Comment
Draft Local Plan - Supplementary Consultation
Representation ID: 9753
Received: 15/03/2019
Respondent: IM Land
Agent: Turley
Agree that SM is good starting point for assessing housing need. PPG states that only a minimum.
Two factors need to be considered at the next stage of the Local Plan:
a) Impact of supergrowth associated with High Speed 2 (HS2), the planned investment in strategic infrastructure improvements at UK Central and elsewhere in the Borough to facilitate growth, on the housing needs
b) Reach a more firm position in respect of the level of HMA shortfall that will be accommodated in the Borough.
Please find attached representations prepared by Turley on behalf of IM Land in respect of Land at Earlswood Station in response to the Solihull Local Plan Review - Draft Local Plan Supplementary Consultation (January 2019).