Policy P18 Health and Wellbeing

Showing comments and forms 1 to 21 of 21

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 10631

Received: 16/11/2020

Respondent: Edward Fraser

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

The Doctors surgeries are full to overflowing with the present population

Full text:

The draft proposals for the housing developments still has far too many sites with large numbers in the Shirley Area.
We already have far too much traffic on roads due to people from Dickens Heath,Tidbury Green etc developments passing through our roads.
The Doctors surgeries are full to overflowing with the present population and the erosion of Green Belt land is not acceptable.
We already have a plethora of housing/apartments for elderly developments. It's time to build some affordable housing for first time buyers and young families. But we can't cope with the disproportionate amount of suggested development in and around Shirley.

Support

Solihull Local Plan (Draft Submission) 2020

Representation ID: 10715

Received: 09/12/2020

Respondent: The Theatres Trust

Representation Summary:

The Trust is supportive of this policy, although with note to parts 6 and 7 we would suggest there is great merit in also requiring HIA on proposals seeking to lose community and cultural facilities such as community centres and halls, cinemas, pub and theatres as this would also potentially have negative impacts on health and wellbeing.

Full text:

The Trust is supportive of this policy, although with note to parts 6 and 7 we would suggest there is great merit in also requiring HIA on proposals seeking to lose community and cultural facilities such as community centres and halls, cinemas, pub and theatres as this would also potentially have negative impacts on health and wellbeing.

Support

Solihull Local Plan (Draft Submission) 2020

Representation ID: 10884

Received: 14/12/2020

Respondent: The British Horse Society

Representation Summary:

Broadly accept.
2 i) The diverse population includes equestrians and physical activity includes horse riding/driving which research shows to have significant physical and mental health benefits (Sung et al, 2015).
2 iii) Active travel definition includes equestrians as they are also vulnerable road users (Jesse Norman MP, 2018)

Full text:

Broadly accept.
2 i) The diverse population includes equestrians and physical activity includes horse riding/driving which research shows to have significant physical and mental health benefits (Sung et al, 2015).
2 iii) Active travel definition includes equestrians as they are also vulnerable road users (Jesse Norman MP, 2018)

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 10929

Received: 14/12/2020

Respondent: SSA Planning

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

No objectively assessed requirement based on specific problem with HFTs or proliferation, existing or projected numbers, above average or increasing obesity, link with proximity or mechanism (particularly for primary schools), extent of affected area, real walk distances, impacts on sustainable accessibility, footfall or other retail uses nearby. No assessment of impact, therefore no balance. Negative assumptions disincentivise good practice. Impossible to monitor or manage. Other planning and non-planning policies and interventions more effective. National policy seeks to create not restrict choice. Soundness tests not removed by practice guidance but focussed on areas of high incidence and over-concentration.

Change suggested by respondent:

Clarify actual meaning and intent of last sentence in part 3, evidence and re-focus part 4 to achieve objective in last sentence of part 3 and delete part 5 .

Full text:

POSITIVELY PREPARED
1. The draft policy is not based on any objectively assessed development requirement, but instead implies that within 400 metres of the boundary of primary or secondary schools, no hot food takeaways (HFTs) will be required over the Plan Period. It does this without evidence of:
• existing numbers of HFTs within these areas or the wider Borough
• the effect of the policy on numbers in these areas or the Borough
• link between obesity incidence and proximity of HFTs to schools
• any particular distance at which incidence increases or is harmful
2. In fact, the distance chosen has the effect of banning HFTs from a significant proportion of the Borough. Because no assessment has been made of the number of HFTs that might be refused as a result of this or what the social, economic or environmental impacts of that might be, it is not possible to balance these impacts.
3. The policy is essentially an area-based blanket ban and is negative in its assumption that all HFTs offer little choice and serve the same type and standard of food. This is unfair to those that engage positively to offer healthy choices and therefore acts as a powerful disincentive to do so where others established businesses compete negatively.
4. Increasingly, town centres and lower-order parades and groups of shops depend upon the presence of experiential (that is, difficult or impossible to replace online) or serendipitous uses (that is, unlikely to generate a specific trip), such as hairdressers and HFTs, to draw in and maintain the footfall to support remaining non-experiential uses.
5. An inability to operate such uses will result in not only their loss and resulting additional and longer trips by car, but also the loss of the remaining convenience stores and other non-experiential uses close by. Each zone covers 50 hectares, containing typically around 1,000 households. This amounts to a significant spend lost and car journeys caused.
JUSTIFIED
6. Neither the supporting text nor the evidence base provide any information to show that the incidence of overweight or obesity in the district is above average or increasing, but rather focusses on disparities within the Borough.
7. Consequently, it is difficult to draw any conclusions from the evidence as to the effect of particular land uses or their proximity to others on the attainment of healthy diet and weight. Clearly, diet is a key determinant both of general health and obesity levels, but its predictors are far more complex than the environment around schools.
8. Whilst some HFTs, together with restaurants, pubs and shops are a source of cheap, energy dense and nutrient poor foods, not all of them are, and the planning system is ineffective in distinguishing between those that are and those that are not. Indeed, in some respects, pubs and restaurants can often be worse (Robinson et al, 2018).
9. Planning Inspectors at appeal (APP/P4415/A/11/2159082) have found that refusing HFTs within 400 metres of primary schools cannot be justified. This is because such policies tend to be justified as countering the vulnerability of unaccompanied children to making poor diet choices. However, primary school children are rarely unaccompanied.
10. Sometimes, local evidence can demonstrate a correlation between the density of food and drink uses in a given geography and incidence of overweight or obesity. Policies related to limiting over-concentration of these uses within a specified area might be justified, but the evidence on proximity specifically as a factor is very weak.
11. Typically, where similar policies have been adopted elsewhere in the United Kingdom, it has been as a result of very high and increasing incidence coupled with proliferation of the use controlled, together outweighing limited evidence of effectiveness. It is also often the case that, where adopted, no objections have been made.
EFFECTIVE
12. In the past, reviews (Williams et al, 2014) have found very little evidence for an effect of the retail food environment surrounding schools on food purchases and consumption, so it is at best unclear whether an effort to attain healthy diets and weights based on refusing HFTs within 400 m of primary and secondary schools could ever work.
13. As discussed in Williams et al (2004), the methods for defining and measuring the food environment vary widely between studies and few consistent findings emerge. The premises studied rarely, if ever, map across to actual use classes or specific land uses, making it near-impossible to conclude whether HFTs specifically are problematic.
13. The inclusion of primary schools is particularly problematic, as it is clear that children at primary schools are not usually permitted to leave the premises at lunchtime and, given their age, are unlikely to travel to or from school unaccompanied. Outside school time, children’s diets are properly the responsibility their parents or guardians.
14. On a point of practicality, exclusion zones based on radii take no account of real barriers, either physical or perceptual and therefore affect premises on the other side of line features, such as canals or rivers, that are in reality more than a 400 m walk away. Such premises can play no part in a supposed link between incidence and proximity.
15. The area affected covers a significant part of the Borough, so it is hard to see how the effectiveness of its extent could be monitored. Would poor or negative achievement against the objective result in reduction or expansion of the zones? What other corrective action might be taken short of their withdrawal?
16. Exercise is also a key determinant that must be considered for a complete picture. Access to open space, sport and recreation facilities is a longstanding and achievable output of the planning system. Directing resources to this and targeted lifestyle interventions would be a far more appropriate strategy for reducing childhood obesity.
CONSISTENT WITH NATIONAL POLICY
17. The National Planning Policy Framework (NPPF) recognises the role planning takes in better enabling people to live healthier lifestyles. However, it seeks to do this by creating, not restricting choice, by increasing access to open space, sport and recreation facilities and health services, and ensuring developments are within walkable distance.
18. The NPPF requires policies to be sound, assessed against tests, including justification (which requires evidence that there is problem that can be solved by planning policy) and effectiveness (which requires at least reasonable correlation and a potential mechanism of action between the thing controlled and outcome sought.
19. The NPPF requirements are not overridden by Planning Practice Guidance (PPG) paragraph 4 of part 53, which suggests consideration of a list of issues, including high incidence of obesity and over-concentration of certain uses (implicitly food and drink, not necessarily HFTs) in proximity to locations where children and young people gather.
REFERENCES
Robinson E, Jones A, Whitelock V, Mead B R, Haynes A, (Over)eating out at major UK restaurant chains: observational study of energy content of main meals. BMJ 2018; 363: 4982
Williams J, Scarborough P, Matthews A, Cowburn G, Foster C, Roberts N and Rayner M, A systematic review of the influence of the retail food environment around schools on obesity-related outcomes. Obes Rev 2014; 15: 359-374

Support

Solihull Local Plan (Draft Submission) 2020

Representation ID: 11171

Received: 12/12/2020

Respondent: Natural England

Representation Summary:

Particularly support sub criterion 2x - Retaining, increasing and enhancing green infrastructure within developments including green spaces, planting, trees, open spaces and soft surfaces, in order to secure a variety of spaces for residents, visitors or employees to use and observe.

Full text:

See Attached Letter.

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 13922

Received: 10/12/2020

Respondent: Sport England

Legally compliant? Yes

Sound? Yes

Duty to co-operate? Yes

Representation Summary:

Support Policy P18 Health and Wellbeing which contains a number of Active Design Principles which help to promote physical activity. The policy could be made more effective by promoting co-location of destinations, allowing users to make only one linked trip to an area for multiple reasons. Co-location assists with reducing the need to travel and social interaction, whilst also creating variety and vitality in town and local centres.
Supporting infrastructure should also be promoted to influence physical activity choices and meet the needs of a range of potential users.

Full text:

Policy P14 sets out how developments which will cause or be subject to existing
noise, odour or atmospheric pollution, will need to satisfactorily mitigate or abate the identified negative impact on amenity.
The Policy in part covers NPPF paragraph 182 agent of change principle. However, it fails to consider circumstances such as a developments adjacent playing field site for example a cricket club, which could be at risk of ball strike. In such circumstances, in line with NPPF paragraph 182, the development would need to provide mitigation through the provision of ball stop netting to ensure the use of the playing field is not prejudiced or that any unreasonable restrictions are placed on the use of the site.
An additional criterion should be added to Policy P14 to ensure consistency with national planning policy paragraph 182.
* Existing businesses and facilities should not have unreasonable restrictions placed on them as a result of development permitted after they were established. Where the operation of an existing business or community facility could have a significant adverse effect on new development (including changes of use) in its vicinity, the applicant (or ‘agent of change’) should be required to provide suitable mitigation before the development has been completed.

Policy P15 could be made more effective in promoting health and well-being, in line with NPPF paragraph 127, by referring to Sport England’s Active Design Guid-ance. The Guidance sets out 10 principles which developments should seek to ad-here to promote activity, health and stronger communities through design.
Active Design is supported by Public Health England and is part of our collabora-tive action to promote the principles set out in Public Health England’s ‘Everybody Active, Every Day’, to create active environments that make physical activity the easiest and most practical option in everyday life.
Add reference to point Policy P15 point 4 to help achieve Objectives F, H and J -
4. All developments should comply with the urban design principles set out in es-tablished current design guidance, including at present; The National Design Guide (2019), Urban Design Compendium 1 and 2 (2007), Manual for Streets 1 (2007) and 2 (2010), Active Design (20015), Building for Life 12 and Secured by Design principles, or their equivalents.

Sport England are supportive of Policy P18 Health and Wellbeing with it containing a number of Active Design Principles which help to promote physical activity.
Sport England considers the policy could be made more effective through the promotion of co-location (the grouping of destinations such as community facilities, schools, shops, work places, sports facilities and leisure centres within close proximity of each other), allowing users to make only one linked trip to an area for multiple reasons. Co-location assists with linked trips reducing the need to travel and allow more time for people to linger and be socially interactive, whilst also creating variety and vitality in town and local centres.
Linked to the above supporting infrastructure should also be promoted such as public conveniences; drinking fountains; cycle, mobility scooter and pushchair storage; changing rooms; quality of seating; Wi-Fi access; shelter and showers. The above are all elements that can influence physical activity choices and should be provided where appropriate to meet the needs of a range of potential users.
Supporting infrastructure to enable sport and physical activity to take place should be provided across all contexts including workplaces, sports facilities and public space, to facilitate all forms of activity.
Provision of new public open space, children’s play, sports and recreational facilities
Point 7 sets out new housing development will be required to provide or contribute towards new open spaces or the improvement of existing provision in the area, in line with the minimum standard of 3.57ha per 1,000 population.
The Council’s Playing Pitch Strategy Update and Playing Pitch Mitigation utilises Sport England’s Playing Pitch Demand Calculator Tool to ascertain the playing pitch demand from proposed housing allocations contained within the Plan.
Sport England promotes the use of the calculator with it being informed by a local evidence base document assessment of supply and demand. It is unclear if the standard of 3.57ha per 1,000 population encapsulates playing field provision and if so, how has the figure been justified to identify demand in line with Playing Pitch Strategy and whether it would meet the CIL regulation 122 tests.
Provision of new public open space, children’s play, sports and recreational facilities
Point 9 states new housing developments will be required to provide or contribute towards new open spaces or the improvement of existing provision in the area, unless financial unviability is clearly demonstrated. It is unclear why the viability caveat is included particularly given Policy P21 and the Plan’s objectives F and J, it might be the circumstances that other contributions should not be sought or that contributions should be proportionality reduced.
Indoor Sports Facilities Strategy 2012

Policy P20 points 10 and 13 refers to an Indoor Sports Facilities Strategy 2012. The document sets out provision standards based on deficit and surpluses for the Borough and then applies these standards to the 2026 projected future population of the Borough. Therefore, the standards proposed and identified deficits/surpluses are not based on robust and up to date assessment of need as there is a failure to consider needs up to 2036.
On the basis of the above the policy (and the IDP) is not consistent with national planning policy with NPPF paragraph 96, which requires planning policies to be based on robust and up-to-date assessments of the need for open space, sport and recreation facilities (including quantitative or qualitative deficits or surpluses) and opportunities for new provision.
Playing Pitch Strategy
Sport England welcomes the authority undertaking a monitoring and review of its Playing Pitch Strategy 2017. The Playing Pitch Strategy (update) 2019 provides an update on the following inputs amongst others; sites (where informed by national governing bodies and the LPA); team numbers (informed by national governing bodies); strategy period (extending from 2026 to 2036); and site actions.
The update document reaffirms that there are current and future shortfalls in playing field provision within the Borough. Therefore, to ensure demand for pitches are met there is a need to protect existing sites; provide new sites and to improve the quality of the existing sites where identified within the Playing Pitch Strategy Action Plan. The document also provides a robust evidence base to inform the Playing Pitch Mitigation Strategy which establishes the need to replace existing playing field sites proposed for development and identify the playing pitch demands from residential developments. The use of the Playing Pitch Strategy Mitigation report within the site allocations policies contained within the Plan is welcomed and in line with NPPF paragraph 96.
It should be noted dialogue with the LPA as part of the PPS update work confirmed that the authority will conduct a full Playing Pitch Strategy in early 2022, this is supported by Sport England to ensure that authority evidence base remains robust. It should be noted that the authority should still undertake annual reviews in line with Stage E of Sport England’s Playing Pitch Strategy Guidance.
1. The incorporation of the below text within P20 ensures that the demand for playing pitches will be informed/justified by evidence namely the Council’s Playing Pitch Strategy in line with NPPF paragraph 96.
Developer contributions will be required to enhance provision of playing pitch-es, based on additional demand generated by the new residential development and the sufficiency of existing provision to meet current and projected need. The Council will have regard to Sport England’s strategic planning tools and findings of the Playing Pitch Strategy to determine an appropriate amount and type of contribution or provision within new developments.
Where it is agreed by the Council that on-site pitch provision is appropriate to meet identified demand, the applicant is required to provide the new pitch(es) and make provision for its management and maintenance in perpetuity, and clarify these arrangements within a management plan to be agreed by the Council.
2. To ensure that the policy is effective in achieving its objective and policies considerations are not replicated the following amendment is suggested:
New housing developments will be required to provide or contribute to-wards new open spaces or the improvement of existing provision in the area, unless financial unviability is clearly demonstrated.
3. Indoor Sports Facilities Strategy 2012
The authority should commit to updating its Indoor Sports Facilities Strategy 2012 with works commencing prior to the adoption of the Plan to ensure the Plan is consistent with NPPF paragraph 96.

Policy BC2 2. V states the retention of the existing playing field site which is welcomed and in line with the finding of the Playing Pitch Strategy. However, SMBC illustrative concept masterplan appears to display a road abutting the playing field site and the removal of part of a hedgerow which creates a boundary for the playing field site. It is unclear why this has been proposed as it could lead impact on the use of the site such as it being less secure and balls leaving the playing field site.
To ensure that there is reduced impact on the use of playing field the concept masterplan should maintain a strong boundary for the playing field site.
Sport England welcomes the vast majority of the proposed housing allocation policies identifying a need to provide a financial contribution towards the provision of new playing pitches and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy and the Playing Pitch Strategy which identified that there are current and future shortfalls in pitch provision.
However, at this point in time it is unclear as to where the contributions will be directed to with the Plan failing to identify the location or allocation of the new playing pitches/hubs sites.
Further to this on the larger proposed allocation sites (sites which generate the demand for multiple pitches) the illustrative concept masterplans fail to incorporate any on-site playing pitch provision As such there is a possibility that no additional pitches are created which could lead to the deterioration of existing pitches (which already in short supply) due to their use being exacerbated even further.
It should also be noted that ancillary uses such as car parking and changing room facilities will also be required to support the use of playing field sites for formal activities in line with the Playing Pitch Strategy.
Pitch Provision
To ensure the shortfalls identified within the Playing Pitch Strategy is met in accordance with NPPF paragraph 96 the Concept Illustrative Masterplans for sites which create the demand for multi playing pitches should clearly display locations for the pitches and ancillary provision. The need to provide for the pitches will rescind upon such time suitable new off site playing field site(s) have been identified to meet the developments demands for playing field provision. This approach will also assist in ensuring Plan objectives F and J are met.
Ancillary Provision
To ensure that the playing field demand generated from sites in accordance with NPPF paragraph 96 the policy should incorporate the provision of supporting infrastructure required to serve the playing field sites, therefore the below additional text should be incorporated.
v. Financial contribution to provision of new playing pitches (and supporting ancillary provisions) and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy.
The wording of paragraph 594 should be made clear that the replacement provision should be equivalent or better provision in terms quantity and quality to ensure consistency with NPPF paragraph 97. Further to this new sports provision would also be required to meet the demand generated from the new developments.
In relation to shortlisted replacement sites further details should be provided to ascertain the sites suitability and further clarification is required as to what part of P20 is an enabling policy for replacement pitches and facilities.
For clarity paragraph 594 should be amended as per the below:
Sports and Recreation - Replacement of any lost recreation / sports provision as a result of development will be required to an equivalent or better standard in terms of quantity and quality, including ancillary provision, access and use by the wider community where appropriate. Provision will also be made for playing pitches (and ancillary provision) to meet the demands generated from new developments. Several sites have been shortlisted in the vicinity of the existing clubs West of Dickens Heath, and an enabling policy for replacement pitches and facilities is incorporated within Policy P20

Policy BL1 sets out the existing sports facilities should be retained and remain accessible until such time replacement sites are in place, which is supported by Sport England.
However Policy BL1 fails to set out how the playing pitch demand generated from the site will be met with no reference to the Playing Pitch Strategy/Playing Pitch Mitigation Strategy. The Playing Pitch Strategy identifies shortfalls in playing field provision which will increase when taking account of future growth.
Should the site make no on-site playing field provision nor an off-site contribution, the shortfalls identified within the Playing Pitch Strategy will be exacerbated with existing pitches being utilised more intensively thus reducing their quality. For this reason, it is considered that policy is not consistent with NPPF paragraph 96 as the policy fails to help address shortfalls in provision as identified within an up to date evidence base document.
To enable the sporting needs from the development are met in line with Playing Pitch Strategy and NPPF paragraph 96 the following change is proposed:
-iii Relocation of the existing sports provision. Financial contribution to provision of new playing pitches (and ancillary facilities) and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy.

Paragraph 605 incorrectly sets out the sports club sites to be relocated with Leafield Athletic FC being retained and Wychall Wanderers FC to be replaced. To ensure clarity as to the site’s to be replaced the following modification is proposed.
605 The larger site is currently occupied by Highgate United FC, Leafield FC Wychall Wanderers FC and Old Yardleians .Rugby Football Club, and re-provision will be required for these sports pitches.

Policy BL2 fails to set out how the playing pitch demand generated from the site will be met with no reference to the Playing Pitch Strategy/Playing Pitch Mitigation Strategy. The Playing Pitch Strategy identifies shortfalls in playing field provision which will increase when taking account of future growth.
Should the site make no on-site playing field provision nor an off-site contribution, the shortfalls identified within the Playing Pitch Strategy will be exacerbated with existing pitches being utilised more intensively thus reducing their quality. For this reason, it is considered that policy is not consistent with NPPF paragraph 96 as the policy fails to help address shortfalls in provision as identified within an up to date evidence base document.
To ensure the policy is consistent with NPPF paragraph 96 provision should be made within the policy to address the current and future shortfalls identified within the Playing Pitch Strategy.
The following modification is therefore proposed in relation to likely infrastructure requirements to be included within the policy:
3.V. Financial contribution to provision of new playing pitches (and ancillary facilities) and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy.

Policy BL3 fails to set out how the playing pitch demand generated from the site will be met with no reference to the Playing Pitch Strategy/Playing Pitch Mitigation Strategy. The Playing Pitch Strategy identifies shortfalls in playing field provision which will increase when taking account of future growth.
Should the site make no on-site playing field provision nor an off-site contribution, the shortfalls identified within the Playing Pitch Strategy will be exacerbated with existing pitches being utilised more intensively thus reducing their quality. For this reason, it is considered that policy is not consistent with NPPF paragraph 96 as the policy fails to help address shortfalls in provision as identified within an up to date evidence base document.
To ensure the policy is consistent with NPPF paragraph 96 provision should be made within the policy to address the current and future shortfalls identified within the Playing Pitch Strategy.
The following modification is therefore proposed in relation to likely infrastructure requirements to be included within the policy:
3.V. Financial contribution to provision of new playing pitches (and ancillary facilities) and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy.

Policy HH1 fails to set out how the playing pitch demand generated from the site will be met with no reference to the Playing Pitch Strategy/Playing Pitch Mitigation Strategy. The Playing Pitch Strategy identifies shortfalls in playing field provision which will increase when taking account of future growth.
Should the site make no on-site playing field provision nor an off-site contribution, the shortfalls identified within the Playing Pitch Strategy will be exacerbated with existing pitches being utilised more intensively thus reducing their quality. For this reason, it is considered that policy is not consistent with NPPF paragraph 96 as the policy fails to help address shortfalls in provision as identified within an up to date evidence base document.
To ensure the policy is consistent with NPPF paragraph 96 provision should be made within the policy to address the current and future shortfalls identified within the Playing Pitch Strategy.
The following modification is therefore proposed in relation to likely infrastructure requirements to be included within the policy:
3.V. Financial contribution to provision of new playing pitches (and ancillary facilities) and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy.

The allocation of KN1 would entail the relocation of Knowle Football Club within the site on land between the new development and the canal. The policy states that appropriate facilities associated with the provision of outdoor sport will be permitted in the Green Belt, provided they preserve the openness of the Green Belt and do not conflict with the purposes of including land within it.
To ensure the current site can be relocated in the area identified within the concept illustrative masterplan, the policy should make clear the replacement entails pitches and ancillary provision (such as floodlighting, clubhouse and car parking). Further to this provisions should be made within the policy to enable the capability of the site containing a 3G pitch in line with recommendations contained within the Council’s Playing Pitch Strategy and the Football Foundations Local Facilities Football Plan to ensure demand in the area can be met.
With regards to the illustrative concept masterplan Sport England and national governing bodies are keen to be engaged with the layout of the replacement site as there are some concerns based on concept such as:
- the introduction of trees within the central areas of the replacement playing field area would reduce the flexibility of the site to be marked out for alternative pitch layouts.
- car parking is detached from the sports pavilion;
- pavilion should be centrally located to the main pitch it seeks to serve
- Pitch orientation should accord with Sport England’s Natural Turf for Sport Guidance which is endorsed by national governing bodies.
- Seek to ensure the provision of sports light and the potential for a 3G pitch is not impacted by the LWS, Listed Buildings or proximity to residential dwellings.
- Cricket pitch should be sited in an area which would be impact by ball strike.
Policy KN1 would result in residential development adjacent an existing cricket club the policy fails to identify this as a principle which should be taken account of within the concept masterplan. The policy should reflect the requirements of NPPF paragraph 182 requiring a ball strike assessment to be undertaken should residential development come forward on the football club site but not on the cricket club site. The findings of the ball strike assessment should be implemented and maintained by the developer (unless of otherwise agreed by the Club following consultation with Sport England and the ECB). It is viewed that this is necessary as the proposed development could be at risk of ball strike which could prejudice the use of the cricket pitch.
a) To ensure replacement provision is equivalent in terms of quantity and quality in line with NPPF paragraph 97 and Sport England Exception Policy E4 the following modification is considered necessary:
viii. Relocation of the existing playing field site (pitches and ancillary provision) sports pitches currently occupied by Knowle Football Club;
b) For consistency and clarity purposes all reference to the reprovision/relocation of the Knowle pitches within the policy and supporting text should be modified to playing field site (pitches and ancillary provision)
c) To ensure that the use of the cricket club is not prejudiced by the introduction of residential development adjacent to it the following design principle in line NPPF paragraph 182 should be incorporated into the Policy:
2.IX The provision and maintenance of ball stop mitigation will be required, if deemed necessary following a ball strike risk assessment, and implemented before any ball strike risk is introduced as a result of the proposed development.
d) To enable an identified need within the Council’s Playing Pitch Strategy and Playing Pitch Mitigation Strategy to be met at the site, in accordance with NPPF paragraph 96, provisions within the policy for a 3G pitch should be made within the replacement site.
4.IV The provision for a full sized 3G pitch with sports lighting to be provided at the site.

Policy KN2 entails the relocation of the Arden Academy site. The Academy’s playing field site contains hard court provision, AGP and a number of playing pitches. The Council’s Playing Pitch Strategy identifies that there are current and future shortfalls in playing field provision. The Playing Pitch Strategy identifies that the site is used by the community, which should be formal secured via a community use agreement, and that sports provision should be replaced. In relation to the AGP the Playing Pitch Strategy states that it should replaced by a 3G pitch instead. Given the above the playing field site is not deemed to be surplus to requirement and the policy should ensure the playing field site should not be lost until a replacement provision of equivalent quantity and quality being developed and available for use.
Policy KN2 also fails to set out how the playing pitch demand generated from the site will be met with no reference to the Playing Pitch Strategy/Playing Pitch Mitigation Strategy. The Playing Pitch Strategy identifies shortfalls in playing field provision which will increase when taking account of future growth.
Should the site make no on-site playing field provision nor an off-site contribution, the shortfalls identified within the Playing Pitch Strategy will be exacerbated with existing pitches being utilised more intensively thus reducing their quality. For this reason, it is considered that policy is not consistent with NPPF paragraph 96 as the policy fails to help address shortfalls in provision as identified within an up to date evidence base document.
a) To ensure the policy is consistent with NPPF paragraph 97b, as the playing field site incorporating hard court and AGP has not been demonstrated to be surplus to requirement by the Playing Pitch Strategy and utilised by the community, the following modification is proposed to policy KN2:
2. x Development of the Arden Academy Trust playing field site (inclusive of hard court and AGP) and its ancillary facilities shall not commence until the provision of replacement playing field is made available for use. The replacement provision will be at least equivalent or better in terms quantity and quality of that proposed to be lost.
b) To ensure the policy is consistent with NPPF paragraph 96 provision should be made within the policy to address the current and future shortfalls identified within the Playing Pitch Strategy.
The following modification is therefore proposed in relation to likely infrastructure requirements to be included within the policy:
3.V. Financial contribution to provision of new playing pitches (and ancillary facilities) and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy.

Policy ME1 fails to set out how the playing pitch demand generated from the site will be met with no reference to the Playing Pitch Strategy/Playing Pitch Mitigation Strategy. The Playing Pitch Strategy identifies shortfalls in playing field provision which will increase when taking account of future growth.
Should the site make no on-site playing field provision nor an off-site contribution, the shortfalls identified within the Playing Pitch Strategy will be exacerbated with existing pitches be utilised more intensively thus reducing its quality. For this reason, it is considered that policy is not consistent with NPPF paragraph 96 as it fails to help address shortfalls in provision as identified within an up to date evidence base document.
To ensure the policy is consistent with NPPF paragraph 96 provision should be made within the policy to address the current and future shortfalls identified within the Playing Pitch Strategy.
The following modification is therefore proposed in relation to likely infrastructure requirements to be included within the policy:
3.V. Financial contribution to provision of new playing pitches (and ancillary facilities) and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy.

Policy SO2 fails to set out how the playing pitch demand generated from the site will be met with no reference to the Playing Pitch Strategy/Playing Pitch Mitigation Strategy. The Playing Pitch Strategy identifies shortfalls in playing field provision which will increase when taking account of future growth.
Should the site make no on-site playing field provision nor an off-site contribution, the shortfalls identified within the Playing Pitch Strategy will be exacerbated with existing pitches be utilised more intensively thus reducing its quality. For this reason, it is considered that policy is not consistent with NPPF paragraph 96 as it fails to help address shortfalls in provision as identified within an up to date evidence base document.
To ensure the policy is consistent with NPPF paragraph 96 provision should be made within the policy to address the current and future shortfalls identified within the Playing Pitch Strategy.
The following modification is therefore proposed in relation to likely infrastructure requirements to be included within the policy:
3.V. Financial contribution to provision of new playing pitches (and ancillary facilities) and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy.

Policy SO1 identifies that the existing sports pitches are to be retained. Sport England consider that wording sports pitches should be replaced with ‘playing field site’ which is aligned to the wording of NPPF paragraph 97. Further to this the sports pitch layout within a playing field can alter and is not fixed on the site.
Sport England considers this modification is necessary as it would appear that the illustrative concept masterplan for the site has a road which encroaches on to the playing field site reducing the capability of site to accommodate pitches (reducing the size of pitches). No information has been submitted to justify the loss of playing field land in accordance with NPPF paragraph 97/Sport England’s Exception Policies.
Policy SO1 also fails to set out how the playing pitch demand generated from the site will be met with no reference to the Playing Pitch Strategy/Playing Pitch Mitigation Strategy. The Playing Pitch Strategy identifies shortfalls in playing field provision which will increase when taking account of future growth.
Should the site make no on-site playing field provision nor an off-site contribution, the shortfalls identified within the Playing Pitch Strategy will be exacerbated with existing pitches be utilised more intensively thus reducing its quality. For this reason, it is considered that policy is not consistent with NPPF paragraph 96 as it fails to help address shortfalls in provision as identified within an up to date evidence base document.
A) To ensure the policy wording in relation to the retention of existing playing field site in accordance with NPPF paragraph 97 the following modification is proposed:
V. iii. Retention of existing sports pitch playing field site.
B) For clarity the Concept Illustrative Masterplan should clearly set out there is no encroachment on to the playing field site.
C) To ensure the policy is consistent with NPPF paragraph 96 provision should be made within the policy to address the current and future shortfalls identified within the Playing Pitch Strategy.
The following modification is therefore proposed in relation to likely infrastructure requirements to be included within the policy:
3.V. Financial contribution to provision of new playing pitches (and ancillary facilities) and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy.

Sport England welcomes the identification of the provision of leisure and community infrastructure though the needs for the site should be informed by a Playing Pitch Strategy and Indoor Needs Assessment. To ensure that the leisure provision and playing pitch demand generated for the site is met the policy/supporting text should make reference to the need to undertake a site specific leisure and playing pitch needs assessment to inform the requirements for the site.

Sport England are supportive of policy UK2 with it ensuring the retention of the existing sports provision site until a suitable alternative site, agreed with Sport England and national governing bodies, being provided and ready for use.

Support

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14083

Received: 09/12/2020

Respondent: MACC Group

Agent: Claremont Planning Consultancy

Representation Summary:

Our client supports the Council’s recognition that the numbers of old age residents within the Borough of Solihull is increasing as this is a key challenge that must be addressed by the emerging Local Plan Review.

Full text:

See attachment

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14084

Received: 09/12/2020

Respondent: MACC Group

Agent: Claremont Planning Consultancy

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

The policy, as currently drafted, fails to acknowledge the importance of housing in delivering improved health outcomes, despite the recognition of this in Paragraph
454 in the Supporting Text. This is particularly the case in relation to housing for older people, with the text suggesting that developments that address such issues and mitigate health impacts for an ageing population will be supported. It is imperative that this is acknowledged within the policy itself, in order to give weight to this
statement and emphasise support for such proposals that deliver specialist housing and care accommodation.

Change suggested by respondent:

Modify Policy P18 to include support for specialist housing and care accommodation:

'2. (vii) Delivering new and improved health services and facilities, or specialist housing and care accommodation for older people or those with disabilities, in areas accessed by sustainable transport modes (facilities for primary medical care should be identified and planned for);

Full text:

See attachment

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14111

Received: 20/11/2020

Respondent: McDonald’s Restaurants Ltd

Agent: Planware Ltd

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

The proposed Policy P18 approach is unsound. It is too restrictive and prevents local planning authorities from pursuing a more positive policy approach.

The underlying assumption is that all Sui Generis uses are inherently harmful to health, which is not supported by evidence. McDonald’s offers healthy meal options, transparent nutritional information to allow healthy choices, and quality food and food preparation. The policy fails to acknowledge the wider benefits that restaurants can have on the economy and sustainable development.

Full text:

Dear Sir/Madam,

Please find attached our response on Policy P18

Can you please confirm receipt?

Kind Regards

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14112

Received: 20/11/2020

Respondent: McDonald’s Restaurants Ltd

Agent: Planware Ltd

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Restricting hot food takeaways within a 400m radius from an entrance to a primary or secondary school, youth centre or similar location is in direct conflict with national planning policy. The Policy provides no flexibility in accordance with town centre sites, conflicting with the sequential approach.

The phrasing “or similar location” needs to be defined. A map showing such exclusion zones will highlight the negative land use consequences of Policy P18. The policy is likely to be damaging to the district’s economy.

Change suggested by respondent:

Point 5 is unsound and should be deleted from the plan.

Full text:

Dear Sir/Madam,

Please find attached our response on Policy P18

Can you please confirm receipt?

Kind Regards

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14113

Received: 20/11/2020

Respondent: McDonald’s Restaurants Ltd

Agent: Planware Ltd

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Policy P18 takes an inconsistent approach towards new development that sells food and discriminates against operations with a hot food takeaway Sui Generis use. Given the objectives of Policy P18, it should apply equally to all relevant food retailers (A1 and A3 uses).
The policy is wholly disproportionate as it fails to acknowledge that the opportunity for children to access Sui Generis development, as part of a school day, is extremely limited.

Change suggested by respondent:

Point 5 is unsound and should be deleted from the plan.

Full text:

Dear Sir/Madam,

Please find attached our response on Policy P18

Can you please confirm receipt?

Kind Regards

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14115

Received: 20/11/2020

Respondent: McDonald’s Restaurants Ltd

Agent: Planware Ltd

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

There is no evidence to indicate over-concentrated areas of hot food takeaway’s gives rise to obesity or poor health outcomes. Evidence from the Borough of Waltham Forest, which introduced a school proximity policy, shows there has been no discernible impact on childhood obesity rates. More research and investigation is needed before such a approach can be justified. Similar policies have been found to be unsound by inspectors who have examined other plans such as South Ribble, London Borough of Croydon, Nottingham City, Rotherham and Guilford.

Change suggested by respondent:

Point 5 is unsound and should be deleted from the plan.

Full text:

Dear Sir/Madam,

Please find attached our response on Policy P18

Can you please confirm receipt?

Kind Regards

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14118

Received: 14/12/2020

Respondent: Domino’s Pizza UK & Ireland

Agent: DPP Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

There is no sound justification for criteria 3 to 5 of Policy P18.

No evidence to justify that locating any A5/Sui Generis use within certain distances of schools causes adverse health consequences. The evidence base documents do not refer to takeaways as a specific issue, make a link between the location of schools next to hot food takeaways and unhealthy eating habits, or identify a proliferation of such uses where obesity rates are higher in specific wards within the Council’s area.
Solihull fares very well in terms of childhood obesity, therefore it is difficult therefore to understand the evidence to justify Policy P18.

The approach conflicts with national policy which contains no support for a policy containing a blanket ban or exclusion zone for A5 uses. The sequential approach (as detailed at paragraph 86 of the National Planning Policy Framework) would be undermined by the approach as the policy provides no flexibility for sites which could be within 400m of a school but within a designated centre.

Domino’s support any initiative to promote health, wellbeing, and obesity. The positive economic benefits of a Domino’s are significant. National policy places significant weight on economic health/growth.

Change suggested by respondent:

Criterion 3 should be re-worded to deal only with the amenity impacts of such a use.

Criteria 4 and 5 should be deleted from the plan and policy altogether.

Full text:

Dear Sir/Madam

On Behalf of Domino's Pizza UK & Ireland, please find enclosed representations in respect of Policy P18 Health & Wellbeing of the Draft Submission Version of the Solihull Local Plan Review.

Attached is the Representation Form along with a covering letter which sets out the case in detail.

I trust this is sufficient, however, if anything further is required, please do not hesitate to ask.

Regards

Osian

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14119

Received: 14/12/2020

Respondent: Domino’s Pizza UK & Ireland

Agent: DPP Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Policy P18 approach has been found unsound by several planning inspectors elsewhere, both at appeal and Local Plan examination stage. The London Borough of Waltham Forest had such a policy in place for over a decade and its application has proven ineffective in tackling obesity. Nottingham City Council have very recently had a similar policy thrown out by the Local Plan Inspector.

Change suggested by respondent:

Criterion 3 should be re-worded to deal only with the amenity impacts of such a use.

Criteria 4 and 5 should be deleted from the plan and policy altogether.

Full text:

Dear Sir/Madam

On Behalf of Domino's Pizza UK & Ireland, please find enclosed representations in respect of Policy P18 Health & Wellbeing of the Draft Submission Version of the Solihull Local Plan Review.

Attached is the Representation Form along with a covering letter which sets out the case in detail.

I trust this is sufficient, however, if anything further is required, please do not hesitate to ask.

Regards

Osian

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14120

Received: 14/12/2020

Respondent: Domino’s Pizza UK & Ireland

Agent: DPP Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Policy P18 takes an inconsistent approach towards new development that sells food and discriminates against operations with an A5 use, leaving nowhere reasonable for them to locate. The approach is likely to result in significant harmful impacts on the local economy.

Change suggested by respondent:

Criterion 3 should be re-worded to deal only with the amenity impacts of such a use.

Criteria 4 and 5 should be deleted from the plan and policy altogether.

Full text:

Dear Sir/Madam

On Behalf of Domino's Pizza UK & Ireland, please find enclosed representations in respect of Policy P18 Health & Wellbeing of the Draft Submission Version of the Solihull Local Plan Review.

Attached is the Representation Form along with a covering letter which sets out the case in detail.

I trust this is sufficient, however, if anything further is required, please do not hesitate to ask.

Regards

Osian

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14177

Received: 14/12/2020

Respondent: Hampton Road Developments Ltd

Agent: Savills

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Object to the requirement at 2 vii for all new development to deliver new and improved health services. This is not justified and not effective due to requirement being placed on all development sites without site specific consideration. New health facilities should not be a blanket requirement.
Where improvements are needed, but a new building or facility is not required, then financial contributions could be sought to improve existing facilities.
Recommend the policy is amended to allow for financial contributions where improvements are identified as the necessary mitigation to make development acceptable in planning terms.
Supports the principle of this policy.

Change suggested by respondent:

Propose that the policy is amended to allow for financial contributions where improvements are identified as the necessary mitigation to make development acceptable in planning terms.

Full text:

See attached documents.

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14248

Received: 12/11/2020

Respondent: Meriden Parish Council

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Policy P18 should include that access to leisure schemes for people with disabilities who can’t easily access facilities through either their disability or income should be considered so their health and well being is being met by the same resources.

Full text:

Good evening

Please see attached letter from Meriden Parish Council in response to Solihull’s Draft Local Plan consultation.

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14472

Received: 10/12/2020

Respondent: Jon Ashley

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Solihull along with most of UK suffers from an obesity and poor diet crisis. There are already too many hot food takeaway provisions in the borough and close by in neighbouring boroughs. Further hot food takeaway provision is contrary to the purpose of this policy. There should be a presumption against new takeaway provision as a minimum.

Full text:

I have looked at your proposed form for Submission of Representations. It is not fit for purpose.

I wish to submit multiple and linked representations.

I find the plan and the consultation process severely flawed such as to make the current plan and timetable for consultation Unsound and not legal.

I outline my reasoning in the attached document which is ordered according yo your plan and where possible references specific paragraphs and Policies.

My high level objections to the consultation process are stated at the start of the attached document.

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14481

Received: 10/02/2021

Respondent: Mr David Roberts

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Solihull Hospital is not open for general use by Silhillians and the service provided by Birmingham and Solihull Hospital Trust is at hospitals in Birmingham and only
minor injuries and emergencies are serviced from a small unit in Chelmsley Wood, which is difficult to access from south and central Solihull and controlled by the CCG.
The service provision is already stretched.

Full text:

See attachment

Attachments:

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14570

Received: 11/12/2020

Respondent: Bloor Homes

Agent: Savills

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Object to the requirement at Policy P18 2vii for all new development to deliver new and improved health services. This is not justified or effective due to requirement being placed on all development sites without site specific consideration. New health facilities should not be a blanket requirement on all new developments and should be considered on a site by site
basis. Where improvements are needed in health services or facilities, but a new building or
facility is not required, then financial contributions could be sought to improve existing facilities.

Change suggested by respondent:

Policy P18 should be amended to allow for financial contributions where improvements are identified as the necessary mitigation to make development acceptable in
planning terms.

Full text:

Policy BL1
References contained at point 5 of the policy clearly indicate that there is a significant question
mark over its deliverability. The policy states “Until such time as these facilities [existing sports
facilities south of Tythe Barn Lane] are appropriately relocated or robust plans have been
confirmed to secure a timely relocation that would prevent the closure of any associated
clubs….development of the site will not be supported”. Until the relocation of the sports
pitches that enable the deliverability to take place on site BL1 (land West of Dickens Heath) it
cannot be justified in policy terms. There are significant delays associated with resolving this
issue; firstly suitable alternative locations have to be found for the pitches to be relocated to;
and secondly, those sports pitches have to be laid out and often that takes a 2 to 3 year time
span to set them up because of the need for specialist grass and proper drainage and sub soil
preparation for that grass to be laid.
Paragraph 16 of the National Planning Policy Framework (‘NPPF’), requires plans to “be
prepared positively, in a way that is aspirational but deliverable”. Savills emphasis
This reference provides a very real risk to the deliverability of this allocation and something we
consider the Council should not be leaving to aspiration or fortune. The proposed allocation of
the 350 homes is being put at jeopardy where alternative locations cannot be found for the
existing sports pitches and on this basis the site should only be safeguarded at this stage and
an alternative site such as site 192 (land east of Tilehouse Lane, Tidbury Green) be included
in the plan as this site is not the subject of these deliverability concerns and performs lower in
Green Belt terms than BL1.

We consider that there are several options the Council have to make this allocation sound.
Firstly they should confirm the latest position on the progress made on the relocation of the
sports pitches required to make BL1 deliverable. As written BL1 is not justified or effective as
the text (bullet 5) is clear that until these facilities are relocated or robust plans the relocation
has not been confirmed “development of this site will not be supported”. This is not positive
planning and puts much needed housing delivery at risk. Secondly the Council could consider
whether a larger area of land around Tidbury Green such as land east of Tilehouse Green
land could be considered as part of the comprehensive strategy to deliver the housing as it
does not require the relocation of sports pitches. This could mean that some or all of the
sports pitches remain in situ. Until the position regarding the sports pitches is made clear then
either the allocation should be downgraded to safeguarded land or an alternative allocation is
provided that is deliverable site such as the site to the south (site 192 ) - land east of
Tilehouse Lane, Tidbury Green.
In Green Belt terms site 192 scores 6 which is less (i.e. lower performing in Green Belt terms)
than the proposed allocation BL1 (score of 7). In landscape sensitivity terms site 192 scores
the same (as they are in the same sub area - LCA2) as BL1.
In allocating site 192 and safeguarding site BL1, we consider the plan would be more effective
and sound. This representation should be read in conjunction with representations made to
policies P1 and P5 which are fundamental to the Borough’s housing strategy.

Policy P1
Officially, the Government state that the HS2 Interchange station will be completed by 2026. Given delays that often happen on large infrastructure project, we consider that this timescale is likely to be pushed back. Paragraph 280 of the draft plan states that the HS2 line is ex-pected to open between 2029 – 33. Paragraph 89 of the plan refers to 2,740 homes being delivered up to 2036. If the plan is adopted in early 2022, with two years lead in for planning and a year for site works, development may not begin until 2025. This allows for eleven years to develop out the 2,740 units. If this was spread out over eleven years equally, this would equate to 249 dwellings per annum. This is a very high level of delivery, that we do not con-sider has been adequately demonstrated as being deliverable, considering delays in delivery of the HS2 Station.
It should be noted that in 2018, the Hub Framework stated that delivery of 2,240 homes during the plan period would include up to 550 homes being delivered at the NEC up to 2022. We have reviewed Solihull’s online application register and cannot see reference to an application for residential development at the NEC. We therefore consider that the levels of delivery en-visaged, even in the early stages of the plan period are overambitious. We therefore consider that this policy is not effective in the way that it is currently drafted. Furthermore, we under-stand that UK Hub requires a new connector road from the Coventry Road to a new motorway junction on the M42, being a “just in time” for JLR and its Damson Parkway units. Whilst it has received in-principle go-ahead, the land has to be purchased and the road has to be built which could involve a significant delay.
We have requested further information form the Council in relation to the planned trajectory and stages of delivery of these housing numbers. We understand that such details are not available. We are therefore also not aware of how much of this housing delivery the Council considers will be required to be delivered before the HS2 station is completed.

We therefore request further information in relation the planned delivery of the site and reas-surance that the delivery of the HS2 station does not prejudice the delivery of the 2,740 homes to be delivered up to 2036. Notwithstanding we challenge the assumed delivery rate proposed by the Council in this location and the provision of circa 20% of the overall dwelling provision in a single location in a high density format which does not accord with the Bor-ough’s housing requirement for predominantly family housing.
We request confirmation from the Council of the amount of housing and related infrastructure that will be coming forward for completion before this date. A whole community is needed to be formed from scratch. Although this is not beyond the realms of possibility, we request further evidence from the Council to ensure that conclusions regarding housing delivery are effective to deliver a sound plan.
The proposals for circa 20% of the housing target in a single location should be reviewed as they are not considered to be sound, deliverable or provide an effective or justified strategy.

Policy P4A
We do not consider that this policy is effective (NPPF paragraph 35) as it does not provide
developers with flexibility and the mix of housing should be considered at the application stage
in accordance with the Housing and Economic Development Needs Assessment 2020 (‘HEDNA’).
For example, as stated under point 9 of Policy P4A, it may be appropriate for sites that
are within the town centre to provide a higher percentage of 1 and 2 bedroom dwellings compared
to a site on the edge of a rural settlement. The HEDNA sets out a range for of mixes for
each dwelling size. We support the Council providing some guidance on housing mix but this
should accord with the mix proposed in the HEDNA.
The NPPF (Annex 2) sets out a definition of affordable housing and identifies affordable housing
tenures which includes: affordable housing for rent, starter homes, discounted market
sales and affordable routes to home ownership. Policy P4A sets out a proposed tenure requirement
for 65% social rent and 35% shared ownership within the Borough. The HEDNA
has been used as the evidence base to support this policy. The HEDNA has identified that
there is a need for affordable rent within the Borough (paragraph 7.101). The HEDNA also
states that there is a clear requirement for both social and affordable rent but has recommended
to the Council that they do not propose a rigid mix on the split between social and
affordable rented housing. Furthermore, shared ownership is a narrow offer of affordable
housing that is not social rented. Intermediate housing is considered to be a more appropriate
definition to use.
Affordable Rent is also encouraged by Homes England and should be included in the Council’s
list of tenures. Nevertheless, Policy P4A makes no provision for affordable rent. Therefore we request that the Policy P4A is amended to refer to both affordable rent and social rent.

The HEDNA sets out range for the proposed affordable housing mix which provides flexibility,
it is not clear how or why the Council has chosen to apply fixed percentage requirements for
social rented and shared ownership homes. Each application for residential development
should be considered on its merits and the type and mix of affordable housing should be discussed
with the Council’s housing and planning departments at the pre-application stage. We
consider that this will make the policy more effective than simply applying a fixed blanket approach
across all residential sites in the borough.
Policy P4A (bullet 6) should be amended to include reference to a requirement for social and
affordable rent rather than purely social rent. The policy should also be amended to replace
“shared ownership” with “intermediate housing” which includes Shared Ownership, Shared
Equity, Discounted Market Housing for Sale etc

Policy P4C
Point 1 of Policy P4C lists a range of criteria that the Council will have regard to when negotiating housing mix on allocated and windfall major development sites. Within the list it notes that the “current indicative Borough-wide needs assessment” and “the existing mix of market housing and local housing demand” will be taken into account. Point 3 of Policy P4C goes on to set out specific requirements for housing mix. We do not consider that this policy is effective (NPPF paragraph 35) as it does not provide developers with flexibility and the mix of housing should be considered at application stage in accordance with the Housing and Economic Development Needs Assessment 2020 (‘HEDNA’).
Paragraph 122 of the National Planning Policy Framework (NPPF) sets out the importance of planning policies to make efficient use of land taking into account: the identified need for different types of housing, local market conditions and viability, the availability and capacity of infrastructure, the desirability of maintaining an area’s character and setting and the importance of securing well-designed and attractive places. The housing mix proposed in the HEDNA provides a range for each dwelling type which reflects the ‘latest’ evidence in 2020. However, many sites are different in character and surroundings and therefore a blanket approach to the unit mix is not considered appropriate or sound. Furthermore, market demand can change and so this ‘latest’ evidence may not be representative of need when planning applications are submitted in the future. As developers and national housebuilders have a focus on building and products that are deliverable and meet market needs, the policy should not provide a fixed dwelling mix and a blanket approach to the size and mix should be avoided as not all residential sites will be appropriate for this mix. A rigid approach to mix and house type could have a negative effect on development viability, leading to inflexibility and result in unnecessary delays to developments coming forward.
In addition to the above, the policy does not make any reference to the approach that may be required where there is an existing proposed housing mix set out in ‘made’ Neighbourhood Plans (‘NP’).

We request that the Council removes reference to mix (point 3) from Policy P4C and instead refer indicative housing mix ranges in accordance with the HEDNA within the explanatory text. Developers should be ‘encouraged’ and not ‘required’ to accord with the mixes set out in the explanatory text. This is the approach the LPA has taken to density requirements (Policy P5) in the Submission Draft and we consider this flexible approach should be used for market housing mix. Market demand at the time of the application should play an important role in determining the mix of dwellings delivered on a site.

Policy P4D
Policy P4D requires allocated sites of 100 dwellings or more to contribute 5% of open market
dwellings in the form of self and custom build plots on each of the development sites. We
object to this requirement and do not consider that the Council has provided sufficient
evidence to justify a threshold of 100 dwellings or for these sites to contribute 5% self and
custom build homes. The PPG (Reference ID: 57-025-201760728) sets out ways in which the
Council should consider supporting self and custom build homes which includes: developing
policies in their Local Plan for self-build and custom housebuilding and “engaging with
landowners who own sites that are suitable for housing and encouraging them to consider
self-build and custom housebuilding” [Savills emphasis]. There is no requirement in the PPG
for self or custom build plots to be provided as part of new housing allocations and landowners
should only be ‘encouraged to consider’ promoting their land for self and custom build
housing. The policy has been prepared without any regard to the potential for unintended
consequences arising from this approach which could have a negative impact on the policy
delivering the 5% self or custom built homes. We consider the policy to be ineffective.
Paragraph 195 of the Submission Draft states that there are 370 individual entries on the
Council’s ‘Self Build and Custom Housebuilding Register’. The register may provide an
indication of the level of interest, but this needs to be analysed in further detail to uncover the
specific requirements of respondents. Furthermore, this register does not test whether people
have the means to acquire the land and privately construct their own property or whether their
requirements align with being located on a large new housing development. Without this
exercise having been undertaken and supporting the Council’s conclusions, we do not
consider that Policy P4d to be justified or effective.
Furthermore, there are also practical issues to consider in providing self and custom building housing plots on an allocated site. For example, the day to day operation of such sites and
consideration of potential health and safety issues of having multiple individual construction
sites within one development. Other considerations that do not appear to be factored in
include where a large housing site is the subject of a design code. What approach in the
Council expecting self-build projects to take in the design of their “bespoke” self or custom
built home?

Policy P4E
Policy P4E requires major residential development sites to be built to Category M4(2) building regulations and at least 5% of dwellings to be wheelchair user friendly. The Planning Practice Guidance (PPG) states that Councils have the option to “set additional technical requirements exceeding the minimum standards required by Building Regulations in respect of access” where there is a justified need (Savills emphasis) for this requirement (Reference ID: 56-002-20160519). The PPG does not state what level of provision should be required within Local Plan policies.
Requiring all new dwellings to be built to the Category M4(2) standards will result in larger dwellings and in turn less dwellings being delivered per net developable hectare. The NPPF is clear that planning policies should support development that makes efficient use of land (Paragraph 122). Furthermore, as a Green Belt authority with limited brownfield redevelopment opportunities (Housing Land Supply table on page 69 of the consultation document) and part of a Housing Market Area with a shortfall in housing (NPPF Paragraph 123), Solihull Council should be making the most efficient use of land on the Green Belt sites proposed to be released in order to avoid significant Green Belt release in future Local Plan Reviews. We therefore consider that the requirement to build all dwellings to Category M4(2) standards should be evidenced and balanced against the need to make the most efficient use of land available. Without this approach, the policy will not be consistent with national planning policy or effective, making Policy P4E unsound.
In addition to the above, the PPG is clear that “Local Plan policies should also take into account site specific factors such as vulnerability to flooding, site topography, and other circumstances which may make a specific site less suitable for M4(2) and M4(3) compliant dwellings, particularly where step free access cannot be achieved or is not viable. Where step-free access is not viable, neither of the Optional Requirements in Part M should be applied” (Reference ID: 56-008-20160519) [Savills emphasis]. Policy P4E includes 4 criteria (Point 5) for how the policy will be applied flexibly which relate to: viability; the need to achieve a successful development; and whether the standards would prejudice the realisation of other planning objectives. However, none of the criteria make reference to the suitability of a site to accommodate accessible dwellings, for example their topography or local demographic requirements. We consider that the policy should be amended to accord with the PPG guidance or evidence provided which justifies the position being proposed in the policy.
Policy P4E also requires developments of 300+ dwellings to provide specialist housing or care bed spaces. By taking this approach it is appears that there is a disconnect between the Council’s housing strategy and the health and well-being of the various communities with differing specialist and health requirements across the Borough. Although the policy does not state how many dwellings or care bed spaces should be provided as part of the development, the viability appraisal has assumed that 0.5ha of land on each site will be delivered and has concluded that this will improve viability on the site as the land can be sold to a specialist provider. No evidence is provided to justify 0.5ha provision. In our experience a full care village will require sites larger than this and so the requirement put forward in this policy may only cover part of the specialist housing requirement it needs to.
We consider that this requirement is ambiguous and not shaped by effective engagement between the Council, developers and specialist care providers (NPPF paragraph 16) for the following three reasons:
1. There is no clear evidence which demonstrates or justifies how the Council has cho-sen the 300 dwellings threshold;
2. Point 6 of Policy P4E lists criteria where applications for specialist housing will be supported, for example, the site needs to be accessible to shops and services and the specialist housing needs to meet specialist building regulations. It is not clear whether this criteria will also be used to determine whether the 300+dwelling sites are actually suitable locations for specialist housing or care bed spaces; and
3. It is unclear whether all specialist and senior living providers will be interested in sites as small as 0.5ha and whether it is appropriate for specialist sites to be dispersed around the borough rather than provision being met on a few specifically allocated sites in suitable and accessible locations. Providers of open market housing and spe-cialist / senior living accommodation are usually different. Therefore, it is not as sim-ple as seeking these specialist requirements to be provided as part of the larger resi-dential allocations. Careful consideration of the demographic and health needs of each community need to be assessed and understood to enable appropriate sites to be identified that will meet the specialist and elderly care accommodation needs that is required for each community.
We consider that the requirement for 300+ dwellings sites to deliver specialist housing or care bed spaces should be removed from this policy and instead specific and suitable sites which accord with Point 6 of Policy P4E should be allocated within the plan to deliver this provision.

The requirement for all dwellings to be built to Category M4(2) standards should be removed unless evidence can be provided to justify this blanket approach or a percentage requirement that is evidenced based on an appropriate assessment of need to ensure that developments can still make the most efficient use of land in accordance with the NPPF (paragraphs 122 and 123).
The criteria listed under Point 5 of Policy P4E should be amended to state “Site specific factors which may make step-free access unsuitable or unviable”. For example not every site identified is flat and able to accommodate level access in a uniform matter.
The requirement for 300+ dwellings to deliver specialist housing or care beds paces should be removed from this policy and specific sites for specialist and senior living should be allocated to deliver this specialist provision. This will ensure that the requirements of Point 6 are met.

Policy P5
Policy P5 states that the Council will allocate at least 5,270 dwellings to meet their housing
requirement of 15,017 dwellings between 2020 – 2036. This equates to 938 dwellings per
annum. The proposed number of allocated dwellings has decreased by 1,040 dwellings
between the Draft version of the Local Plan Review document (January 2019) (6,310
dwellings) and the Submission Draft (5,270 dwellings). From our understanding, three
allocations have been removed since the Draft version (Sharmans Cross Road, Jensen House
and TRW/The Green) for 790 dwellings, four allocations have increased their capacity (East of
Solihull, Lavender Hall Farm, Oak Farm and Pheasant Oak Farm) by 235 dwellings and seven
of the remaining allocations have seen a reduction in their capacity by 485 dwellings.
Furthermore, 600 dwellings have been added to the windfall category. Given that this is
meant to be a plan-led process we do not consider this approach to meet the test of the plan
being positively prepared.
We do not support the proposed reduction in the number of allocated sites and the reduction
in site capacity for seven of the proposed allocations. As we have stated in our separate
response to Policy P4E, the NPPF is clear that planning policies should support development
that makes efficient use of land (Paragraph 122). Furthermore, as a Green Belt authority with
limited brownfield redevelopment opportunities (Housing Land Supply table on page 69 of the
consultation document) and part of a Housing Market Area with a shortfall in housing (NPPF
Paragraph 123), the Council should be making the most efficient use of land on the Green Belt
sites proposed to be released in order to avoid significant Green Belt release in future Local
Plan Reviews.
The Housing Land Supply in the table of page 69 of the Submission Draft document states
that across the plan period the UK Central Hub area is expected to deliver 2,740 dwellings;
2,240 dwellings at the NEC and 500 dwellings at Arden Cross. This equates to around 18% of
the proposed housing requirement for the Borough (15,017 dwellings). Due to the amount of
development proposed in this area, we consider that the majority of dwellings delivered will be
apartments. The Council should be seeking to deliver a balanced housing portfolio across the
Borough. By relying on 18% of the provision in one location and all potentially high density
living which doesn’t meet the needs of most families, we do not consider the Council to be
presenting a positively prepared plan nor is this strategy considered to be justified or effective.
Furthermore, having reviewed the evidence base for the UK Central Hub area, we do not
consider that 2,740 dwellings will be delivered at the NEC and Arden Cross between now and
2036. Firstly, the evidence documents seem to show different housing figures for the sites For
example, the NEC masterplan (2018) states that 2,500 dwellings could potentially be
accommodated on the site (page 34) whereas the Hub Framework Plan (2018) states that
1,780 dwellings could be delivered at the NEC. The Hub Framework Plan also sets out
potential timescales for development coming forward. Table 1 sets out a land use trajectory
which states that between 2018 – 2033 only 1,675 dwellings are expected to be delivered on
the Arden Cross and NEC sites. Between 2018 – 2022, circa 130 - 550 dwellings were
expected to be delivered at the NEC. With no planning application submitted at the NEC, we
consider it unlikely that any dwellings will be delivered by 2022. In light of this, we do not
consider that the expected housing delivery for UK Central of 2,740 dwellings up to 2036 to be
justified or supported by any of the Council’s evidence base and is therefore considered
unsound. We consider that the target for the anticipated number of houses to be delivered at
UK Central should be reduced to a more realistic level and additional housing sites added to
the portfolio rather than being overly focussed around UK Central or simply added to the
windfall provision. If almost 20% of the Council’s housing target is to be met by high density
accommodation in a single location, then this needs to be evidenced and justified as it
represents a departure from the Borough’s previous housing strategy and prevailing demand
for family housing. The constraints associated with the timing in the delivery of HS2 are also
not clear or explained.
Windfall provision has increased by 600 dwellings between the Draft version of the Local Plan
Review document and the Submission Draft and is 50 dwellings per annum more than the
adopted Local Plan. The NPPF states that there must be “compelling evidence” that windfall
sites will provide a reliable and realistic source of supply having regard to the strategic
housing land availability assessment, historic windfall delivery rates and expected future
trends (paragraph 70). As Solihull is constrained by Green Belt and there are only limited
deliverable brownfield land opportunities (77 dwellings identified on page 69 of the Submission
Draft document), we do not consider that 200 dwellings per annum of windfall dwellings is
realistic or an effective way to plan for the future. Rather than relying on windfall provision, the
Council should have additional sites identified and allocated and/or safeguarded for residential
development.
In relation to the contribution towards the HMA’s housing need, Solihull is currently proposing
to contribute 2,105 dwellings towards the Housing Market Area shortfall (paragraph 2.28 of the
Submission Draft document). We do not consider that this is a sufficient contribution from
Solihull Council towards the contributions (North Warwickshire is contributing an additional
3790 dwellings to support the Greater Birmingham HMA shortfall) and there is no evidence to
justify how the 2,105 dwelling “offer” was calculated. The most recent HMA Position Statement
states that the remaining shortfall up to 2031 is now estimated to be 2,597 dwellings.
However, it is now apparent that there will be a shortfall post-2031 (minimum 29,260
dwellings). As the plan period for the Submission Draft will cover up to 2036, we consider that
this should be addressed within the Local Plan Review. Once an agreement is in place
between the HMA authorities as to the distribution of the shortfall, a Statement of Common
Ground should be prepared to demonstrate to the Inspector that Solihull has complied with the
duty to cooperate (PPG Reference ID: 61-010-20190315) and that Solihull has addressed key
strategic matters through effective joint working and not deferred them to a subsequent Local Plan Review (PPG Reference ID: 61-022-20190315).
The housing need figure should be calculated at the start of the plan-making process and kept
under review until the Local Plan Review document is submitted for Examination (PPG
reference 2a-008-20190220). This is important for Solihull as at the same time as consulting
on the ‘White Paper – Planning for the Future’ document (August 2020), the Government has
also confirmed its intention to review the standard methodology. Using the Government’s
revised standard methodology that was published for consultation, the minimum housing need
figure for Solihull could increase by 25% to 1,011 dwellings per annum (16,176 dwellings
between 2020-2036). This could equate to a total minimum housing requirement of 3,264
more dwellings than the proposed housing requirement figure between now and 2036.
We consider that the Council could plan for this additional growth by considering the two
scenarios that may emerge from the Standard Method calculations. The first option could be
what the Council is currently planning for which is using the current Standard Method figure of
807 dwellings. The second option that the Council should also consider is the revised
Standard Method which could see the annual housing need increasing to 1,011 dwellings. In
order to demonstrate a robust approach at Examination and to be able to present a positively
prepared Local Plan (NPPF paragraph 35), we consider that the Council should plan for
additional growth than currently proposed and identify additional sites which could be
allocated if the Inspector requires the Council to plan for growth in accordance with the revised
standard methodology figure or if they agree with our findings set out above, that the UK
Central Hub area is unlikely to deliver 2,740 dwellings by 2036. The Council should recognise
and test a range of housing growth options that may be derived from changes to the standard
method and wider HMA growth requirements and plan for these options.
Point 6 of Policy P5 sets out that appropriate density of new housing will be based on a variety
of factors which are listed in the policy. We support the flexibility provided within this policy,
however, in order to comply with national policy, we consider that the criteria listed under Point
6 should be the same criteria that are listed under paragraph 122 of the NPPF. Paragraph 122
states that in order to make efficient use of land, planning policies should consider: the
identified need for different types of housing, local market conditions and viability, the
availability and capacity of infrastructure, the desirability of maintaining an area’s character
and setting and the importance of securing well-designed and attractive places. Currently,
Point 6 makes no reference to local market conditions and viability which we consider is an
important consideration that should be taken into account when identifying the appropriate
density and mix for each site.
In addition to the above, the indicative densities set out under paragraph 240 of the
Submission Draft state that the Council will seek to achieve indicative densities of 40dph for
houses, 90dph – 150dph for apartments and 50-70dph mixed areas at the UK Central Hub
area. The Arden Cross Masterplan shows 13.04ha of land designated for residential use
(Page 47). 500 dwellings are expected to be delivered during this plan period once HS2 is
completed. Although they are not expected to all be delivered in this plan period, if 3,000
dwellings are expected on the Arden Cross site, densities will need to be circa 250dph –
300dph in order to achieve the Council’s target. This is a significant increase on the densities
of development currently achieved in Solihull and the Council will need to ensure that the
impact of these densities is reflected and considered in the Local Plan Review document.
In summary, we consider that the Council should seek to allocate additional sites for
residential development within the plan because we consider that:
1. the UK Central Hub site will be unlikely to deliver 2,740 dwellings up to 2036 which
could leave a shortfall of circa 700 – 1,000 dwellings;
2. the revised Standard Methodology could increase the Council’s minimum housing
need by 25%; and,
3. the proposed contribution towards the HMA shortfall is not a sufficient or justified contribution
in light of the identified shortfall post-2031 which should be addressed in the Local Plan Review as the plan period runs until 2036.
In light of the above, the Council will need to identify additional sites to meet their increased
housing need requirements. Our client’s site at land east of Tilehouse Lane, Tidbury Green
(Site reference 192) is being promoted for circa 300 dwellings and public open space. The site
is located immediately adjacent to Dickens Heath and Tidbury Green in area which has been
expanded and is identified for further expansion in the Submission Draft given its accessibility
and sustainability.
In the Council’s evidence base site 192:
 is located within a lower performing Green Belt parcel;
 is located within a Medium / Low landscape parcel;
 has ‘Medium / High’ accessibility;
 is a Category 1 site in the Site Assessment Paper as it performs well against the suitability,
availability and achievability assessments.
In summary, our client’s site is strongly performing potential development site in the Council’s
evidence base and should be considered for a residential allocation to assist the Council in
meeting their housing needs. It would provide a logical extension to the proposed allocation
(BL1) land West of Dickens Heath.

Having reviewed the evidence base, we consider that the UK Central Hub area will not deliver
2,740 dwellings in this plan period, an additional contribution should be made towards the
HMA shortfall and the revised standard methodology requirement should be taken into
consideration by the Council before submitting the Local Plan for Examination. Furthermore,
the most recent reduction in some allocations and an the revised plan strategy of adding
another 600 homes to the windfall provision should be reviewed. We consider that the
Council should allocate additional housing sites and select those which have performed well
against the Council’s evidence base criteria and are in sustainable locations.
The land being promoted by Bloor Homes (site 192) should be considered as an additional
allocation being a high performing site adjacent to the proposed allocation (BL1) land west of
Dickens Heath.
Amend Point 6 of Policy P5 to accord with the criteria listed in NPPF Paragraph 122 and
amend the indicative densities table on page 76 to set out more realistic densities for the UK
Central Hub area if 5,000 dwellings are going to be delivered on the UK Central Site
(paragraph 830 of the Submission Draft document).

Policy P9
Policy P9 proposes to set additional requirements on development sites in order to reduce energy demand and minimise carbon dioxide emissions. The requirements include all new dwellings having to:
 achieve a 30% reduction in energy demand over and above the requirements of Build-ing Regulations Part L;
 be net zero carbon from 2025;
 provide at least 15% of energy from renewables; and,
 provide at least 1 charging point for electric vehicles.
To justify the proposed 30% uplift, the Council’s ‘Protecting the Environment’ Topic Paper (October 2020) refers to paragraph 148 of the NPPF which states that “the planning system should support the transition to a low carbon future in a changing climate… It should help to: shape places in ways that contribute to radical reductions in greenhouse gas emissions…and support renewable and low carbon energy and associated infrastructure”. These requirements are considered to be over and above the requirements of the PPG which states that Local Plans “can set energy performance standards for new housing or the adaptation of buildings to provide dwellings, that are higher than the building regulations, but only up to the equivalent of Level 4 of the Code for Sustainable Homes” (Reference ID: 6-012-20190315).
The PPG also states that if a Council is “considering policies on local requirements for the sustainability of other buildings, local planning authorities will wish to consider if there are nationally described standards and the impact on viability of development” (Reference ID: 6-009-20150327). Viability has been tested on the Governments preferred interim standard which shows that 30% uplift is “generally viable at 2020 land and sales values” (paragraph 113 of the Protecting the Environment Topic Paper). The Protecting the Environment Topic Paper refers to precedents set elsewhere in the UK. Having reviewed the examples given, London seeks 35% uplift but Milton Keynes and Reading only seek a 19% uplift. We do not consider that Solihull has sufficiently justified why it is proposing an uplift of 30%.
In relation to developments providing at least 15% of energy from renewables, consideration should be given to the capital cost and land take involved to achieve this requirement which we do not consider has been undertaken in the Council’s evidence base. Furthermore, it should be noted that it is now the case that sourcing energy from the National Grid can actually, in some cases be more sustainable than small scale renewable energy production as each year they are sourcing more of their energy from renewable sources.
The Council’s viability appraisal sets out that circa £6,000 per dwelling has been allowed for in order to meet the future homes standard and provide electric vehicle charging required by Policy P9. We consider that this is a significant amount of money per dwelling just to meet energy requirements without any of the other requirements being sought in the plan to be taken into account e.g. affordable housing, specialist housing, accessible dwellings, Green – Belt compensation and other S106 contributions and CIL monies that will be sought by the Council and statutory consultees.

Amend Policy P9 to ‘encourage’ development to apply the energy hierarchy to reduce energy demand and minimise carbon dioxide emissions. The policy should state that this will be subject to viability and suitability considerations at the application stage. The requirement to reduce energy demand to over and above Building Regulations Part L should be removed as this does not comply with the PPG.

Policy P10
We note that reference is made to the requirement for a “net gain” in biodiversity of at least
10% compared with the pre-development baseline. It is not clear whether the Council intend to
bring a 10% requirement in ahead of the Environment Bill being passed, which is potentially
before the Plan’s scheduled adoption. We do not consider that the Council is justified in
bringing this requirement forward ahead of the Bill being progressed through parliament, and
secondary legislation has been passed and brought into effect.
We support reference to Natural England standing advice in relation to ancient woodland and
veteran trees. This is the most appropriate guidance to take note of in respect of these trees.
16 i makes reference to development proposals being required to demonstrate that they have
considered impact on tranquility. We request that the Council clarify what is meant the
reference to “tranquility”, and how the impact on tranquility can be effectively measured. We
are unsure how this will be assessed as part of a planning application. Without this evidence
we do not consider the policy as written to be justified or effective.

The requirement for a biodiversity net gain of 10% should be removed from this
policy and any requirements left to SPD once the Environment Bill is passed and
secondary legislation has been brought in.

Policy P15
Bloor Homes consider that climate change considerations should be a ‘fabric first’ approach to build i.e. building in such efficiencies to new homes that reduce the call on energy demand in the first place and avoids ‘retro fits’.
We generally support the approach to this draft policy but suggest that amendments are required to 2iv and 7 to make the policy more effective.

We request that the following amendments are made to the wording of this policy:
Point 2 iv of this policy should be amended as follows: “Where possible, make appropriate provision for water management within development, without causing unacceptable harm to retained features, utilising innovative design solutions.” The reason for adding “where possible” is to ensure that allowance can be made for site specific constraints such as ground conditions that may be present preventing delivery of SuDS.

Policy P17
When defining Green Belt boundaries, the NPPF states that Local Plans should “be able to
demonstrate that Green Belt boundaries will not need to be altered at the end of the plan
period” (Paragraph 139e). The Council’s evidence base acknowledges that there are limited
brownfield opportunities left in Solihull and so to meet their housing needs Green Belt release
is needed for this Local Plan Review and may therefore will be needed again in future reviews.
The NPPF encourages Councils to identify areas of safeguarded land in order to meet longerterm
development needs beyond the plan period (paragraph 139c). However, the Council has
not sought to safeguard any land for development as part of the Local Plan Review. This is
particularly surprising where the housing requirement for the Borough has been the subject of
several key influences, including proposed changes to the standard method and the HMA
shortfall (Birmingham and Black Country).
In order to be consistent with national policy, we consider that the Council should identify
areas of land that could be released from the Green Belt in this Local Plan Review and
safeguarded for future development should the Council not be able to meet their housing
needs or the housing needs of the HMA during the next plan period.
As stated in our separate response to Policy P5, a significant HMA housing shortfall is
expected from 2031 so it is likely that Solihull will need to contribute additional dwellings to
assist in addressing this shortfall. Therefore, safeguarding land for the future is needed in
order to meet the longer term development needs of the HMA.
When identifying potential sites to release from the Green Belt and safeguard, the Council
should choose sites in lower performing Green Belt parcels, which are adjacent to sustainable
settlements, accessible and considered suitable, achievable and deliverable in the Council’s SHELAA (Category 1). Our client’s land at Our client’s site at land east of Tilehouse Lane,
Tidbury Green (Site reference 192) is being promoted for circa 300 dwellings and public open
space. The site is located immediately adjacent to Dickens Heath and Tidbury Green in area
which has been expanded and is identified for further expansion (BL1 – Land west of Dickens
Heath) in the Submission Draft given its accessibility and sustainability.
In the Council’s evidence base site 192:
 is located within a lower performing Green Belt parcel;
 is located within a Medium / Low landscape parcel;
 has ‘Medium / High’ accessibility;
 is a Category 1 site in the Site Assessment Paper as it performs well against the suitability,
availability and achievability assessments.

To provide a plan which is more effective and responsive to these variables we consider that
the Council should have tested a number of scenarios and provided appropriate allocations
and safeguarded areas to enable them to flexibly respond to the ever changing
circumstances. We request that the Council consider identifying areas of land that could be
released from the Green Belt in this Local Plan Review and safeguarded for future
development should the Council not be able to meet their housing needs or the housing needs
of the HMA during the next plan period.
We consider that additional allocations and/or safeguarded ;and should be identified and in
that regard we consider that site 192 (land east of Tilehouse Lane, Tidbury Green) is a
suitable and sustainable opportunity that is deliverable.

Policy P17A
The planning practice guidance states that compensatory improvements to environmental quality and accessibility of remaining Green Belt will be incorporated into a Section 106 agreement. The NPPF (paragraph 138) does not specifically state that Green Belt compensation has to be sought through S106 contributions. The PPG states that compensation can be secured through CIL or conditions and the S106 can be used to set out the long-term maintenance of sites (Reference ID: 64-002-20190722). As Solihull is a CIL charging authority, we consider that the Council should also set out Green Belt compensation projects which can be paid for through CIL. The PPG states that when setting out policies for compensatory improvements, they may be “informed by supporting evidence of landscape, biodiversity or recreational needs and opportunities including those set out in local strategies, and could for instance include: new or enhanced green infrastructure; woodland planting; landscape and visual enhancements (beyond those needed to mitigate the immediate impacts of the proposal); improvements to biodiversity, habitat connectivity and natural capital; new or enhanced walking and cycle routes; and improved access to new, enhanced or existing recreational and playing field provision” (Reference ID: 64-002-20190722). As local communities receive a percentage of the CIL contribution this could enable the local communities to identify the projects that they would like compensation to fund.
In terms of Green Belt compensation, there may be circumstances where the Green Belt compensation cannot be provided effectively on site or it could significantly reduce the net developable area of the proposed allocation. Where these circumstance exist, the Council should have an effective strategy in place that enables off site contributions to be made to Green Belt mitigation in other locations e.g. through the identification of donor sites.
Additionally, the Council has not provided any indication of how the level of compensation will be determined. We request that a formula or calculation be provided in order to determine the level of contribution that may be provided to allow developers to plan for this requirement on top of the other contributions / requirements being sought in the Local Plan Review.

We request that the Council amend Policy P17A to refer to the use of CIL as well as S106 agreements to set out the Green Belt compensation projects. We also seek confirmation from the Council as to the level of compensation that will be requested for sites removed from the Green Belt.

Policy P18
We object to the requirement at 2 vii for all new development to deliver new and improved health services. This is not justified and therefore not effective due to requirement being placed on all development sites without site specific consideration. Delivering new and improved health facilities as part of all new developments. New health facilities should not be a blanket requirement no all new developments and should be considered on a site by site basis. Where improvements are needed in health services or facilities, but a new building or facility is not required, then financial contributions could be sought to improve existing facilities.

We propose that the policy is amended to allow for financial contributions where improvements are identified as the necessary mitigation to make development acceptable in planning terms.

Policy P20
We object to the requirement in point 10 that new development should look to accommodate the needs of existing population. Although it is likely that the existing population will use any open space provided, it should be recognised that any contribution or enhancement to be agreed through a section 106 agreement should be directly related to the development and take account of the tests of Regulation 122 of The Community Infrastructure Levy Regulations (2010) and NPPF paragraph 54 and 56. In essence new development should only seek to mitigate the impacts arising from tat development and not resolve existing deficiencies.

Point 10 of the policy should be amended to remove the reference to providing for the open space needs of the existing population as this would be contrary to Reg122.

Attachments:

  • BL1 (463.91 KB)
  • p1 (309.38 KB)
  • P4a (308.72 KB)
  • p4C (306.95 KB)
  • p4d (309.88 KB)
  • p4e (315.52 KB)
  • p5 (342.90 KB)
  • p9 (395.18 KB)
  • p10 (301.48 KB)
  • p15 (298.09 KB)
  • p17 (385.89 KB)
  • p17a (307.99 KB)
  • p18 (207.29 KB)
  • p20 (315.80 KB)

Object

Solihull Local Plan (Draft Submission) 2020

Representation ID: 14953

Received: 14/12/2020

Respondent: The Home Builders Federation Midland Region

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Policy P18 (10):
o References to SPDs and other guidance are inappropriate and non-compliant with the Regulations.
o Regulations are clear that development management policies should be set out in Local Plan policies. Council’s approach of requiring compliance with adopted SPDs is giving Development Management Plan Document (DPD) status to documents which are not part of the Local Plan, and have not been subject to the same process of preparation, consultation and examination.
o For policy to be effective should be clearly written and unambiguous, set out in sufficient detail, so it is evident how a decisionmaker should react to development proposals and not reliant on other criteria or guidance set out in a separate SPD.
o NPPF and PPG confirm scope and nature of SPDs and that they should not introduce new planning policies nor add unnecessary financial burdens on development.

Change suggested by respondent:

Amend P18 (10) to remove inappropriate references to SPDs. Reference to guidance provided in SPDs could be inserted into supporting text.

Full text:

See attached letter