Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 9615
Received: 15/03/2019
Respondent: Albanwise Ltd
Agent: Barton Willmore
- Plan period end date should be extended to 2036 to align with GL Hearn Strategic Growth Study
- Plan may be delayed, and will ensure a minimum 15 year time horizon
- Cites Para. 60-61 of NPPF on housing need assumptions
- Urge SMBC suitably considers contribution to unmet housing need in wider GBBBC HMA
Please see attached submission on behalf of our Client, Albanwise Limited, in response to the Solihull Local Plan Review: Draft Local Plan Supplementary Consultation.
We respond in respect of their land interest known as 'Land at Wychwood Roundabout' ('the Site'); and support its inclusion within the Draft Local Plan
Review, as a suitable and sustainable location for residential development