Comment

Draft Local Plan - Supplementary Consultation

Representation ID: 9615

Received: 15/03/2019

Respondent: Albanwise Ltd

Agent: Barton Willmore

Representation Summary:

- Plan period end date should be extended to 2036 to align with GL Hearn Strategic Growth Study
- Plan may be delayed, and will ensure a minimum 15 year time horizon
- Cites Para. 60-61 of NPPF on housing need assumptions
- Urge SMBC suitably considers contribution to unmet housing need in wider GBBBC HMA

Full text:

Please see attached submission on behalf of our Client, Albanwise Limited, in response to the Solihull Local Plan Review: Draft Local Plan Supplementary Consultation.
We respond in respect of their land interest known as 'Land at Wychwood Roundabout' ('the Site'); and support its inclusion within the Draft Local Plan
Review, as a suitable and sustainable location for residential development