Barratt’s Farm, Balsall Common
We note that 1,756 new homes are proposed for Balsall Common across the plan period with the sole justification seemingly being that it contains both a primary and secondary school and has a full range of retail and associated facilities. However, it is still described as a rural settlement with no significant areas of employment and the distribution strategy remains one of “proportional distribution”. 1,756 dwellings to a single rural village would be completely disproportionate. There is discussion in the document regarding delivery of a by-pass; provision a station car park; improved public transport and a new primary school. However, there is no discussion as to how these are to be funded / delivered relative to the level of growth identified. In addition, there is discussion regarding the scope to enhance the existing local centre and the provision of a village centre masterplan. However, this land is in multiple ownerships and there are no proposals for what these enhancements could entail or how they could function – particularly with a by-pass in place which could actually draw trade away from the existing centre.
There is no assessment of the ability of Balsall Common to deliver this level of growth in such a small area. Whilst clearly some sites (i.e. Barratts Farm) will be able to have multiple outlets, the ability of the market to absorb and deliver multiple sites at any one time in a rural location should be reviewed; particular when Balsall Common will be acutely affected by HS2 – both in terms of the physical construction of the line and the disruption and uncertainty that this will bring; but also in terms of market desirability until such time as the line is constructed.
We also note that Barratts Farm is in multiple ownerships and these are described as “complex” in paragraph 541. This is the single largest site and the one which is proposed to deliver the by-pass. Within the previous draft of the Plan, it was stated that this site would only be taken forward if the landowners / promoters could demonstrate they are working on a collaborate and comprehensive basis. Reading paragraph 541, this collaborate working has clearly not been secured in the way it was envisaged and nothing additional is suggested to demonstrate that joint / collaborative working is possible.
The relief road is identified as being necessary for Barratts Farm in particular with the policy advising that is required early in the plan period. The road is provisionally to be funded via CIL payments; and grant funding which “may” be possible through the WMCA. Firstly, CIL payments can only be secured through those sites which will come forward in the future however these sites are Green Belt sites and cannot therefore be delivered until the Local Plan Review is completed and the subsequent CIL schedule is adopted. Secondly, there is no grant funding proposal in place to fund the road. As it currently stands this road is not deliverable. The road is required to be delivered early in the plan period i.e. before there are significant CIL funds in place and, potentially, at a point where, in order to receive grant funding, applications should be being made now / near future.
There has to be serious doubt over the ability of Barratts Farm to be delivered within the anticipated timeframes and therefore places serous doubt over the plan as a whole given the scale of this allocation.
The Sustainability Appraisal notes that there are limited employment opportunities within Balsall Common and that people travel outside of the settlement to work. As such, it is noted that the expansion of this settlement would fly in the face of sustainability objectives of reducing the need to travel to areas of employment. Whilst such a case could be made for the majority of the rural areas of the Borough, it is heightened especially here when such a large proportion of future growth is identified for one rural settlement.
At this stage, the level of growth attributed to Balsall Common is disproportionate and that inadequate research has been undertaken into the deliverability of this level of growth and the associated aspirations; and the ability of the market to deliver this level of growth in a rural area is considered to be unrealistic.
On the basis that we do not consider the sites identified to be deliverable and the significant shortfall in supply identified by the more realistic timescales we have identified for UK Central, we propose an alternative site – Land at Hawkshurst (Site 544) as an alternative to meeting part of this need. To date this site has been inappropriately assessment by the Council and a more appropriate evaluation of the site is given in the section below.
Policy BL1 – West of Dickens Heath
The policy requires that the proposal for BL1 secures the relocation of the existing sports provision to a suitable site in the local vicinity. Until such time as these facilities are relocated or a plan is in place to secure timely relocation (which should include the grant of planning permission in our view, given that any site will be in the Green Belt), then the site cannot come forward for development. Our key concern here relates to Site 4 (West of Dickens Heath). It is noted that the identification of a Local Wildlife Site within the site hampers re-provision within the site itself and therefore alternative options will need to be pursued outside of the site. We consider that these alternatives should be considered now as clearly, as it currently stands, the pitches will be lost with no alternative in place (and therefore no guarantee of any re-provision). This is all the more important given that the land in the area is all located within the Green Belt and therefore any proposals which may, for example, include floodlighting, will have to be carefully considered against the Green Belt ‘tests’. We understand that the loss of these facilities is causing significant local concern particularly with no proposals for replacement.
The Council have had ample time to identify and secure alternative provision and therefore the fact that this is not identified within the plan, suggests that there are currently no alternative sites. This calls into question the delivery of this site and with no evidence and no proposals in place, we consider that proposal BL1 should be deleted from the plan.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Policy KN1 Hampton Road, Knowle
As with the Site West of Dickens Heath, this draft allocation requires the reprovision of sports pitches. In this instance, the re-provided pitches are currently shown within the Green Belt to the north of the allocation.
The Council, within Paragraphs 713-715 state that it’s likely that very special circumstances will exist to support development in this location and, as such, the reprovision will likely be acceptable. However, this pre-judges any application, for which the detail is not known, and as such cannot be relied upon. Therefore the housing that would be provided on the sports pitches should not be included until the reprovision of the sports pitches is secured.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Site Assessment Criteria
We consider that a more dispersed growth option should be considered and, as set out previously, consider that the land at Broad Lane, Hawkshurst (Site 544) is ideally suited to make an important contribution to the Council’s housing need. Following the Council’s own site selection criteria, we set out why this site is a suitable and deliverable alternative site which can be delivered utilising existing infrastructure:
We object strongly to the manner in which Site 544 has been assessed in the site selection process for the reasons which are set out below – and on that basis, object to the inconsistent application of the methodology.
Firstly, in assessing Site 544, the Council deemed that the site did not pass ‘Step 1’ – which is the initial, high-level sieving process. Sites which are not taken forward at this stage are then not subject to the more refined ‘Step 2’ analysis. We consider the manner in which the process was applied is fundamentally flawed and have carried out our own assessment (using the Council’s own analysis) to demonstrate that the site should not have been discounted at Step 1 and should have been included in Step 2.
STEP 1
The first stage in the sieving process is a high-level look at the following:
(i) Brownfield vs greenfield
(ii) Urban areas vs Green Belt
(iii) Accessibility
Sites can be rated from Priority 1 (brownfield in urban area or settlement) to Priority 10 (greenfield in isolated highly performing Green Belt location). A traffic light rating is then applied – sites which falls within Priority 1 to Priority 4 are green sites; Priority 5 sites are yellow; Priority 6, 6b and 7 sites are blue; and Priority 8, 9 and 10 sites are red. Red sites fail Step 1 and are not taken forward to Step 2 for assessment. Site 544 was incorrectly identified as a Priority 9 red site and was not therefore taken forward to Step 2.
In summary, Site 544 is a greenfield and Green Belt site. However, it is accessible (being on the edge of the Coventry urban area) and also within an area with a low GB score of 5. Therefore, it should be allocated a Priority score of no higher than 5 (yellow). We review below the manner in which this initial sieving assessment was flawed - taking Site 544 step by step through the same assessment process as the Council.
Green Belt
In the Green Belt Assessment 2016, Site 544 is identified as part of Refined Parcel RP83:5 which has a combined score of 5, within a range from the highest performing Green Belt sites (12) to the lowest performing sites, scoring as low as 0. With a score of 5, site 544 is clearly a lower performing site. The starting point for consideration as a Priority 5 site is a score of 5 or lower in the Green Belt––Site 544 falls into that category. The results of this assessment are backed up by our own Green Belt assessment which is included with this submission.
Accessibility
The second part of the criteria relates to accessibility and to achieve a Priority 5 ranking, the site is required to be in an accessible location. This is defined as:
(a) On the edge of the urban area or
(b) On the edge of a settlement which has a wide range of services and facilities including a primary school and a range of retail facilities.
Site 544 adjoins the urban edge of Coventry – indeed in the Council’s Site Assessment, the site is identified as possibly being an extension to Coventry.
It should be noted that in relation to the Publication Draft Plan, the Council have updated the Accessibility Study to take account of retail / surgery provision in adjoining LPA areas, however they have then not used this information to re-visit first principles and determine whether sites have been appropriately assessed from the start. Therefore, whilst this site now scores more positively, its ‘priority 9’ status has not been re-evaluated despite an Addendum to the Site Assessments being produced and the Accessibility Study being revisited. It appears that despite the site being on the urban edge of Coventry this has been discounted due to the sites geographical relationship with Coventry as opposed to Solihull. However, accessibility should be based upon spatial location rather than boundaries. The fact that the retail offer is in Coventry will not prevent residents of Hawkshurst using it.
For the absolute avoidance of doubt therefore, we enclose our own submission produced by Phil Jones Associates which demonstrates that the site is in a suitable and sustainable location.
It is fundamentally incorrect for Site 544 to have been ‘sieved out’ at Step 1. The site should have been correctly assessed as a Priority 5 yellow site as it meets the two necessary criteria. The site, therefore, should have been taken forward for a more detailed analysis in Step 2.
On the basis that the site does pass Step 1 – we have carried out the Step 2 assessment using the same table and criteria as the Council. There are no scorings or weightings attributed to the Step 2 analysis – it assessed on a qualitative basis.
STEP 2 – REFINEMENT CRITERIA
FACTORS IN FAVOUR
In accordance with the spatial strategy
(including only proportional additions to lower order settlements (i.e. those without a secondary school or not located close to the urban edge).
The preferred spatial strategy would be to locate development needs close to where they arise. However the Plan identifies that there is limited land available to achieve this and therefore the Council has had to look at alternative options, which includes land released from the Green Belt in the form of urban extensions and also followed a more dispersed strategy for development. They have sought to focus development in locations that are, or can be made, accessible and sustainable. Such locations are identified as typically being on the edge of urban areas (or within ruralsettlements) that have a greater range of services. Potential locations for development include adjoining the urban edge or a highly accessible settlement. This will have the benefit of focusing on urban areas and sustainable urban extensions to provide the best opportunity for achieving accessibility and delivering public transport improvements.
It is abundantly clear that geographically Site 544 adjoins the urban edge of Coventry – Coventry is the second largest City in the West Midlands, after Birmingham. Site 544, as confirmed in the SHELAA assessment, would be viewed as an urban extension to Coventry and there is, therefore, no doubt that Site 544 is in accordance with the Spatial Strategy, which seeks to locate development in the most accessible locations. Coventry is clearly such a location and there is nothing within the Spatial Strategy which would rule against this.
Therefore, it can only be concluded that the development of Site 544 would be in accordance with the Spatial Strategy.
Any hard constraints only affect a small proportion of the site and/or can be mitigated.
The SHELAA does not identify any hard constraints – we concur with this assessment.
The site would not breach a strong defensible boundary to the Green Belt.
There are no strong existing defensible Green Belt boundaries that would be breached. The existing boundaries to Bannerbrook Park comprise simply hedgerows, some of which were planted in conjunction with the existing development. The same form of boundary treatment can therefore be replicated on this site and indeed is proposed within the masterplan included with this submission.
Any identified wider planning gain over and above that which would normally be expected.
Following discussions with local undertakers regarding the lack of burial space available within the Borough, the landowners are willing to offer land for a multi faith burial space which will provide a much needed facility for the Borough and also secure the long term permanence of the Green Belt boundary in this location.
Sites that would use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
See above.
If finer grain accessibility analysis (including output from the Accessibility Study) shows the site (or the part to be included) is accessible.
The Accessibility Study is flawed when it comes to assessment of sites on the Solihull / Coventry boundary. The Study provides a scoring for accessibility for facilities within 1,200m of a site, however when assessing facilities beyond the administrative area of Solihull only facilities within 800m of the boundary are assessed, this is despite an updated assessment being provided in 2020 which proposed to apply some adjustment of standards and yet makes no sensible adjustment to standards for cross boundary provision. Sites in such locations are not therefore being assessed on a comparable basis. Furthermore, the assessment is only being undertaken of walking distances and makes no allowance for accessing facilities by bike. The document references ‘shared cycle’ routes but then makes no consideration of people actually using them for cycling. Clearly were cycling to be factored in, especially for those sites, which adjoin major settlements and therefore have access to a good cycleway network (such as Site 544) then their accessibility criteria would be much improved.
Whilst it is noted that some provision is now taken off cross boundary retail provision and public transport which has moved Site 544 to a higher scoring position; it is still not being assessed on a comparable basis.
There is a shared footway/cycleway through the Bannerbrook Park development which can be extended into Site 544. Furthermore, opportunities will be considered to accommodate a bus route through Site 544 and on through Bannerbrook Park.
It is therefore clear that the proposal can only be defined as being in an ‘accessible location’.
FACTORS AGAINST
Not in accordance with the Spatial Strategy
As set out above, the development of this site is in accordance with the Spatial Strategy
Overriding hard constraints that cannot be mitigated.
There are no hard constraints identified.
SHELAA Category 3 sites unless demonstrated that concerns can be overcome.
The site is not identified as a Category 3 site in the SHELAA. We make comments below in respect of the flaws of SHELAA assessment and carry out our own assessment.
Sites that would not use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
As already confirmed, the site uses existing defensible boundaries and proposes to strengthen the defensible boundary and strengthen existing hedgerow planting.
If finer grain analysis shows the site (or the part to be included) is not accessible.
As previously confirmed, the Council have failed to consider the proximity of services in Coventry on a fair basis and because of this, it is not possible to determine how detailed the assessment has been. However, given that the site adjoins a major urban area is it simply not feasible to draw a conclusion that the site is inaccessible.
If the site is in a landscape character area that has a very low landscape capacity rating.
It is wholly unreasonable if the Council have used this criterion to discount this site. According to the Council’s Landscape Character Study (December 2016) this site falls within Landscape Character Area (LCA) 26 – which covers the eastern fringe of the Borough – yet significant Green Belt release is proposed in other areas of the Borough which are in an identical LCA. With one blanket ‘very low’ landscape capacity conclusion for such wide areas it cannot be used to discount some sites and not others – there must be parity in assessment. Furthermore, the study itself (page 49 – text adjoining Table 24) confirmed that it is not possible to establish a baseline sensitivity to change without having details of a given development proposal and therefore the conclusions should be taken as a guide only. On this basis, we do not consider it appropriate to use this criterion as a basis to discount sites given sites with the same assessment have been given a ‘green’ score’.
We enclose with this submission our own detailed, site specific, landscape and visual appraisal which confirms that the site has the ability to accommodate development of scale which is comparable to the surrounding area without compromising the function of the surrounding Green Belt.
If the SA appraisal identifies significant harmful impacts.
The SA identified 2 harmful impacts:
(i) The site contains over 20ha of Grade 1 – 3 agricultural land.
The site is wholly Grade 3 agricultural land – clearly within Grade 3, the site could in fact be Grade 3b land which would mean it is not BMVL. Furthermore, the Regional ALC mapping, which was last updated in November 2018, shows this to be the prevailing land type across the Borough which is not unsurprising. As a result, a number of proposed allocated sites have the same classification. It is not therefore appropriate to identify this as a harmful impact when a consistent approach has not been applied across the board.
(ii) The distance to jobs is identified as 8km within the SA
This is clearly incorrect as the SA treats the administrative boundary between Coventry and Solihull as a line which people will not cross. This is clearly incorrect. As already stated, there is for example a good bus connection to Warwick University which is a key local employer as well as Coventry city centre which offers multiple employment opportunities. The SA has applied the same approach to all services and facilities – relating its conclusions only to Solihull Borough and thus the distances to shops / schooling / healthcare are distorted. In addition, we highlight that this is a specific issue related to Balsall Common also (which is also further away from Coventry) and yet the Council has seen fit to allocate in excess of 1,700 dwellings in Balsall Common.
In summary:
• The site has medium / high accessibility – at the same level as the other ‘green sites’ identified in the Draft Plan.
• The site is in lower performing Green Belt than other ‘green sites’ in the plan.
• The site has existing defensible Green Belt boundaries which can be strengthened.
• The site has no constraints within the development area which cannot be mitigated in the normal way.
• The site has the same landscape character as other ‘green sites’.
• It is not, therefore, credible for Site 544 to be categorised as a ‘red’ site.
• For this reason, we consider the score for Site 544 should be corrected and the Council should re-visit their assessments from first principles.
As is evidenced from the corrected SHELAA commentary the site is rated as a Category 1 – Deliverable Site. Such sites are deemed to be available now, offer a suitable location for housing now and there is a reasonable prospect that housing will be delivered on site within 5 years from the date of adoption of the plan.

Object

Solihull Local Plan (Draft Submission) 2020

Policy P5 – Provision of Land for Housing

Representation ID: 15069

Received: 14/12/2020

Respondent: Barratt David Wilson Homes - Land south of Broad Lane

Agent: Barton Willmore Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Housing Need evidence in 2020 HEDNA:
- PPG state that SM only minimum
- Expected growth at UKC Hub meets criteria in PPG to increase SM
- HEDNA state 13,000 jobs at UKC Hub, over 10,000 Experian baseline
- HEDNA assume only 25% of jobs occupied by Solihull residents.
- Barton Willmore carried out own analysis at 0.93 and 0.98 commuting ratios
- Demographic modelling shows that between 1,036 and 1,248 dpa are required to support the UK Central Hub scenario
- HEDNA identifies acute affordable housing need in Borough, BW analysis conclude HEDNA housing need should increase to meet this component of need.

Change suggested by respondent:

• Review of demand and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible

Full text:

Introduction
Paragraph 18 sets out that the site allocations from the Solihull Local Plan (December 2013) will be brought forward. We consider that the automatic allocation of these sites which have been allocated for a number of years, without any justification as to their deliverability, is an incorrect approach. We address this in more detail under our comments in respect of Policy 4.
Finally, Paragraph 21 refers to neighbourhood plans and the importance SMBC places on these. Paragraph 30 of the National Planning Policy Framework (NPPF) sets the most recently adopted policies will take precedence. SMBC may wish to set this out within this section, to make it clear that the LPR will take precedence upon adoption over any currently adopted Neighbourhood Plans.
Soundness – The Plan is not:
- Justified
Change Sought:
- Existing allocations should be tested for deliverability prior to re-allocation
- The hierarchy of neighbourhood plans should be made clear
Vision
Given that paragraph 59 of the NPPF states that the Government’s objective is to significantly boost the supply of housing, the wording relating to meeting the needs of the housing market area should be more positively worded.
Paragraph 50 sets out that SMBC are seeking to protect the integrity of the Green Belt. Wording should be included setting out that lower performing parcels could be released to protect higher performing parcels while meeting identified and evidenced needs.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- The vision should be more positively worded in order to significantly boost the supply of housing
- The need to release lower performing green belt to meet identified needs, and preserve higher performing parcels, should be set out
Providing Homes for All
Policy P4C Meeting Housing Needs – Market Housing
We object to the inflexible market housing mix which is prescribed within this policy. The NPPF encourages provision of balanced and mixed communities catering for a wide range of the population.
Individual sites should cater for a wide range of housing types and sizes. Provision of such a significant proportion of only smaller (3 bed or fewer) dwellings on sites will not develop long term sustainable communities. Instead it will result in a transient community where people will not be able to form long term neighbourhoods as they will need to move on as their circumstances change if there are insufficient homes of the right size on a site to accommodate them. We do not consider that this represents good planning and consider that the focus should be on building strong healthy communities which can cater for all, rather than simply planning for short term ownership.
The inclusion of a prescribed housing mix runs counter to the criterion elsewhere within the policy which allow a number of factors to be taken into consideration. This plan has a significant lifespan and to prescribe a housing market mix which is to remain in place for the whole of plan period does not provide sufficient flexibility for adaptation to current housing need and demand. We have seen with the current pandemic the way external factors can influence people’s choice of lifestyle.
Soundness – The Plan is not:
• Justified
• Effective
Change Sought:
• Amendment of policy to allow for housing mix based on up to date market evidence
Policy P4D Meeting Housing Needs – Self and Custom Housebuilding
The latest Annual Monitoring Report (March 2020), covering the period 2018/19, sets out that for the period November 2018 – October 2019 there were 374 entries on the Self-build register.
As such, requiring all sites of over 100 houses to provide 5% of open market dwellings in the form of self-build plots is unreasonable and unjustified. Given provision is being made for 7,605 houses through allocations above 100 houses and the UK Central Hub area, this would equate to the 761 self and custom build plots to be provided from the draft allocations.
The Planning Practice Guidance (PPG) advises that the Council should engage with landowners who own sites that are suitable for housing and ‘encourage’ them to consider self-build and custom housing and who are interested in provision. Imposition of mandatory requirement goes beyond encouragement.
Following the example of Stratford District for example, the Council have specifically identified custom build sites which are discreet standalone small sites.
We also include extracts from the Bedford Local Plan Inspector’s Report (Appendix 4) where the Inspector recommended deletion the policy akin to that being proposed here as the policy was not justified with reference to the self-build register. The same principle applies here in that the amount being sought is over double that on the register.
Soundness – The Plan is not:
• Justified
• Consistent with national policy
Change Sought:
• Deletion of specific policy requirement and replacement with specific allocations or general support for self-build sites
Policy P5 Provision of Land for Housing
Policy P5 sets out the Council will allocate sufficient land for at least 5,270 net additional homes to ensure sufficient housing supply to deliver 15,017 additional homes in the plan period. This would result in an average annual housing land provision target of 938 net additional homes per year. This annualised target is made up of a stepped requirement with 851 homes per year delivered between 2020-2026 and 991 dwellings delivered between 2026-2036.
Demand
A Housing Need Technical Report has been provided (December 2020) (Appendix 5) and should be read in conjunction with our commentary on Policy P5. In summary, this Note makes the following key points:
• Planning Practice Guidance (PPG) states the Standard Method (SM) figure represents the minimum housing need, and there may be circumstances whereby need is higher;
• The Draft Plan identifies the clear economic growth aspirations for the Borough, including the nationally significant growth planned for the UK Central Hub. This is a circumstance where housing need may exceed the minimum need. If it does, housing delivery must be of a quantum to support these aspirations;
• The Council’s 2020 HEDNA confirms that the calculation of housing need is underpinned by the growth at the UK Central Hub. The Hub is projected to generate an additional 13,000 jobs to the baseline Experian job growth forecast (10,000 jobs) included in the HEDNA;
• The HEDNA tests several economic-led housing need scenarios. However, the UK Hub Scenario assumes only 25% of the additional 13,000 jobs created by the Hub are to be taken up by Solihull residents. This results in the housing need (816 dpa) underpinning the Plan;
• However, this ignores the ‘Growth A’ scenario which concludes that 908 dpa would be required based on the ‘Adjusted Local Growth’ scenario. This scenario assumes that strong industries in Solihull will outperform the baseline Experian forecast, resulting in an additional 5,680 jobs to the baseline (10,000 jobs) over the Plan period, with Solihull residents taking up these jobs;
• However, no scenario is presented to show what the housing need would be based on the UK Central Hub scenario being fulfilled in full by Solihull residents. It is important to understand this so that the duty to cooperate discussions referred to in the HEDNA are well informed;
Barton Willmore provide these sensitivity scenarios based on two approaches to commuting, and two approaches to underlying demographic rates (mortality, fertility, and migration);
• The results of our testing are summarised in Table 7.1:
Table 7.1: Solihull Borough – Barton Willmore Demographic Forecasting 2020-2036 Scenario Demographic rates Jobs per annum 2020-2036 Dwellings per annum 2020-2036
Dwelling-constrained:
Standard Method
2016 ONS rates
7721 – 8132
807
2018 ONS rates
1,0141 – 1,0682
Employment-constrained:
UK Central Hub
2016 ONS rates
1,437
1,1991 – 1,2482
2018 ONS rates
1,0361 – 1,0852
Source: Barton Willmore Development Economics
1 Commuting Ratio 0.98
2 Commuting Ratio 0.93
• Growth of between 1,036 and 1,248 dpa would be required to support the UK Central Hub scenario (between 16,576 and 19,968 dwellings in total);
• This represents an increase of between 220 dpa and 432 dpa on the housing need calculated by the HEDNA (816 dpa), or an additional 3,520 to 6,912 dwellings over the Plan period;
• Our analysis of historic levels of job growth in Solihull 1991-2019 shows a range of 1,225 and 1,650 jobs per annum (jpa). This highlights that the UK Central Hub scenario (1,437 jpa) is a realistic assumption;
• The HEDNA identifies an ‘acute’ situation in respect of affordable housing need. Our analysis suggests that the HEDNA’s conclusion on overall need (816 dpa) should be increased to meet as much affordable need as possible.
• Furthermore, our analysis of unmet need in the wider GBBCHMA suggests that the 2020 Position Statement’s conclusions under-estimate the remaining unmet housing need from Birmingham up to 2031, and for Birmingham alone the deficit in unmet need is between 11,294 and 13,101 dwellings up to 2031;
• In addition, there is significant unmet need up to 2031 based on the existing Standard Method coming from Birmingham City and the Black Country. This amounts to unmet need of between 25,543 and 27,350 dwellings up to 2031. If we were to assume the increased capacity for Birmingham City (65,400 dwellings 2011-2031) set out in the 2020 Position Statement the unmet need would still be between 11,243 and 13,050 dwellings up to 2031. This increases significantly based on the uncapped Standard Method figure for Birmingham City which would come into effect once Birmingham’s Local Plan becomes older than 5 years in 14 months’ time;
Adoption of the proposed changes to Standard Method consulted on by Government in summer 2020 would lead to there being unmet need against emerging/existing housing requirements in all but one of the GBBCHMA authorities;
• Furthermore, the unmet need post 2031 should be considered, as referenced to in the 2020 Position Statement. Based on data available at the present time and the most recent Local Plan figures, Barton Willmore calculate this to be a minimum 17,700 dwellings 2031-2040.
• In summary, the analysis in this report results in the following broad conclusions:
1. The SM’s minimum need for Solihull (807 dpa) will need to be increased to account for expected job growth from the UK Central Hub and the ‘acute’ need for affordable housing in the Borough;
2. Barton Willmore’s demographic modelling shows that between 1,036 and 1,248 dpa are required to support the UK Central Hub scenario;
3. Barton Willmore’s calculations suggest that the deficit in unmet housing need from Birmingham City being delivered by HMA Local Plans amounts to a minimum of between 11,294 and 13,101 dwellings up to 2031, a significant increase from the 2,597 dwellings concluded on by the 2020 Position Statement. This increases when the unmet need from the Black Country is considered. Additional unmet need will be created post 2031.
As such, in order to ensure the LPR is positively prepared, SMBC should seek to plan for more housing, and should allocate further sites.
SUPPLY
Further to the above, and as set out above, we also consider that some elements of the supply should be reviewed:
Dealing with the supply side of the equation, we make the following objections to the various components of supply:
‘Sites identified in land availability assessments’
It is unclear what is meant by ‘sites identified in land availability assessments’. Given these are sites which do not benefit from a draft allocation, then they are by definition, windfall sites which means that there is double counting from unknown sources of supply.
Solihull Local Plan sites
We question the automatic inclusion of Solihull Local Plan sites which have yet to be granted planning permission. The current Plan was adopted in 2013 and the Council cannot currently demonstrate a 5-year supply of housing. In this situation, the Council should be encouraging every suitable site to come forward. The fact that these sites have not come forward despite the housing shortfall, suggests that these should not be considered ‘deliverable’ housing sites without significant justification as to why they will now come forward when they have not to date.
Brownfield Land Register (BLR)
We query the separate identification of sites identified in the BLR – this BLR is subject to periodic review and thus will not be fixed as a permanent source of supply. We consider that any sites to be delivered in this way should be considered as windfall developments.
Lapse Rates
Whilst we support the use of a 10% lapse rates, it needs to be applied across the board i.e. it is equally application in relation to what is to come as to what has already gone before. If the Council accept that a 10% lapse rate is application to sites which already benefit from planning permission, then surely it should also accept that it is applicable to future planning consents which have yet to be granted.
Windfall allowance
The windfall allowance is justified by reference to past windfall rates however it fails to recognise that ‘ town centre sites’ (a traditional source of windfall supply) are allocated in the plan through the town centre masterplan and the Council have identified other sources of supply through the brownfield register. In the absence of any assessment / analysis of this component demonstrating the projected level of future windfall provision taking these factors in account, we consider that the level of windfall should be reviewed and adjusted accordingly.
UK Central Hub
We consider that given the scale of the UK Central Hub proposals, the rate of delivery assumed by the Council is overly optimistic. The Council have not provided any trajectory for the Site, and we note that the August 2020 consultation did not contain any firm commitments to delivery timescales or set out any delivery partners.
This assertion is supposed by the findings of the Lichfields’ Report1 that sets out the average time from outline planning application to the first delivery of homes is 8.4 years. The average build out rate is 160dpa.
As such, taking this into account, and based on a LPR adoption date of 20222, we consider the first completions will likely be C.2030. With an average build out rate of 160dpa, this means that approximately 960 dwellings will be delivered during the Plan Period, assuming that the housing is within the first delivery phases (the August 2020 consultation referenced a mix of uses coming forward). While more outlets may increase the speed of delivery, the amount of infrastructure required also needs to be taken into account. The type of supply also needs to be considered, with UK Central Hub likely to be geared towards apartments.
As such, we consider that 1,780 houses should be removed to take into account the likely delivery timescales.
Trajectory
We also note that SMBC are seeking to provide a stepped trajectory as some of the larger sites will not make a significant contribution to completions until the mid-delivery phase. The Inspector assessing the Guildford Local Plan set out:
39. In the submitted plan, the combined effect of the stepped trajectory in Policy S2 together with the “Liverpool” methodology (in which the delivery shortfall accumulated over the first 4 years of the plan (2015/16 to 2018/19) is spread over the whole plan period), would have deferred a significant proportion of the housing requirement to the later years of the plan. Set against the (then higher) housing requirement, this would not have met the Government’s objective to boost the supply of housing in the shorter term. (our emphasis)
We consider that SMBC should take the same approach as Guildford and allocate further sites to meet need early in the Plan Period. The existence of the UK Central Hub is not of a sufficient size to warrant a different approach (i.e. it is not akin to a new settlement).
Further, as with the withdrawn Uttlesford Local Plan, this stepped trajectory may create a fragile 5 year housing land supply position, taking into account the ambitious delivery targets of the UK Central Hub and the delivery concerns relating to the draft allocations set out below. The Inspectors’ letter relating to the withdrawn plan states:
29. This calculation relies on the use of a reduced annual requirement of 568 dpa for most of the years, as it is based on the stepped trajectory set out in Policy SP3. It is also based on what we consider to be unrealistic commencement/housing delivery dates for two of the Garden Communities (North Uttlesford and Easton Park, as set out above). So, whilst the Council can, in theory, demonstrate a 5.65 year HLS, we are concerned that if the housing delivery at North Uttlesford and Easton Park slips by just one year, as seems very likely, this would result in 100 less dwellings in this 5 year period. This would result in a very fragile 5 year HLS position.
There are comparisons that can be drawn here based on the stepped trajectory and the anticipated 5.37 year supply upon adoption.
The Inspectors for the withdrawn Uttlesford Local Plan also referenced the need to meet the full objectively assessed need for market and affordable housing in the housing market area (NPPF Paragraph 47). The HEDNA states there is a ‘clearly acute’ shortage of affordable housing. The proposed stepped trajectory therefore may worsen the affordability problem as it would delay the provision of housing until late years of the plan period.
Taking the above into account, we consider that the SMBC’s supply is actually 11,496 (rounded) before any reduction in windfall or the deletion of draft allocations which are unlikely to be delivered is taken into account.
This is a reduction of 3,521 and, as such, to meet the increased demand set out above, and take into account the concerns relating to a stepped trajectory, a review of the supply is required and additional sites allocated.
The Council should also ensure that a large number of these sites can be delivered early on in the Plan Period in order to take account of the likely later delivery of some other sites.
Soundness – The Plan is not:
• Positively prepared
• Justified
• Effective
• Consistent with national policy
Change Sought:
• Review of demand and amendment to the strategy
• Review of supply and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible
Improving Accessibility and Encouraging Sustainable Travel
Policy P7 Accessibility and Ease of Access
We consider that the requirement for major residential development should be clarified to set out that there may be other ways in which sustainable access options can be implemented. The distance to a bus stop/train station should not be seen as the only measure of sustainable access.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- Policy should be clarified that there are other ways of ensuring sustainable transport options are available
Policy P8 Managing Travel Demand and Reducing Congestion
Paragraph 109 of the NPPF states that development should only be prevented or refused on highway grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. Within point 2(ii), SMBC are seeking to bring in a further test which would not be in accordance with the NPPF. This should therefore be deleted.
Soundness – The Plan is not:
• Consistent with national policy
Change Sought:
• Point 2(ii) should be deleted
Protecting and Enhancing our Environment
Policy P11 Water and Flood Risk Management
With regards to point 6, the confirmation of discharge into a public sewer falls under Section 106 of the Water Industry Act 1991. As such, it should be made clear that planning permission can be granted prior to this being confirmed, as it falls within a different regulatory regime.
With regards to point 14, it should be clarified that contribution through a Section 106 Agreement is only required where it meets the tests set out in NPPF Paragraph 56.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Deletion of point relating to confirmation from relevant infrastructure owner
• Clarification as to obligation requirements and the necessary tests
Promoting Quality of Place
Policy P17 Countryside and Green Belt
Within Point 1 of the policy, SMBC is seeking to safeguard best and most versatile agricultural land (BMVAL) unless there is an overriding need for development that outweighs the loss. BMVAL is referenced within the NPPF at Paragraph 170 which states that planning policies should contribute to and enhance the natural and local environment by taking into account a number of criteria. One of these is:
b) recognising the intrinsic character and beauty of the countryside, and the wider benefits from natural capital and ecosystem services – including the economic and other benefits of the best and most versatile agricultural land, and of trees and woodland.
Firstly, we consider that including reference to BMVAL within a policy relating to Green Belt seeks to conflate two separate issues. Further, as can be seen above, the test set out by the NPPF does not require the safeguarding of BMVAL. Planning policies are required to contribute to and enhance natural and local environment by recognising economic and other benefits from BMVAL. As such, we consider this point should be deleted.
SMBC have set out, within Point 4, a number of different factors that may be taken into account when considering very special circumstances.
Further to this, point 5 sets out that development that is ‘conspicuous’ from the Green Belt must not harm the visual amenity of the Green Belt by reason of siting, materials or design. Given Green Belt is a spatial designation, designed to prevent sprawl, we consider that this requirement goes beyond the scope of the Green Belt, as set out in the NPPF. The LPR contains policies relating to protecting landscape, where necessary, and as such, this point should be deleted.
Soundness – The Plan is not:
• Positively prepared
• Consistent with National Policy
Change Sought:
• Deletion of point 1
• Inclusion of further factors which may create very special circumstances
• Deletion of point 5
Policy P17A Green Belt Compensation
Paragraph 138 of the NPPF sets out that ways in which the impact of removing land from the Green Belt can be offset through compensatory improvements to the environmental quality and accessibility of remaining Green Belt Land.
Policy P17 is seeking to require this by requiring development on sites removed from the Green Belt to provide appropriate compensatory improvements to environmental quality and accessibility of remaining Green Belt in the form of a Section 106 Agreement utilising the below hierarchy:
1. Compensatory requirements as set out as part of the Local Plan masterplans
2. Where no compensation has been set out within the Local Plan masterplan, improvements are provided as:
i. Improvements within the Green Belt adjacent to, or in close proximity to, the development site;
ii. Improvements within the Green Belt adjacent to, or in close proximity to, the settlement or area accommodating the development;
iii. Improvements within the Green Belt in an area identified for environmental improvements as part of the Council’s Green Infrastructure Opportunity Mapping.
3. In the event it is robustly demonstrated that none of the above options can be satisfied then the Council will accept a commuted sum.
Given none of the emerging masterplans show any compensatory improvements within the Green Belt, it would appear that the Policy is relying on there being additional land being available within the control of applicants (which may not be the case), or the payment of contributions.
SMBC’s viability evidence does not take this requirement into account, and no detail is provided as to how these contributions will be spent or what level of contribution is required. This therefore brings uncertainty, and the Policy should be reconsidered to ensure what is required is clear, and that it will not impact upon the viability of schemes.
Soundness – The Plan is not:
• Consistent with National Policy
Change Sought:
• Reconsideration of the policy to ensure that it is evidenced based, does not impact upon viability of schemes, and is in accordance with national policy
Delivery and Monitoring
Policy P21 Developer Contributions and Infrastructure Provision
Policy P21 expected major development to provide or contribute towards the provision of measures to directly mitigate its impact and physical, social, green and digital infrastructure.
SMBC’s viability testing does not take into account digital infrastructure within the testing and, as such, it should be evidenced that this will not render development unviable.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Confirmation that digital infrastructure provision allows for viable development
Settlement Chapters
Policy BC1 Barratt’s Farm, Balsall Common
We note that 1,756 new homes are proposed for Balsall Common across the plan period with the sole justification seemingly being that it contains both a primary and secondary school and has a full range of retail and associated facilities. However, it is still described as a rural settlement with no significant areas of employment and the distribution strategy remains one of “proportional distribution”. 1,756 dwellings to a single rural village would be completely disproportionate. There is discussion in the document regarding delivery of a by-pass; provision a station car park; improved public transport and a new primary school. However, there is no discussion as to how these are to be funded / delivered relative to the level of growth identified. In addition, there is discussion regarding the scope to enhance the existing local centre and the provision of a village centre masterplan. However, this land is in multiple ownerships and there are no proposals for what these enhancements could entail or how they could function – particularly with a by-pass in place which could actually draw trade away from the existing centre.
There is no assessment of the ability of Balsall Common to deliver this level of growth in such a small area. Whilst clearly some sites (i.e. Barratts Farm) will be able to have multiple outlets, the ability of the market to absorb and deliver multiple sites at any one time in a rural location should be reviewed; particular when Balsall Common will be acutely affected by HS2 – both in terms of the physical construction of the line and the disruption and uncertainty that this will bring; but also in terms of market desirability until such time as the line is constructed.
We also note that Barratts Farm is in multiple ownerships and these are described as “complex” in paragraph 541. This is the single largest site and the one which is proposed to deliver the by-pass. Within the previous draft of the Plan, it was stated that this site would only be taken forward if the landowners / promoters could demonstrate they are working on a collaborate and comprehensive basis. Reading paragraph 541, this collaborate working has clearly not been secured in the way it was envisaged and nothing additional is suggested to demonstrate that joint / collaborative working is possible.
The relief road is identified as being necessary for Barratts Farm in particular with the policy advising that is required early in the plan period. The road is provisionally to be funded via CIL payments; and grant funding which “may” be possible through the WMCA. Firstly, CIL payments can only be secured through those sites which will come forward in the future however these sites are Green Belt sites and cannot therefore be delivered until the Local Plan Review is completed and the subsequent CIL schedule is adopted. Secondly, there is no grant funding proposal in place to fund the road. As it currently stands this road is not deliverable. The road is required to be delivered early in the plan period i.e. before there are significant CIL funds in place and, potentially, at a point where, in order to receive grant funding, applications should be being made now / near future.
There has to be serious doubt over the ability of Barratts Farm to be delivered within the anticipated timeframes and therefore places serous doubt over the plan as a whole given the scale of this allocation.
The Sustainability Appraisal notes that there are limited employment opportunities within Balsall Common and that people travel outside of the settlement to work. As such, it is noted that the expansion of this settlement would fly in the face of sustainability objectives of reducing the need to travel to areas of employment. Whilst such a case could be made for the majority of the rural areas of the Borough, it is heightened especially here when such a large proportion of future growth is identified for one rural settlement.
At this stage, the level of growth attributed to Balsall Common is disproportionate and that inadequate research has been undertaken into the deliverability of this level of growth and the associated aspirations; and the ability of the market to deliver this level of growth in a rural area is considered to be unrealistic.
On the basis that we do not consider the sites identified to be deliverable and the significant shortfall in supply identified by the more realistic timescales we have identified for UK Central, we propose an alternative site – Land at Hawkshurst (Site 544) as an alternative to meeting part of this need. To date this site has been inappropriately assessment by the Council and a more appropriate evaluation of the site is given in the section below.
Policy BL1 – West of Dickens Heath
The policy requires that the proposal for BL1 secures the relocation of the existing sports provision to a suitable site in the local vicinity. Until such time as these facilities are relocated or a plan is in place to secure timely relocation (which should include the grant of planning permission in our view, given that any site will be in the Green Belt), then the site cannot come forward for development. Our key concern here relates to Site 4 (West of Dickens Heath). It is noted that the identification of a Local Wildlife Site within the site hampers re-provision within the site itself and therefore alternative options will need to be pursued outside of the site. We consider that these alternatives should be considered now as clearly, as it currently stands, the pitches will be lost with no alternative in place (and therefore no guarantee of any re-provision). This is all the more important given that the land in the area is all located within the Green Belt and therefore any proposals which may, for example, include floodlighting, will have to be carefully considered against the Green Belt ‘tests’. We understand that the loss of these facilities is causing significant local concern particularly with no proposals for replacement.
The Council have had ample time to identify and secure alternative provision and therefore the fact that this is not identified within the plan, suggests that there are currently no alternative sites. This calls into question the delivery of this site and with no evidence and no proposals in place, we consider that proposal BL1 should be deleted from the plan.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Policy KN1 Hampton Road, Knowle
As with the Site West of Dickens Heath, this draft allocation requires the reprovision of sports pitches. In this instance, the re-provided pitches are currently shown within the Green Belt to the north of the allocation.
The Council, within Paragraphs 713-715 state that it’s likely that very special circumstances will exist to support development in this location and, as such, the reprovision will likely be acceptable. However, this pre-judges any application, for which the detail is not known, and as such cannot be relied upon. Therefore the housing that would be provided on the sports pitches should not be included until the reprovision of the sports pitches is secured.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Site Assessment Criteria
We consider that a more dispersed growth option should be considered and, as set out previously, consider that the land at Broad Lane, Hawkshurst (Site 544) is ideally suited to make an important contribution to the Council’s housing need. Following the Council’s own site selection criteria, we set out why this site is a suitable and deliverable alternative site which can be delivered utilising existing infrastructure:
We object strongly to the manner in which Site 544 has been assessed in the site selection process for the reasons which are set out below – and on that basis, object to the inconsistent application of the methodology.
Firstly, in assessing Site 544, the Council deemed that the site did not pass ‘Step 1’ – which is the initial, high-level sieving process. Sites which are not taken forward at this stage are then not subject to the more refined ‘Step 2’ analysis. We consider the manner in which the process was applied is fundamentally flawed and have carried out our own assessment (using the Council’s own analysis) to demonstrate that the site should not have been discounted at Step 1 and should have been included in Step 2.
STEP 1
The first stage in the sieving process is a high-level look at the following:
(i) Brownfield vs greenfield
(ii) Urban areas vs Green Belt
(iii) Accessibility
Sites can be rated from Priority 1 (brownfield in urban area or settlement) to Priority 10 (greenfield in isolated highly performing Green Belt location). A traffic light rating is then applied – sites which falls within Priority 1 to Priority 4 are green sites; Priority 5 sites are yellow; Priority 6, 6b and 7 sites are blue; and Priority 8, 9 and 10 sites are red. Red sites fail Step 1 and are not taken forward to Step 2 for assessment. Site 544 was incorrectly identified as a Priority 9 red site and was not therefore taken forward to Step 2.
In summary, Site 544 is a greenfield and Green Belt site. However, it is accessible (being on the edge of the Coventry urban area) and also within an area with a low GB score of 5. Therefore, it should be allocated a Priority score of no higher than 5 (yellow). We review below the manner in which this initial sieving assessment was flawed - taking Site 544 step by step through the same assessment process as the Council.
Green Belt
In the Green Belt Assessment 2016, Site 544 is identified as part of Refined Parcel RP83:5 which has a combined score of 5, within a range from the highest performing Green Belt sites (12) to the lowest performing sites, scoring as low as 0. With a score of 5, site 544 is clearly a lower performing site. The starting point for consideration as a Priority 5 site is a score of 5 or lower in the Green Belt––Site 544 falls into that category. The results of this assessment are backed up by our own Green Belt assessment which is included with this submission.
Accessibility
The second part of the criteria relates to accessibility and to achieve a Priority 5 ranking, the site is required to be in an accessible location. This is defined as:
(a) On the edge of the urban area or
(b) On the edge of a settlement which has a wide range of services and facilities including a primary school and a range of retail facilities.
Site 544 adjoins the urban edge of Coventry – indeed in the Council’s Site Assessment, the site is identified as possibly being an extension to Coventry.
It should be noted that in relation to the Publication Draft Plan, the Council have updated the Accessibility Study to take account of retail / surgery provision in adjoining LPA areas, however they have then not used this information to re-visit first principles and determine whether sites have been appropriately assessed from the start. Therefore, whilst this site now scores more positively, its ‘priority 9’ status has not been re-evaluated despite an Addendum to the Site Assessments being produced and the Accessibility Study being revisited. It appears that despite the site being on the urban edge of Coventry this has been discounted due to the sites geographical relationship with Coventry as opposed to Solihull. However, accessibility should be based upon spatial location rather than boundaries. The fact that the retail offer is in Coventry will not prevent residents of Hawkshurst using it.
For the absolute avoidance of doubt therefore, we enclose our own submission produced by Phil Jones Associates which demonstrates that the site is in a suitable and sustainable location.
It is fundamentally incorrect for Site 544 to have been ‘sieved out’ at Step 1. The site should have been correctly assessed as a Priority 5 yellow site as it meets the two necessary criteria. The site, therefore, should have been taken forward for a more detailed analysis in Step 2.
On the basis that the site does pass Step 1 – we have carried out the Step 2 assessment using the same table and criteria as the Council. There are no scorings or weightings attributed to the Step 2 analysis – it assessed on a qualitative basis.
STEP 2 – REFINEMENT CRITERIA
FACTORS IN FAVOUR
In accordance with the spatial strategy
(including only proportional additions to lower order settlements (i.e. those without a secondary school or not located close to the urban edge).
The preferred spatial strategy would be to locate development needs close to where they arise. However the Plan identifies that there is limited land available to achieve this and therefore the Council has had to look at alternative options, which includes land released from the Green Belt in the form of urban extensions and also followed a more dispersed strategy for development. They have sought to focus development in locations that are, or can be made, accessible and sustainable. Such locations are identified as typically being on the edge of urban areas (or within ruralsettlements) that have a greater range of services. Potential locations for development include adjoining the urban edge or a highly accessible settlement. This will have the benefit of focusing on urban areas and sustainable urban extensions to provide the best opportunity for achieving accessibility and delivering public transport improvements.
It is abundantly clear that geographically Site 544 adjoins the urban edge of Coventry – Coventry is the second largest City in the West Midlands, after Birmingham. Site 544, as confirmed in the SHELAA assessment, would be viewed as an urban extension to Coventry and there is, therefore, no doubt that Site 544 is in accordance with the Spatial Strategy, which seeks to locate development in the most accessible locations. Coventry is clearly such a location and there is nothing within the Spatial Strategy which would rule against this.
Therefore, it can only be concluded that the development of Site 544 would be in accordance with the Spatial Strategy.
Any hard constraints only affect a small proportion of the site and/or can be mitigated.
The SHELAA does not identify any hard constraints – we concur with this assessment.
The site would not breach a strong defensible boundary to the Green Belt.
There are no strong existing defensible Green Belt boundaries that would be breached. The existing boundaries to Bannerbrook Park comprise simply hedgerows, some of which were planted in conjunction with the existing development. The same form of boundary treatment can therefore be replicated on this site and indeed is proposed within the masterplan included with this submission.
Any identified wider planning gain over and above that which would normally be expected.
Following discussions with local undertakers regarding the lack of burial space available within the Borough, the landowners are willing to offer land for a multi faith burial space which will provide a much needed facility for the Borough and also secure the long term permanence of the Green Belt boundary in this location.
Sites that would use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
See above.
If finer grain accessibility analysis (including output from the Accessibility Study) shows the site (or the part to be included) is accessible.
The Accessibility Study is flawed when it comes to assessment of sites on the Solihull / Coventry boundary. The Study provides a scoring for accessibility for facilities within 1,200m of a site, however when assessing facilities beyond the administrative area of Solihull only facilities within 800m of the boundary are assessed, this is despite an updated assessment being provided in 2020 which proposed to apply some adjustment of standards and yet makes no sensible adjustment to standards for cross boundary provision. Sites in such locations are not therefore being assessed on a comparable basis. Furthermore, the assessment is only being undertaken of walking distances and makes no allowance for accessing facilities by bike. The document references ‘shared cycle’ routes but then makes no consideration of people actually using them for cycling. Clearly were cycling to be factored in, especially for those sites, which adjoin major settlements and therefore have access to a good cycleway network (such as Site 544) then their accessibility criteria would be much improved.
Whilst it is noted that some provision is now taken off cross boundary retail provision and public transport which has moved Site 544 to a higher scoring position; it is still not being assessed on a comparable basis.
There is a shared footway/cycleway through the Bannerbrook Park development which can be extended into Site 544. Furthermore, opportunities will be considered to accommodate a bus route through Site 544 and on through Bannerbrook Park.
It is therefore clear that the proposal can only be defined as being in an ‘accessible location’.
FACTORS AGAINST
Not in accordance with the Spatial Strategy
As set out above, the development of this site is in accordance with the Spatial Strategy
Overriding hard constraints that cannot be mitigated.
There are no hard constraints identified.
SHELAA Category 3 sites unless demonstrated that concerns can be overcome.
The site is not identified as a Category 3 site in the SHELAA. We make comments below in respect of the flaws of SHELAA assessment and carry out our own assessment.
Sites that would not use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
As already confirmed, the site uses existing defensible boundaries and proposes to strengthen the defensible boundary and strengthen existing hedgerow planting.
If finer grain analysis shows the site (or the part to be included) is not accessible.
As previously confirmed, the Council have failed to consider the proximity of services in Coventry on a fair basis and because of this, it is not possible to determine how detailed the assessment has been. However, given that the site adjoins a major urban area is it simply not feasible to draw a conclusion that the site is inaccessible.
If the site is in a landscape character area that has a very low landscape capacity rating.
It is wholly unreasonable if the Council have used this criterion to discount this site. According to the Council’s Landscape Character Study (December 2016) this site falls within Landscape Character Area (LCA) 26 – which covers the eastern fringe of the Borough – yet significant Green Belt release is proposed in other areas of the Borough which are in an identical LCA. With one blanket ‘very low’ landscape capacity conclusion for such wide areas it cannot be used to discount some sites and not others – there must be parity in assessment. Furthermore, the study itself (page 49 – text adjoining Table 24) confirmed that it is not possible to establish a baseline sensitivity to change without having details of a given development proposal and therefore the conclusions should be taken as a guide only. On this basis, we do not consider it appropriate to use this criterion as a basis to discount sites given sites with the same assessment have been given a ‘green’ score’.
We enclose with this submission our own detailed, site specific, landscape and visual appraisal which confirms that the site has the ability to accommodate development of scale which is comparable to the surrounding area without compromising the function of the surrounding Green Belt.
If the SA appraisal identifies significant harmful impacts.
The SA identified 2 harmful impacts:
(i) The site contains over 20ha of Grade 1 – 3 agricultural land.
The site is wholly Grade 3 agricultural land – clearly within Grade 3, the site could in fact be Grade 3b land which would mean it is not BMVL. Furthermore, the Regional ALC mapping, which was last updated in November 2018, shows this to be the prevailing land type across the Borough which is not unsurprising. As a result, a number of proposed allocated sites have the same classification. It is not therefore appropriate to identify this as a harmful impact when a consistent approach has not been applied across the board.
(ii) The distance to jobs is identified as 8km within the SA
This is clearly incorrect as the SA treats the administrative boundary between Coventry and Solihull as a line which people will not cross. This is clearly incorrect. As already stated, there is for example a good bus connection to Warwick University which is a key local employer as well as Coventry city centre which offers multiple employment opportunities. The SA has applied the same approach to all services and facilities – relating its conclusions only to Solihull Borough and thus the distances to shops / schooling / healthcare are distorted. In addition, we highlight that this is a specific issue related to Balsall Common also (which is also further away from Coventry) and yet the Council has seen fit to allocate in excess of 1,700 dwellings in Balsall Common.
In summary:
• The site has medium / high accessibility – at the same level as the other ‘green sites’ identified in the Draft Plan.
• The site is in lower performing Green Belt than other ‘green sites’ in the plan.
• The site has existing defensible Green Belt boundaries which can be strengthened.
• The site has no constraints within the development area which cannot be mitigated in the normal way.
• The site has the same landscape character as other ‘green sites’.
• It is not, therefore, credible for Site 544 to be categorised as a ‘red’ site.
• For this reason, we consider the score for Site 544 should be corrected and the Council should re-visit their assessments from first principles.
As is evidenced from the corrected SHELAA commentary the site is rated as a Category 1 – Deliverable Site. Such sites are deemed to be available now, offer a suitable location for housing now and there is a reasonable prospect that housing will be delivered on site within 5 years from the date of adoption of the plan.

Object

Solihull Local Plan (Draft Submission) 2020

Policy P5 – Provision of Land for Housing

Representation ID: 15070

Received: 14/12/2020

Respondent: Barratt David Wilson Homes - Land south of Broad Lane

Agent: Barton Willmore Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

GBBCHMA Unmet Housing Need:
o Barton Willmore analysis of unmet need in wider GBCCHMA suggests that 2020 Position Statement’s conclusions under-estimate the remaining unmet housing need from Birmingham up to 2031; Birmingham’s deficit alone is between 11,924 – 13,101 dwellings up to 2031.
o Furthermore, if using the current standard methodology, then significant unmet need from Birmingham City and Black Country between 25,543 and 27,350 dwellings up to 2031.
o If we were to assume the increased capacity for Birmingham City (65,400 dwellings 2011-2031) set out in the 2020 Position Statement the unmet need would still be between 11,243 and 13,050 dwellings up to 2031.
- This increases significantly based on the uncapped Standard Method figure for Birmingham City which would come into effect in January 2022.
o Taking into consideration the proposed changes to Standard Method (consulted on by Government in summer 2020), this would lead to there being unmet need against emerging/existing housing requirements in all but one of the GBBCHMA authorities;
o Unmet need post 2031 should be considered, as referenced to in the 2020 Position Statement. Based on data available at the present time and the most recent Local Plan figures, Barton Willmore calculate this to be a minimum 17,700 dwellings 2031-2040.

Change suggested by respondent:

• Review of demand and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible

Full text:

Introduction
Paragraph 18 sets out that the site allocations from the Solihull Local Plan (December 2013) will be brought forward. We consider that the automatic allocation of these sites which have been allocated for a number of years, without any justification as to their deliverability, is an incorrect approach. We address this in more detail under our comments in respect of Policy 4.
Finally, Paragraph 21 refers to neighbourhood plans and the importance SMBC places on these. Paragraph 30 of the National Planning Policy Framework (NPPF) sets the most recently adopted policies will take precedence. SMBC may wish to set this out within this section, to make it clear that the LPR will take precedence upon adoption over any currently adopted Neighbourhood Plans.
Soundness – The Plan is not:
- Justified
Change Sought:
- Existing allocations should be tested for deliverability prior to re-allocation
- The hierarchy of neighbourhood plans should be made clear
Vision
Given that paragraph 59 of the NPPF states that the Government’s objective is to significantly boost the supply of housing, the wording relating to meeting the needs of the housing market area should be more positively worded.
Paragraph 50 sets out that SMBC are seeking to protect the integrity of the Green Belt. Wording should be included setting out that lower performing parcels could be released to protect higher performing parcels while meeting identified and evidenced needs.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- The vision should be more positively worded in order to significantly boost the supply of housing
- The need to release lower performing green belt to meet identified needs, and preserve higher performing parcels, should be set out
Providing Homes for All
Policy P4C Meeting Housing Needs – Market Housing
We object to the inflexible market housing mix which is prescribed within this policy. The NPPF encourages provision of balanced and mixed communities catering for a wide range of the population.
Individual sites should cater for a wide range of housing types and sizes. Provision of such a significant proportion of only smaller (3 bed or fewer) dwellings on sites will not develop long term sustainable communities. Instead it will result in a transient community where people will not be able to form long term neighbourhoods as they will need to move on as their circumstances change if there are insufficient homes of the right size on a site to accommodate them. We do not consider that this represents good planning and consider that the focus should be on building strong healthy communities which can cater for all, rather than simply planning for short term ownership.
The inclusion of a prescribed housing mix runs counter to the criterion elsewhere within the policy which allow a number of factors to be taken into consideration. This plan has a significant lifespan and to prescribe a housing market mix which is to remain in place for the whole of plan period does not provide sufficient flexibility for adaptation to current housing need and demand. We have seen with the current pandemic the way external factors can influence people’s choice of lifestyle.
Soundness – The Plan is not:
• Justified
• Effective
Change Sought:
• Amendment of policy to allow for housing mix based on up to date market evidence
Policy P4D Meeting Housing Needs – Self and Custom Housebuilding
The latest Annual Monitoring Report (March 2020), covering the period 2018/19, sets out that for the period November 2018 – October 2019 there were 374 entries on the Self-build register.
As such, requiring all sites of over 100 houses to provide 5% of open market dwellings in the form of self-build plots is unreasonable and unjustified. Given provision is being made for 7,605 houses through allocations above 100 houses and the UK Central Hub area, this would equate to the 761 self and custom build plots to be provided from the draft allocations.
The Planning Practice Guidance (PPG) advises that the Council should engage with landowners who own sites that are suitable for housing and ‘encourage’ them to consider self-build and custom housing and who are interested in provision. Imposition of mandatory requirement goes beyond encouragement.
Following the example of Stratford District for example, the Council have specifically identified custom build sites which are discreet standalone small sites.
We also include extracts from the Bedford Local Plan Inspector’s Report (Appendix 4) where the Inspector recommended deletion the policy akin to that being proposed here as the policy was not justified with reference to the self-build register. The same principle applies here in that the amount being sought is over double that on the register.
Soundness – The Plan is not:
• Justified
• Consistent with national policy
Change Sought:
• Deletion of specific policy requirement and replacement with specific allocations or general support for self-build sites
Policy P5 Provision of Land for Housing
Policy P5 sets out the Council will allocate sufficient land for at least 5,270 net additional homes to ensure sufficient housing supply to deliver 15,017 additional homes in the plan period. This would result in an average annual housing land provision target of 938 net additional homes per year. This annualised target is made up of a stepped requirement with 851 homes per year delivered between 2020-2026 and 991 dwellings delivered between 2026-2036.
Demand
A Housing Need Technical Report has been provided (December 2020) (Appendix 5) and should be read in conjunction with our commentary on Policy P5. In summary, this Note makes the following key points:
• Planning Practice Guidance (PPG) states the Standard Method (SM) figure represents the minimum housing need, and there may be circumstances whereby need is higher;
• The Draft Plan identifies the clear economic growth aspirations for the Borough, including the nationally significant growth planned for the UK Central Hub. This is a circumstance where housing need may exceed the minimum need. If it does, housing delivery must be of a quantum to support these aspirations;
• The Council’s 2020 HEDNA confirms that the calculation of housing need is underpinned by the growth at the UK Central Hub. The Hub is projected to generate an additional 13,000 jobs to the baseline Experian job growth forecast (10,000 jobs) included in the HEDNA;
• The HEDNA tests several economic-led housing need scenarios. However, the UK Hub Scenario assumes only 25% of the additional 13,000 jobs created by the Hub are to be taken up by Solihull residents. This results in the housing need (816 dpa) underpinning the Plan;
• However, this ignores the ‘Growth A’ scenario which concludes that 908 dpa would be required based on the ‘Adjusted Local Growth’ scenario. This scenario assumes that strong industries in Solihull will outperform the baseline Experian forecast, resulting in an additional 5,680 jobs to the baseline (10,000 jobs) over the Plan period, with Solihull residents taking up these jobs;
• However, no scenario is presented to show what the housing need would be based on the UK Central Hub scenario being fulfilled in full by Solihull residents. It is important to understand this so that the duty to cooperate discussions referred to in the HEDNA are well informed;
Barton Willmore provide these sensitivity scenarios based on two approaches to commuting, and two approaches to underlying demographic rates (mortality, fertility, and migration);
• The results of our testing are summarised in Table 7.1:
Table 7.1: Solihull Borough – Barton Willmore Demographic Forecasting 2020-2036 Scenario Demographic rates Jobs per annum 2020-2036 Dwellings per annum 2020-2036
Dwelling-constrained:
Standard Method
2016 ONS rates
7721 – 8132
807
2018 ONS rates
1,0141 – 1,0682
Employment-constrained:
UK Central Hub
2016 ONS rates
1,437
1,1991 – 1,2482
2018 ONS rates
1,0361 – 1,0852
Source: Barton Willmore Development Economics
1 Commuting Ratio 0.98
2 Commuting Ratio 0.93
• Growth of between 1,036 and 1,248 dpa would be required to support the UK Central Hub scenario (between 16,576 and 19,968 dwellings in total);
• This represents an increase of between 220 dpa and 432 dpa on the housing need calculated by the HEDNA (816 dpa), or an additional 3,520 to 6,912 dwellings over the Plan period;
• Our analysis of historic levels of job growth in Solihull 1991-2019 shows a range of 1,225 and 1,650 jobs per annum (jpa). This highlights that the UK Central Hub scenario (1,437 jpa) is a realistic assumption;
• The HEDNA identifies an ‘acute’ situation in respect of affordable housing need. Our analysis suggests that the HEDNA’s conclusion on overall need (816 dpa) should be increased to meet as much affordable need as possible.
• Furthermore, our analysis of unmet need in the wider GBBCHMA suggests that the 2020 Position Statement’s conclusions under-estimate the remaining unmet housing need from Birmingham up to 2031, and for Birmingham alone the deficit in unmet need is between 11,294 and 13,101 dwellings up to 2031;
• In addition, there is significant unmet need up to 2031 based on the existing Standard Method coming from Birmingham City and the Black Country. This amounts to unmet need of between 25,543 and 27,350 dwellings up to 2031. If we were to assume the increased capacity for Birmingham City (65,400 dwellings 2011-2031) set out in the 2020 Position Statement the unmet need would still be between 11,243 and 13,050 dwellings up to 2031. This increases significantly based on the uncapped Standard Method figure for Birmingham City which would come into effect once Birmingham’s Local Plan becomes older than 5 years in 14 months’ time;
Adoption of the proposed changes to Standard Method consulted on by Government in summer 2020 would lead to there being unmet need against emerging/existing housing requirements in all but one of the GBBCHMA authorities;
• Furthermore, the unmet need post 2031 should be considered, as referenced to in the 2020 Position Statement. Based on data available at the present time and the most recent Local Plan figures, Barton Willmore calculate this to be a minimum 17,700 dwellings 2031-2040.
• In summary, the analysis in this report results in the following broad conclusions:
1. The SM’s minimum need for Solihull (807 dpa) will need to be increased to account for expected job growth from the UK Central Hub and the ‘acute’ need for affordable housing in the Borough;
2. Barton Willmore’s demographic modelling shows that between 1,036 and 1,248 dpa are required to support the UK Central Hub scenario;
3. Barton Willmore’s calculations suggest that the deficit in unmet housing need from Birmingham City being delivered by HMA Local Plans amounts to a minimum of between 11,294 and 13,101 dwellings up to 2031, a significant increase from the 2,597 dwellings concluded on by the 2020 Position Statement. This increases when the unmet need from the Black Country is considered. Additional unmet need will be created post 2031.
As such, in order to ensure the LPR is positively prepared, SMBC should seek to plan for more housing, and should allocate further sites.
SUPPLY
Further to the above, and as set out above, we also consider that some elements of the supply should be reviewed:
Dealing with the supply side of the equation, we make the following objections to the various components of supply:
‘Sites identified in land availability assessments’
It is unclear what is meant by ‘sites identified in land availability assessments’. Given these are sites which do not benefit from a draft allocation, then they are by definition, windfall sites which means that there is double counting from unknown sources of supply.
Solihull Local Plan sites
We question the automatic inclusion of Solihull Local Plan sites which have yet to be granted planning permission. The current Plan was adopted in 2013 and the Council cannot currently demonstrate a 5-year supply of housing. In this situation, the Council should be encouraging every suitable site to come forward. The fact that these sites have not come forward despite the housing shortfall, suggests that these should not be considered ‘deliverable’ housing sites without significant justification as to why they will now come forward when they have not to date.
Brownfield Land Register (BLR)
We query the separate identification of sites identified in the BLR – this BLR is subject to periodic review and thus will not be fixed as a permanent source of supply. We consider that any sites to be delivered in this way should be considered as windfall developments.
Lapse Rates
Whilst we support the use of a 10% lapse rates, it needs to be applied across the board i.e. it is equally application in relation to what is to come as to what has already gone before. If the Council accept that a 10% lapse rate is application to sites which already benefit from planning permission, then surely it should also accept that it is applicable to future planning consents which have yet to be granted.
Windfall allowance
The windfall allowance is justified by reference to past windfall rates however it fails to recognise that ‘ town centre sites’ (a traditional source of windfall supply) are allocated in the plan through the town centre masterplan and the Council have identified other sources of supply through the brownfield register. In the absence of any assessment / analysis of this component demonstrating the projected level of future windfall provision taking these factors in account, we consider that the level of windfall should be reviewed and adjusted accordingly.
UK Central Hub
We consider that given the scale of the UK Central Hub proposals, the rate of delivery assumed by the Council is overly optimistic. The Council have not provided any trajectory for the Site, and we note that the August 2020 consultation did not contain any firm commitments to delivery timescales or set out any delivery partners.
This assertion is supposed by the findings of the Lichfields’ Report1 that sets out the average time from outline planning application to the first delivery of homes is 8.4 years. The average build out rate is 160dpa.
As such, taking this into account, and based on a LPR adoption date of 20222, we consider the first completions will likely be C.2030. With an average build out rate of 160dpa, this means that approximately 960 dwellings will be delivered during the Plan Period, assuming that the housing is within the first delivery phases (the August 2020 consultation referenced a mix of uses coming forward). While more outlets may increase the speed of delivery, the amount of infrastructure required also needs to be taken into account. The type of supply also needs to be considered, with UK Central Hub likely to be geared towards apartments.
As such, we consider that 1,780 houses should be removed to take into account the likely delivery timescales.
Trajectory
We also note that SMBC are seeking to provide a stepped trajectory as some of the larger sites will not make a significant contribution to completions until the mid-delivery phase. The Inspector assessing the Guildford Local Plan set out:
39. In the submitted plan, the combined effect of the stepped trajectory in Policy S2 together with the “Liverpool” methodology (in which the delivery shortfall accumulated over the first 4 years of the plan (2015/16 to 2018/19) is spread over the whole plan period), would have deferred a significant proportion of the housing requirement to the later years of the plan. Set against the (then higher) housing requirement, this would not have met the Government’s objective to boost the supply of housing in the shorter term. (our emphasis)
We consider that SMBC should take the same approach as Guildford and allocate further sites to meet need early in the Plan Period. The existence of the UK Central Hub is not of a sufficient size to warrant a different approach (i.e. it is not akin to a new settlement).
Further, as with the withdrawn Uttlesford Local Plan, this stepped trajectory may create a fragile 5 year housing land supply position, taking into account the ambitious delivery targets of the UK Central Hub and the delivery concerns relating to the draft allocations set out below. The Inspectors’ letter relating to the withdrawn plan states:
29. This calculation relies on the use of a reduced annual requirement of 568 dpa for most of the years, as it is based on the stepped trajectory set out in Policy SP3. It is also based on what we consider to be unrealistic commencement/housing delivery dates for two of the Garden Communities (North Uttlesford and Easton Park, as set out above). So, whilst the Council can, in theory, demonstrate a 5.65 year HLS, we are concerned that if the housing delivery at North Uttlesford and Easton Park slips by just one year, as seems very likely, this would result in 100 less dwellings in this 5 year period. This would result in a very fragile 5 year HLS position.
There are comparisons that can be drawn here based on the stepped trajectory and the anticipated 5.37 year supply upon adoption.
The Inspectors for the withdrawn Uttlesford Local Plan also referenced the need to meet the full objectively assessed need for market and affordable housing in the housing market area (NPPF Paragraph 47). The HEDNA states there is a ‘clearly acute’ shortage of affordable housing. The proposed stepped trajectory therefore may worsen the affordability problem as it would delay the provision of housing until late years of the plan period.
Taking the above into account, we consider that the SMBC’s supply is actually 11,496 (rounded) before any reduction in windfall or the deletion of draft allocations which are unlikely to be delivered is taken into account.
This is a reduction of 3,521 and, as such, to meet the increased demand set out above, and take into account the concerns relating to a stepped trajectory, a review of the supply is required and additional sites allocated.
The Council should also ensure that a large number of these sites can be delivered early on in the Plan Period in order to take account of the likely later delivery of some other sites.
Soundness – The Plan is not:
• Positively prepared
• Justified
• Effective
• Consistent with national policy
Change Sought:
• Review of demand and amendment to the strategy
• Review of supply and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible
Improving Accessibility and Encouraging Sustainable Travel
Policy P7 Accessibility and Ease of Access
We consider that the requirement for major residential development should be clarified to set out that there may be other ways in which sustainable access options can be implemented. The distance to a bus stop/train station should not be seen as the only measure of sustainable access.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- Policy should be clarified that there are other ways of ensuring sustainable transport options are available
Policy P8 Managing Travel Demand and Reducing Congestion
Paragraph 109 of the NPPF states that development should only be prevented or refused on highway grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. Within point 2(ii), SMBC are seeking to bring in a further test which would not be in accordance with the NPPF. This should therefore be deleted.
Soundness – The Plan is not:
• Consistent with national policy
Change Sought:
• Point 2(ii) should be deleted
Protecting and Enhancing our Environment
Policy P11 Water and Flood Risk Management
With regards to point 6, the confirmation of discharge into a public sewer falls under Section 106 of the Water Industry Act 1991. As such, it should be made clear that planning permission can be granted prior to this being confirmed, as it falls within a different regulatory regime.
With regards to point 14, it should be clarified that contribution through a Section 106 Agreement is only required where it meets the tests set out in NPPF Paragraph 56.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Deletion of point relating to confirmation from relevant infrastructure owner
• Clarification as to obligation requirements and the necessary tests
Promoting Quality of Place
Policy P17 Countryside and Green Belt
Within Point 1 of the policy, SMBC is seeking to safeguard best and most versatile agricultural land (BMVAL) unless there is an overriding need for development that outweighs the loss. BMVAL is referenced within the NPPF at Paragraph 170 which states that planning policies should contribute to and enhance the natural and local environment by taking into account a number of criteria. One of these is:
b) recognising the intrinsic character and beauty of the countryside, and the wider benefits from natural capital and ecosystem services – including the economic and other benefits of the best and most versatile agricultural land, and of trees and woodland.
Firstly, we consider that including reference to BMVAL within a policy relating to Green Belt seeks to conflate two separate issues. Further, as can be seen above, the test set out by the NPPF does not require the safeguarding of BMVAL. Planning policies are required to contribute to and enhance natural and local environment by recognising economic and other benefits from BMVAL. As such, we consider this point should be deleted.
SMBC have set out, within Point 4, a number of different factors that may be taken into account when considering very special circumstances.
Further to this, point 5 sets out that development that is ‘conspicuous’ from the Green Belt must not harm the visual amenity of the Green Belt by reason of siting, materials or design. Given Green Belt is a spatial designation, designed to prevent sprawl, we consider that this requirement goes beyond the scope of the Green Belt, as set out in the NPPF. The LPR contains policies relating to protecting landscape, where necessary, and as such, this point should be deleted.
Soundness – The Plan is not:
• Positively prepared
• Consistent with National Policy
Change Sought:
• Deletion of point 1
• Inclusion of further factors which may create very special circumstances
• Deletion of point 5
Policy P17A Green Belt Compensation
Paragraph 138 of the NPPF sets out that ways in which the impact of removing land from the Green Belt can be offset through compensatory improvements to the environmental quality and accessibility of remaining Green Belt Land.
Policy P17 is seeking to require this by requiring development on sites removed from the Green Belt to provide appropriate compensatory improvements to environmental quality and accessibility of remaining Green Belt in the form of a Section 106 Agreement utilising the below hierarchy:
1. Compensatory requirements as set out as part of the Local Plan masterplans
2. Where no compensation has been set out within the Local Plan masterplan, improvements are provided as:
i. Improvements within the Green Belt adjacent to, or in close proximity to, the development site;
ii. Improvements within the Green Belt adjacent to, or in close proximity to, the settlement or area accommodating the development;
iii. Improvements within the Green Belt in an area identified for environmental improvements as part of the Council’s Green Infrastructure Opportunity Mapping.
3. In the event it is robustly demonstrated that none of the above options can be satisfied then the Council will accept a commuted sum.
Given none of the emerging masterplans show any compensatory improvements within the Green Belt, it would appear that the Policy is relying on there being additional land being available within the control of applicants (which may not be the case), or the payment of contributions.
SMBC’s viability evidence does not take this requirement into account, and no detail is provided as to how these contributions will be spent or what level of contribution is required. This therefore brings uncertainty, and the Policy should be reconsidered to ensure what is required is clear, and that it will not impact upon the viability of schemes.
Soundness – The Plan is not:
• Consistent with National Policy
Change Sought:
• Reconsideration of the policy to ensure that it is evidenced based, does not impact upon viability of schemes, and is in accordance with national policy
Delivery and Monitoring
Policy P21 Developer Contributions and Infrastructure Provision
Policy P21 expected major development to provide or contribute towards the provision of measures to directly mitigate its impact and physical, social, green and digital infrastructure.
SMBC’s viability testing does not take into account digital infrastructure within the testing and, as such, it should be evidenced that this will not render development unviable.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Confirmation that digital infrastructure provision allows for viable development
Settlement Chapters
Policy BC1 Barratt’s Farm, Balsall Common
We note that 1,756 new homes are proposed for Balsall Common across the plan period with the sole justification seemingly being that it contains both a primary and secondary school and has a full range of retail and associated facilities. However, it is still described as a rural settlement with no significant areas of employment and the distribution strategy remains one of “proportional distribution”. 1,756 dwellings to a single rural village would be completely disproportionate. There is discussion in the document regarding delivery of a by-pass; provision a station car park; improved public transport and a new primary school. However, there is no discussion as to how these are to be funded / delivered relative to the level of growth identified. In addition, there is discussion regarding the scope to enhance the existing local centre and the provision of a village centre masterplan. However, this land is in multiple ownerships and there are no proposals for what these enhancements could entail or how they could function – particularly with a by-pass in place which could actually draw trade away from the existing centre.
There is no assessment of the ability of Balsall Common to deliver this level of growth in such a small area. Whilst clearly some sites (i.e. Barratts Farm) will be able to have multiple outlets, the ability of the market to absorb and deliver multiple sites at any one time in a rural location should be reviewed; particular when Balsall Common will be acutely affected by HS2 – both in terms of the physical construction of the line and the disruption and uncertainty that this will bring; but also in terms of market desirability until such time as the line is constructed.
We also note that Barratts Farm is in multiple ownerships and these are described as “complex” in paragraph 541. This is the single largest site and the one which is proposed to deliver the by-pass. Within the previous draft of the Plan, it was stated that this site would only be taken forward if the landowners / promoters could demonstrate they are working on a collaborate and comprehensive basis. Reading paragraph 541, this collaborate working has clearly not been secured in the way it was envisaged and nothing additional is suggested to demonstrate that joint / collaborative working is possible.
The relief road is identified as being necessary for Barratts Farm in particular with the policy advising that is required early in the plan period. The road is provisionally to be funded via CIL payments; and grant funding which “may” be possible through the WMCA. Firstly, CIL payments can only be secured through those sites which will come forward in the future however these sites are Green Belt sites and cannot therefore be delivered until the Local Plan Review is completed and the subsequent CIL schedule is adopted. Secondly, there is no grant funding proposal in place to fund the road. As it currently stands this road is not deliverable. The road is required to be delivered early in the plan period i.e. before there are significant CIL funds in place and, potentially, at a point where, in order to receive grant funding, applications should be being made now / near future.
There has to be serious doubt over the ability of Barratts Farm to be delivered within the anticipated timeframes and therefore places serous doubt over the plan as a whole given the scale of this allocation.
The Sustainability Appraisal notes that there are limited employment opportunities within Balsall Common and that people travel outside of the settlement to work. As such, it is noted that the expansion of this settlement would fly in the face of sustainability objectives of reducing the need to travel to areas of employment. Whilst such a case could be made for the majority of the rural areas of the Borough, it is heightened especially here when such a large proportion of future growth is identified for one rural settlement.
At this stage, the level of growth attributed to Balsall Common is disproportionate and that inadequate research has been undertaken into the deliverability of this level of growth and the associated aspirations; and the ability of the market to deliver this level of growth in a rural area is considered to be unrealistic.
On the basis that we do not consider the sites identified to be deliverable and the significant shortfall in supply identified by the more realistic timescales we have identified for UK Central, we propose an alternative site – Land at Hawkshurst (Site 544) as an alternative to meeting part of this need. To date this site has been inappropriately assessment by the Council and a more appropriate evaluation of the site is given in the section below.
Policy BL1 – West of Dickens Heath
The policy requires that the proposal for BL1 secures the relocation of the existing sports provision to a suitable site in the local vicinity. Until such time as these facilities are relocated or a plan is in place to secure timely relocation (which should include the grant of planning permission in our view, given that any site will be in the Green Belt), then the site cannot come forward for development. Our key concern here relates to Site 4 (West of Dickens Heath). It is noted that the identification of a Local Wildlife Site within the site hampers re-provision within the site itself and therefore alternative options will need to be pursued outside of the site. We consider that these alternatives should be considered now as clearly, as it currently stands, the pitches will be lost with no alternative in place (and therefore no guarantee of any re-provision). This is all the more important given that the land in the area is all located within the Green Belt and therefore any proposals which may, for example, include floodlighting, will have to be carefully considered against the Green Belt ‘tests’. We understand that the loss of these facilities is causing significant local concern particularly with no proposals for replacement.
The Council have had ample time to identify and secure alternative provision and therefore the fact that this is not identified within the plan, suggests that there are currently no alternative sites. This calls into question the delivery of this site and with no evidence and no proposals in place, we consider that proposal BL1 should be deleted from the plan.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Policy KN1 Hampton Road, Knowle
As with the Site West of Dickens Heath, this draft allocation requires the reprovision of sports pitches. In this instance, the re-provided pitches are currently shown within the Green Belt to the north of the allocation.
The Council, within Paragraphs 713-715 state that it’s likely that very special circumstances will exist to support development in this location and, as such, the reprovision will likely be acceptable. However, this pre-judges any application, for which the detail is not known, and as such cannot be relied upon. Therefore the housing that would be provided on the sports pitches should not be included until the reprovision of the sports pitches is secured.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Site Assessment Criteria
We consider that a more dispersed growth option should be considered and, as set out previously, consider that the land at Broad Lane, Hawkshurst (Site 544) is ideally suited to make an important contribution to the Council’s housing need. Following the Council’s own site selection criteria, we set out why this site is a suitable and deliverable alternative site which can be delivered utilising existing infrastructure:
We object strongly to the manner in which Site 544 has been assessed in the site selection process for the reasons which are set out below – and on that basis, object to the inconsistent application of the methodology.
Firstly, in assessing Site 544, the Council deemed that the site did not pass ‘Step 1’ – which is the initial, high-level sieving process. Sites which are not taken forward at this stage are then not subject to the more refined ‘Step 2’ analysis. We consider the manner in which the process was applied is fundamentally flawed and have carried out our own assessment (using the Council’s own analysis) to demonstrate that the site should not have been discounted at Step 1 and should have been included in Step 2.
STEP 1
The first stage in the sieving process is a high-level look at the following:
(i) Brownfield vs greenfield
(ii) Urban areas vs Green Belt
(iii) Accessibility
Sites can be rated from Priority 1 (brownfield in urban area or settlement) to Priority 10 (greenfield in isolated highly performing Green Belt location). A traffic light rating is then applied – sites which falls within Priority 1 to Priority 4 are green sites; Priority 5 sites are yellow; Priority 6, 6b and 7 sites are blue; and Priority 8, 9 and 10 sites are red. Red sites fail Step 1 and are not taken forward to Step 2 for assessment. Site 544 was incorrectly identified as a Priority 9 red site and was not therefore taken forward to Step 2.
In summary, Site 544 is a greenfield and Green Belt site. However, it is accessible (being on the edge of the Coventry urban area) and also within an area with a low GB score of 5. Therefore, it should be allocated a Priority score of no higher than 5 (yellow). We review below the manner in which this initial sieving assessment was flawed - taking Site 544 step by step through the same assessment process as the Council.
Green Belt
In the Green Belt Assessment 2016, Site 544 is identified as part of Refined Parcel RP83:5 which has a combined score of 5, within a range from the highest performing Green Belt sites (12) to the lowest performing sites, scoring as low as 0. With a score of 5, site 544 is clearly a lower performing site. The starting point for consideration as a Priority 5 site is a score of 5 or lower in the Green Belt––Site 544 falls into that category. The results of this assessment are backed up by our own Green Belt assessment which is included with this submission.
Accessibility
The second part of the criteria relates to accessibility and to achieve a Priority 5 ranking, the site is required to be in an accessible location. This is defined as:
(a) On the edge of the urban area or
(b) On the edge of a settlement which has a wide range of services and facilities including a primary school and a range of retail facilities.
Site 544 adjoins the urban edge of Coventry – indeed in the Council’s Site Assessment, the site is identified as possibly being an extension to Coventry.
It should be noted that in relation to the Publication Draft Plan, the Council have updated the Accessibility Study to take account of retail / surgery provision in adjoining LPA areas, however they have then not used this information to re-visit first principles and determine whether sites have been appropriately assessed from the start. Therefore, whilst this site now scores more positively, its ‘priority 9’ status has not been re-evaluated despite an Addendum to the Site Assessments being produced and the Accessibility Study being revisited. It appears that despite the site being on the urban edge of Coventry this has been discounted due to the sites geographical relationship with Coventry as opposed to Solihull. However, accessibility should be based upon spatial location rather than boundaries. The fact that the retail offer is in Coventry will not prevent residents of Hawkshurst using it.
For the absolute avoidance of doubt therefore, we enclose our own submission produced by Phil Jones Associates which demonstrates that the site is in a suitable and sustainable location.
It is fundamentally incorrect for Site 544 to have been ‘sieved out’ at Step 1. The site should have been correctly assessed as a Priority 5 yellow site as it meets the two necessary criteria. The site, therefore, should have been taken forward for a more detailed analysis in Step 2.
On the basis that the site does pass Step 1 – we have carried out the Step 2 assessment using the same table and criteria as the Council. There are no scorings or weightings attributed to the Step 2 analysis – it assessed on a qualitative basis.
STEP 2 – REFINEMENT CRITERIA
FACTORS IN FAVOUR
In accordance with the spatial strategy
(including only proportional additions to lower order settlements (i.e. those without a secondary school or not located close to the urban edge).
The preferred spatial strategy would be to locate development needs close to where they arise. However the Plan identifies that there is limited land available to achieve this and therefore the Council has had to look at alternative options, which includes land released from the Green Belt in the form of urban extensions and also followed a more dispersed strategy for development. They have sought to focus development in locations that are, or can be made, accessible and sustainable. Such locations are identified as typically being on the edge of urban areas (or within ruralsettlements) that have a greater range of services. Potential locations for development include adjoining the urban edge or a highly accessible settlement. This will have the benefit of focusing on urban areas and sustainable urban extensions to provide the best opportunity for achieving accessibility and delivering public transport improvements.
It is abundantly clear that geographically Site 544 adjoins the urban edge of Coventry – Coventry is the second largest City in the West Midlands, after Birmingham. Site 544, as confirmed in the SHELAA assessment, would be viewed as an urban extension to Coventry and there is, therefore, no doubt that Site 544 is in accordance with the Spatial Strategy, which seeks to locate development in the most accessible locations. Coventry is clearly such a location and there is nothing within the Spatial Strategy which would rule against this.
Therefore, it can only be concluded that the development of Site 544 would be in accordance with the Spatial Strategy.
Any hard constraints only affect a small proportion of the site and/or can be mitigated.
The SHELAA does not identify any hard constraints – we concur with this assessment.
The site would not breach a strong defensible boundary to the Green Belt.
There are no strong existing defensible Green Belt boundaries that would be breached. The existing boundaries to Bannerbrook Park comprise simply hedgerows, some of which were planted in conjunction with the existing development. The same form of boundary treatment can therefore be replicated on this site and indeed is proposed within the masterplan included with this submission.
Any identified wider planning gain over and above that which would normally be expected.
Following discussions with local undertakers regarding the lack of burial space available within the Borough, the landowners are willing to offer land for a multi faith burial space which will provide a much needed facility for the Borough and also secure the long term permanence of the Green Belt boundary in this location.
Sites that would use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
See above.
If finer grain accessibility analysis (including output from the Accessibility Study) shows the site (or the part to be included) is accessible.
The Accessibility Study is flawed when it comes to assessment of sites on the Solihull / Coventry boundary. The Study provides a scoring for accessibility for facilities within 1,200m of a site, however when assessing facilities beyond the administrative area of Solihull only facilities within 800m of the boundary are assessed, this is despite an updated assessment being provided in 2020 which proposed to apply some adjustment of standards and yet makes no sensible adjustment to standards for cross boundary provision. Sites in such locations are not therefore being assessed on a comparable basis. Furthermore, the assessment is only being undertaken of walking distances and makes no allowance for accessing facilities by bike. The document references ‘shared cycle’ routes but then makes no consideration of people actually using them for cycling. Clearly were cycling to be factored in, especially for those sites, which adjoin major settlements and therefore have access to a good cycleway network (such as Site 544) then their accessibility criteria would be much improved.
Whilst it is noted that some provision is now taken off cross boundary retail provision and public transport which has moved Site 544 to a higher scoring position; it is still not being assessed on a comparable basis.
There is a shared footway/cycleway through the Bannerbrook Park development which can be extended into Site 544. Furthermore, opportunities will be considered to accommodate a bus route through Site 544 and on through Bannerbrook Park.
It is therefore clear that the proposal can only be defined as being in an ‘accessible location’.
FACTORS AGAINST
Not in accordance with the Spatial Strategy
As set out above, the development of this site is in accordance with the Spatial Strategy
Overriding hard constraints that cannot be mitigated.
There are no hard constraints identified.
SHELAA Category 3 sites unless demonstrated that concerns can be overcome.
The site is not identified as a Category 3 site in the SHELAA. We make comments below in respect of the flaws of SHELAA assessment and carry out our own assessment.
Sites that would not use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
As already confirmed, the site uses existing defensible boundaries and proposes to strengthen the defensible boundary and strengthen existing hedgerow planting.
If finer grain analysis shows the site (or the part to be included) is not accessible.
As previously confirmed, the Council have failed to consider the proximity of services in Coventry on a fair basis and because of this, it is not possible to determine how detailed the assessment has been. However, given that the site adjoins a major urban area is it simply not feasible to draw a conclusion that the site is inaccessible.
If the site is in a landscape character area that has a very low landscape capacity rating.
It is wholly unreasonable if the Council have used this criterion to discount this site. According to the Council’s Landscape Character Study (December 2016) this site falls within Landscape Character Area (LCA) 26 – which covers the eastern fringe of the Borough – yet significant Green Belt release is proposed in other areas of the Borough which are in an identical LCA. With one blanket ‘very low’ landscape capacity conclusion for such wide areas it cannot be used to discount some sites and not others – there must be parity in assessment. Furthermore, the study itself (page 49 – text adjoining Table 24) confirmed that it is not possible to establish a baseline sensitivity to change without having details of a given development proposal and therefore the conclusions should be taken as a guide only. On this basis, we do not consider it appropriate to use this criterion as a basis to discount sites given sites with the same assessment have been given a ‘green’ score’.
We enclose with this submission our own detailed, site specific, landscape and visual appraisal which confirms that the site has the ability to accommodate development of scale which is comparable to the surrounding area without compromising the function of the surrounding Green Belt.
If the SA appraisal identifies significant harmful impacts.
The SA identified 2 harmful impacts:
(i) The site contains over 20ha of Grade 1 – 3 agricultural land.
The site is wholly Grade 3 agricultural land – clearly within Grade 3, the site could in fact be Grade 3b land which would mean it is not BMVL. Furthermore, the Regional ALC mapping, which was last updated in November 2018, shows this to be the prevailing land type across the Borough which is not unsurprising. As a result, a number of proposed allocated sites have the same classification. It is not therefore appropriate to identify this as a harmful impact when a consistent approach has not been applied across the board.
(ii) The distance to jobs is identified as 8km within the SA
This is clearly incorrect as the SA treats the administrative boundary between Coventry and Solihull as a line which people will not cross. This is clearly incorrect. As already stated, there is for example a good bus connection to Warwick University which is a key local employer as well as Coventry city centre which offers multiple employment opportunities. The SA has applied the same approach to all services and facilities – relating its conclusions only to Solihull Borough and thus the distances to shops / schooling / healthcare are distorted. In addition, we highlight that this is a specific issue related to Balsall Common also (which is also further away from Coventry) and yet the Council has seen fit to allocate in excess of 1,700 dwellings in Balsall Common.
In summary:
• The site has medium / high accessibility – at the same level as the other ‘green sites’ identified in the Draft Plan.
• The site is in lower performing Green Belt than other ‘green sites’ in the plan.
• The site has existing defensible Green Belt boundaries which can be strengthened.
• The site has no constraints within the development area which cannot be mitigated in the normal way.
• The site has the same landscape character as other ‘green sites’.
• It is not, therefore, credible for Site 544 to be categorised as a ‘red’ site.
• For this reason, we consider the score for Site 544 should be corrected and the Council should re-visit their assessments from first principles.
As is evidenced from the corrected SHELAA commentary the site is rated as a Category 1 – Deliverable Site. Such sites are deemed to be available now, offer a suitable location for housing now and there is a reasonable prospect that housing will be delivered on site within 5 years from the date of adoption of the plan.

Object

Solihull Local Plan (Draft Submission) 2020

Policy P5 – Provision of Land for Housing

Representation ID: 15071

Received: 14/12/2020

Respondent: Barratt David Wilson Homes - Land south of Broad Lane

Agent: Barton Willmore Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Vulnerability of housing supply:
‘Sites identified in land availability assessments’
It is unclear what is meant by ‘sites identified in land availability assessments’.
Given these are sites which do not benefit from a draft allocation, then they are by definition, windfall sites which means that there is double counting from unknown sources of supply.

Change suggested by respondent:

- Amend supply and spatial strategy in Plan.
- Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible

Full text:

Introduction
Paragraph 18 sets out that the site allocations from the Solihull Local Plan (December 2013) will be brought forward. We consider that the automatic allocation of these sites which have been allocated for a number of years, without any justification as to their deliverability, is an incorrect approach. We address this in more detail under our comments in respect of Policy 4.
Finally, Paragraph 21 refers to neighbourhood plans and the importance SMBC places on these. Paragraph 30 of the National Planning Policy Framework (NPPF) sets the most recently adopted policies will take precedence. SMBC may wish to set this out within this section, to make it clear that the LPR will take precedence upon adoption over any currently adopted Neighbourhood Plans.
Soundness – The Plan is not:
- Justified
Change Sought:
- Existing allocations should be tested for deliverability prior to re-allocation
- The hierarchy of neighbourhood plans should be made clear
Vision
Given that paragraph 59 of the NPPF states that the Government’s objective is to significantly boost the supply of housing, the wording relating to meeting the needs of the housing market area should be more positively worded.
Paragraph 50 sets out that SMBC are seeking to protect the integrity of the Green Belt. Wording should be included setting out that lower performing parcels could be released to protect higher performing parcels while meeting identified and evidenced needs.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- The vision should be more positively worded in order to significantly boost the supply of housing
- The need to release lower performing green belt to meet identified needs, and preserve higher performing parcels, should be set out
Providing Homes for All
Policy P4C Meeting Housing Needs – Market Housing
We object to the inflexible market housing mix which is prescribed within this policy. The NPPF encourages provision of balanced and mixed communities catering for a wide range of the population.
Individual sites should cater for a wide range of housing types and sizes. Provision of such a significant proportion of only smaller (3 bed or fewer) dwellings on sites will not develop long term sustainable communities. Instead it will result in a transient community where people will not be able to form long term neighbourhoods as they will need to move on as their circumstances change if there are insufficient homes of the right size on a site to accommodate them. We do not consider that this represents good planning and consider that the focus should be on building strong healthy communities which can cater for all, rather than simply planning for short term ownership.
The inclusion of a prescribed housing mix runs counter to the criterion elsewhere within the policy which allow a number of factors to be taken into consideration. This plan has a significant lifespan and to prescribe a housing market mix which is to remain in place for the whole of plan period does not provide sufficient flexibility for adaptation to current housing need and demand. We have seen with the current pandemic the way external factors can influence people’s choice of lifestyle.
Soundness – The Plan is not:
• Justified
• Effective
Change Sought:
• Amendment of policy to allow for housing mix based on up to date market evidence
Policy P4D Meeting Housing Needs – Self and Custom Housebuilding
The latest Annual Monitoring Report (March 2020), covering the period 2018/19, sets out that for the period November 2018 – October 2019 there were 374 entries on the Self-build register.
As such, requiring all sites of over 100 houses to provide 5% of open market dwellings in the form of self-build plots is unreasonable and unjustified. Given provision is being made for 7,605 houses through allocations above 100 houses and the UK Central Hub area, this would equate to the 761 self and custom build plots to be provided from the draft allocations.
The Planning Practice Guidance (PPG) advises that the Council should engage with landowners who own sites that are suitable for housing and ‘encourage’ them to consider self-build and custom housing and who are interested in provision. Imposition of mandatory requirement goes beyond encouragement.
Following the example of Stratford District for example, the Council have specifically identified custom build sites which are discreet standalone small sites.
We also include extracts from the Bedford Local Plan Inspector’s Report (Appendix 4) where the Inspector recommended deletion the policy akin to that being proposed here as the policy was not justified with reference to the self-build register. The same principle applies here in that the amount being sought is over double that on the register.
Soundness – The Plan is not:
• Justified
• Consistent with national policy
Change Sought:
• Deletion of specific policy requirement and replacement with specific allocations or general support for self-build sites
Policy P5 Provision of Land for Housing
Policy P5 sets out the Council will allocate sufficient land for at least 5,270 net additional homes to ensure sufficient housing supply to deliver 15,017 additional homes in the plan period. This would result in an average annual housing land provision target of 938 net additional homes per year. This annualised target is made up of a stepped requirement with 851 homes per year delivered between 2020-2026 and 991 dwellings delivered between 2026-2036.
Demand
A Housing Need Technical Report has been provided (December 2020) (Appendix 5) and should be read in conjunction with our commentary on Policy P5. In summary, this Note makes the following key points:
• Planning Practice Guidance (PPG) states the Standard Method (SM) figure represents the minimum housing need, and there may be circumstances whereby need is higher;
• The Draft Plan identifies the clear economic growth aspirations for the Borough, including the nationally significant growth planned for the UK Central Hub. This is a circumstance where housing need may exceed the minimum need. If it does, housing delivery must be of a quantum to support these aspirations;
• The Council’s 2020 HEDNA confirms that the calculation of housing need is underpinned by the growth at the UK Central Hub. The Hub is projected to generate an additional 13,000 jobs to the baseline Experian job growth forecast (10,000 jobs) included in the HEDNA;
• The HEDNA tests several economic-led housing need scenarios. However, the UK Hub Scenario assumes only 25% of the additional 13,000 jobs created by the Hub are to be taken up by Solihull residents. This results in the housing need (816 dpa) underpinning the Plan;
• However, this ignores the ‘Growth A’ scenario which concludes that 908 dpa would be required based on the ‘Adjusted Local Growth’ scenario. This scenario assumes that strong industries in Solihull will outperform the baseline Experian forecast, resulting in an additional 5,680 jobs to the baseline (10,000 jobs) over the Plan period, with Solihull residents taking up these jobs;
• However, no scenario is presented to show what the housing need would be based on the UK Central Hub scenario being fulfilled in full by Solihull residents. It is important to understand this so that the duty to cooperate discussions referred to in the HEDNA are well informed;
Barton Willmore provide these sensitivity scenarios based on two approaches to commuting, and two approaches to underlying demographic rates (mortality, fertility, and migration);
• The results of our testing are summarised in Table 7.1:
Table 7.1: Solihull Borough – Barton Willmore Demographic Forecasting 2020-2036 Scenario Demographic rates Jobs per annum 2020-2036 Dwellings per annum 2020-2036
Dwelling-constrained:
Standard Method
2016 ONS rates
7721 – 8132
807
2018 ONS rates
1,0141 – 1,0682
Employment-constrained:
UK Central Hub
2016 ONS rates
1,437
1,1991 – 1,2482
2018 ONS rates
1,0361 – 1,0852
Source: Barton Willmore Development Economics
1 Commuting Ratio 0.98
2 Commuting Ratio 0.93
• Growth of between 1,036 and 1,248 dpa would be required to support the UK Central Hub scenario (between 16,576 and 19,968 dwellings in total);
• This represents an increase of between 220 dpa and 432 dpa on the housing need calculated by the HEDNA (816 dpa), or an additional 3,520 to 6,912 dwellings over the Plan period;
• Our analysis of historic levels of job growth in Solihull 1991-2019 shows a range of 1,225 and 1,650 jobs per annum (jpa). This highlights that the UK Central Hub scenario (1,437 jpa) is a realistic assumption;
• The HEDNA identifies an ‘acute’ situation in respect of affordable housing need. Our analysis suggests that the HEDNA’s conclusion on overall need (816 dpa) should be increased to meet as much affordable need as possible.
• Furthermore, our analysis of unmet need in the wider GBBCHMA suggests that the 2020 Position Statement’s conclusions under-estimate the remaining unmet housing need from Birmingham up to 2031, and for Birmingham alone the deficit in unmet need is between 11,294 and 13,101 dwellings up to 2031;
• In addition, there is significant unmet need up to 2031 based on the existing Standard Method coming from Birmingham City and the Black Country. This amounts to unmet need of between 25,543 and 27,350 dwellings up to 2031. If we were to assume the increased capacity for Birmingham City (65,400 dwellings 2011-2031) set out in the 2020 Position Statement the unmet need would still be between 11,243 and 13,050 dwellings up to 2031. This increases significantly based on the uncapped Standard Method figure for Birmingham City which would come into effect once Birmingham’s Local Plan becomes older than 5 years in 14 months’ time;
Adoption of the proposed changes to Standard Method consulted on by Government in summer 2020 would lead to there being unmet need against emerging/existing housing requirements in all but one of the GBBCHMA authorities;
• Furthermore, the unmet need post 2031 should be considered, as referenced to in the 2020 Position Statement. Based on data available at the present time and the most recent Local Plan figures, Barton Willmore calculate this to be a minimum 17,700 dwellings 2031-2040.
• In summary, the analysis in this report results in the following broad conclusions:
1. The SM’s minimum need for Solihull (807 dpa) will need to be increased to account for expected job growth from the UK Central Hub and the ‘acute’ need for affordable housing in the Borough;
2. Barton Willmore’s demographic modelling shows that between 1,036 and 1,248 dpa are required to support the UK Central Hub scenario;
3. Barton Willmore’s calculations suggest that the deficit in unmet housing need from Birmingham City being delivered by HMA Local Plans amounts to a minimum of between 11,294 and 13,101 dwellings up to 2031, a significant increase from the 2,597 dwellings concluded on by the 2020 Position Statement. This increases when the unmet need from the Black Country is considered. Additional unmet need will be created post 2031.
As such, in order to ensure the LPR is positively prepared, SMBC should seek to plan for more housing, and should allocate further sites.
SUPPLY
Further to the above, and as set out above, we also consider that some elements of the supply should be reviewed:
Dealing with the supply side of the equation, we make the following objections to the various components of supply:
‘Sites identified in land availability assessments’
It is unclear what is meant by ‘sites identified in land availability assessments’. Given these are sites which do not benefit from a draft allocation, then they are by definition, windfall sites which means that there is double counting from unknown sources of supply.
Solihull Local Plan sites
We question the automatic inclusion of Solihull Local Plan sites which have yet to be granted planning permission. The current Plan was adopted in 2013 and the Council cannot currently demonstrate a 5-year supply of housing. In this situation, the Council should be encouraging every suitable site to come forward. The fact that these sites have not come forward despite the housing shortfall, suggests that these should not be considered ‘deliverable’ housing sites without significant justification as to why they will now come forward when they have not to date.
Brownfield Land Register (BLR)
We query the separate identification of sites identified in the BLR – this BLR is subject to periodic review and thus will not be fixed as a permanent source of supply. We consider that any sites to be delivered in this way should be considered as windfall developments.
Lapse Rates
Whilst we support the use of a 10% lapse rates, it needs to be applied across the board i.e. it is equally application in relation to what is to come as to what has already gone before. If the Council accept that a 10% lapse rate is application to sites which already benefit from planning permission, then surely it should also accept that it is applicable to future planning consents which have yet to be granted.
Windfall allowance
The windfall allowance is justified by reference to past windfall rates however it fails to recognise that ‘ town centre sites’ (a traditional source of windfall supply) are allocated in the plan through the town centre masterplan and the Council have identified other sources of supply through the brownfield register. In the absence of any assessment / analysis of this component demonstrating the projected level of future windfall provision taking these factors in account, we consider that the level of windfall should be reviewed and adjusted accordingly.
UK Central Hub
We consider that given the scale of the UK Central Hub proposals, the rate of delivery assumed by the Council is overly optimistic. The Council have not provided any trajectory for the Site, and we note that the August 2020 consultation did not contain any firm commitments to delivery timescales or set out any delivery partners.
This assertion is supposed by the findings of the Lichfields’ Report1 that sets out the average time from outline planning application to the first delivery of homes is 8.4 years. The average build out rate is 160dpa.
As such, taking this into account, and based on a LPR adoption date of 20222, we consider the first completions will likely be C.2030. With an average build out rate of 160dpa, this means that approximately 960 dwellings will be delivered during the Plan Period, assuming that the housing is within the first delivery phases (the August 2020 consultation referenced a mix of uses coming forward). While more outlets may increase the speed of delivery, the amount of infrastructure required also needs to be taken into account. The type of supply also needs to be considered, with UK Central Hub likely to be geared towards apartments.
As such, we consider that 1,780 houses should be removed to take into account the likely delivery timescales.
Trajectory
We also note that SMBC are seeking to provide a stepped trajectory as some of the larger sites will not make a significant contribution to completions until the mid-delivery phase. The Inspector assessing the Guildford Local Plan set out:
39. In the submitted plan, the combined effect of the stepped trajectory in Policy S2 together with the “Liverpool” methodology (in which the delivery shortfall accumulated over the first 4 years of the plan (2015/16 to 2018/19) is spread over the whole plan period), would have deferred a significant proportion of the housing requirement to the later years of the plan. Set against the (then higher) housing requirement, this would not have met the Government’s objective to boost the supply of housing in the shorter term. (our emphasis)
We consider that SMBC should take the same approach as Guildford and allocate further sites to meet need early in the Plan Period. The existence of the UK Central Hub is not of a sufficient size to warrant a different approach (i.e. it is not akin to a new settlement).
Further, as with the withdrawn Uttlesford Local Plan, this stepped trajectory may create a fragile 5 year housing land supply position, taking into account the ambitious delivery targets of the UK Central Hub and the delivery concerns relating to the draft allocations set out below. The Inspectors’ letter relating to the withdrawn plan states:
29. This calculation relies on the use of a reduced annual requirement of 568 dpa for most of the years, as it is based on the stepped trajectory set out in Policy SP3. It is also based on what we consider to be unrealistic commencement/housing delivery dates for two of the Garden Communities (North Uttlesford and Easton Park, as set out above). So, whilst the Council can, in theory, demonstrate a 5.65 year HLS, we are concerned that if the housing delivery at North Uttlesford and Easton Park slips by just one year, as seems very likely, this would result in 100 less dwellings in this 5 year period. This would result in a very fragile 5 year HLS position.
There are comparisons that can be drawn here based on the stepped trajectory and the anticipated 5.37 year supply upon adoption.
The Inspectors for the withdrawn Uttlesford Local Plan also referenced the need to meet the full objectively assessed need for market and affordable housing in the housing market area (NPPF Paragraph 47). The HEDNA states there is a ‘clearly acute’ shortage of affordable housing. The proposed stepped trajectory therefore may worsen the affordability problem as it would delay the provision of housing until late years of the plan period.
Taking the above into account, we consider that the SMBC’s supply is actually 11,496 (rounded) before any reduction in windfall or the deletion of draft allocations which are unlikely to be delivered is taken into account.
This is a reduction of 3,521 and, as such, to meet the increased demand set out above, and take into account the concerns relating to a stepped trajectory, a review of the supply is required and additional sites allocated.
The Council should also ensure that a large number of these sites can be delivered early on in the Plan Period in order to take account of the likely later delivery of some other sites.
Soundness – The Plan is not:
• Positively prepared
• Justified
• Effective
• Consistent with national policy
Change Sought:
• Review of demand and amendment to the strategy
• Review of supply and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible
Improving Accessibility and Encouraging Sustainable Travel
Policy P7 Accessibility and Ease of Access
We consider that the requirement for major residential development should be clarified to set out that there may be other ways in which sustainable access options can be implemented. The distance to a bus stop/train station should not be seen as the only measure of sustainable access.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- Policy should be clarified that there are other ways of ensuring sustainable transport options are available
Policy P8 Managing Travel Demand and Reducing Congestion
Paragraph 109 of the NPPF states that development should only be prevented or refused on highway grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. Within point 2(ii), SMBC are seeking to bring in a further test which would not be in accordance with the NPPF. This should therefore be deleted.
Soundness – The Plan is not:
• Consistent with national policy
Change Sought:
• Point 2(ii) should be deleted
Protecting and Enhancing our Environment
Policy P11 Water and Flood Risk Management
With regards to point 6, the confirmation of discharge into a public sewer falls under Section 106 of the Water Industry Act 1991. As such, it should be made clear that planning permission can be granted prior to this being confirmed, as it falls within a different regulatory regime.
With regards to point 14, it should be clarified that contribution through a Section 106 Agreement is only required where it meets the tests set out in NPPF Paragraph 56.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Deletion of point relating to confirmation from relevant infrastructure owner
• Clarification as to obligation requirements and the necessary tests
Promoting Quality of Place
Policy P17 Countryside and Green Belt
Within Point 1 of the policy, SMBC is seeking to safeguard best and most versatile agricultural land (BMVAL) unless there is an overriding need for development that outweighs the loss. BMVAL is referenced within the NPPF at Paragraph 170 which states that planning policies should contribute to and enhance the natural and local environment by taking into account a number of criteria. One of these is:
b) recognising the intrinsic character and beauty of the countryside, and the wider benefits from natural capital and ecosystem services – including the economic and other benefits of the best and most versatile agricultural land, and of trees and woodland.
Firstly, we consider that including reference to BMVAL within a policy relating to Green Belt seeks to conflate two separate issues. Further, as can be seen above, the test set out by the NPPF does not require the safeguarding of BMVAL. Planning policies are required to contribute to and enhance natural and local environment by recognising economic and other benefits from BMVAL. As such, we consider this point should be deleted.
SMBC have set out, within Point 4, a number of different factors that may be taken into account when considering very special circumstances.
Further to this, point 5 sets out that development that is ‘conspicuous’ from the Green Belt must not harm the visual amenity of the Green Belt by reason of siting, materials or design. Given Green Belt is a spatial designation, designed to prevent sprawl, we consider that this requirement goes beyond the scope of the Green Belt, as set out in the NPPF. The LPR contains policies relating to protecting landscape, where necessary, and as such, this point should be deleted.
Soundness – The Plan is not:
• Positively prepared
• Consistent with National Policy
Change Sought:
• Deletion of point 1
• Inclusion of further factors which may create very special circumstances
• Deletion of point 5
Policy P17A Green Belt Compensation
Paragraph 138 of the NPPF sets out that ways in which the impact of removing land from the Green Belt can be offset through compensatory improvements to the environmental quality and accessibility of remaining Green Belt Land.
Policy P17 is seeking to require this by requiring development on sites removed from the Green Belt to provide appropriate compensatory improvements to environmental quality and accessibility of remaining Green Belt in the form of a Section 106 Agreement utilising the below hierarchy:
1. Compensatory requirements as set out as part of the Local Plan masterplans
2. Where no compensation has been set out within the Local Plan masterplan, improvements are provided as:
i. Improvements within the Green Belt adjacent to, or in close proximity to, the development site;
ii. Improvements within the Green Belt adjacent to, or in close proximity to, the settlement or area accommodating the development;
iii. Improvements within the Green Belt in an area identified for environmental improvements as part of the Council’s Green Infrastructure Opportunity Mapping.
3. In the event it is robustly demonstrated that none of the above options can be satisfied then the Council will accept a commuted sum.
Given none of the emerging masterplans show any compensatory improvements within the Green Belt, it would appear that the Policy is relying on there being additional land being available within the control of applicants (which may not be the case), or the payment of contributions.
SMBC’s viability evidence does not take this requirement into account, and no detail is provided as to how these contributions will be spent or what level of contribution is required. This therefore brings uncertainty, and the Policy should be reconsidered to ensure what is required is clear, and that it will not impact upon the viability of schemes.
Soundness – The Plan is not:
• Consistent with National Policy
Change Sought:
• Reconsideration of the policy to ensure that it is evidenced based, does not impact upon viability of schemes, and is in accordance with national policy
Delivery and Monitoring
Policy P21 Developer Contributions and Infrastructure Provision
Policy P21 expected major development to provide or contribute towards the provision of measures to directly mitigate its impact and physical, social, green and digital infrastructure.
SMBC’s viability testing does not take into account digital infrastructure within the testing and, as such, it should be evidenced that this will not render development unviable.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Confirmation that digital infrastructure provision allows for viable development
Settlement Chapters
Policy BC1 Barratt’s Farm, Balsall Common
We note that 1,756 new homes are proposed for Balsall Common across the plan period with the sole justification seemingly being that it contains both a primary and secondary school and has a full range of retail and associated facilities. However, it is still described as a rural settlement with no significant areas of employment and the distribution strategy remains one of “proportional distribution”. 1,756 dwellings to a single rural village would be completely disproportionate. There is discussion in the document regarding delivery of a by-pass; provision a station car park; improved public transport and a new primary school. However, there is no discussion as to how these are to be funded / delivered relative to the level of growth identified. In addition, there is discussion regarding the scope to enhance the existing local centre and the provision of a village centre masterplan. However, this land is in multiple ownerships and there are no proposals for what these enhancements could entail or how they could function – particularly with a by-pass in place which could actually draw trade away from the existing centre.
There is no assessment of the ability of Balsall Common to deliver this level of growth in such a small area. Whilst clearly some sites (i.e. Barratts Farm) will be able to have multiple outlets, the ability of the market to absorb and deliver multiple sites at any one time in a rural location should be reviewed; particular when Balsall Common will be acutely affected by HS2 – both in terms of the physical construction of the line and the disruption and uncertainty that this will bring; but also in terms of market desirability until such time as the line is constructed.
We also note that Barratts Farm is in multiple ownerships and these are described as “complex” in paragraph 541. This is the single largest site and the one which is proposed to deliver the by-pass. Within the previous draft of the Plan, it was stated that this site would only be taken forward if the landowners / promoters could demonstrate they are working on a collaborate and comprehensive basis. Reading paragraph 541, this collaborate working has clearly not been secured in the way it was envisaged and nothing additional is suggested to demonstrate that joint / collaborative working is possible.
The relief road is identified as being necessary for Barratts Farm in particular with the policy advising that is required early in the plan period. The road is provisionally to be funded via CIL payments; and grant funding which “may” be possible through the WMCA. Firstly, CIL payments can only be secured through those sites which will come forward in the future however these sites are Green Belt sites and cannot therefore be delivered until the Local Plan Review is completed and the subsequent CIL schedule is adopted. Secondly, there is no grant funding proposal in place to fund the road. As it currently stands this road is not deliverable. The road is required to be delivered early in the plan period i.e. before there are significant CIL funds in place and, potentially, at a point where, in order to receive grant funding, applications should be being made now / near future.
There has to be serious doubt over the ability of Barratts Farm to be delivered within the anticipated timeframes and therefore places serous doubt over the plan as a whole given the scale of this allocation.
The Sustainability Appraisal notes that there are limited employment opportunities within Balsall Common and that people travel outside of the settlement to work. As such, it is noted that the expansion of this settlement would fly in the face of sustainability objectives of reducing the need to travel to areas of employment. Whilst such a case could be made for the majority of the rural areas of the Borough, it is heightened especially here when such a large proportion of future growth is identified for one rural settlement.
At this stage, the level of growth attributed to Balsall Common is disproportionate and that inadequate research has been undertaken into the deliverability of this level of growth and the associated aspirations; and the ability of the market to deliver this level of growth in a rural area is considered to be unrealistic.
On the basis that we do not consider the sites identified to be deliverable and the significant shortfall in supply identified by the more realistic timescales we have identified for UK Central, we propose an alternative site – Land at Hawkshurst (Site 544) as an alternative to meeting part of this need. To date this site has been inappropriately assessment by the Council and a more appropriate evaluation of the site is given in the section below.
Policy BL1 – West of Dickens Heath
The policy requires that the proposal for BL1 secures the relocation of the existing sports provision to a suitable site in the local vicinity. Until such time as these facilities are relocated or a plan is in place to secure timely relocation (which should include the grant of planning permission in our view, given that any site will be in the Green Belt), then the site cannot come forward for development. Our key concern here relates to Site 4 (West of Dickens Heath). It is noted that the identification of a Local Wildlife Site within the site hampers re-provision within the site itself and therefore alternative options will need to be pursued outside of the site. We consider that these alternatives should be considered now as clearly, as it currently stands, the pitches will be lost with no alternative in place (and therefore no guarantee of any re-provision). This is all the more important given that the land in the area is all located within the Green Belt and therefore any proposals which may, for example, include floodlighting, will have to be carefully considered against the Green Belt ‘tests’. We understand that the loss of these facilities is causing significant local concern particularly with no proposals for replacement.
The Council have had ample time to identify and secure alternative provision and therefore the fact that this is not identified within the plan, suggests that there are currently no alternative sites. This calls into question the delivery of this site and with no evidence and no proposals in place, we consider that proposal BL1 should be deleted from the plan.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Policy KN1 Hampton Road, Knowle
As with the Site West of Dickens Heath, this draft allocation requires the reprovision of sports pitches. In this instance, the re-provided pitches are currently shown within the Green Belt to the north of the allocation.
The Council, within Paragraphs 713-715 state that it’s likely that very special circumstances will exist to support development in this location and, as such, the reprovision will likely be acceptable. However, this pre-judges any application, for which the detail is not known, and as such cannot be relied upon. Therefore the housing that would be provided on the sports pitches should not be included until the reprovision of the sports pitches is secured.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Site Assessment Criteria
We consider that a more dispersed growth option should be considered and, as set out previously, consider that the land at Broad Lane, Hawkshurst (Site 544) is ideally suited to make an important contribution to the Council’s housing need. Following the Council’s own site selection criteria, we set out why this site is a suitable and deliverable alternative site which can be delivered utilising existing infrastructure:
We object strongly to the manner in which Site 544 has been assessed in the site selection process for the reasons which are set out below – and on that basis, object to the inconsistent application of the methodology.
Firstly, in assessing Site 544, the Council deemed that the site did not pass ‘Step 1’ – which is the initial, high-level sieving process. Sites which are not taken forward at this stage are then not subject to the more refined ‘Step 2’ analysis. We consider the manner in which the process was applied is fundamentally flawed and have carried out our own assessment (using the Council’s own analysis) to demonstrate that the site should not have been discounted at Step 1 and should have been included in Step 2.
STEP 1
The first stage in the sieving process is a high-level look at the following:
(i) Brownfield vs greenfield
(ii) Urban areas vs Green Belt
(iii) Accessibility
Sites can be rated from Priority 1 (brownfield in urban area or settlement) to Priority 10 (greenfield in isolated highly performing Green Belt location). A traffic light rating is then applied – sites which falls within Priority 1 to Priority 4 are green sites; Priority 5 sites are yellow; Priority 6, 6b and 7 sites are blue; and Priority 8, 9 and 10 sites are red. Red sites fail Step 1 and are not taken forward to Step 2 for assessment. Site 544 was incorrectly identified as a Priority 9 red site and was not therefore taken forward to Step 2.
In summary, Site 544 is a greenfield and Green Belt site. However, it is accessible (being on the edge of the Coventry urban area) and also within an area with a low GB score of 5. Therefore, it should be allocated a Priority score of no higher than 5 (yellow). We review below the manner in which this initial sieving assessment was flawed - taking Site 544 step by step through the same assessment process as the Council.
Green Belt
In the Green Belt Assessment 2016, Site 544 is identified as part of Refined Parcel RP83:5 which has a combined score of 5, within a range from the highest performing Green Belt sites (12) to the lowest performing sites, scoring as low as 0. With a score of 5, site 544 is clearly a lower performing site. The starting point for consideration as a Priority 5 site is a score of 5 or lower in the Green Belt––Site 544 falls into that category. The results of this assessment are backed up by our own Green Belt assessment which is included with this submission.
Accessibility
The second part of the criteria relates to accessibility and to achieve a Priority 5 ranking, the site is required to be in an accessible location. This is defined as:
(a) On the edge of the urban area or
(b) On the edge of a settlement which has a wide range of services and facilities including a primary school and a range of retail facilities.
Site 544 adjoins the urban edge of Coventry – indeed in the Council’s Site Assessment, the site is identified as possibly being an extension to Coventry.
It should be noted that in relation to the Publication Draft Plan, the Council have updated the Accessibility Study to take account of retail / surgery provision in adjoining LPA areas, however they have then not used this information to re-visit first principles and determine whether sites have been appropriately assessed from the start. Therefore, whilst this site now scores more positively, its ‘priority 9’ status has not been re-evaluated despite an Addendum to the Site Assessments being produced and the Accessibility Study being revisited. It appears that despite the site being on the urban edge of Coventry this has been discounted due to the sites geographical relationship with Coventry as opposed to Solihull. However, accessibility should be based upon spatial location rather than boundaries. The fact that the retail offer is in Coventry will not prevent residents of Hawkshurst using it.
For the absolute avoidance of doubt therefore, we enclose our own submission produced by Phil Jones Associates which demonstrates that the site is in a suitable and sustainable location.
It is fundamentally incorrect for Site 544 to have been ‘sieved out’ at Step 1. The site should have been correctly assessed as a Priority 5 yellow site as it meets the two necessary criteria. The site, therefore, should have been taken forward for a more detailed analysis in Step 2.
On the basis that the site does pass Step 1 – we have carried out the Step 2 assessment using the same table and criteria as the Council. There are no scorings or weightings attributed to the Step 2 analysis – it assessed on a qualitative basis.
STEP 2 – REFINEMENT CRITERIA
FACTORS IN FAVOUR
In accordance with the spatial strategy
(including only proportional additions to lower order settlements (i.e. those without a secondary school or not located close to the urban edge).
The preferred spatial strategy would be to locate development needs close to where they arise. However the Plan identifies that there is limited land available to achieve this and therefore the Council has had to look at alternative options, which includes land released from the Green Belt in the form of urban extensions and also followed a more dispersed strategy for development. They have sought to focus development in locations that are, or can be made, accessible and sustainable. Such locations are identified as typically being on the edge of urban areas (or within ruralsettlements) that have a greater range of services. Potential locations for development include adjoining the urban edge or a highly accessible settlement. This will have the benefit of focusing on urban areas and sustainable urban extensions to provide the best opportunity for achieving accessibility and delivering public transport improvements.
It is abundantly clear that geographically Site 544 adjoins the urban edge of Coventry – Coventry is the second largest City in the West Midlands, after Birmingham. Site 544, as confirmed in the SHELAA assessment, would be viewed as an urban extension to Coventry and there is, therefore, no doubt that Site 544 is in accordance with the Spatial Strategy, which seeks to locate development in the most accessible locations. Coventry is clearly such a location and there is nothing within the Spatial Strategy which would rule against this.
Therefore, it can only be concluded that the development of Site 544 would be in accordance with the Spatial Strategy.
Any hard constraints only affect a small proportion of the site and/or can be mitigated.
The SHELAA does not identify any hard constraints – we concur with this assessment.
The site would not breach a strong defensible boundary to the Green Belt.
There are no strong existing defensible Green Belt boundaries that would be breached. The existing boundaries to Bannerbrook Park comprise simply hedgerows, some of which were planted in conjunction with the existing development. The same form of boundary treatment can therefore be replicated on this site and indeed is proposed within the masterplan included with this submission.
Any identified wider planning gain over and above that which would normally be expected.
Following discussions with local undertakers regarding the lack of burial space available within the Borough, the landowners are willing to offer land for a multi faith burial space which will provide a much needed facility for the Borough and also secure the long term permanence of the Green Belt boundary in this location.
Sites that would use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
See above.
If finer grain accessibility analysis (including output from the Accessibility Study) shows the site (or the part to be included) is accessible.
The Accessibility Study is flawed when it comes to assessment of sites on the Solihull / Coventry boundary. The Study provides a scoring for accessibility for facilities within 1,200m of a site, however when assessing facilities beyond the administrative area of Solihull only facilities within 800m of the boundary are assessed, this is despite an updated assessment being provided in 2020 which proposed to apply some adjustment of standards and yet makes no sensible adjustment to standards for cross boundary provision. Sites in such locations are not therefore being assessed on a comparable basis. Furthermore, the assessment is only being undertaken of walking distances and makes no allowance for accessing facilities by bike. The document references ‘shared cycle’ routes but then makes no consideration of people actually using them for cycling. Clearly were cycling to be factored in, especially for those sites, which adjoin major settlements and therefore have access to a good cycleway network (such as Site 544) then their accessibility criteria would be much improved.
Whilst it is noted that some provision is now taken off cross boundary retail provision and public transport which has moved Site 544 to a higher scoring position; it is still not being assessed on a comparable basis.
There is a shared footway/cycleway through the Bannerbrook Park development which can be extended into Site 544. Furthermore, opportunities will be considered to accommodate a bus route through Site 544 and on through Bannerbrook Park.
It is therefore clear that the proposal can only be defined as being in an ‘accessible location’.
FACTORS AGAINST
Not in accordance with the Spatial Strategy
As set out above, the development of this site is in accordance with the Spatial Strategy
Overriding hard constraints that cannot be mitigated.
There are no hard constraints identified.
SHELAA Category 3 sites unless demonstrated that concerns can be overcome.
The site is not identified as a Category 3 site in the SHELAA. We make comments below in respect of the flaws of SHELAA assessment and carry out our own assessment.
Sites that would not use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
As already confirmed, the site uses existing defensible boundaries and proposes to strengthen the defensible boundary and strengthen existing hedgerow planting.
If finer grain analysis shows the site (or the part to be included) is not accessible.
As previously confirmed, the Council have failed to consider the proximity of services in Coventry on a fair basis and because of this, it is not possible to determine how detailed the assessment has been. However, given that the site adjoins a major urban area is it simply not feasible to draw a conclusion that the site is inaccessible.
If the site is in a landscape character area that has a very low landscape capacity rating.
It is wholly unreasonable if the Council have used this criterion to discount this site. According to the Council’s Landscape Character Study (December 2016) this site falls within Landscape Character Area (LCA) 26 – which covers the eastern fringe of the Borough – yet significant Green Belt release is proposed in other areas of the Borough which are in an identical LCA. With one blanket ‘very low’ landscape capacity conclusion for such wide areas it cannot be used to discount some sites and not others – there must be parity in assessment. Furthermore, the study itself (page 49 – text adjoining Table 24) confirmed that it is not possible to establish a baseline sensitivity to change without having details of a given development proposal and therefore the conclusions should be taken as a guide only. On this basis, we do not consider it appropriate to use this criterion as a basis to discount sites given sites with the same assessment have been given a ‘green’ score’.
We enclose with this submission our own detailed, site specific, landscape and visual appraisal which confirms that the site has the ability to accommodate development of scale which is comparable to the surrounding area without compromising the function of the surrounding Green Belt.
If the SA appraisal identifies significant harmful impacts.
The SA identified 2 harmful impacts:
(i) The site contains over 20ha of Grade 1 – 3 agricultural land.
The site is wholly Grade 3 agricultural land – clearly within Grade 3, the site could in fact be Grade 3b land which would mean it is not BMVL. Furthermore, the Regional ALC mapping, which was last updated in November 2018, shows this to be the prevailing land type across the Borough which is not unsurprising. As a result, a number of proposed allocated sites have the same classification. It is not therefore appropriate to identify this as a harmful impact when a consistent approach has not been applied across the board.
(ii) The distance to jobs is identified as 8km within the SA
This is clearly incorrect as the SA treats the administrative boundary between Coventry and Solihull as a line which people will not cross. This is clearly incorrect. As already stated, there is for example a good bus connection to Warwick University which is a key local employer as well as Coventry city centre which offers multiple employment opportunities. The SA has applied the same approach to all services and facilities – relating its conclusions only to Solihull Borough and thus the distances to shops / schooling / healthcare are distorted. In addition, we highlight that this is a specific issue related to Balsall Common also (which is also further away from Coventry) and yet the Council has seen fit to allocate in excess of 1,700 dwellings in Balsall Common.
In summary:
• The site has medium / high accessibility – at the same level as the other ‘green sites’ identified in the Draft Plan.
• The site is in lower performing Green Belt than other ‘green sites’ in the plan.
• The site has existing defensible Green Belt boundaries which can be strengthened.
• The site has no constraints within the development area which cannot be mitigated in the normal way.
• The site has the same landscape character as other ‘green sites’.
• It is not, therefore, credible for Site 544 to be categorised as a ‘red’ site.
• For this reason, we consider the score for Site 544 should be corrected and the Council should re-visit their assessments from first principles.
As is evidenced from the corrected SHELAA commentary the site is rated as a Category 1 – Deliverable Site. Such sites are deemed to be available now, offer a suitable location for housing now and there is a reasonable prospect that housing will be delivered on site within 5 years from the date of adoption of the plan.

Object

Solihull Local Plan (Draft Submission) 2020

Policy P5 – Provision of Land for Housing

Representation ID: 15072

Received: 14/12/2020

Respondent: Barratt David Wilson Homes - Land south of Broad Lane

Agent: Barton Willmore Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Vulnerability of housing supply:
Consider automatic allocation of 2013 Solihull Local Plan sites, which have been allocated for a number of years, without any justification as to their deliverability, is an incorrect approach.
Sites not come forward despite Council lacking a 5YLS, points to deliverability issues with sites.

Change suggested by respondent:

Existing 2013 Local Plan site allocations should be tested for deliverability prior to re-allocation

Full text:

Introduction
Paragraph 18 sets out that the site allocations from the Solihull Local Plan (December 2013) will be brought forward. We consider that the automatic allocation of these sites which have been allocated for a number of years, without any justification as to their deliverability, is an incorrect approach. We address this in more detail under our comments in respect of Policy 4.
Finally, Paragraph 21 refers to neighbourhood plans and the importance SMBC places on these. Paragraph 30 of the National Planning Policy Framework (NPPF) sets the most recently adopted policies will take precedence. SMBC may wish to set this out within this section, to make it clear that the LPR will take precedence upon adoption over any currently adopted Neighbourhood Plans.
Soundness – The Plan is not:
- Justified
Change Sought:
- Existing allocations should be tested for deliverability prior to re-allocation
- The hierarchy of neighbourhood plans should be made clear
Vision
Given that paragraph 59 of the NPPF states that the Government’s objective is to significantly boost the supply of housing, the wording relating to meeting the needs of the housing market area should be more positively worded.
Paragraph 50 sets out that SMBC are seeking to protect the integrity of the Green Belt. Wording should be included setting out that lower performing parcels could be released to protect higher performing parcels while meeting identified and evidenced needs.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- The vision should be more positively worded in order to significantly boost the supply of housing
- The need to release lower performing green belt to meet identified needs, and preserve higher performing parcels, should be set out
Providing Homes for All
Policy P4C Meeting Housing Needs – Market Housing
We object to the inflexible market housing mix which is prescribed within this policy. The NPPF encourages provision of balanced and mixed communities catering for a wide range of the population.
Individual sites should cater for a wide range of housing types and sizes. Provision of such a significant proportion of only smaller (3 bed or fewer) dwellings on sites will not develop long term sustainable communities. Instead it will result in a transient community where people will not be able to form long term neighbourhoods as they will need to move on as their circumstances change if there are insufficient homes of the right size on a site to accommodate them. We do not consider that this represents good planning and consider that the focus should be on building strong healthy communities which can cater for all, rather than simply planning for short term ownership.
The inclusion of a prescribed housing mix runs counter to the criterion elsewhere within the policy which allow a number of factors to be taken into consideration. This plan has a significant lifespan and to prescribe a housing market mix which is to remain in place for the whole of plan period does not provide sufficient flexibility for adaptation to current housing need and demand. We have seen with the current pandemic the way external factors can influence people’s choice of lifestyle.
Soundness – The Plan is not:
• Justified
• Effective
Change Sought:
• Amendment of policy to allow for housing mix based on up to date market evidence
Policy P4D Meeting Housing Needs – Self and Custom Housebuilding
The latest Annual Monitoring Report (March 2020), covering the period 2018/19, sets out that for the period November 2018 – October 2019 there were 374 entries on the Self-build register.
As such, requiring all sites of over 100 houses to provide 5% of open market dwellings in the form of self-build plots is unreasonable and unjustified. Given provision is being made for 7,605 houses through allocations above 100 houses and the UK Central Hub area, this would equate to the 761 self and custom build plots to be provided from the draft allocations.
The Planning Practice Guidance (PPG) advises that the Council should engage with landowners who own sites that are suitable for housing and ‘encourage’ them to consider self-build and custom housing and who are interested in provision. Imposition of mandatory requirement goes beyond encouragement.
Following the example of Stratford District for example, the Council have specifically identified custom build sites which are discreet standalone small sites.
We also include extracts from the Bedford Local Plan Inspector’s Report (Appendix 4) where the Inspector recommended deletion the policy akin to that being proposed here as the policy was not justified with reference to the self-build register. The same principle applies here in that the amount being sought is over double that on the register.
Soundness – The Plan is not:
• Justified
• Consistent with national policy
Change Sought:
• Deletion of specific policy requirement and replacement with specific allocations or general support for self-build sites
Policy P5 Provision of Land for Housing
Policy P5 sets out the Council will allocate sufficient land for at least 5,270 net additional homes to ensure sufficient housing supply to deliver 15,017 additional homes in the plan period. This would result in an average annual housing land provision target of 938 net additional homes per year. This annualised target is made up of a stepped requirement with 851 homes per year delivered between 2020-2026 and 991 dwellings delivered between 2026-2036.
Demand
A Housing Need Technical Report has been provided (December 2020) (Appendix 5) and should be read in conjunction with our commentary on Policy P5. In summary, this Note makes the following key points:
• Planning Practice Guidance (PPG) states the Standard Method (SM) figure represents the minimum housing need, and there may be circumstances whereby need is higher;
• The Draft Plan identifies the clear economic growth aspirations for the Borough, including the nationally significant growth planned for the UK Central Hub. This is a circumstance where housing need may exceed the minimum need. If it does, housing delivery must be of a quantum to support these aspirations;
• The Council’s 2020 HEDNA confirms that the calculation of housing need is underpinned by the growth at the UK Central Hub. The Hub is projected to generate an additional 13,000 jobs to the baseline Experian job growth forecast (10,000 jobs) included in the HEDNA;
• The HEDNA tests several economic-led housing need scenarios. However, the UK Hub Scenario assumes only 25% of the additional 13,000 jobs created by the Hub are to be taken up by Solihull residents. This results in the housing need (816 dpa) underpinning the Plan;
• However, this ignores the ‘Growth A’ scenario which concludes that 908 dpa would be required based on the ‘Adjusted Local Growth’ scenario. This scenario assumes that strong industries in Solihull will outperform the baseline Experian forecast, resulting in an additional 5,680 jobs to the baseline (10,000 jobs) over the Plan period, with Solihull residents taking up these jobs;
• However, no scenario is presented to show what the housing need would be based on the UK Central Hub scenario being fulfilled in full by Solihull residents. It is important to understand this so that the duty to cooperate discussions referred to in the HEDNA are well informed;
Barton Willmore provide these sensitivity scenarios based on two approaches to commuting, and two approaches to underlying demographic rates (mortality, fertility, and migration);
• The results of our testing are summarised in Table 7.1:
Table 7.1: Solihull Borough – Barton Willmore Demographic Forecasting 2020-2036 Scenario Demographic rates Jobs per annum 2020-2036 Dwellings per annum 2020-2036
Dwelling-constrained:
Standard Method
2016 ONS rates
7721 – 8132
807
2018 ONS rates
1,0141 – 1,0682
Employment-constrained:
UK Central Hub
2016 ONS rates
1,437
1,1991 – 1,2482
2018 ONS rates
1,0361 – 1,0852
Source: Barton Willmore Development Economics
1 Commuting Ratio 0.98
2 Commuting Ratio 0.93
• Growth of between 1,036 and 1,248 dpa would be required to support the UK Central Hub scenario (between 16,576 and 19,968 dwellings in total);
• This represents an increase of between 220 dpa and 432 dpa on the housing need calculated by the HEDNA (816 dpa), or an additional 3,520 to 6,912 dwellings over the Plan period;
• Our analysis of historic levels of job growth in Solihull 1991-2019 shows a range of 1,225 and 1,650 jobs per annum (jpa). This highlights that the UK Central Hub scenario (1,437 jpa) is a realistic assumption;
• The HEDNA identifies an ‘acute’ situation in respect of affordable housing need. Our analysis suggests that the HEDNA’s conclusion on overall need (816 dpa) should be increased to meet as much affordable need as possible.
• Furthermore, our analysis of unmet need in the wider GBBCHMA suggests that the 2020 Position Statement’s conclusions under-estimate the remaining unmet housing need from Birmingham up to 2031, and for Birmingham alone the deficit in unmet need is between 11,294 and 13,101 dwellings up to 2031;
• In addition, there is significant unmet need up to 2031 based on the existing Standard Method coming from Birmingham City and the Black Country. This amounts to unmet need of between 25,543 and 27,350 dwellings up to 2031. If we were to assume the increased capacity for Birmingham City (65,400 dwellings 2011-2031) set out in the 2020 Position Statement the unmet need would still be between 11,243 and 13,050 dwellings up to 2031. This increases significantly based on the uncapped Standard Method figure for Birmingham City which would come into effect once Birmingham’s Local Plan becomes older than 5 years in 14 months’ time;
Adoption of the proposed changes to Standard Method consulted on by Government in summer 2020 would lead to there being unmet need against emerging/existing housing requirements in all but one of the GBBCHMA authorities;
• Furthermore, the unmet need post 2031 should be considered, as referenced to in the 2020 Position Statement. Based on data available at the present time and the most recent Local Plan figures, Barton Willmore calculate this to be a minimum 17,700 dwellings 2031-2040.
• In summary, the analysis in this report results in the following broad conclusions:
1. The SM’s minimum need for Solihull (807 dpa) will need to be increased to account for expected job growth from the UK Central Hub and the ‘acute’ need for affordable housing in the Borough;
2. Barton Willmore’s demographic modelling shows that between 1,036 and 1,248 dpa are required to support the UK Central Hub scenario;
3. Barton Willmore’s calculations suggest that the deficit in unmet housing need from Birmingham City being delivered by HMA Local Plans amounts to a minimum of between 11,294 and 13,101 dwellings up to 2031, a significant increase from the 2,597 dwellings concluded on by the 2020 Position Statement. This increases when the unmet need from the Black Country is considered. Additional unmet need will be created post 2031.
As such, in order to ensure the LPR is positively prepared, SMBC should seek to plan for more housing, and should allocate further sites.
SUPPLY
Further to the above, and as set out above, we also consider that some elements of the supply should be reviewed:
Dealing with the supply side of the equation, we make the following objections to the various components of supply:
‘Sites identified in land availability assessments’
It is unclear what is meant by ‘sites identified in land availability assessments’. Given these are sites which do not benefit from a draft allocation, then they are by definition, windfall sites which means that there is double counting from unknown sources of supply.
Solihull Local Plan sites
We question the automatic inclusion of Solihull Local Plan sites which have yet to be granted planning permission. The current Plan was adopted in 2013 and the Council cannot currently demonstrate a 5-year supply of housing. In this situation, the Council should be encouraging every suitable site to come forward. The fact that these sites have not come forward despite the housing shortfall, suggests that these should not be considered ‘deliverable’ housing sites without significant justification as to why they will now come forward when they have not to date.
Brownfield Land Register (BLR)
We query the separate identification of sites identified in the BLR – this BLR is subject to periodic review and thus will not be fixed as a permanent source of supply. We consider that any sites to be delivered in this way should be considered as windfall developments.
Lapse Rates
Whilst we support the use of a 10% lapse rates, it needs to be applied across the board i.e. it is equally application in relation to what is to come as to what has already gone before. If the Council accept that a 10% lapse rate is application to sites which already benefit from planning permission, then surely it should also accept that it is applicable to future planning consents which have yet to be granted.
Windfall allowance
The windfall allowance is justified by reference to past windfall rates however it fails to recognise that ‘ town centre sites’ (a traditional source of windfall supply) are allocated in the plan through the town centre masterplan and the Council have identified other sources of supply through the brownfield register. In the absence of any assessment / analysis of this component demonstrating the projected level of future windfall provision taking these factors in account, we consider that the level of windfall should be reviewed and adjusted accordingly.
UK Central Hub
We consider that given the scale of the UK Central Hub proposals, the rate of delivery assumed by the Council is overly optimistic. The Council have not provided any trajectory for the Site, and we note that the August 2020 consultation did not contain any firm commitments to delivery timescales or set out any delivery partners.
This assertion is supposed by the findings of the Lichfields’ Report1 that sets out the average time from outline planning application to the first delivery of homes is 8.4 years. The average build out rate is 160dpa.
As such, taking this into account, and based on a LPR adoption date of 20222, we consider the first completions will likely be C.2030. With an average build out rate of 160dpa, this means that approximately 960 dwellings will be delivered during the Plan Period, assuming that the housing is within the first delivery phases (the August 2020 consultation referenced a mix of uses coming forward). While more outlets may increase the speed of delivery, the amount of infrastructure required also needs to be taken into account. The type of supply also needs to be considered, with UK Central Hub likely to be geared towards apartments.
As such, we consider that 1,780 houses should be removed to take into account the likely delivery timescales.
Trajectory
We also note that SMBC are seeking to provide a stepped trajectory as some of the larger sites will not make a significant contribution to completions until the mid-delivery phase. The Inspector assessing the Guildford Local Plan set out:
39. In the submitted plan, the combined effect of the stepped trajectory in Policy S2 together with the “Liverpool” methodology (in which the delivery shortfall accumulated over the first 4 years of the plan (2015/16 to 2018/19) is spread over the whole plan period), would have deferred a significant proportion of the housing requirement to the later years of the plan. Set against the (then higher) housing requirement, this would not have met the Government’s objective to boost the supply of housing in the shorter term. (our emphasis)
We consider that SMBC should take the same approach as Guildford and allocate further sites to meet need early in the Plan Period. The existence of the UK Central Hub is not of a sufficient size to warrant a different approach (i.e. it is not akin to a new settlement).
Further, as with the withdrawn Uttlesford Local Plan, this stepped trajectory may create a fragile 5 year housing land supply position, taking into account the ambitious delivery targets of the UK Central Hub and the delivery concerns relating to the draft allocations set out below. The Inspectors’ letter relating to the withdrawn plan states:
29. This calculation relies on the use of a reduced annual requirement of 568 dpa for most of the years, as it is based on the stepped trajectory set out in Policy SP3. It is also based on what we consider to be unrealistic commencement/housing delivery dates for two of the Garden Communities (North Uttlesford and Easton Park, as set out above). So, whilst the Council can, in theory, demonstrate a 5.65 year HLS, we are concerned that if the housing delivery at North Uttlesford and Easton Park slips by just one year, as seems very likely, this would result in 100 less dwellings in this 5 year period. This would result in a very fragile 5 year HLS position.
There are comparisons that can be drawn here based on the stepped trajectory and the anticipated 5.37 year supply upon adoption.
The Inspectors for the withdrawn Uttlesford Local Plan also referenced the need to meet the full objectively assessed need for market and affordable housing in the housing market area (NPPF Paragraph 47). The HEDNA states there is a ‘clearly acute’ shortage of affordable housing. The proposed stepped trajectory therefore may worsen the affordability problem as it would delay the provision of housing until late years of the plan period.
Taking the above into account, we consider that the SMBC’s supply is actually 11,496 (rounded) before any reduction in windfall or the deletion of draft allocations which are unlikely to be delivered is taken into account.
This is a reduction of 3,521 and, as such, to meet the increased demand set out above, and take into account the concerns relating to a stepped trajectory, a review of the supply is required and additional sites allocated.
The Council should also ensure that a large number of these sites can be delivered early on in the Plan Period in order to take account of the likely later delivery of some other sites.
Soundness – The Plan is not:
• Positively prepared
• Justified
• Effective
• Consistent with national policy
Change Sought:
• Review of demand and amendment to the strategy
• Review of supply and amendment to the strategy
• Allocation of additional sites to ensure housing need is met (including suitable provision for wider HMA needs) and an annualised trajectory is possible
Improving Accessibility and Encouraging Sustainable Travel
Policy P7 Accessibility and Ease of Access
We consider that the requirement for major residential development should be clarified to set out that there may be other ways in which sustainable access options can be implemented. The distance to a bus stop/train station should not be seen as the only measure of sustainable access.
Soundness – The Plan is not:
- Positively prepared
Change Sought:
- Policy should be clarified that there are other ways of ensuring sustainable transport options are available
Policy P8 Managing Travel Demand and Reducing Congestion
Paragraph 109 of the NPPF states that development should only be prevented or refused on highway grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. Within point 2(ii), SMBC are seeking to bring in a further test which would not be in accordance with the NPPF. This should therefore be deleted.
Soundness – The Plan is not:
• Consistent with national policy
Change Sought:
• Point 2(ii) should be deleted
Protecting and Enhancing our Environment
Policy P11 Water and Flood Risk Management
With regards to point 6, the confirmation of discharge into a public sewer falls under Section 106 of the Water Industry Act 1991. As such, it should be made clear that planning permission can be granted prior to this being confirmed, as it falls within a different regulatory regime.
With regards to point 14, it should be clarified that contribution through a Section 106 Agreement is only required where it meets the tests set out in NPPF Paragraph 56.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Deletion of point relating to confirmation from relevant infrastructure owner
• Clarification as to obligation requirements and the necessary tests
Promoting Quality of Place
Policy P17 Countryside and Green Belt
Within Point 1 of the policy, SMBC is seeking to safeguard best and most versatile agricultural land (BMVAL) unless there is an overriding need for development that outweighs the loss. BMVAL is referenced within the NPPF at Paragraph 170 which states that planning policies should contribute to and enhance the natural and local environment by taking into account a number of criteria. One of these is:
b) recognising the intrinsic character and beauty of the countryside, and the wider benefits from natural capital and ecosystem services – including the economic and other benefits of the best and most versatile agricultural land, and of trees and woodland.
Firstly, we consider that including reference to BMVAL within a policy relating to Green Belt seeks to conflate two separate issues. Further, as can be seen above, the test set out by the NPPF does not require the safeguarding of BMVAL. Planning policies are required to contribute to and enhance natural and local environment by recognising economic and other benefits from BMVAL. As such, we consider this point should be deleted.
SMBC have set out, within Point 4, a number of different factors that may be taken into account when considering very special circumstances.
Further to this, point 5 sets out that development that is ‘conspicuous’ from the Green Belt must not harm the visual amenity of the Green Belt by reason of siting, materials or design. Given Green Belt is a spatial designation, designed to prevent sprawl, we consider that this requirement goes beyond the scope of the Green Belt, as set out in the NPPF. The LPR contains policies relating to protecting landscape, where necessary, and as such, this point should be deleted.
Soundness – The Plan is not:
• Positively prepared
• Consistent with National Policy
Change Sought:
• Deletion of point 1
• Inclusion of further factors which may create very special circumstances
• Deletion of point 5
Policy P17A Green Belt Compensation
Paragraph 138 of the NPPF sets out that ways in which the impact of removing land from the Green Belt can be offset through compensatory improvements to the environmental quality and accessibility of remaining Green Belt Land.
Policy P17 is seeking to require this by requiring development on sites removed from the Green Belt to provide appropriate compensatory improvements to environmental quality and accessibility of remaining Green Belt in the form of a Section 106 Agreement utilising the below hierarchy:
1. Compensatory requirements as set out as part of the Local Plan masterplans
2. Where no compensation has been set out within the Local Plan masterplan, improvements are provided as:
i. Improvements within the Green Belt adjacent to, or in close proximity to, the development site;
ii. Improvements within the Green Belt adjacent to, or in close proximity to, the settlement or area accommodating the development;
iii. Improvements within the Green Belt in an area identified for environmental improvements as part of the Council’s Green Infrastructure Opportunity Mapping.
3. In the event it is robustly demonstrated that none of the above options can be satisfied then the Council will accept a commuted sum.
Given none of the emerging masterplans show any compensatory improvements within the Green Belt, it would appear that the Policy is relying on there being additional land being available within the control of applicants (which may not be the case), or the payment of contributions.
SMBC’s viability evidence does not take this requirement into account, and no detail is provided as to how these contributions will be spent or what level of contribution is required. This therefore brings uncertainty, and the Policy should be reconsidered to ensure what is required is clear, and that it will not impact upon the viability of schemes.
Soundness – The Plan is not:
• Consistent with National Policy
Change Sought:
• Reconsideration of the policy to ensure that it is evidenced based, does not impact upon viability of schemes, and is in accordance with national policy
Delivery and Monitoring
Policy P21 Developer Contributions and Infrastructure Provision
Policy P21 expected major development to provide or contribute towards the provision of measures to directly mitigate its impact and physical, social, green and digital infrastructure.
SMBC’s viability testing does not take into account digital infrastructure within the testing and, as such, it should be evidenced that this will not render development unviable.
Soundness – The Plan is not:
• Justified
• Consistent with National Policy
Change Sought:
• Confirmation that digital infrastructure provision allows for viable development
Settlement Chapters
Policy BC1 Barratt’s Farm, Balsall Common
We note that 1,756 new homes are proposed for Balsall Common across the plan period with the sole justification seemingly being that it contains both a primary and secondary school and has a full range of retail and associated facilities. However, it is still described as a rural settlement with no significant areas of employment and the distribution strategy remains one of “proportional distribution”. 1,756 dwellings to a single rural village would be completely disproportionate. There is discussion in the document regarding delivery of a by-pass; provision a station car park; improved public transport and a new primary school. However, there is no discussion as to how these are to be funded / delivered relative to the level of growth identified. In addition, there is discussion regarding the scope to enhance the existing local centre and the provision of a village centre masterplan. However, this land is in multiple ownerships and there are no proposals for what these enhancements could entail or how they could function – particularly with a by-pass in place which could actually draw trade away from the existing centre.
There is no assessment of the ability of Balsall Common to deliver this level of growth in such a small area. Whilst clearly some sites (i.e. Barratts Farm) will be able to have multiple outlets, the ability of the market to absorb and deliver multiple sites at any one time in a rural location should be reviewed; particular when Balsall Common will be acutely affected by HS2 – both in terms of the physical construction of the line and the disruption and uncertainty that this will bring; but also in terms of market desirability until such time as the line is constructed.
We also note that Barratts Farm is in multiple ownerships and these are described as “complex” in paragraph 541. This is the single largest site and the one which is proposed to deliver the by-pass. Within the previous draft of the Plan, it was stated that this site would only be taken forward if the landowners / promoters could demonstrate they are working on a collaborate and comprehensive basis. Reading paragraph 541, this collaborate working has clearly not been secured in the way it was envisaged and nothing additional is suggested to demonstrate that joint / collaborative working is possible.
The relief road is identified as being necessary for Barratts Farm in particular with the policy advising that is required early in the plan period. The road is provisionally to be funded via CIL payments; and grant funding which “may” be possible through the WMCA. Firstly, CIL payments can only be secured through those sites which will come forward in the future however these sites are Green Belt sites and cannot therefore be delivered until the Local Plan Review is completed and the subsequent CIL schedule is adopted. Secondly, there is no grant funding proposal in place to fund the road. As it currently stands this road is not deliverable. The road is required to be delivered early in the plan period i.e. before there are significant CIL funds in place and, potentially, at a point where, in order to receive grant funding, applications should be being made now / near future.
There has to be serious doubt over the ability of Barratts Farm to be delivered within the anticipated timeframes and therefore places serous doubt over the plan as a whole given the scale of this allocation.
The Sustainability Appraisal notes that there are limited employment opportunities within Balsall Common and that people travel outside of the settlement to work. As such, it is noted that the expansion of this settlement would fly in the face of sustainability objectives of reducing the need to travel to areas of employment. Whilst such a case could be made for the majority of the rural areas of the Borough, it is heightened especially here when such a large proportion of future growth is identified for one rural settlement.
At this stage, the level of growth attributed to Balsall Common is disproportionate and that inadequate research has been undertaken into the deliverability of this level of growth and the associated aspirations; and the ability of the market to deliver this level of growth in a rural area is considered to be unrealistic.
On the basis that we do not consider the sites identified to be deliverable and the significant shortfall in supply identified by the more realistic timescales we have identified for UK Central, we propose an alternative site – Land at Hawkshurst (Site 544) as an alternative to meeting part of this need. To date this site has been inappropriately assessment by the Council and a more appropriate evaluation of the site is given in the section below.
Policy BL1 – West of Dickens Heath
The policy requires that the proposal for BL1 secures the relocation of the existing sports provision to a suitable site in the local vicinity. Until such time as these facilities are relocated or a plan is in place to secure timely relocation (which should include the grant of planning permission in our view, given that any site will be in the Green Belt), then the site cannot come forward for development. Our key concern here relates to Site 4 (West of Dickens Heath). It is noted that the identification of a Local Wildlife Site within the site hampers re-provision within the site itself and therefore alternative options will need to be pursued outside of the site. We consider that these alternatives should be considered now as clearly, as it currently stands, the pitches will be lost with no alternative in place (and therefore no guarantee of any re-provision). This is all the more important given that the land in the area is all located within the Green Belt and therefore any proposals which may, for example, include floodlighting, will have to be carefully considered against the Green Belt ‘tests’. We understand that the loss of these facilities is causing significant local concern particularly with no proposals for replacement.
The Council have had ample time to identify and secure alternative provision and therefore the fact that this is not identified within the plan, suggests that there are currently no alternative sites. This calls into question the delivery of this site and with no evidence and no proposals in place, we consider that proposal BL1 should be deleted from the plan.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Policy KN1 Hampton Road, Knowle
As with the Site West of Dickens Heath, this draft allocation requires the reprovision of sports pitches. In this instance, the re-provided pitches are currently shown within the Green Belt to the north of the allocation.
The Council, within Paragraphs 713-715 state that it’s likely that very special circumstances will exist to support development in this location and, as such, the reprovision will likely be acceptable. However, this pre-judges any application, for which the detail is not known, and as such cannot be relied upon. Therefore the housing that would be provided on the sports pitches should not be included until the reprovision of the sports pitches is secured.
Soundness – The Plan is not:
• Justified
• Effective
• Consistent with National Policy
Change Sought:
• Reprovision of the sports pitches should be secured prior to allocation
Site Assessment Criteria
We consider that a more dispersed growth option should be considered and, as set out previously, consider that the land at Broad Lane, Hawkshurst (Site 544) is ideally suited to make an important contribution to the Council’s housing need. Following the Council’s own site selection criteria, we set out why this site is a suitable and deliverable alternative site which can be delivered utilising existing infrastructure:
We object strongly to the manner in which Site 544 has been assessed in the site selection process for the reasons which are set out below – and on that basis, object to the inconsistent application of the methodology.
Firstly, in assessing Site 544, the Council deemed that the site did not pass ‘Step 1’ – which is the initial, high-level sieving process. Sites which are not taken forward at this stage are then not subject to the more refined ‘Step 2’ analysis. We consider the manner in which the process was applied is fundamentally flawed and have carried out our own assessment (using the Council’s own analysis) to demonstrate that the site should not have been discounted at Step 1 and should have been included in Step 2.
STEP 1
The first stage in the sieving process is a high-level look at the following:
(i) Brownfield vs greenfield
(ii) Urban areas vs Green Belt
(iii) Accessibility
Sites can be rated from Priority 1 (brownfield in urban area or settlement) to Priority 10 (greenfield in isolated highly performing Green Belt location). A traffic light rating is then applied – sites which falls within Priority 1 to Priority 4 are green sites; Priority 5 sites are yellow; Priority 6, 6b and 7 sites are blue; and Priority 8, 9 and 10 sites are red. Red sites fail Step 1 and are not taken forward to Step 2 for assessment. Site 544 was incorrectly identified as a Priority 9 red site and was not therefore taken forward to Step 2.
In summary, Site 544 is a greenfield and Green Belt site. However, it is accessible (being on the edge of the Coventry urban area) and also within an area with a low GB score of 5. Therefore, it should be allocated a Priority score of no higher than 5 (yellow). We review below the manner in which this initial sieving assessment was flawed - taking Site 544 step by step through the same assessment process as the Council.
Green Belt
In the Green Belt Assessment 2016, Site 544 is identified as part of Refined Parcel RP83:5 which has a combined score of 5, within a range from the highest performing Green Belt sites (12) to the lowest performing sites, scoring as low as 0. With a score of 5, site 544 is clearly a lower performing site. The starting point for consideration as a Priority 5 site is a score of 5 or lower in the Green Belt––Site 544 falls into that category. The results of this assessment are backed up by our own Green Belt assessment which is included with this submission.
Accessibility
The second part of the criteria relates to accessibility and to achieve a Priority 5 ranking, the site is required to be in an accessible location. This is defined as:
(a) On the edge of the urban area or
(b) On the edge of a settlement which has a wide range of services and facilities including a primary school and a range of retail facilities.
Site 544 adjoins the urban edge of Coventry – indeed in the Council’s Site Assessment, the site is identified as possibly being an extension to Coventry.
It should be noted that in relation to the Publication Draft Plan, the Council have updated the Accessibility Study to take account of retail / surgery provision in adjoining LPA areas, however they have then not used this information to re-visit first principles and determine whether sites have been appropriately assessed from the start. Therefore, whilst this site now scores more positively, its ‘priority 9’ status has not been re-evaluated despite an Addendum to the Site Assessments being produced and the Accessibility Study being revisited. It appears that despite the site being on the urban edge of Coventry this has been discounted due to the sites geographical relationship with Coventry as opposed to Solihull. However, accessibility should be based upon spatial location rather than boundaries. The fact that the retail offer is in Coventry will not prevent residents of Hawkshurst using it.
For the absolute avoidance of doubt therefore, we enclose our own submission produced by Phil Jones Associates which demonstrates that the site is in a suitable and sustainable location.
It is fundamentally incorrect for Site 544 to have been ‘sieved out’ at Step 1. The site should have been correctly assessed as a Priority 5 yellow site as it meets the two necessary criteria. The site, therefore, should have been taken forward for a more detailed analysis in Step 2.
On the basis that the site does pass Step 1 – we have carried out the Step 2 assessment using the same table and criteria as the Council. There are no scorings or weightings attributed to the Step 2 analysis – it assessed on a qualitative basis.
STEP 2 – REFINEMENT CRITERIA
FACTORS IN FAVOUR
In accordance with the spatial strategy
(including only proportional additions to lower order settlements (i.e. those without a secondary school or not located close to the urban edge).
The preferred spatial strategy would be to locate development needs close to where they arise. However the Plan identifies that there is limited land available to achieve this and therefore the Council has had to look at alternative options, which includes land released from the Green Belt in the form of urban extensions and also followed a more dispersed strategy for development. They have sought to focus development in locations that are, or can be made, accessible and sustainable. Such locations are identified as typically being on the edge of urban areas (or within ruralsettlements) that have a greater range of services. Potential locations for development include adjoining the urban edge or a highly accessible settlement. This will have the benefit of focusing on urban areas and sustainable urban extensions to provide the best opportunity for achieving accessibility and delivering public transport improvements.
It is abundantly clear that geographically Site 544 adjoins the urban edge of Coventry – Coventry is the second largest City in the West Midlands, after Birmingham. Site 544, as confirmed in the SHELAA assessment, would be viewed as an urban extension to Coventry and there is, therefore, no doubt that Site 544 is in accordance with the Spatial Strategy, which seeks to locate development in the most accessible locations. Coventry is clearly such a location and there is nothing within the Spatial Strategy which would rule against this.
Therefore, it can only be concluded that the development of Site 544 would be in accordance with the Spatial Strategy.
Any hard constraints only affect a small proportion of the site and/or can be mitigated.
The SHELAA does not identify any hard constraints – we concur with this assessment.
The site would not breach a strong defensible boundary to the Green Belt.
There are no strong existing defensible Green Belt boundaries that would be breached. The existing boundaries to Bannerbrook Park comprise simply hedgerows, some of which were planted in conjunction with the existing development. The same form of boundary treatment can therefore be replicated on this site and indeed is proposed within the masterplan included with this submission.
Any identified wider planning gain over and above that which would normally be expected.
Following discussions with local undertakers regarding the lack of burial space available within the Borough, the landowners are willing to offer land for a multi faith burial space which will provide a much needed facility for the Borough and also secure the long term permanence of the Green Belt boundary in this location.
Sites that would use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
See above.
If finer grain accessibility analysis (including output from the Accessibility Study) shows the site (or the part to be included) is accessible.
The Accessibility Study is flawed when it comes to assessment of sites on the Solihull / Coventry boundary. The Study provides a scoring for accessibility for facilities within 1,200m of a site, however when assessing facilities beyond the administrative area of Solihull only facilities within 800m of the boundary are assessed, this is despite an updated assessment being provided in 2020 which proposed to apply some adjustment of standards and yet makes no sensible adjustment to standards for cross boundary provision. Sites in such locations are not therefore being assessed on a comparable basis. Furthermore, the assessment is only being undertaken of walking distances and makes no allowance for accessing facilities by bike. The document references ‘shared cycle’ routes but then makes no consideration of people actually using them for cycling. Clearly were cycling to be factored in, especially for those sites, which adjoin major settlements and therefore have access to a good cycleway network (such as Site 544) then their accessibility criteria would be much improved.
Whilst it is noted that some provision is now taken off cross boundary retail provision and public transport which has moved Site 544 to a higher scoring position; it is still not being assessed on a comparable basis.
There is a shared footway/cycleway through the Bannerbrook Park development which can be extended into Site 544. Furthermore, opportunities will be considered to accommodate a bus route through Site 544 and on through Bannerbrook Park.
It is therefore clear that the proposal can only be defined as being in an ‘accessible location’.
FACTORS AGAINST
Not in accordance with the Spatial Strategy
As set out above, the development of this site is in accordance with the Spatial Strategy
Overriding hard constraints that cannot be mitigated.
There are no hard constraints identified.
SHELAA Category 3 sites unless demonstrated that concerns can be overcome.
The site is not identified as a Category 3 site in the SHELAA. We make comments below in respect of the flaws of SHELAA assessment and carry out our own assessment.
Sites that would not use or create a strong defensible boundary to define the extent of land to be removed from the Green Belt.
As already confirmed, the site uses existing defensible boundaries and proposes to strengthen the defensible boundary and strengthen existing hedgerow planting.
If finer grain analysis shows the site (or the part to be included) is not accessible.
As previously confirmed, the Council have failed to consider the proximity of services in Coventry on a fair basis and because of this, it is not possible to determine how detailed the assessment has been. However, given that the site adjoins a major urban area is it simply not feasible to draw a conclusion that the site is inaccessible.
If the site is in a landscape character area that has a very low landscape capacity rating.
It is wholly unreasonable if the Council have used this criterion to discount this site. According to the Council’s Landscape Character Study (December 2016) this site falls within Landscape Character Area (LCA) 26 – which covers the eastern fringe of the Borough – yet significant Green Belt release is proposed in other areas of the Borough which are in an identical LCA. With one blanket ‘very low’ landscape capacity conclusion for such wide areas it cannot be used to discount some sites and not others – there must be parity in assessment. Furthermore, the study itself (page 49 – text adjoining Table 24) confirmed that it is not possible to establish a baseline sensitivity to change without having details of a given development proposal and therefore the conclusions should be taken as a guide only. On this basis, we do not consider it appropriate to use this criterion as a basis to discount sites given sites with the same assessment have been given a ‘green’ score’.
We enclose with this submission our own detailed, site specific, landscape and visual appraisal which confirms that the site has the ability to accommodate development of scale which is comparable to the surrounding area without compromising the function of the surrounding Green Belt.
If the SA appraisal identifies significant harmful impacts.
The SA identified 2 harmful impacts:
(i) The site contains over 20ha of Grade 1 – 3 agricultural land.
The site is wholly Grade 3 agricultural land – clearly within Grade 3, the site could in fact be Grade 3b land which would mean it is not BMVL. Furthermore, the Regional ALC mapping, which was last updated in November 2018, shows this to be the prevailing land type across the Borough which is not unsurprising. As a result, a number of proposed allocated sites have the same classification. It is not therefore appropriate to identify this as a harmful impact when a consistent approach has not been applied across the board.
(ii) The distance to jobs is identified as 8km within the SA
This is clearly incorrect as the SA treats the administrative boundary between Coventry and Solihull as a line which people will not cross. This is clearly incorrect. As already stated, there is for example a good bus connection to Warwick University which is a key local employer as well as Coventry city centre which offers multiple employment opportunities. The SA has applied the same approach to all services and facilities – relating its conclusions only to Solihull Borough and thus the distances to shops / schooling / healthcare are distorted. In addition, we highlight that this is a specific issue related to Balsall Common also (which is also further away from Coventry) and yet the Council has seen fit to allocate in excess of 1,700 dwellings in Balsall Common.
In summary:
• The site has medium / high accessibility – at the same level as the other ‘green sites’ identified in the Draft Plan.
• The site is in lower performing Green Belt than other ‘green sites’ in the plan.
• The site has existing defensible Green Belt boundaries which can be strengthened.
• The site has no constraints within the development area which cannot be mitigated in the normal way.
• The site has the same landscape character as other ‘green sites’.
• It is not, therefore, credible for Site 544 to be categorised as a ‘red’ site.
• For this reason, we consider the score for Site 544 should be corrected and the Council should re-visit their assessments from first principles.
As is evidenced from the corrected SHELAA commentary the site is rated as a Category 1 – Deliverable Site. Such sites are deemed to be available now, offer a suitable location for housing now and there is a reasonable prospect that housing will be delivered on site within 5 years from the date of adoption of the plan.

For instructions on how to use the system and make comments, please see our help guide.